Help
Home
Search the Forum
You are Here :
Forum
Jobs
Gulf, Dubai Saudi Arabia UAE
Qatar Oman : Civil Engineer : STAAD Pro, PDS PDMS
Ask Question / Post resume
Post a reply to the thread:
Qatar Oman : Civil Engineer : STAAD Pro, PDS PDMS
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Unregistered;294754]Resume GOPAL KRISHAN [b][u]Email [/u][/b]: gopal.krishan AT rediffmail.com [b][u]Personal Details [/u][/b]: [b][u]Father’s name [/u][/b]: Shri Jagdev Singh [b][u]Date of Birth [/u][/b]: 16 September 1974 [b][u]Sex [/u][/b]: Male [b][u]Marital Status [/u][/b]:Married [b][u]Nationality [/u][/b]: Indian [b][u]ACADEMIC QUALIFICATION [/u][/b]: ** Graduation from Delhi University in 1996 [b][u]PROFESSIONAL QUALIFICATION [/u][/b]: ** 2 Years Certificate Course of D/M/Civil from ITI, Tilaknagar, New Delhi in 1998 [b][u]TRAINING [/u][/b]: ** Course on AutoCAD from R.M. CAD Center, New Delhi COMPUTER PROFICIENCY ** AutoCAD Rl 14, 2000, 2002, 2004~2010 ** SP3D ** Microstation ** PDS – FrameWorks Plus ** Well conversant with Ms Excel, Ms Word [b][u]WORK EXPERIENCE [/u][/b]: From September 2006 to Till date [b][u]Employer [/u][/b]: Samsung Engineering India Pvt. Ltd. [b][u]Position [/u][/b]: Sr. Designer [b][u]PROFESSIONAL EXPERIENCE [/u][/b]: Total Professional Experience 14 Years [b][u]Major experience [/u][/b]: Preparation of layout Drawings for underground facilities like CRWS system, Storm Sewer system, sanitary system, Pile and Foundation plans, Trench layout & details, Roads & Paving, Drainage details drawings. Preparation of Equipment foundation drawings and PDS modelling for the same. PDS Modelling for Drainage system, Road & Paving, Pipe trenches for Blow Down & Fire fighting system. Preparation of U/G composite drawing. [b][u]Experience Summary [/u][/b]: ** Working on TAKREER Carbon Black & Currently Delayed Coker Project at Abu Dhabi(Started in October 2012). My Responsibilities includes preparation of Contaminated Rain Water System, Oily Water System and Sanitary Sewer systems layouts and detailed drawings. Modelling of Drainage and Pipe trench system. Also responsible for preparation of U/G Composite layout drawing. Preparation of Road & Paving drawings etc. ** HDPE Unit and Associated facilities at Dahej Petrochemical Complex for ONGC Petro Addition Ltd., Dahej, Gujarat, India. Responsible for preparation of CRWS,OWS, SWS & CBD systems drawings as well as modeling. Also responsible for preparation of U/G Composite drawings for all underground piping & other facilities, Pavement drawings and other general civil related drawings. ** Dual Feed Cracker Unit and Associated Facilities for ONGC Petro Addition Ltd., Dahej, Gujarat, India Responsible for preparation of all UG related drawings and preparation for Road & Paving, Pile & foundation layout, drainage, interface plan & sections, valve box pits, slop drum pits, dyke walls, oil containing pits for transformers etc & modeling as well. ** Shah Gas Development(SGD) Programme EPC Package 4- Shah Utilities & Off-sites Project Responsible for modeling of drainage system and Trenches for PKG#4 & PKG#9. ** Basic Engineering Design Package for PTA Project of Samsung Petrochemical Company. Seoul, S. Korea Preparation of Engineering Standards for Basic Engineering Design Package. ** NHT-CCR Trinidad & Tobago Ltd. Responsible for preparation of Standard drawings for RCC and STEEL for the project & also involved in 3D Modelling of various structures of project on PDS, Equipment Concrete Foundation etc. From December 2005 to September 2006 [b][u]Employer [/u][/b]: L&T-RAMBØLL Consulting Engineers Limited, India [b][u]Position [/u][/b]: Engineering Consultant (Highway & Bridges Division) [b][u]Responsibility [/u][/b]: ** Preparation of highway alignment drawings, plan and profile drawings, bridges substructure, superstructure, pile, pilecap, pier and piercap drawings. [b][u]Projects Worked [/u][/b]: ** Panipat Elevated Highway Project,Panipat [b][u]Client [/u][/b]: L&T ECC, Chennai ** Responsible for preparation of detailed drawings for elevated structure, structural drawings, strip plans, alignment plans, cross sections, plan and profile drawings. ** Detailed Design of Rail cum Road Bridge across River Brahmaputra at Bogibil near Dibrugarh in Assam (India) 4.3 km long composite welded steel truss superstructure [b][u]Client [/u][/b]: RIGHTS India Ltd. ** Responsible for preparation of detailed design drawings for Jubilee bridge superstructure (Steel Rail Bridge). From July 2002 to December 2005 [b][u]Employer [/u][/b]: Stup Consultants Pvt. Ltd., New Delhi [b][u]Position [/u][/b]: CAD Operator (Highway & Bridges Division) [b][u]Responsibility [/u][/b]: ** Generate Strip Plan, Alignment Plan, Land Acquisition Plan, Utility Relocation Plan etc. ** Preparation of Cross-section, L-Section drawing including QC of drawings. ** Responsibility also includes data processing, assisting Design personnel in preparation of other details drawings ** Preparation of working drawing of prestressed concrete bridges, pier, pier cap, pile, pile cap, girders, slab culverts, pipe culverts and slab culverts in skew position. ** Preparation of General Arrangement Drawing of Bridges, Foundation drawings, Substructure & Superstructure drawings, Dimension & R.C.C. details of bridges. [b][u]Projects Worked [/u][/b]: [b][u]** Project [/u][/b]: Consultancy Services for DPR for rehabilitation and strengthening of existing 2-lane road and widening to 4/6-lane from Km 152.0 to Km 219.00 (NH-58) and Km 144.00 to Km 197.00 (NH-72) in the state of Uttranchal. [b][u]Client [/u][/b]: Ministry of Road Transport and Highways, India [b][u]** Project [/u][/b]: Consultancy Services for Project Preparation of strengthening of NH-10 for the Road Section from Km 250.0 to Km 275.00 [b][u]Client [/u][/b]: PWD, Haryana [b][u]** Project [/u][/b]: Consultancy Services for Preparation of Conceptual Parking and Traffic Regulation Planning at Inland Container Depot, New Delhi [b][u]Client [/u][/b]: Container Corporation of India [b][u]** Project [/u][/b]: Consultancy Services for Improvement of City Roads in Agartala [b][u]Client [/u][/b]: National Building Construction Corporation, India [b][u]** Project [/u][/b]: Flyover at Moti Nagar Intersection (Ongoing) [b][u]Client [/u][/b]: U.P. State Bridge Corpn. Ltd. From September 1998 to June 2002 [b][u]Employer [/u][/b]: Development Consultants, New Delhi [b][u]Position [/u][/b]: Arch. Draftsman [b][u]Responsibility [/u][/b]: Preparation of working drawings of plans, elevations, Sections of various group housing projects. [b][u]MAJOR PROJECTS [/u][/b]: DDA Mega Housing Project [b][u]Client [/u][/b]: Delhi Development Authority [b][u]Project Cost [/u][/b]: 150 Crores [b][u]Details [/u][/b]: This is a competition project won by us in 1999. The project has an estimated cost of Rs. 150 Crores to be built on 18 hectares at Dwarka, Delhi. The project was won by the team effort. The units designed are of EWS with covered area of 30 sq.mtrs., LIG with covered area of 45 sq.mtrs., MIG with 70 sq.mtrs. and SFS with 120 sq.mtrs. In all there are 2050 DU's. The break-up being EWS with 207 units, LIG with 320 units and MIG with 448 units, SFS with 947 units. The site has a mixed land use plan it incorporates shopping on ground floor and residences on upper 3 floors/All the units except SFS. [b][u]PROJECT STATUS [/u][/b]: [b][u]OTHER PROJECTS [/u][/b]: (1) Vidyut Vihar Sahkari Awas Samiti Ltd. at Noida No. of flats 226 D.U's with 4 types of units. The project cost is Rs. 23 crores approx. (2) Bhagirathi Sahkari Awas Samiti Ltd. at Noida No. of flats 156 D.U's with 3 types of units. The project cost is Rs. 18 crores approx. (3) KSS C.G.H.S. Ltd. at Faridabad No. of flats 100 D.U's with 3 types of units. The project cost is Rs. 12 crores approx. (4) Lovely Home C.G.H.S. Ltd. at Dwarka. No. of flats 107 D.U's with 2 types of units. The project cost is 14 crores approx (5) Vivekanand C.G.H.S. Ltd. at Dwarka No. of flats 105 D.U's with 2 types of units. The project cost is 12 crores approx (6) Janaki C.G.H.S. Ltd. at Dwarka. No. of flats 144 D.U's with 2 type of units. The project cost is 12 crores approx. The project is completed in 1999. [b][u]CERTIFICATION [/u][/b]: I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications, and my experience. (Gopal Krishan) [b][u]Date [/u][/b]: [b][u]Place [/u][/b]: New delhi[/QUOTE]