Help
Home
Search the Forum
You are Here :
Forum
Jobs
Site, Construction, Maintenance
Terminal Engineer Bhogat : Cairn India
Ask Question / Post resume
Post a reply to the thread:
Terminal Engineer Bhogat : Cairn India
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Unregistered;297229]MANSUKH R PARMAR DIC ENGINEER [b][u]E-Mail [/u][/b]: mrp.parmar AT gmail.com , mrp1992 AT yahoo.com [b][u]Career Objective [/u][/b]: To work with a motivated goal oriented team where I can make use of my technical and personal skills for the development of both organization and self. [b][u]Technical Skillls [/u][/b]: Diploma with nearly 2.3 years of experience in overhaul, repair and installation of Instrumentation & control equipment in a large scale oil company. [b][u]Handled the control systems [/u][/b]: ECP –UCP, Capacitance level meter , Orifice flow meter Orifice pressure meter. Working on Company Automation with Control system. Building fire alarm System ,Handled the motor drives Danfoss. Able to understand Technical Drawings P&IDs, cable/JB schedules, loop drawings. Knowledge of Maintenance and Operating procedures pertaining to equipment or facilities being worked on. [b][u]Experience Summery [/u][/b]: [b][u]Current Status [/u][/b]: From April 2012 to January 2014 [b][u]Employer [/u][/b]: Tirupati Enterprise [b][u]Industry Type [/u][/b]: lease holder [b][u]Designation [/u][/b]:Billing & Management [b][u]Salary per Month(Rs) [/u][/b]: 14500 [b][u]Location [/u][/b]: Poicha Narmada [b][u]Preview Status [/u][/b]: From 02 Nov 2010 to April 2012 [b][u]Employer [/u][/b]: Shree ambha associates, Vadinar [b][u]Industry Type [/u][/b]: Oil storage tank [b][u]Designation [/u][/b]: Instrumentation and Control Supervisor [b][u]Salary per Month(Rs) [/u][/b]: 10,600 [b][u]Department [/u][/b]: Instrumentation and Control [b][u]Location [/u][/b]: VADINAR-Jamnagar [b][u]Field Project [/u][/b]: Gear System power plant. Electricity use in this project. 10w to convert 110 w by gear system [b][u]Job Profile [/u][/b]: ** Looking after the daily break down of instrumentation of Tank Farm & Flow Pump . Calibration & configuration of electronic/pneumatic instruments. Maintaining history of instruments. ** I have a very good knowledge of different transmitters (Temperature, pressure, flow, level) their installation and calibration. ** Programming PLC by Ladder Diagram, and hardware troubleshooting ** Maintenance & calibration of transmitters PT, LT , TT ( Rosemount, Yokogawa, Vega, Foxboro, Honeywell......) ** Calibration of turbine measuring system ( Acceleration, Velocity, Thrust, Vibration,......) ** Maintenance and calibration of pneumatic control valves and motorized valves ** Maintenance and calibration of orifice plate flowmeters ( Rosemount ) & gas turbine flowmeters ** Trainer at the company training center ** Calibration and maintenance of Fisher Displacer type level transmitter. ** Commissioning of control valves, solenoid valves and proximity sensors. ** Carried out new instruments configuration, calibration, installation and commissioning. ** Pressure, temperature, level and flow related instruments calibration, installation and loop check with HART communicator and simulator. [b][u]Professional Qualification [/u][/b]: Three year Diploma in Instrumentation & Control Engg . From Govt. Polytechnic, Ahmedabad by T.E.B (Gujarat) second class with 1st Division In 2010. [b][u]Training [/u][/b]: Adco Controls Vatva (Ahmedabad) Control panel system LIFT, Four weeks industrial training in Adco Controls . [b][u]Personal Profile [/u][/b]: [b][u]Father Name [/u][/b]: Ranchhod Bhai [b][u]Date of Birth [/u][/b]: Jan. 23 .1992 [b][u]Languages Known [/u][/b]: English , Hindi & Gujarati [b][u]Marital Status [/u][/b]: Unmarried [b][u]Nationality [/u][/b]: Indian [b][u]Place [/u][/b]: Poicha Narmada Date :30/11/2013 (Mansukh Parmar)[/QUOTE]