Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
Resume : Instrumentation Service Engineer
Ask Question / Post resume
Post a reply to the thread:
Resume : Instrumentation Service Engineer
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=RICH5310;171512]RICHARD J. DIOTALLEVI [b][u]OBJECTIVE [/u][/b]: Career in instrument and control industry QUALIFICATIONS " Thirty-five years of control/instrumentation design experience. Worked on all aspects of installing various control systems at nuclear and fossil plants, including estimating, designing, purchasing, installing, start-up and troubleshooting. Also worked on instrumentation in refineries.  Developed and aided in the preparation of computer control and data acquisition systems, including proposal evaluations  Prepared specifications and purchased instruments for many different types of instruments/systems  Prepared many construction specifications for instrument and control installation  Located problems in control systems in the field  Responsible for preparing studies, design criteria, and standards  Prepared specifications and purchased instruments for oil refineries [b][u]PROFESSIONAL EXPERIENCE [/u][/b]: HERITAGE CRYSTAL CLEAN 2011-2011 Elgin, Illinois [b][u]Contract Instrument Engineer [/u][/b]:  Prepared specifications and purchased instruments and auto valves on a new used oil refinery unit  Prepared spare parts list , instrument index ,P&IDs and installation details [b][u]UOP LLV 2006-2009 [/u][/b]: Des Plaines, Illinois [b][u]Contract Instrument Engineer [/u][/b]:  Prepared specifications and purchased instruments and auto valves on PSA oil refinery units  Reviewed new PSA proposals  Prepared spare parts list , instrument index ,P&IDs and installation details  Checked instruments at warehouse before shipping overseas RICHARD J. DIOTALLEVI Page two [b][u]DOYEN & ASSOCIATES, INC. 1998-2000 [/u][/b]: Chicago, Illinois [b][u]Senior Instrument and Control Engineer [/u][/b]:  Converted relay logic systems to DCS control system at Powerton Unit 5, a 900-megawatt coal-fired station  Aided in remedying the year 2000 problem for Commonwealth Edison  Aided in remedying the year 2000 problem for Akzo-Nobel  Prepared various estimates in installing new control systems [b][u]DEL TECHNICAL SERVICES, INC. 1997-1998 [/u][/b]: Chicago, Illinois [b][u]Senior Instrument and Control Engineer [/u][/b]:  Converted relay logic systems to DCS control system at Powerton Unit 5  Aided in remedying the year 2000 problem for Commonwealth Edison  Designed plc control system for heating system at Waukegan Power Plant [b][u]JOHNSON YOKOGAWA CORPORATION 1995-1997 [/u][/b]: Aurora, Illinois [b][u]Application Engineer [/u][/b]:  Built graphics and control loops on digital computer  As general contractor, responsible for ordering, receiving and expediting required material  Designed and built control panels [b][u]SARGENT & LUNDY ENGINEERS 1977-1995 [/u][/b]: Chicago, Illinois [b][u]Instrument and Control Project Engineer [/u][/b]: Designed and purchased instruments and controls for all facets of utility power plants. Given responsibility for all tasks from initial design concept to placing a system in service  Developed controls/instrument specifications and design drawings for a 500-megawatt coal, oil, and gas-fired power plant RICHARD J. DIOTALLEVI Page four  Prepared specifications for purchasing control and data acquisition computers to operate two 900-megawatt coal-fired power plants  Designed the Post Accident Sampling System, High Gamma Radiation Monitoring System, and H2/02 Monitoring System for Clinton nuclear power station  Upgraded power plant control systems for a southwestern electric utility during a five-year field assignment  Participated in the design of a combined cycle unit The above projects involved preparation of budgets, installation specifications, control specifications, evaluation proposals, purchasing, programming, small plcs, scheduling, preparing schematics, logic, wiring diagrams and field troubleshooting. [b][u]FLUOR PIONEER, INC. 1973-1977 [/u][/b]:Chicago, Illinois [b][u]Instrument and Control Engineer [/u][/b]:  Assisted with hot functional testing  Designed a new condensate polisher system for a nuclear plant  Produced specifications for instruments for a new oil-fired plant for a California utility  Created a design criteria manual for a nuclear power station [b][u]COMMONWEALTH EDISON 1970-1973 [/u][/b]: Pekin, Illinois [b][u]Instrument and Control Engineer [/u][/b]: Member of a field start-up team for Commonwealth Edisons Powerton-Unit 5  Calibrated instruments  Tested and operated equipment  Prepared reports Prior to working at the station, prepared and presented operating costs analyses involving different energy systems to clients constructing commercial/industrial buildings. [b][u]EDUCATION [/u][/b]: University of Illinois, Champaign-Urbana (1970) Bachelor of Science, Mechanical Engineering [b][u]REGISTRATION [/u][/b]: Professional Engineer, State of Illinois (inactive) [b][u]COMPUTER SKILLS [/u][/b]: Experience with Allen-Bradley, PLC-2 and SLIC Software/Hardware, AutoCad, Access, Word, and Excel[/QUOTE]