Shaping Careers : Chennai

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    Shaping Careers : Chennai

    Company Name : Shaping Careers

    Company Location : Chennai

    Company Profile :
    Shaping Careers is launched to provide quality consultancy in the field of Human Resources and Training. Shaping Careers aspires to mould and develop the right resources to the right teams.Getting the Right People - A company is nothing but a summation of its constituents & hence there is a strong focus on people.We at Shaping Careers, realize the importance of getting the right people.

    Services Offered :
    Recruitment Solutions
    Permanent Staffing
    Training

    Company Address :
    Shaping Careers
    No. 3, Varadharaja Nagar, Near Indian Air Force Camp Selaiyur, Chennai 600 073.

    Website : http://www.shapingcareers.co.in

    How to submit CV / resume : info@shapingcareers.co.in

    Placement Agencies Chennai, Manpower Consultants Chennai, Staffing Companies Chennai

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : Radha Krishna Chilukalapalli
    Email : kittu2496 AT yahoo.com
    Designation / Skillset : Resume for suitable post

    Resume :
    Career objective :
    To work in a dynamic and esteemed organization to exercise my knowledge, skills and potentials towards organizational development and growth.
    Educational qualification :
    Higher educational qualification : MIT (Master in Information Technology) Marks: 80%
    Educational Qualifications : B.Sc. (First Class), Marks: 76%
    Computer Education : Basics, MS – Office & C
    Professional Experience (Total experience : 13 yrs):
    GULF Experience :

    - Worked in Commissioning of Saudi International Petrochemical Company (SYNTHESIS GAS PLANT (H2 + CO)), which consist of Sulphur Removal, Steam Methane Reformer, Cryogenic system, Acid Gas recovery system (Absorption Columns), Centrifugal and Reciprocating Compressors, Centrifugal and Reciprocating Pumps, Heat Exchangers etc.
    Pre-Commissioning & Commissioning Experience :
    - Air blowings.
    - Steam blowing of HP & LP Steam lines.
    - Flushing & degreasing of lines.
    - Mechanical completion checking of various lines with isometric views.
    - Hot lube oil circulations.
    - Commissioning of Centrifugal Compressor.
    - Chemical cleaning & Amine circulation of CO2 Removal unit.
    - Catalyst filling in Reformer, Hydrogenerator, Desulphurisers, etc..
    - Chemical circulation of STEAM DRUM for passivation.
    - Boil out & Dry out of STEAM REFORMER & STEAM DRUM.
    - Centrifugal Compressors commissioning & start up.
    - Flare commissioning & start up.
    - Deriming & Start-up of CRYOGENIC System -- COLD BOX
    Experience in INDIA :
    - Worked in commissioning of Synthesis gas production unit Hydrogen (AMMONIA PLANT), and as Panel operator in M/S Nagarjuna Fertilizers and Chemicals ltd.
    Company Profile :
    - SIPCHEM is the world’s largest SYNGAS (CO & HYDROGEN) producing
    Petrochemical plant producing CO & H2 at a capacity of 345,000 MTPA with
    NATURAL GAS as raw material. Technology supplied by LURGI, GERMANY in
    Association with AIR LIQUID, France.
    - M/S Nagarjuna Fertilizers and Chemicals ltd One of the major Ammonia production plant with the capacity of 1050 MTPD, Naphtha / NG based NG & naphtha reforming process, technology supplied by HALDOR TOPSOE. DCS (of ABB) HYDROGEN (Ammonia) Plant.
    - Commissioning Experience : Pre Commissioning & Commissioning in SIPCHEM & NFCL.
    - Present Responsibilities : LEAD PROCESS OPERATOR
    - Previous Responsibilities : FIELD & PANEL COORDINATOR (Ammonia HYDROGEN plant)
    -
    Proven Experience in operating the following sections Equipments from the panel and field :
    - Pre de-sulphurisation, Final de-sulphurisation of naphtha& Naphtha Tank Farm area
    - NG & NAPHTHA mixed feed steam reforming & Synthesis Gas purification
    - G.V.process to remove and recover the acid gas
    - Compressor house (Three numbers with the power of 17MW, 9 MW & 6 MW)
    - Synthesis Section, Refrigeration Section and the Purge gas recovery unit (CRYOGENIC SECTION)
    - Multi stage pumps like Naphtha feed; BFW feed, G.V.solution & Ammonia Product.
    - Operating 11 no. Of fixed bed catalyst reactors of different type including AMMONIA SYNTHESIS REACTOR, FIRED TUBULAR REFORMER AND THE AUTO THERMAL REFORMER.
    - Career Specialties : Joined in Ammonia plant by “Campus Recruitment “
    Rich Commissioning and A.P.C. Implementation
    Experience.
    Recently received Cash Awards for four Suggestions
    Hands on Experience on the following process equipments :
    Naphtha Storage : Floating roof atmospheric pressure storage tanks, with all safety equipments.
    Raw Naphtha - 2 No’s –Capacity : 3450KL
    Sweet Naphtha - 1No.-Capacity : 7050KL
    SULPHUR REMOVAL SECTION
    AT Pre-Desulphurization : It consists de-aeration, hydrogenation and stripper, Sulphur content in the Naphtha is reduced to a Level of 10 PPM.
    AT Final Desulphurization : It consists of feed stock preheated, hydrogenator And H2S absorber beds. Sulphur content is reduced to a level of 0.01 PPM.
    AT Reforming Section : System consists of adiabatic pre-reformer, Primary Reformer and Secondary reformer. By steam Reforming of Hydro-carbons methane Content is reduced to 0.6%.
    AT Adiabatic Reformer : Having catalyst RKNGR contains magnesia (MgO) Operating at 510 deg. It reforms higher hydrocarbons into lower hydrocarbons. It is second successful catalyst in India.
    AT Primary Reformer : Side-firing reformer having 190 Catalytic tubes in two Chambers subjected by 360 natural gas & naphtha Burners. The nickel based catalyst operating at 35KSC/730 deg.
    AT Secondary Reformer : Air injected auto ignition chamber and nickel based Catalyst bed type reformer operating at out-let conditions 34 KSC/895 c. Methane is 0.6 % maintained.
    Co-Conversion : High temperature, Iron-chromium catalyst Co-converter, Low temperature Zinc-copper converter. Operating at 350 c and 196 c respectively.
    Acid gas removal section : Giammarco Vetrocoke (GV) solution absorption Process. Absorption column operating at 30 KSC by feeding lean and semi lean solutions. CO2 slip Outlet of absorber is reduced to 500 PPM.
    : Regeneration takes place in HP generator with steam input operating at 1.02 KSC and in LP Regenerator by flashing operating at 750 mm of water column, boosting up the CO2 to 0.8 KSC by Booster compressor.
    Methanation : Nickel based catalyst reactor converts residual CO2 and CO into CH4 operating at 25KSC/300 OC inlet conditions.
    Syn. Gas Loop : Syn-loop having waste heat boiler, heat exchangers And Converter Coolers, chillers and separators operating at 150 KSC. Iron based catalyst converter having two beds with Inter cooling heat exchanger with cold shot provision. Topsoe - 200 Series radial flow type of converter.
    Product Ammonia and wash Section & Distillation
    : The separated ammonia is purified in letdown Vessel at 25 KSC and flash vessel at 0.1 KSC and Ammonia pumps for product transfer to urea Ammonia vapors from letdown vessel feed to Absorber and Distillation column operating at 15 KSC and 20 KSC respectively.
    Refrigeration unit : The syn-gas in loop is cooled to 150c by operating Ammonia refrigeration chillers at 1.2 KSC and 6 KSC.
    Cryogenic Section : Programme Logic controller based Absorbers and Cryogenic unit for hydrogen recovery from loop Purge gas supplied by LINDE, GERMANY.
    Furnaces : Natural Draught and Balanced draught furnaces
    BFW Treatment : De-aeration, Chemical dosing
    Steam Turbine : Extraction and condensing type turbine (18MW, 108 KSC, 5100c inlet flow 240 T/hr) supplied by SIEMENS, Germany to drive Centrifugal synthesis gas compressor supplied By Hitachi, Japan.
    : Injection cum condensing type steam turbine (9.6MW, 39 KSC, 3700c) to drive centrifugal Processor air compressor both supplied by MAN GHH, Germany
    : Condensing type turbine (6.5 MW, 39 KSC, 3700 c) to drive centrifugal ammonia refrigeration compressor both supplied by MAN GHH, Germany.
    Compressors : We have both centrifugal type and reciprocating Type of compressors.
    AT Centrifugal type Compressors: a) 4 stage horizontal split casing processor a Compressor which suck ambient air an Compress it up to 34 KSC .Capacity: 55085 NM3/hr
    Syn - gas Compressor :b) 4 stage vertical split casing synthesis gas Compressor in 3 stages it compresses make-up gas from 24.5. KSC to 145 KSC. 4th stage is re-circulator to increase synthesis gas pressure from 140 to 150 KSC. Make up gas Compressor of capacity: 1, 70,000NM3/hr.
    c) 3 stage horizontal split casing Ammonia refrigeration compressor is to compress Ammonia vapors from 0.05 KSC to 25 KSC.
    Reciprocating type compressor: d) Double acting horizontal balance opposite crosshead type-reciprocating compressor for Compressing recycle gas supplied by Khosla - Crepelle.
    Cooling Towers : It consists of 2 pumps of capacity 18,000 M3/hr driven by 1.2 MW motor and 1 pump driven by condensing type of turbine. Tower designed by Paharpur Cooling Towers.
    CONDENSATE RECOVERY : High pressure process condensate stripper (35ksc) pressure BFW Pumps, capacity 114m3/hr and 150 KSC, two waste heat steam boilers of total Capacity 240 T/hr and Steam super heater furnace operating at 105 KSC and 5100c.
    - SULPHUR REMOVAL SECTION:
    - Desulphurization: It consists of feed stock pre heater, hydrogenation (Co-Mo bed) and H2S absorption (Zink oxide bed). The out let of this unit contains 0.03 ppm of Sulphur.
    - REFORMING SECTION:
    - Primary Reformer: It is an Adiabatic Shift Reactor with nickel based catalyst operating at 30bar and 800-850 deg which reforms Higher Hydrocarbons into Methane Rich Gas.
    - Steam Reformer: Nickel based catalyst bed reformer with 400 tubes & 135 burners, operating at outlet conditions of 28bar, 890 deg C and methane level is reduced to 5%.
    - ACID GAS REMOVAL SECTION:
    - aMDEA solution absorption process.
    - Absorption column operating at 27bar and CO2 slip outlet of the absorber is reduced to 12 ppm.
    - Regeneration takes place in regenerator operating at 0.3bar.
    - CO2 Removal using activated MDEA solution.
    - COLD BOX:
    - Operating at Cryogenic temperatures at (–180 deg C), Separating the gases like CO, H2, CH4 & N2 by cryogenic distillation and to achieve the highest purities.
    - FURNACES:
    - Process gas reforming furnace, balanced draught, and top fired, 135 burners, 400 tubes and heat duty of the furnace is 48 G Cal/hr.
    - Waste heat recovery system with steam production of 60 T/hr AT 48 bar pressure.
    - STEAM TURBINES:
    - Condensing type turbine (35 MW, 47 bar, 405 deg C).
    - COMPRESSORS:
    - Seven Stage, 18MW Turbine Driven Centrifugal Compressor with Dry Gas Seal System, Which Compresses Low Pressure CO (1.5 bar) to MP CO (6.5 bar and 22 bar) and HP CO (38 bar and 63 bar) with capacity of 133,000 Nm3/hr and supplied by MAN TURBO, Germany.
    - Two stages horizontal split casing centrifugal compressor, which compresses Natural Gas from 24bar to 35bar and its capacity 55,000 Nm3/hr, and supplied by KOBELCO, Japan.
    - Six stage Motor Driven CO2 compressor, Which Compresses CO2 from 0.3bar to 40bar at a flow of 16,000Nm3/hr, Supplied by KOBELCO, Japan.
    - Two stage Motor Driven Positive Displacement H2 Compressor, Which Compresses Hydrogen from 24bar to 68bar, Supplied by KOBELCO, Japan.
    - Two Diaphragm Motor Driven H2 Compressors, Which Compresses Hydrogen from 24 bar to 44 bar, Supplied by HOFER, Germany.
    DCS System Handled:
    Emerson Delta V
    CATALYSTS HANDLED:
    Experienced in loading, unloading & stabilization of various catalysts like…
    - Ni Catalyst (Alumina based Alkali activated Nickel
    Catalyst)
    - CoMoX (Cobalt Molybdenum Oxide)
    - Zno (Zinc Oxide)
    Job Responsibilities:
    - Monitoring and controlling of process parameters & equipment's condition.
    - Startups and shutdowns of the plant.
    - Maintaining safety and house keeping in work area
    - Handing over the equipments safely for maintenance after positive isolation
    - Generating requisite work permit for the concerned job
    - Preparing and updating the unit operating manuals
    - Studying of P&IDs and Writing of SOPs for safe start-up of equipments or plant.
    - Giving training to junior operators
    SAFETY:
    I have thorough knowledge and practice on the application of the following systems.
    - Work permit system :
    - Cold work Permit
    - Hot work Permit
    - Confined Space Entry Permit
    - Vehicle Entry Permit
    - Process Safety Management System
    - JOSE PLAN
    - IDLH
    - Fire Extinguishers
    - Personal Protective Equipment (PPE)
    - Material Safety Data Sheet (MSDS)
    - Deluge system
    - Fire Hydrant System
    Special Training & safety courses attended:
    - Basic training on usage of personal safety devices
    - Mock drill on emergency attendance
    - Human Relations & Psychology
    - Team building etc.
    I heard about the prospects of your organization, and strongly believe that I can be a reliable candidature with the technical and human skills acquired in my previous work experience as briefed above and mentioned in detail in the appended Resume.
    Given an opportunity to work in your esteemed organization, I can prove the skills required for the above position and can assure you of my best services.
    Thanking you in anticipation.
    Yours faithfully
    CH. RADHA KRISHNA
    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4211936
    Date & Time : 4th Jun 2011 9:02 PM (UTC)
    IP Address : 46.230.38.43
    Browser Info : Mozilla/5.0 (Windows; U; Windows NT 6.0; en-US; rv:1.9.2.17) Gecko/20110420 Firefox/3.6.17
    Predicted Country : --

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Mechanical Supervisor

    V.PARTHIBAN
    Mail id : parthi_vasu AT yahoo.com
    vasuparthiban4 AT gmail.com

    MECHANICAL SUPERVISOR
    SYNOPSIS
    Having 17 years varied experience in the field of Project Execution, Utilities operation and maintenance in Petro chemical industries and Oil & Gas fields. Can work efficiency and effectively as an individual and also as a team member. Possess excellent inter personal and communication skills.
    Education
    - National Certificate in supervision from National productivity council India in 2006 Secured first class with 69% marks.
    - Diploma in Mechanical Engineering from Kongu Institute of technology in 1993 Secured First Class with 77% marks.
    Present Employment
    Presently associating with M/s S K Engineering & Construction LTD, Abu Dhabi as Mechanical Supervisor.
    The proficiency forte
    Team Management/ Execution/ Quality Control / Safety
    - Supervising construction of Equipments for rendering and achieving quality services; providing first line client service by providing timely disbursement of amount.
    - Managing & monitoring the performance of team members to ensure efficiency in progress and meeting of individual & group targets.
    - Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction and work within the budget.
    Experience Details
    Name of the Company
    SK Engineering & Construction LTD, Abu Dhabi
    Mechanical Supervisor from April 2011 – Till Present
    Projects Handled :
    Project : Ruwais Refinery Expansion (RRE) Project – EPC 1 Crude Distillation Unit & Associated Downstream Units (CDU)
    PMC JACOBS
    Client Abu Dhabi Oil Refining Company (TAKREER)
    - Installation, alignment and Commissioning of static and rotating equipments.
    - Responsible for the Execution of Hydrogen Reformer(HTAS). Vendor : - ITT SPA ITALY.
    - Coordinating with the sub-con for the execution of work.
    - Responsible for the daily site activities to monitor (Check) work permits, manpower and safety hazards.
    - Planning for the erection activities as per the delivery sequence of materials.
    - Responsible for the execution of radiant section, radiant wall panels, steel structures, flue gas duct, air duct, burners, cold collector, catalyst tube, convection section- steel structure, feed preheat coil, air pre heater, waste heat boiler, steam drums, flue gas stack, fans and blowers.
    - Responsible for pre and final alignment of static, rotating equipments & final box up inspection.
    - Preparing daily reports, reporting to mechanical engineer
    - Attending weekly meeting with subcontractor
    - Planning for mechanical clearance to start further activities.
    - Coordinating with the engineering department for field technical queries and giving clarification to subcontractor.
    Name of the Company
    Nasser’s Al-Hajri Corporation K.S.A
    Equipment Supervisor Furnace from July 2008 – July 2010
    Projects Handled :
    Project : Saudi Kayan Olefins Project Al-Jubial Saudi Arabia
    Client : Saudi Kayan, Saudi Arabia.
    EPC : Kellogg Brown Root Saudi Ltd.
    - Nine Score Cracking Furnaces of KBR
    - Installation of radiant modules, convection modules prior to design position and alignment of all modules.
    - Installation of Burner assembly in radiant section prior to orientation.
    - Installations of radiant coils in radiant arch panel, primary quench exchangers through convection sections, Alignment of PQE.
    - Installation of secondary Quench Exchangers prior to orientation on SQE structural frames.
    - Installation of Induced Draft fan skid on structure frames with vibration isolator.
    - Connecting to the Breeching Module ducting with expansion joints. Prior to orientation, outlet expansion bellow and exhaust stack installed in structure frames. Alignment of induced draft fan.
    - Installation of steam drum, vent silencer prior to orientation, on structure frames.
    - Installation of lever arm assembly and counter weight assembly on radiant manifold and cross over piping.
    - Offering for client pre and final alignment of all equipments and final box up inspection of radiant modules, burners, induced draft fan, PQE, SQE, Steam drum etc.
    - Planning Materials for the sequence of erection .
    - Co-Ordination with Other Depts. like Piping, Electrical, Instrumentation, Civil etc.
    - Co-Ordination with Client and QA/QC inspectors.
    - Planning Mechanical Clearance to start further activities.
    - Responsible for Planning and Preparing daily work permits.
    - Activities with client for commissioning start-up of furnace.
    - Achieved 45 million man hours without LTI in Olefins Project.
    - Successfully Completed 910MT of carbon steel structural and Equipments erection per furnace.
    Name of the Company
    Gangotri Textiles Ltd, Sip cot Perundurai, India
    Maintenance Supervisor from March 2007 – June 2008
    - Managing overall Maintenance activities pertaining to process.
    - Responsible for maintenance of process Machines and its Utilities.
    - Preparation of daily, weekly, Quarterly, and monthly Maintenance Schedules.
    - Preparing to work within the timely Schedules and planning for maintenance spares.
    - Preparation of Maintenance reports.
    Name of the Company
    SKM Egg Products Exports India Ltd, Erode
    Utility In-Charge from September 2004 – March 2007
    GMP certified, ISO9001, SQF2000, HACCP Company
    - Responsible for operation and maintenance of Air conditioning plant, Air compressor plant, Ice water plant, DG plant, Water treatment plant, Boiler etc.
    - Responsible for Erection of Boiler and Ice Water Plant, Planning for Material and Coordinating with the contractor.
    - Follow up and monitoring the daily progress of work.
    - Failure analysis and down time are taken for corrective measures, to improve production and maintenance of Equipment control.
    - Scheduling with the production Department for the available of equipment for the maintenance work and necessary servicing.
    - Planning with material department for special materials and minimum spares stock for maintenance work.
    - Routine monitoring is done to find the condition of the machine while running.
    - Preparing cost estimation for Schedule Maintenance.
    Name of the Company
    APOLLO Idhayam Hospital, Erode, India
    Maintenance Engineer from August 2002 – July 2004
    75 Bedded CARDIAC SUPER Specialty Hospital.
    - Responsible for Commissioning and maintenance of mechanical and electrical Equipments like Air conditioning plant, water treatment plant, Generators etc.
    - Instructing individuals about the daily schedules and methods of work.
    - Planning for schedule maintenance of Air conditioning plant, Air handling units, Generators other mechanical and electrical equipment.
    - Preparing maintenance Budget and monthly consumption report.
    Name of the Company
    LOTUS APOLLO Hospital, Erode, India
    Maintenance Engineer from March 1998 – August 2002
    150 Bedded Multi Specialty Hospital.
    - Responsible for Erection, commissioning of Boiler, Vapour absorption machine, Water treatment plant, Gas plant, etc.
    - Co-ordination with supplier and contractors for Erection, Commissioning of pipelines, ducts, Air handling units, etc.
    - Responsible for operation and maintenance of NON-IBR Boiler, vapour Absorption machine, water treatment plant and General maintenance of all Equipments
    - Planning for schedule maintenance of Boilers, air handling units etc.
    - General maintenance like plumbing, Civil, carpentry etc, Timely maintenance of all Equipment and its proper utilization helped in Conserving the energy consumption.
    Name of the Company
    Universal Heat Exchangers Ltd, Coimbatore, India
    Production Supervisor from December 1995 – January 1998
    - Manufacturers of pressure vessels, Heat exchangers, Oil Coolers etc.
    - Material planning, process planning, and job allocating, machining of Aluminum shells, tube plates, Headers and process inspection.
    - Assembling of tube bundles for coolers and heat exchangers
    - Work involves brazing, arc welding gas welding.
    - Pneumatic test for shell & tube side of heat Exchangers, oil coolers.
    Name of the Company
    Sakthi Sugars Ltd, Foundary Division, Perundurai, India
    Company Apprentice Trainee from April 1994 – November 1995
    - Manufactures of Maruthi car break drum, steering knuckle, manifold for 800cc, 1000cc, gypsy cars.
    - CNC Machine operator : Machining of 800cc, 1000cc, car steering knuckles in CNC Machines, other operations like drilling, milling, tapping in various machines.
    - Stage by Stage inspection by using bore gauges, micrometer, vernier -caliper, go and No-go gauges.