Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
Production & Quality Control Engineer : Resume
Ask Question / Post resume
Post a reply to the thread:
Production & Quality Control Engineer : Resume
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;260988]DEAR SIR, I HAVE 8 YEAR EXPERIENCE IN POWER PLANT,WIND MILL,HEAVY MACHINERY, CURRICULAM VITAE [b][i][u]NAME [/u][/i][/b]: SANJAY KUMAR DWIVEDI [b][i][u]CONTACT DETAILS [/u][/i][/b]: SANJAY DWIVEDI, [b][i][u]ADDRESS [/u][/i][/b]: DURG Chhattisgarh INDIA [b][i][u]E-mail Address [/u][/i][/b]: sanjayashu82 AT yahoo.com dwivedi.s AT regenpowertech.com [b][i][u]CAREER OBJECTIVE [/u][/i][/b]: To work in global competitive environment on the challenging assignment that shall yield the benefits of the job satisfaction & steady-paced professional growth. [b][i][u]EXPERIENCE DETAILS [/u][/i][/b]: [b][i][u]Total experience [/u][/i][/b]:-8 + years’ experience. [b][i][u]PRESENT EXPERIENCE [/u][/i][/b]:- M/s. ReGen Power Tech Pvt Ltd Chennai Company from 30.03.2009 to till date as a Production & QA in charge. India largest Growing Third Position Wind Mill Company. [b][i][u]Job Responsibilities [/u][/i][/b]:- [b][i][u]- Production [/u][/i][/b]:- - Entirely responsible for achieving Welding & Fabrication Shop Production targets. - Prepared Monthly and Weekly schedule considering orders in hand, resource requirement & customer delivery dates. - Checked & ensured all Technical inputs like Drawings, QAP, etc and all corrective measures were taken in case of discrepancies. - Provides BOM details to stores and gets availability / shortage of material from stores & co-ordinate with various departments and gathered information on all shortage materials. - Ensured that all production materials were available and communicated to procurement department when needed. - Decide and prepare list of in house production items and subcontracted items along with part drawing & right selection of sub- contractors as per purchase procedure and issue of PO copy & material with relevant drawings to the sub- contractor. - Co-ordinate with purchase department to stock material ordering & fabrication accessories. - Monitor and control expenses on In-house process & subcontracting Items. - Monitoring project progress with the department and training junior staff members. - Organize and attend technical meetings to discuss and give proposals for non-constructible design related issues. - Organize technical meetings of Subcontractors to discuss Drawings, Material, Delivery, Cost and process. - Developing and implementing process methods & its controls to improve cost saving, Delivery & Quality. - Implement production procedure and quality control systems &analyzing production, maintenance and other operational reports, to detect production problems & take Corrective action. - Ensure the availability of machine equipment, tool and utility in perfect condition and look after that the repair work / maintenance attended timely without much loss of down time. - Identify new technological needs of process and implement new technologies for the production to reduce cost and save time & inform to Management. - Acting on constructive feedback given by management staff, other department, customers and vendors to improve performance. - Fill up Welding Log book & WPQ. [b][i][u]- Material Handle [/u][/i][/b]: - Generator Rotor /Supporting Structure/Bolt Guide Plate/Brake Disc. [b][i][u]- Production Documentations [/u][/i][/b]:- [b][i][u]- All ISO 9001 [/u][/i][/b]:2008 Documents. - WPS / PQR/ WOP/ welding log book. - NDT (RT, DPT, UT, MPT). - Data Analysis (On Timely Delivery & Subcontracting Rating). - JCR, Stage Inspection Reports. - Production Plan Monthly, Weekly & Daily. - Rework Register. - CA/PA & Continual Improvement Points. - Compliant register. [b][i][u]QUALITY WORK [/u][/i][/b]: Verify thoroughly our P.O., purchase Specification, Drawing, QAP requirement & Vendors internal inspection reports before proceeding with inspection. - Ensure all the Dimensions mentioned in the “required” column are specified with “tolerance” as per Drawing or as per Tolerance standards. - Verify the actual dimensions & records the same. - Verify the following with all vendors who are performing the welding. - Availability of Qualified WPS & PQR - Availability of Qualified welders & their WPQ record. - Ensure, only qualified welder, are engaged in our jobs. - Ensure approved brands of welding consumables are only used in our jobs, with recommended redrying procedures. - Ensure the welders are having “Portable Ovens” for storage of electrode till they use. - Ensure all the part numbers as per BOM are fitted in the job. [b][i][u]- Welding check [/u][/i][/b]: Ensure the required “fillet size” & “weld length” are achieved. - Use fillet gauge or templates to check the fillet size. - Conduct weld visual examination to ensure there is (no cracks, no lack of fusion, lake of penetration, no undercut, no open porosity, no craters, no spatters, no overlaps) - Insist for rotation of jobs whenever inaccessible. [b][i][u]- Material Testing [/u][/i][/b]: - - Lab testing Physical, chemical, Micro, Macro as per material STD (Testing Witness/ report Reviewed). - PMI Report reviewed. - Moly Test (Performed). - [b][i][u]- NDT Tests [/u][/i][/b]:- - RT, DP, UT, MPT, Hydro test. [b][i][u]- Technical Qualifications [/u][/i][/b]: - RT / UT / MPT / DPT Level–II, AUTO CAD, Working on ERP.MR. [b][i][u]- Known STD [/u][/i][/b]: - ASTM, ASME-IX, VII, and ANSI, DIN STANDARD, BIS STANDARD. [b][i][u]- QA [/u][/i][/b]:- - Maintain quality management system throughout Organization. - Find out NC & Raise CA/PA. - Training to Personal. - Calibration of all equipment, instruments, gauges and welding machine. - Prepare, update & maintained welder qualification records. - Attain & receive customer complaint & find out root cause & Raise CA/PA - Inward inspection (Raw Material Inspection, Wind mill Tower, Wind Mill Generator Rotor, Power Plant Structures, Coolum, Beams, Crane Grader, Boiler Presser vessels, Pipes, Flanges, Fittings, Bar, M/C components.etc.). - Reviewed/Witnessed in process inspection. - Final Inspection & documentation of project. - Responsible for follow up to the supplier for raw material TC - Co-ordination with customer job inspection, third party inspection agency. (DNV, BV, EIL, BPCL, HPCL, etc). - Conduct internal audit & MRM. - Welding/Painting Inspection. - Review RT Reports & film. - Drawing study & prepare internal QAP. - Data analysis for QA objectives & to raise the corrective action if required. - Fabricated cooling coil inspection. [b][i][u]- Design Related [/u][/i][/b]: Preparation of Drawing & BOM. [b][i][u]- Sponsored Links [/u][/i][/b]: Release job QRN. [b][i][u]PAST EXPERIENCE [/u][/i][/b]:- - M/s. SPML Infra Ltd. from 15 may 2008 to 15 march 2009. [b][i][u]- Department [/u][/i][/b]: Quality Control Dept. [b][i][u]- Designation [/u][/i][/b]: Sr. Engineer. [b][i][u]- Industry [/u][/i][/b]: EPC Company [b][i][u]- Job Profile [/u][/i][/b]: - Working experience on Production, QA, MR., Internal Auditor, NDT level-II. [b][i][u]- Responsibility & Activity [/u][/i][/b]: - Inspection & Production in Power plant structure. [b][i][u]- PROJECTS DETAILS [/u][/i][/b]: -THERMAL POWER PLANT NTPC LTD MAIN WORK CIVIL PACKAGE STAGE-III (1X500MW), KORBA (C.G.) [b][i][u]- Projects Details [/u][/i][/b]:- NTPC LTD 500MW THERMAL POWER PLANT PROJECTS KORBA C.G. [b][i][u]2. COMPANY NAME [/u][/i][/b]: - M/s. BHILAI ENGINEERING CORPORATION LIMITED BHILAI C.G. (BEC) [b][i][u]- Department [/u][/i][/b]: Quality Control Dept. [b][i][u]- Designation [/u][/i][/b]: Engineer. [b][i][u]- INDUSTRY TYPE [/u][/i][/b]: FABRIACTION AND MACHINING INDUSTRY. [b][i][u]PROFESSIONAL QUALIFICATION [/u][/i][/b]: [b][i][u]- GRADUATE DEGREE [/u][/i][/b]: AMIE in Mechanical Engineering. (SEC-A running) [b][i][u]- INSTITUTE [/u][/i][/b]: THE INSTUTION OF ENGINEERS INDIA KOLKATA.(IEI) [b][i][u]- DIPLOMA [/u][/i][/b]: Diploma in Mechanical Engineering. [b][i][u]- INSTITUTE NAME [/u][/i][/b]: GOVT. POLYTECHNIC COLLEGE KHIRSADOH (M.P). [b][i][u]- UNIVERSITY [/u][/i][/b]: RAJIV GANDHI PROUDYOGIKI VISHWAVIDHYALAYA BHOPAL (RGPV) (UNIVERSITY OF TECHNOLOGY OF MADHYA PRADESH) [b][i][u]- YEAR OF PASSING [/u][/i][/b]: 2003 [b][i][u]OTHER QULIFACTION [/u][/i][/b]: NDE CERTIFICATETION AS PER AMERICAN SOCIETY FOR NON DESTRUCTION TESTING. (ASNT) [b][i][u]- METHOD/LEVEL [/u][/i][/b]: UT/RT/MPT/LPT / LEVEL-II [b][i][u]- INSTITUTE [/u][/i][/b]: INSTITUTE OF QUALITY EVALUATION CONCEPTS Durgapur, West Bengal [b][i][u]EDUCATIONAL QUALIFICATIONS [/u][/i][/b]: - SSC with 68.64% from M.P. Board Bhopal. - HSC with 64.68% from M.P. Board Bhopl. [b][i][u]STRENGTHS [/u][/i][/b]: - High Confidence Level. - Good Communication Skill. - Team Work. [b][i][u]PERSONAL INFORMATION [/u][/i][/b]: [b][i][u]- Date of Birth [/u][/i][/b]: 07.05.1982 [b][i][u]- Marital Status [/u][/i][/b]: Marred [b][i][u]- Languages Known [/u][/i][/b]: Hindi / English [b][i][u]- Nationality [/u][/i][/b]: India [b][i][u]DECLARATION [/u][/i][/b]: - I hereby declare that the above information is true to the best of my knowledge and belief. [b][i][u]Place [/u][/i][/b]: --Bhilai C.G.------- [b][i][u]Date [/u][/i][/b]: --13.10.12-------- SANJAY DWIVEDI[/QUOTE]