Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
ELECTRICAL ENGINEER : Resume CV
Ask Question / Post resume
Post a reply to the thread:
ELECTRICAL ENGINEER : Resume CV
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;247406]AJAY SINGH THAKUR [B][U]e-mail ID [/U][/B]: ajaysinghthakur2007 AT rediffmail.com [B][U]PERSONAL PARTICULARS [/U][/B]: Date of Birth : 01/05/1964, Religion : HINDU State of Origin : MADHYA PRADESH Nationality : INDIAN Category :(Gen/SC/ST/ OBC/Etc) _GEN Marital Status : MARRIDE [B][U]2.EDUCATION QUALIFICATION [/U][/B]: [B][U]Name of Course University / Board Year of Passing Division [/U][/B]: H.S.C.C M.P.BOARD BHOPAL 1981 2nd B. Sc. R.D.V.V. JABALPUR 1984 2nd Post Gratuion Diploma in Electronic R.D.V.V. JABALPUR 1986 2nd [B][U]3. EMPLOYMENT HISTORY [/U][/B]: (STARTING WITH CURRENT EMPLOYMENT) [B][U]Name of the Company, Location Designation Duration CTC From To [/U][/B]: DIAMOND CEMENT,NARSINGARH,DAMOH,M.P (MNC) Asst Manager (Instrument) 1987 2004 16000 PM [B][U]Job Responsibility [/U][/B]: Project Compilation 4000 TPD Cement Plant and 15 MW Power Plant from Instrumentation & Electrical side and after that looking Operation and Maintenance of 4000TPD Kiln. An ISO 9001 Company. [B][U]Name of the Company, Location Designation Duration CTC From To [/U][/B]: SMC Power Generation Ltd, Jharsuguda, Orissa. Dy Manager (Instrument) HOD. 2004 2005 30000 PM [B][U]Job Responsibility [/U][/B]: Project Compilation 350 TPD Kiln and 8MW Power Plant (WHRB) after that looking O & M Power Plant & Kiln. [B][U]Name of the Company, Location Designation Duration CTC From To [/U][/B]: Jain Steel and Power Ltd, Jharsuguda, Orissa. DGM (E & I) HOD 2005 July 2012 75000 pm [B][U]Job Responsibility [/U][/B]: Project Compilation 350 TPD Kiln and 8MW Power Plant (WHRB) after that looking O & M Power Plant & Kiln and all Electrical Liasoning with related Dep’t. Coordination with factory side to Corporate office day to day basis. [B][U]Name of the Company, Location Designation Duration CTC From To [/U][/B]: SHYAM METALICS AND ENERGY LIMITED,SAMBALPUR,ORISSA DGM (E & I) HOD,PELLET PLANT. SEP 2012 TILL DATE 80000 pm [B][U]Job Responsibility [/U][/B]: Project Commissioning start hope it will be completed December 2012 .6MPTA Pellet Plant Electrical Liasoning with related Dep’t. Coordination with factory side to corporate office day to day basis. - Project planning & implementation. - Providing power to all the facilities in the plant maintaining the relevant statutory. - Making of PPA & maintaining the power export-import platform. - Lessoning with electricity board ( WESCO) - Power Distribution section, execution of HT/LT line132/33kv, 33/11 KV switch yard, 11/0.433kv Power transformers (RMHS, Pump House, and DRI), and DG set upto 725kva x 2 with synchronizing. - 33 kV Transmission line erection and maintains. - 33/11KV switch yard Equipments erection and maintenance. - Maintenance and operation of Main VCB and ACB. - Maintenance and Operation of ESP. - Maintenance, operation and calibration with Hart calibrator of (DCS ABB, PLC 5/40 Allen Bradley, VVFD. DC Drive, Gas Analyzer O2 and CO, Weigh Feeders, Belt weigher and Transmitters like Pressure , Flow, Level and temperature transmitter, - Maintenance and operation of PCC and MCC Panel. [B][U]Declaration [/U][/B]: I hereby declare that above written data are true and the best of my Knowledge. Regards, AJAY SINGH THAKUR[/QUOTE]