Help
Home
Search the Forum
You are Here :
Forum
Lists
Placement Agencies
R K Enterprises : Mumbai
Ask Question / Post resume
Post a reply to the thread:
R K Enterprises : Mumbai
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Salman2741;194571]CURRICULLAM VATAE [b]Email [/b]: salmanmohdsalman AT yahoo.com msolayan1 AT gmail.com msalman AT olayandescon.com Mohammed Salman [b]Post Applied For [/b]: Mechanical Engineer Educational / Technical Qualification B.E. (Bachelor of Mechanical Engineering) [b]Software Support [/b]: MS Windows, MS Word, MS Excel, MS Project [b]Career Summary [/b]: Eleven years experience as a Senior Engineer Mechanical. Projects construction and Projects planning in Tank fabrication / Tank Erection/Piping/Pipeline. Technically sound in discipline. QA/QC awareness and Health Safety Environment (HSE) awareness. [b]Fields of Experience [/b]: Steel work Fabrication/ Construction in Oil & Petrochemical Sectors. Also having a wide Exposure in the following activities; Conversant with all relevant codes Standards and specification like ASME SEC VIII, ASME SEC IX, ANSI B 31.3, B31.4, API 1104, API 620 and API 650 ETC. Identification of all Piping and Tanks Materials. Review of GADS with respect to P & ID, Isometric Drawings, Piping Support Drawings, and Pipeline route Drawings. Review of GADS and Details Drawing for all types of Tanks Self supported and Supported roof (Fixed cone type and Dome type). [b]Responsibilities [/b]: - Preparation of Storage Tank Erection Procedure, Schedule plan for Tank Fabrication, Tank Erection, Testing, coating and Pre- Commissioning of the Projects. - Preparation of Piping NDT plan, Tie in procedure.coating, painting and Pre-commissioning of projects. - Liaison with Client & Inspection Agency, Sub-Contractor. - As Built documentation, Reconciliation of Materials. [b]General responsibilities [/b]: - Respect own company’s operating & core values. - Implement company’s quality & loss prevention policies. - Follow Company’s quality & administrative. [b]Job related responsibilities [/b]: - Read thoroughly contract documents, client drawings and assign the work accordingly to Area Engineer/Area Supervisor. - Prepare project mobilization plan for manpower and equipments. - Liaison with Project group (PMG) for preparation of fabrication & site erection schedule. - To prepare the checklist of tanks prior to erection. - Preparation of daily progress report on the basis of progress, man hour efficiency and productivity. - Ensure for availability of all Engineering drawings and QA documents before proceeding at site. - Attend the Progress meetings with client. - Communication with client for day to day matters with copy to Construction Management. - Maintaining the project schedule, bottle necks & critical path with co-ordination of relevant sections till resolution. - Weekly internal meetings with area Engineers, Supervisors, quality and safety. - Optimum utilization of manpower, equipments, vehicles etc (own/hired) for project duration. - Control over site expenses. Approved budgeted figures to be followed. [b]WORK HISTORY [/b]: [b]Employer Name [/b]: Olayan Descon Engineering Company Jubail-Saudi Arabia. [b]Duration [/b]: JUNE 2005 TO TILL DATE. [b]Client [/b]: AL FANAR / SAUDI ELECTRICITY COMPANY HAIL K.S.A [b]Duration [/b]: Nov 2011 to till date [b]Position [/b]: Site Manager [b]Project [/b]: PM 105 HAIL-11 POWER PLANT EXTENSION III, Two carbon steel field erected Tank fixed cone inter floating type 35 meter dia and 24 meter height [b]Client [/b]: ARBIAN CHEMICAL TERMINAL (ACT) JUBAIL K.S.A [b]Duration [/b]: February 2011 to October 2011. [b]Position [/b]: Site Manager [b]Project [/b]: Bulk liquid Chemical Terminal Phase-1 Jubail Port Fourteen storage Tank Fixed cone type carbon steel and stainless steel 14.4 mtr dia. [b]Client [/b]: HYUNDAI / SAUDI ARAMCO KARAN GAS KHURSANIYAH K.S.A [b]Duration [/b]: May2010 to September 2011. [b]Position [/b]: Site Manager [b]Project [/b]: Karan Gas Field Development Project (KGF) Saudi Aramco, Two Carbon steel Field erected (20.42 mtr dia) with PWHT and Four shop fabricated Tank (5.5mtr dia). [b]Client [/b]: AL-BAYRONI-AL-JUBAIL FERTILIZAR CO (SABIC). [b]Duration [/b]: December 2008 to January 2009 Position : Site Manager Project : Prilling Tower Dust Emission Control of Urea plant, One Storage Tank Stainless steel fixed cone type 8mtr dia & 8mtr height Client : TECHNICAS REUNIDAS /SAUDI KAYAN PETROCHEMICALCOMPANY (SABIC) Duration : October 2008 to April 2010. Position : Construction Manager Project : Saudi Kayan Petrochemical Complex Phenolics Facilities Sabic, 28 storage Tank Carbon steel and Stainless steel Fixed Cone type Internal Floating roof 9 Mtr dia to 32 Mtr dia. Client : SNC LAVALIN / SAUDI ARAMCO OIL COMPANY SHAYBAH K.S.A Duration : March 2008 to September 2008. Position : Site Manager Project : Shaybah Central Processing Facilities Saudi Aramco, four carbons steel Fixed cone type 24 mtr dia, storage Tanks. Client : Snam progetti/Saudi Aramco khursaniyah producing facilities.KSA Duration : Jan 2007 to February 2008 Position : Site Manager Project : Khursaniyah Producing Facilities Saudi Aramco, 15 Carbons Steel Tanks Dome type.7Dia mtr to 28.5Dia mtr. Client : Samsung Engineering (SHARQ SABIC) Jubail K.S.A Duration : April 2006 to Dec 2006 Position : Site Engineer Project : SHARQ-3rd Expansion project EG Plant thirteen Tanks carbon steel & stainless steel Fixed Cone Type Field Erection.15 mtr Dia to 9mtr Dia. Client : SNC Lavalin International (GULF FARABI) Jubail K.S.A Duration : August 2005 to March2006. Position : Site Engineer Project : Tanks Erection project, Gulf Farabi Petro- chemical Company Jubail, SNC Lavallin International is EPC Contractor Olayan Descon is Subcontractor for prefabrication and erection of Twenty Eight Tanks types Fixed Con type, Dome type, External Floating Roof and Internal floating Roof from 25mtr Dia to 8mtr Dia Client : SAUDI ARAMCO K.S.A Duration : June 2005 to Sep 2005 Position : Production Leader. Project : Fabrication of Supply of slop Tank for Tanajib Shop Stock. Client : SAFCO SABIC JUBAIL K.S.A Duration : June 2005 to June 2005 Position : Production Leader Project Prefabrication of Urea Formaldehyde Concentrate Storage Tank (Fixed cone Type Stainless Steel) Client : JUPC SABIC Jubail K.S.A Position : Production Leader Duration : June 2005 to July 2005 Project : Fabrication of Solid Accumulation Tank-02nos (Stainless Steel) Name of Employer : M/S Manco International General Contracting (W.L.L.) Doha, Qatar. Duration : Dec 2003 to Sept 2004. Position : Site Engineer. Client : Qatar Petroleum. Project : External Floating Roof Tank 60 meter Dias, 15.5 heights for Messaied Tank farm of Qatar Petroleum in Doha, Qatar. Responsibilities : Responsibilities for the following activities: - Review of work order documents, drawing and assign work to Area supervisor. - Resource requirements, discussion, coordination with Site In charge. - Coordination and follow up for required material, especially for missing/balance supplies. Arrangement of job execution. - Coordination with welding section for availability of work frontage to them and task completion from them. Weekly schedule plane & daily schedule plan. - Daily monitoring for daily progress against weekly plan, Controlling & monitoring budgeted man hours. - Coordination with rigging crew and discuss rigging plan for all lifts. Conduct daily Tool Box talk within the section to discuss the awareness among the workers about safety, hazards during - work. Attend safety/construction meeting as and when required. Prepare standard work practices. - Innovation in work execution to optimize the resources and output. Name of Employer : M/S Offshore Industrial Construction Pvt. Ltd. (Mumbai) Duration : April 2002 to September 2003 Position : Site Engineer Client : M/S Gas Authority Ltd. (GAIL) Consultant : Engineers India Ltd. (EIL) Project : Agra City Gas Distribution Expansion Project (8”& 4” dia) Agra (U.P.) Responsibilities : Responsible for the following activities: - Review of Pipeline Installation Rout Drawings and Pipeline support drawings. - Supervision of Work Force employed for the above job. - Responsible for Supervision of Fabrication, Wielding, Coating, NDT Plan, Pigging, Painting, Trenching, Lowering, Padding, Back filling, Pre-commissioning of the Project. Responsible for as built documentation and billing. Name of Employer : M/S ACE Pipeline Contracts Pvt. Ltd.(Mumbai) Duration : September 2000 to March 2002 Position : Site Engineer Client : M/S Bharat Petroleum Corporation Ltd. Consultant : Engineers India Ltd. (EIL) Project : Installation of Dock Lines 24” Dia 6.4 mm Thickness for POL Jetty Project for BPCL 18 km Long from JNP Oil Jetty to IOCL in Uran, Mumbai. Client : M/S Indian Oil Tanking Ltd. (IOTL) Project : Cross-country Pipeline 12” dia & 6.4 mm thick, Naphtha IOTL Mumbai. Responsibilities : Responsible for the following activities: - Identification of all Piping - Materials. Review of GADS with respect to P & ID, Isometric drawings, Piping Support Drawings. Review of Pipeline Installation Route Drawing & Pipeline Drawings. Declaration : I hereby declare that all the above statements are correct to the best of my knowledge. (Mohammed Salman)[/QUOTE]