Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
Civil Land Surveyor : Resume
Ask Question / Post resume
Post a reply to the thread:
Civil Land Surveyor : Resume
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;246565][B]CURRICULUM VITAE :[/B] G.SUBRAMANIYAN [B]E-MAIL [/B]: sasisubu90 AT yahoo.in [B]PERSONAL DETAILS [/B]:- [B]DATE OF BIRTH [/B]: 13/04/1982 [B]LANGUAGE KNOWN [/B]: ENGLISH, HINDI, TAMIL AND MALAYALAM. [B]TECHNICAL QUALIFICATION [/B]: “DIPLOMA CIVIL ENGINEERING” Year of Passing : 2003 April. Institute : Pattukkottai Polytechnic college. [B]COMPUTER QUALIFICATION [/B]: AUTO – CAD Release 2004” Computer Aided Design of Civil Drawing “MICRO SOFT OFFICE” – Word, Excel, Power Point, Photo Shop. [B]Total Experience [/B]: 9 years (Gulf Experience of 7years) [B]DETAILS OF SURVEY “G.P.S” (GLOBAL POSITION SYSTEM) EQUIPMENT USED [/B]: 1 “TRIMBLE” G.P.S. System U.S.A [B]DETAILS OF [/B]: TOTAL STATION” INSTRUMENT USED : [B]Sl. No “Total Station” Instrument Model Made in :[/B] 1 “sokkia” power set 510 total station Japan 2 “Nikon” power set total station Japan 3 “ top con” total station Japan 4 “Leica TC 802” Switzerland [B]Survey Software programs work done [/B]: - Downloading of Field survey details from g.p.s equipment and total station instrument into Computer - Import & Export in DXF and DGN formats in CAD Design - Transforming Co-ordinates from one system to another that is conversion of WGS84 Co-ordinates to local co – ordinates . - Digital Terrain Modeling and Counter Maping an Design. - Calculation of Areas & Quantities. - Design of Multi Highway Lane and Pavement and Design of road curves, roundabout, island and road vertical and horizontal alignment. - Design and infrastructure works like water and sewer and storm water drainage pipe line topological survey, counter survey and profile design of L/S & C/S and pipe line vertical and horizontal alignment control. DETAILS OF ABROAD AND INDIA SURVEY PROJECT WORKS DONE TOWELL INFRASTRUCTURE PROJECTS CO L.LC OMAN [B]S.No Designation Period from Period TO Work Assigned :[/B] 1 Sr. Land Surveyor 2nd December 2011 13th June 2012 Construction of Ground level reservoirs (GLSR) and Over head elevated service reservoirs. (OHESRs). - Earth work excavation, Laying, Jointing, and Hydraulic testing of pipe lines (DI) Ductile iron pipes, (60 KM DI Pipe line). - Earth work excavation, Laying, Jointing, and Hydraulic testing of pipe lines HDPE pipes, (166) KM HDPE Pipe line - Preparation of Weekly, Monthly, daily Progress Reports. - Surveying Work such as Auto level, LS Marking works. - Commissioning and maintenances of the scheme. - Preparation L Section. - Preparation AS Built Drawing. 2 LAND SURVEYOR ALGHANIAM INTERNATONAL CONTRACTING CO W.L.L (OIL & GAS DIVISION) KUWAIT [B]Project Name [/B]: New 30” crude oil transit pipe line project 120 km. From NW to CMM. [B]Contractor [/B]: KOC (Kuwait Oil Company) [B]Sub Contractor [/B]: ABB [B]Position held [/B]: Land Surveyor [B]Work done [/B]: Responsible for overall Co-ordination and supervision of all Survey works and projects Involving utility construction. Then setting out of trench alignments and levels given, (FCN) Making Future change notification. As-Built preparation of all responsibility [B]Duration of work [/B]: 10th January 2011 to 9TH aug 2011 3 LAND SURVEYOR SAUDI COMEDAT COMPANY LIMITED SAUDI ARABIA [B]Project Name [/B]: Al-Jalamid phosphate mine project. [B]Cilnd [/B]: Ma’den [B]Position held [/B]: Mine Surveyor [B]Work done [/B]: Topography of survey and quantity report making and blast holes Marking and blasting design. Blast report making Clind dealing. [B]Duration of work [/B]: 18.6.09 to 18.07. 2010(short time project) 4 LAND SURVEYOR WADE ADAMS CONTRACTING Co. LLC DUBAI Project 1) . Construction of Roads and Infra- structure packkage from “Dubai Studio [B]City”. Clint [/B]: Dubai Properties. Consultant : CANSULT Project 2) . Construction of Roads and Infra- structure package from Mudon housing [B]development. Client [/B]: Dubai Properties, Consultant : MANSUEL [B]Work done [/B]: Topography and contour surveying of project site and establishing of control point co-ordinate and benchmark elevation and setting out of housing infra structure area boundary and vertical & horizontal curves, vertical curves, road junctions , roundabout , road island and setting out and level control of electrical cable and telephone cable. [B]Duration of work [/B]: 17th July 2006 to 10th January 2009 5 LAND SURVEYOR STRABAG OMAN LLC OMAN [B]Project [/B]: Construction of sewage water disposal network for housing area Muscat Municipality. [B]Work Done [/B]: Topography and contour surveying of project site and establishing of control point co-ordinate and benchmark elevation and Setting out of sewer man holes, from depth up to 8m depth. House connection chamber pipe line layout, excavation and formation levels. [B]Duration of work [/B]: Aug 2005 to April 2006 6 Junior civil engineer IDEAL PLANNERS & BUILDERS INDIA [B]Project [/B]: Construction of Multi storied G + 10 Buildings. [B]Work Done [/B]: Setting out of foundation for multi storied structural columns, checking of alignment of structures and checking of R.C.C Concrete and steel reinforcement and interior finishing, taking bill quantity and control of work man power. [B]Duration of work [/B]: 01/05/2003 to25/05/2005 [B]Declaration [/B]: I hereby declare that the above mentioned details are true and correct for my best knowledge. [B]Date [/B]: [B]PLACE [/B]: ARANTHANGI[/QUOTE]