Help
Home
Search the Forum
You are Here :
Forum
Lists
Placement Agencies
Shaping Careers : Chennai
Ask Question / Post resume
Post a reply to the thread:
Shaping Careers : Chennai
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;192256]V.PARTHIBAN [b]Mail id [/b]: parthi_vasu AT yahoo.com vasuparthiban4 AT gmail.com MECHANICAL SUPERVISOR SYNOPSIS Having 17 years varied experience in the field of Project Execution, Utilities operation and maintenance in Petro chemical industries and Oil & Gas fields. Can work efficiency and effectively as an individual and also as a team member. Possess excellent inter personal and communication skills. Education - National Certificate in supervision from National productivity council India in 2006 Secured first class with 69% marks. - Diploma in Mechanical Engineering from Kongu Institute of technology in 1993 Secured First Class with 77% marks. Present Employment Presently associating with M/s S K Engineering & Construction LTD, Abu Dhabi as Mechanical Supervisor. The proficiency forte Team Management/ Execution/ Quality Control / Safety - Supervising construction of Equipments for rendering and achieving quality services; providing first line client service by providing timely disbursement of amount. - Managing & monitoring the performance of team members to ensure efficiency in progress and meeting of individual & group targets. - Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction and work within the budget. Experience Details Name of the Company SK Engineering & Construction LTD, Abu Dhabi Mechanical Supervisor from April 2011 Till Present [b]Projects Handled [/b]: [b]Project [/b]: Ruwais Refinery Expansion (RRE) Project EPC 1 Crude Distillation Unit & Associated Downstream Units (CDU) PMC JACOBS Client Abu Dhabi Oil Refining Company (TAKREER) - Installation, alignment and Commissioning of static and rotating equipments. [b]- Responsible for the Execution of Hydrogen Reformer(HTAS). Vendor [/b]: - ITT SPA ITALY. - Coordinating with the sub-con for the execution of work. - Responsible for the daily site activities to monitor (Check) work permits, manpower and safety hazards. - Planning for the erection activities as per the delivery sequence of materials. - Responsible for the execution of radiant section, radiant wall panels, steel structures, flue gas duct, air duct, burners, cold collector, catalyst tube, convection section- steel structure, feed preheat coil, air pre heater, waste heat boiler, steam drums, flue gas stack, fans and blowers. - Responsible for pre and final alignment of static, rotating equipments & final box up inspection. - Preparing daily reports, reporting to mechanical engineer - Attending weekly meeting with subcontractor - Planning for mechanical clearance to start further activities. - Coordinating with the engineering department for field technical queries and giving clarification to subcontractor. Name of the Company Nassers Al-Hajri Corporation K.S.A Equipment Supervisor Furnace from July 2008 July 2010 [b]Projects Handled [/b]: [b]Project [/b]: Saudi Kayan Olefins Project Al-Jubial Saudi Arabia [b]Client [/b]: Saudi Kayan, Saudi Arabia. [b]EPC [/b]: Kellogg Brown Root Saudi Ltd. - Nine Score Cracking Furnaces of KBR - Installation of radiant modules, convection modules prior to design position and alignment of all modules. - Installation of Burner assembly in radiant section prior to orientation. - Installations of radiant coils in radiant arch panel, primary quench exchangers through convection sections, Alignment of PQE. - Installation of secondary Quench Exchangers prior to orientation on SQE structural frames. - Installation of Induced Draft fan skid on structure frames with vibration isolator. - Connecting to the Breeching Module ducting with expansion joints. Prior to orientation, outlet expansion bellow and exhaust stack installed in structure frames. Alignment of induced draft fan. - Installation of steam drum, vent silencer prior to orientation, on structure frames. - Installation of lever arm assembly and counter weight assembly on radiant manifold and cross over piping. - Offering for client pre and final alignment of all equipments and final box up inspection of radiant modules, burners, induced draft fan, PQE, SQE, Steam drum etc. - Planning Materials for the sequence of erection . - Co-Ordination with Other Depts. like Piping, Electrical, Instrumentation, Civil etc. - Co-Ordination with Client and QA/QC inspectors. - Planning Mechanical Clearance to start further activities. - Responsible for Planning and Preparing daily work permits. - Activities with client for commissioning start-up of furnace. - Achieved 45 million man hours without LTI in Olefins Project. - Successfully Completed 910MT of carbon steel structural and Equipments erection per furnace. Name of the Company Gangotri Textiles Ltd, Sip cot Perundurai, India Maintenance Supervisor from March 2007 June 2008 - Managing overall Maintenance activities pertaining to process. - Responsible for maintenance of process Machines and its Utilities. - Preparation of daily, weekly, Quarterly, and monthly Maintenance Schedules. - Preparing to work within the timely Schedules and planning for maintenance spares. - Preparation of Maintenance reports. Name of the Company SKM Egg Products Exports India Ltd, Erode Utility In-Charge from September 2004 March 2007 GMP certified, ISO9001, SQF2000, HACCP Company - Responsible for operation and maintenance of Air conditioning plant, Air compressor plant, Ice water plant, DG plant, Water treatment plant, Boiler etc. - Responsible for Erection of Boiler and Ice Water Plant, Planning for Material and Coordinating with the contractor. - Follow up and monitoring the daily progress of work. - Failure analysis and down time are taken for corrective measures, to improve production and maintenance of Equipment control. - Scheduling with the production Department for the available of equipment for the maintenance work and necessary servicing. - Planning with material department for special materials and minimum spares stock for maintenance work. - Routine monitoring is done to find the condition of the machine while running. - Preparing cost estimation for Schedule Maintenance. Name of the Company APOLLO Idhayam Hospital, Erode, India Maintenance Engineer from August 2002 July 2004 75 Bedded CARDIAC SUPER Specialty Hospital. - Responsible for Commissioning and maintenance of mechanical and electrical Equipments like Air conditioning plant, water treatment plant, Generators etc. - Instructing individuals about the daily schedules and methods of work. - Planning for schedule maintenance of Air conditioning plant, Air handling units, Generators other mechanical and electrical equipment. - Preparing maintenance Budget and monthly consumption report. Name of the Company LOTUS APOLLO Hospital, Erode, India Maintenance Engineer from March 1998 August 2002 150 Bedded Multi Specialty Hospital. - Responsible for Erection, commissioning of Boiler, Vapour absorption machine, Water treatment plant, Gas plant, etc. - Co-ordination with supplier and contractors for Erection, Commissioning of pipelines, ducts, Air handling units, etc. - Responsible for operation and maintenance of NON-IBR Boiler, vapour Absorption machine, water treatment plant and General maintenance of all Equipments - Planning for schedule maintenance of Boilers, air handling units etc. - General maintenance like plumbing, Civil, carpentry etc, Timely maintenance of all Equipment and its proper utilization helped in Conserving the energy consumption. Name of the Company Universal Heat Exchangers Ltd, Coimbatore, India Production Supervisor from December 1995 January 1998 - Manufacturers of pressure vessels, Heat exchangers, Oil Coolers etc. - Material planning, process planning, and job allocating, machining of Aluminum shells, tube plates, Headers and process inspection. - Assembling of tube bundles for coolers and heat exchangers - Work involves brazing, arc welding gas welding. - Pneumatic test for shell & tube side of heat Exchangers, oil coolers. Name of the Company Sakthi Sugars Ltd, Foundary Division, Perundurai, India Company Apprentice Trainee from April 1994 November 1995 - Manufactures of Maruthi car break drum, steering knuckle, manifold for 800cc, 1000cc, gypsy cars. [b]- CNC Machine operator [/b]: Machining of 800cc, 1000cc, car steering knuckles in CNC Machines, other operations like drilling, milling, tapping in various machines. - Stage by Stage inspection by using bore gauges, micrometer, vernier -caliper, go and No-go gauges.[/QUOTE]