Help
Home
Search the Forum
You are Here :
Forum
Jobs
Gulf, Dubai Saudi Arabia UAE
Technip : Abu Dhabi UAE : Electrical Engineer
Ask Question / Post resume
Post a reply to the thread:
Technip : Abu Dhabi UAE : Electrical Engineer
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;166508]CURRICULUM VITAE [b]NAME [/b]: PRABIR ROY [b]CONTACT E MAIL ID [/b]: prabirroy1960 AT gmail.com prbr_roy AT rediffmail.com [b]EDUCATIONAL QUALIFICATION [/b]: - Passed Secondary Examination of West Bengal Board of Secondary Education.1977 - Passed Diploma Electrical Engineering (DEE) in 1989 from A.P.C.Roy Polytechnic, Jadavpur, Kolkata. - An Electrical SCC Holder [b]PROFESSIONAL EXPERIENCE [/b]: Present Experience with Foster Wheeler (FWIL) - Since Oct’08 to till date. [b]Duration [/b]: From July’09 to till date. [b]Designation [/b]: Electrical Inspector. [b]Project Title [/b]: Infrastructure Development. [b]Job Details [/b]: Working as a PMC Role in this project. Consulting & closely monitoring of Electrical System and [b]Instrumentation System [/b]: Like- Substation work, Fire Alarm & Fire Fighting System, Electrical & Instrument work in WTP/STP, Earthing work, Street Lighting, Area Lighting & Building Lighting, Telecommunication System & HVAC System. [b]Duration [/b]: From March’09 to June ’09. [b]Designation [/b]: QA/QC Engineer (Electrical), [b]Project Title [/b]: Working in Home Office. [b]Job Details [/b]: Home Office Electrical activities for various project and site Preparation of required documents Preparation of Method Statements for ongoing projects Review and give comments to Safety Plan, Electrical schedule, SCC & GCC related to IOCL – Paradip project. [b]Duration [/b]: From October 2008 to March’09. [b]Designation [/b]: QA/QC Engineer (Electrical), [b]Project Title [/b]: PSR-2 Revamp Project, Melaka (Malaysia) [b]Job Details [/b]: Involved in QC activities such as close monitoring of daily site inspection (as per RFI) along with contractor & client, inspection surveillance report , motor preservation & maintenance records maintained, internal inspection carried on, QC documents (inspection test report) updated, installation, testing & commissioning activities of MV/LV/Control/I&C Cables, MV/LV Sw.gear, PMCC/MCC Panels, Power Transformer, MV/LV Motors, Heat Tracing, Modification of PMCC/MCC Panels, Earthing System, Lighting System and preparing of final Dossiers(as per systems). [b]From 2005 to 2008 [/b]: In a French project construction company operating in Qatar, COMSIP CEGELEC [b]Recent Association [/b]: RL (3) Common Off Plot LPG & Condensate Tank Project As a QA/ QC Inspector for Electrical and Instrumentation. From Jan.-Oct.2008. AKG-2 Base Camp facility 8 nos 1.78 MVA Diesel Generators (at 6.6 KV), 2 nos 800 KVA LV generators (at 440 volt) and their Fuel Management units with required instrumentation, MV Switch Gear and LV transformers, Bus duct with LV switchgear and distribution, 25 nos (1000 KVA), compact substations and their LV distributions for potable water lifting stations street and area lighting, earthing pits. Waste Water Treatment Plant all Electrical and Instrumentation, fire sensing devices and their inter looping. From March, 2007 up to December, 2007. [b]CORE COMPETENCY [/b]: Direct Involvement of Testing and Commissioning - LV/Control/I & C Cable Testing 1. Continuity test 2. IR test - MV/HV Testing 1. Continuity test 2. IR test 3. Hi- Pot test 4. Soak test (time of commissioning) - Earth Resistance Testing Measured by Earth Tester (three/ four point method) - LV/HV Switch Gear Panel Testing 1. Visual Inspection 2. Functional Checking with External Recommended Control System voltage (Indication lamp checking, Panel door lamp checking, Anti- condensate heater checking) 3. Voltmeter checking with external power supply (PT voltage) variac control 4. CT Polarity Checking with battery & Analogue meter 5. Various Protection relay (static & numeric) testing with secondary/ primary current injection kit 6. Contact Resistance testing with Low Resistance Tester 7. IR Testing 8. Hi- Pot Testing 9. Phase Sequence checking with Phase Rotation Meter - Equipment Testing (Transformer) 1. Oil Filtration (depend upon transformer condition) 2. Voltage Ratio Testing with external three phase power supply 3. Short circuit Testing 4. Open circuit Testing 5. Vector Group Test (at normal tap) 6. Core (magnetic) Balance Testing (at normal tap) 7. DC Resistance testing 8. IR Testing (with 5kv/2.5kv insulation tester) 9. PI value checking 10. Polarity/ Sequence check 11. Oil Breakdown Voltage testing 12. Transformer Instrument protection control checking - Motor testing 1. IR Testing 2. Wiring Resistance Testing 3. PI Value Checking 4. Control Circuit Checking 5. Rotation Checking 6. Vibration/ Speed/ Temperature Checking 7. Anti- condensate Heater checking (RTD output checking) 8. Visual Inspection 9. Loop Checking Quality Compliance/ Assurance Quality Implementation - Taking stringent quality measures with quality control wings and preparation/ maintenance of necessary documents as per norms and conducting audits to ensure compliance with ISO - Optimizing customer satisfaction level by on time delivery, monitoring customer complaints and providing efficient post installation services. - Assisting quality wing for internal auditor for conducting quality audits and measuring the effectiveness of the quality management system. - Follow ups for testing and getting certification for specialized hands like welders, millwrights, instrument technicians, commissioning crews, etc. - Vigil on inspection & condition monitoring of static and rotary equipment. Materials Inspection- Incoming and In-house - Checking quality standards for incoming materials, ensuring stringent adherence to quality standards, norms & practices such as ISO/IMS identifying gaps and taking corrective action - Conversant with quality management techniques (Total Quality Management). [b]- Experience [/b]: As a QA/QC Inspector for the ORYX-GTL PROJECT (TECHNIP /AIR PRODUCTS) in RASLAFFAN INDUSTRIAL CITY QATAR. Actively involved in the installation, testing and commissioning of Transformers, HV & LV SW gears, HV & LV Motors ,Motor Manager(MM-II , MM-5), Power plux 70 &700 Variable Speed Drives (ALLAN BRADLY), and different equipments. Currently as a QA/QC inspector carrying out the QC activities of Ras laffan B Combined Cycle Power Project of SIEMENS, involving HV Testing, Megger Testing, Earth Testing of Cables, Inspection scheduling and documentation. From 2004 to 2005 [b]Name of Company [/b]: Comsip Al A'Ali Cegelec Bahrain [b]Designation [/b]: QA/QC [b]Experience [/b]: Worked as a QA/QC Inspector for the line-5 Expansion Project of (Aluminum Bahrain) constructed by BECHTEL INTERNATIONAL LTD. Actively involved in the installation, testing and Commissioning of transformers, Lv-Sw.gears, Mv/Lv cables, MCC Panels. Motor manager (mm-II), power plux 70&700 variable Drives (ALLAN BRADLY), and different equipments. Form 2003 to 2004 [b]- Name of Employer [/b]: M/s. A.K. Electrical and Electronics - Worked as a serviceing, testing & Commissioning Engineer on HT Switch-Gear. From 2002 TO 2003 - Worked as a field Engineer in M/s. Jayprakash Industries Ltd. From Dec., 2002- May, 2003 Designation: Field Engineer - Have working Experience of Maintenance of Electrical System for tunneling jobs in HYDRO- Electric Project at Tala, under Tala Hydro- Electric Project Authority (Bhutan). From 2002 to 2002 - Worked as a project Engineer in M/s. Indo Power Projects Ltd. From 2002-2002. - Have working experience of Erection, Testing and commissioning in UPPCL’S up gradation & Modernization of power System at Moradabad-Zone under World Bank Project. From 1999 to 2002 - Worked as a Site –Engineer (Electrical in M/S. Uma Enterprises from 1999 to 2002. - Have Working experience of Erection, Testing AND commissioning in APTRANSCO’SW 33/11 KV Sw. Yard, 11 KV Line & Capacitor Bank. Also as a consultant Engineer in M/S. ANDREW YULE & CO,Ltd..ESG(Electrical System Group)-Unit. From 1996 to 1999 - Worked as a Site Representative (Electrical)Andrew Yule & Co,Ltd.(ESG-Unit)From 1996 to 1999. - Turnkey project- IN SITU Combustion project at Phase-1 N.Shanthal, Mehasana, Gujarat, Client- O.N.G.C. - Turnkey EXECUTION OF D.L.F’S 66KV Sub-Station at“Q” Block. Phase-11, Gurgaon, Haryana. From 1992 to 1995 - Worked as a Site – Engineer (Electrical) in M/s. Nicco Corporation Ltd.(Project Division) From 1992 to 1995. - Have Working experience in Erection, Testing and Commission of Electrical - Installation for the following Project sites - Cabling Project of Metro Railway at Dum –Dum , Belgachia, Shyambazer section and Dum –Dum Metro Railway Car shed. - Lighting Project of Vizag . Steel Plant at Vizag. - Cabling Project of Metal and Steel Factory at Ichapur. - Interplant Piping Project at Durgapur Steel Plant. - Lighting Project at Vidyasagar Setu(Second Hooghly Bridge under Hooghly River Bridge Commission –HRBC). - Turnkey Project –at Rourkela Steel Plant, Rourkela. - Over all site management & Co-ordination. From 1989 to 1992 - Worked as a Site –Supervisor (Electrical) in M/S. S.K. Engineering Enterprise at Dankuni Coal Complex (Under M/s. Simon Carves India Ltd.) and at Garden Reach Ship Builders & Engineers (Under M/s. Flakt India Ltd.) from 1989 to 1992.[/QUOTE]