ELECTRICAL ENGINEER : Resume CV

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    ELECTRICAL ENGINEER : Resume CV

    CURRICULUM VITAE :
    Mr. ABINASH SAHOO
    E-Mail : abinash765 AT gmail.com

    Career Objective :
    To pursue a company which offers brand value to my professional career with my abilities that, center on interpersonal skill, desire to learn and a will to succeed. I would be best suited to a company that offers an opportunity to utilize my knowledge and skill for the growth and development and to gain valuable experience and expertise in the process.

    Academic Qualification :
    Qualification Institute/ University Year Percentage :
    Matriculation H.S.C(Orissa) 2001 43%
    Inter arts C.H.S.E (Orissa) 2003 44%
    B.A SAMBAPUR UNIVERSITY 2007 38%
    Diplma in electrical engineering SCTE&VT(Orissa) 2010 75.6%

    Strengths :
    - Excellent verbal and written communication skill.
    - Hard working learner and excellent team player.
    - High energy level.

    Declaration :
    I do hereby declare that the above mentioned information is correct to the best of my knowledge and conscience and I bear the responsibility for the correctness of above particulars.

    Place : Rajgangpur
    Date :

    ABINASH SAHOO

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    AJAY SINGH THAKUR
    e-mail ID : ajaysinghthakur2007 AT rediffmail.com

    PERSONAL PARTICULARS :
    Date of Birth : 01/05/1964,
    Religion : HINDU
    State of Origin : MADHYA PRADESH
    Nationality : INDIAN
    Category :(Gen/SC/ST/ OBC/Etc) _GEN
    Marital Status : MARRIDE

    2.EDUCATION QUALIFICATION :
    Name of Course University / Board Year of Passing Division :
    H.S.C.C M.P.BOARD BHOPAL 1981 2nd
    B. Sc. R.D.V.V. JABALPUR 1984 2nd
    Post Gratuion Diploma in Electronic R.D.V.V. JABALPUR 1986 2nd

    3. EMPLOYMENT HISTORY : (STARTING WITH CURRENT EMPLOYMENT)
    Name of the Company, Location Designation Duration CTC From To :
    DIAMOND CEMENT,NARSINGARH,DAMOH,M.P (MNC) Asst Manager (Instrument) 1987 2004 16000 PM
    Job Responsibility :
    Project Compilation 4000 TPD Cement Plant and 15 MW Power Plant from Instrumentation & Electrical side and after that looking Operation and Maintenance of 4000TPD Kiln. An ISO 9001 Company.

    Name of the Company, Location Designation Duration CTC From To :
    SMC Power Generation Ltd, Jharsuguda, Orissa. Dy Manager (Instrument) HOD. 2004 2005 30000 PM
    Job Responsibility :
    Project Compilation 350 TPD Kiln and 8MW Power Plant (WHRB) after that looking O & M Power Plant & Kiln.

    Name of the Company, Location Designation Duration CTC From To :
    Jain Steel and Power Ltd, Jharsuguda, Orissa. DGM (E & I) HOD 2005 July 2012 75000 pm
    Job Responsibility :
    Project Compilation 350 TPD Kiln and 8MW Power Plant (WHRB) after that looking O & M Power Plant & Kiln and all Electrical Liasoning with related Dep’t. Coordination with factory side to Corporate office day to day basis.

    Name of the Company, Location Designation Duration CTC From To :
    SHYAM METALICS AND ENERGY LIMITED,SAMBALPUR,ORISSA DGM (E & I) HOD,PELLET PLANT. SEP 2012 TILL DATE 80000 pm
    Job Responsibility :
    Project Commissioning start hope it will be completed December 2012 .6MPTA Pellet Plant Electrical Liasoning with related Dep’t. Coordination with factory side to corporate office day to day basis.
    - Project planning & implementation.
    - Providing power to all the facilities in the plant maintaining the relevant statutory.
    - Making of PPA & maintaining the power export-import platform.
    - Lessoning with electricity board ( WESCO)
    - Power Distribution section, execution of HT/LT line132/33kv, 33/11 KV switch yard, 11/0.433kv Power transformers (RMHS, Pump House, and DRI), and DG set upto 725kva x 2 with synchronizing.
    - 33 kV Transmission line erection and maintains.
    - 33/11KV switch yard Equipments erection and maintenance.
    - Maintenance and operation of Main VCB and ACB.
    - Maintenance and Operation of ESP.
    - Maintenance, operation and calibration with Hart calibrator of (DCS ABB, PLC 5/40 Allen Bradley, VVFD. DC Drive, Gas Analyzer O2 and CO, Weigh Feeders, Belt weigher and Transmitters like Pressure , Flow, Level and temperature transmitter,
    - Maintenance and operation of PCC and MCC Panel.

    Declaration :
    I hereby declare that above written data are true and the best of my Knowledge.

    Regards,
    AJAY SINGH THAKUR