December 31st, 2012, 10:40 AM
Post Count Number #1
Civil Land Surveyor : Resume
RESUME:
ANAND KUMAR
E-mail : anand19930913 AT gmail.com
CAREER OBJECTIVE :
To devoted my entire zest and capabilities for the progress and growth of the organization by constantly enhancing my skill to perfection and wholeheartedly to the form by setting its own standards of quality and achievements.
EXPERIENCE :
COMPANY NAME : ARK Project Services (Land Surveying)
DESIGNATION : Asst. Surveyor
Educational :
. High School from U.P. Board- 2008.
Professional :
. ITI passed in Land Survey
. One year diploma in Computer (Micorsoft Office & Internet& AUTOCAD)
PROFESSIONAL QUALIFICATION :
Topographical Surveying
Land Surveys,Demarcation, and Leveling
Above experience of more than 1/6 years
EQUIPMENT HANDLED :
DGPS : MA
TOTAL STATION TOPOCON, LEICA,
AUTO LEVEL NIKON SOKKIA
HOBBIES :
. Travel and going on adventurous places with friends.
. Interacting with people during Traveling.
. Playing Volleyball.
PERSONAL DETAILS :
Date of Birth : 13.09.1993
Nationality : INDIAN
Marital Status : UNMARRIED
Languages known : ENGLISH, HINDI
DECLARATION :
I hereby declare that the information stated above is true to the best of my knowledge. I am ready to work in India and abroad.
Place :
Date :
(ANAND KUMAR)
January 2nd, 2013, 12:57 PM
Post Count Number #2
POST APPLIED FOR LAND SURVEYOR
CURRICULUM VITAE :
G.SUBRAMANIYAN
E-MAIL : sasisubu90 AT yahoo.in
PERSONAL DETAILS :-
DATE OF BIRTH : 13/04/1982
LANGUAGE KNOWN : ENGLISH, HINDI, TAMIL AND MALAYALAM.
TECHNICAL QUALIFICATION : “DIPLOMA CIVIL ENGINEERING”
Year of Passing : 2003 April.
Institute : Pattukkottai Polytechnic college.
COMPUTER QUALIFICATION :
AUTO – CAD Release 2004” Computer Aided Design of Civil Drawing “MICRO SOFT OFFICE” – Word, Excel, Power Point, Photo Shop.
Total Experience : 9 years (Gulf Experience of 7years)
DETAILS OF SURVEY “G.P.S” (GLOBAL POSITION SYSTEM) EQUIPMENT USED :
1 “TRIMBLE” G.P.S. System U.S.A
DETAILS OF : TOTAL STATION” INSTRUMENT USED :
Sl. No “Total Station” Instrument Model Made in :
1 “sokkia” power set 510 total station Japan
2 “Nikon” power set total station Japan
3 “ top con” total station Japan
4 “Leica TC 802” Switzerland
Survey Software programs work done :
- Downloading of Field survey details from g.p.s equipment and total station instrument into Computer
- Import & Export in DXF and DGN formats in CAD Design
- Transforming Co-ordinates from one system to another that is conversion of WGS84 Co-ordinates to local co – ordinates .
- Digital Terrain Modeling and Counter Maping an Design.
- Calculation of Areas & Quantities.
- Design of Multi Highway Lane and Pavement and Design of road curves, roundabout, island and road vertical and horizontal alignment.
- Design and infrastructure works like water and sewer and storm water drainage pipe line topological survey, counter survey and profile design of L/S & C/S and pipe line vertical and horizontal alignment control.
DETAILS OF ABROAD AND INDIA SURVEY PROJECT WORKS DONE
TOWELL INFRASTRUCTURE PROJECTS CO L.LC OMAN
S.No Designation Period from Period TO Work Assigned :
1 Sr. Land Surveyor 2nd December 2011 13th June 2012
Construction of Ground level reservoirs (GLSR) and Over head elevated service reservoirs. (OHESRs).
- Earth work excavation, Laying, Jointing, and Hydraulic testing of pipe lines (DI) Ductile iron pipes, (60 KM DI Pipe line).
- Earth work excavation, Laying, Jointing, and Hydraulic testing of pipe lines HDPE pipes, (166) KM HDPE Pipe line
- Preparation of Weekly, Monthly, daily Progress Reports.
- Surveying Work such as Auto level, LS Marking works.
- Commissioning and maintenances of the scheme.
- Preparation L Section.
- Preparation AS Built Drawing.
2 LAND SURVEYOR ALGHANIAM INTERNATONAL CONTRACTING CO W.L.L (OIL & GAS DIVISION) KUWAIT
Project Name : New 30” crude oil transit pipe line project 120 km.
From NW to CMM.
Contractor : KOC (Kuwait Oil Company)
Sub Contractor : ABB
Position held : Land Surveyor
Work done : Responsible for overall Co-ordination and
supervision of all Survey works and projects
Involving utility construction. Then
setting out of trench alignments and levels given, (FCN)
Making Future change notification. As-Built
preparation of all responsibility
Duration of work : 10th January 2011 to 9TH aug 2011
3 LAND SURVEYOR SAUDI COMEDAT COMPANY LIMITED SAUDI ARABIA
Project Name : Al-Jalamid phosphate mine project.
Cilnd : Ma’den
Position held : Mine Surveyor
Work done : Topography of survey and quantity report making and
blast holes Marking and blasting design. Blast report
making Clind dealing.
Duration of work : 18.6.09 to 18.07. 2010(short time project)
4 LAND SURVEYOR WADE ADAMS CONTRACTING Co. LLC DUBAI
Project 1) . Construction of Roads and Infra- structure packkage from “Dubai Studio
City”. Clint : Dubai Properties. Consultant : CANSULT
Project 2) . Construction of Roads and Infra- structure package from Mudon housing
development. Client : Dubai Properties, Consultant : MANSUEL
Work done : Topography and contour surveying of project site and establishing of control point co-ordinate and benchmark elevation and setting out of housing infra structure area boundary and vertical & horizontal curves, vertical curves, road junctions , roundabout , road island and setting out and level control of electrical cable and telephone cable.
Duration of work : 17th July 2006 to 10th January 2009
5 LAND SURVEYOR STRABAG OMAN LLC OMAN
Project : Construction of sewage water disposal network for
housing area Muscat Municipality.
Work Done : Topography and contour surveying of project site and
establishing of control point co-ordinate and benchmark
elevation and Setting out of sewer man holes, from
depth up to 8m depth. House connection chamber pipe
line layout, excavation and formation levels.
Duration of work : Aug 2005 to April 2006
6 Junior civil engineer IDEAL PLANNERS & BUILDERS INDIA
Project : Construction of Multi storied G + 10 Buildings.
Work Done : Setting out of foundation for multi storied structural columns, checking of alignment of structures and checking of R.C.C Concrete and steel reinforcement and interior finishing, taking bill quantity and control of work man power.
Duration of work : 01/05/2003 to25/05/2005
Declaration :
I hereby declare that the above mentioned details are true and correct for my best knowledge.
Date :
PLACE : ARANTHANGI