Help
Home
Search the Forum
You are Here :
Forum
Jobs
Gulf, Dubai Saudi Arabia UAE
INCO Dubai Dubai/ UAE : Piping Foreman
Ask Question / Post resume
Post a reply to the thread:
INCO Dubai Dubai/ UAE : Piping Foreman
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;163206]SiyadKasim [b]Email [/b]:siyadkasim456 AT gmail.com ¬¬¬¬¬¬¬¬ CurriculumVitae Post Applied for Piping Foreman Objectives. Seeking a responsible position in a prestigious organization enabling me to utilize my talents and experience, with a willingness to develop new skills & grow with the company. [b]Capabilities [/b]: Energetic, Self motivated, Skilled in problem solving, conflict resolution and quick leaner, capable of working with equal pace and accuracy under mental stress and pressure. And also have personnel attributes are posse’s cultural awareness, sensitivity, flexible, respectful, honest and trustworthy. Summary of professional skills and expertise [b]Sixteen years experience of various project such as [/b]: Iron & Steel ,Sewage Water Treatment Project, Oil Refinery, Petrochemical, Gas Plant and Air Port Cooling System Project which involves on complete construction of Mechanical and Pipe lines and Equipments Installation and inspection. Wide knowledge on Isometric drawing, Piping general plan and Piping and Instrument diagram. Experience in line checking, punch-listing, as-built design and fabrication supervision. Field experience in erection and installation of piping works and equipment. Have also knowledge in pre-commissioning / commissioning works , I am safety oriented person. - Strong communication, prioritization and organizational skills - Fluency in English ,Arabic Hindi, Tamil. kannada (Mother tong- Malayalam) - Analytical problem solving and organizational skills - Strong interpersonal skills and ability to work with others in a positive and collaborative manner. - Demonstrated ability to work accurately, follow instruction/schedules/timelines and handle multiple priorities. - Someone who is polished, professional, well-organized, and eager to learn and be challenge - Excellent Knowledge in MS Office applications Word, Excel, Power Point, etc. and speed on typing - Able to sustain cyclical periods of intense work activity. - Encouraging, warm, and friendly personality - Can handle efficiently work-related conflicts and manage consequences in different environment. Key Responsibilities - Studies project specifications with project superintendent to plan sequencing and schedule for pipe installation. - Utilizes heavy equipment to excavate, install and backfill drainage pipe. - Continually inspects work site surveying for potential hazards or safety concerns. - Responsible for crew safety, enforces company policy and complies with federal, state and company environmental policies. - Sequences pipe installation to reduce inference with other project activities and traveling public. - Analyzes job cost reports to ensure production is within budget. Kharafi National, LLC UAE from 2007 to till working as Piping Foreman - Main Sewage Pumping Station STP-1 Saadiyaat Island - Wathba Water Treatment Plant Project Work [b]- Jabel Ali Air port Project [/b]:CUC-1 [b]Responsibilities [/b]: - Participate with Engineer to check the field measurement as per the drawing of spools and pipes length for make BOQ for the ordering to the GRP,HDPE and UPVC pipe manufacturing company. - Utilizes to heavy equipment from civil department to excavate and bed level for installation of underground pipe line and backfill the pipe line after completion of installation and hydro test. - prepare the Inspection Request and related documents for the QC department as per the completion of daily work and daily work progress submit to the Engineers for the weekly management meeting. - To plan and arrange the materials (H-beams and Channels)for temporary support for heavy wall header lines to connect pumping station, fire water system and cooling tower. Altima Contracting Company Saudi Arabia From 2000 to 2007 As Piping Fabricator/Foreman (manpower Supply Company) Saudi Aramco Gas Plant Project Haradh..as a Pipe Fabricator , Fabrication and Erection of high scheduled S.S pipe lines and Copper Nickel and nickel chromium pipes as per Aramco Procedure. - Olayan Descon K.S.A – (One year contract) Fabrication of heat exchangers, columns ,vessels and Diesel storage tanks and roofs, pontoons, ladders, hand drills . fabrication of heavy walls pipe lines from S.S( 304,312,316) Carbon steel in fabrication shop for various project. - Regional Petroleum Products. (One year contract) as a Piping Forman for Saudi Aramco Riyadh Refinery No.1 (30 years old) dismantling Work. Cordinates and planned secure and safe work followed by Aramco safety procedure. successfully completed the Dismantling and removal of all pipe lines and equipments, structures, control room electrical components and cleared and handover to the client for new construction. - Dodsal Saudi Arabia Ltd. (One year contract) for Saudi Aramco Rahima Refinery Expansion Project as a Piping foreman Lead the group of technician to erection and hydro test of Fin Fan and connection of suction and discharge pipe lines as per ISOMETRIC Drawing and Aramco procedure. - Saudi Binladin Group of Company K.S.A for major shut down job Yanbu Poly Propylene Plant. and Fabrication and erection of S.S pipelines and Plant Service water, plant air, steam and Nitrogen lines as per ISOMETRIC Drawings and field measurement for the expansion project Saudi Fertilizer company. - Al Zamil Operation and Maintenance for new small ship (Vessel) building and ship maintenance ,( Accommodation and tools store for Saudi Aramco Offshore Unit ) to supervised fabrication of doors , windows, frames, platforms, stairs and accommodation facilities drainage systems. After the QC inspection, primer coat then installed the proper location as per the drawing and procedure. MS Alsuwaidi Contracting Company KSA From 1996 to 1999 Pipe Fabricator - Arabian Petrochemical company (Petrokemya) K.S.A as maintenance technician To maintain the plant for smooth running ,to attend every three month partial shutdown Mannesmann & Siemens Singapore (Singapore Aromatic Project) from 1994 to 1995 Pipe fabricator Fabrication and erection of high scheduled pipe lines used for fire water system and cooling water to boiler lines and other pipe lines travel through the pipe racks as per ISOMETRIC and P& ID. Drawings Petron Engineering India Limited Project from 1991 to 1993 as Pipe Fitter (Manglore Refinery and Petrochemical Project,Karnatak,India ) Assist to fabricator for the pipe fabrication and erection in Vizbreacker and hydrocracker unit through the pipe racks and connection to columns ,pumps, exchangers , boilers, and other systems.[/QUOTE]