INCO Dubai Dubai/ UAE : Piping Foreman

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    INCO Dubai Dubai/ UAE : Piping Foreman

    INCO Dubai Dubai/ UAE : Piping Foreman

    Keywords: Piping Foreman

    Designation: Piping Foreman
    Experience: 10 - 12 Years
    Location: Dubai/ UAE
    Compensation:
    Rupees 1,25,000 - 1,50,000
    Education:
    UG - Any Graduate - Any Specialization
    PG - Any PG Course - Any Specialization
    Industry Type: Construction/ Engineering/Cement/Metals
    Functional Area: Production, Maintenance, Quality
    Posted Date: 17 Aug 2009

    Job Description:
    Min 10 Yrs Experience

    Desired Candidate Profile:
    Min 10 Yrs Experience.

    Company Profile:
    Foremanship.

    Executive Name: Mr. Farooq

    Address:
    Dr. Ambedkar Road Byculla East
    MUMBAI,Maharashtra,India 400027

    Email Address: cvs@globaljobs.in

    Telephone: 91-22-23741469

    Keywords: Piping Foreman

    Piping Foreman Jobs

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : Gulab Patel
    Email : goldijnil AT gmail.com
    Designation / Skillset : Foreman / Engineer/Sr. Engineer (Mech.)
    Coal & Steel Sector

    Resume :

    Applied for the post - Engineer / Sr. Engineer (Mechanical)
    PRESENT STATUS
    Presently working with Jayaswal NECO Industries Limited, Ushaa Coal Mines, Banjhikol, Raigarh (CG) as a Fitter (Mechanical) from 13th March 2009 to 30th April 2010 and promoted to the post of Foreman (Mechanical) from 01.05.2010 to still continue.
    TECHNICAL QUALIFICATIONS
    - Diploma in Mechanical Engineering (D.M.E.) passed from Thandra Prapaya Polytechnic Bobbili, Andhra Pradesh in the year 2008 with 65.26 %.
    - I.T.I. (Turner) examination passed from Model I.T.I., Koni, Bilaspur (C. G.) board of State Technical Training, M.P. in the year 1998 with 74 %.
    ACADEMIC QUALIFICATIONS
    Sl Exam Passed Board / University Percentage / Grade Year of Passing
    1 B. Sc (Math’s) Guru Ghasidas University, Bilaspur (CG) 52 % 1998
    2 12th M.P. Board 60 % 1995
    3 10th M.P. Board 65 % 1993
    Training Attended
    Training attended (Trade Test) at Kusmuda Open cast project as representative of Jayaswal NECO Industries Limited, Ushaa Coal Mines, Raigarh, Trade of “Mechanical Fitter” on dated : 30.11.2009. Successfully appear with good result.

    Declaration
    I do hereby declare that above statements furnished in this application are true, complete & correct to the best of my knowledge & belief
    (GULAB PATEL)
    Date………………………
    Place…………………….
    -------------------------------------------------------
    More Information about this submission and submitter :-
    ___________________________________________________
    Submission ID : 4393740
    Date & Time : 20th Jul 2011 5:51 PM (UTC)
    IP Address : 115.240.167.124
    Browser Info : Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; SV1; InfoPath.2; .NET CLR 1.1.4322)
    Predicted Country []: India

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    piping foreman

    i am experienced piping foreman 21 years of experience in oil and gas related petrochemical, power plant,fertilizers, fabrication and installation.

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Post Applied for piping foreman

    SiyadKasim
    Email :siyadkasim456 AT gmail.com
    ¬¬¬¬¬¬¬¬

    CurriculumVitae
    Post Applied for Piping Foreman
    Objectives.
    Seeking a responsible position in a prestigious organization enabling me to utilize my talents and experience, with a willingness to develop new skills & grow with the company.
    Capabilities :
    Energetic, Self motivated, Skilled in problem solving, conflict resolution and quick leaner, capable of working with equal pace and accuracy under mental stress and pressure. And also have personnel attributes are posse’s cultural awareness, sensitivity, flexible, respectful, honest and trustworthy.
    Summary of professional skills and expertise
    Sixteen years experience of various project such as : Iron & Steel ,Sewage Water Treatment Project, Oil Refinery, Petrochemical, Gas Plant and Air Port Cooling System Project which involves on complete construction of Mechanical and Pipe lines and Equipments Installation and inspection. Wide knowledge on Isometric drawing, Piping general plan and Piping and Instrument diagram. Experience in line checking, punch-listing, as-built design and fabrication supervision. Field experience in erection and installation of piping works and equipment. Have also knowledge in pre-commissioning / commissioning works , I am safety oriented person.
    - Strong communication, prioritization and organizational skills
    - Fluency in English ,Arabic Hindi, Tamil. kannada (Mother tong- Malayalam)
    - Analytical problem solving and organizational skills
    - Strong interpersonal skills and ability to work with others in a positive and collaborative manner.
    - Demonstrated ability to work accurately, follow instruction/schedules/timelines and handle multiple priorities.
    - Someone who is polished, professional, well-organized, and eager to learn and be challenge
    - Excellent Knowledge in MS Office applications Word, Excel, Power Point, etc. and speed on typing
    - Able to sustain cyclical periods of intense work activity.
    - Encouraging, warm, and friendly personality
    - Can handle efficiently work-related conflicts and manage consequences in different environment.
    Key Responsibilities
    - Studies project specifications with project superintendent to plan sequencing and schedule for pipe installation.
    - Utilizes heavy equipment to excavate, install and backfill drainage pipe.
    - Continually inspects work site surveying for potential hazards or safety concerns.
    - Responsible for crew safety, enforces company policy and complies with federal, state and company environmental policies.
    - Sequences pipe installation to reduce inference with other project activities and traveling public.
    - Analyzes job cost reports to ensure production is within budget.
    Kharafi National, LLC UAE from 2007 to till working as Piping Foreman
    - Main Sewage Pumping Station STP-1 Saadiyaat Island
    - Wathba Water Treatment Plant Project Work
    - Jabel Ali Air port Project :CUC-1
    Responsibilities :
    - Participate with Engineer to check the field measurement as per the drawing of spools and pipes length for make BOQ for the ordering to the GRP,HDPE and UPVC pipe manufacturing company.
    - Utilizes to heavy equipment from civil department to excavate and bed level for installation of underground pipe line and backfill the pipe line after completion of installation and hydro test.
    - prepare the Inspection Request and related documents for the QC department as per the completion of daily work and daily work progress submit to the Engineers for the weekly management meeting.
    - To plan and arrange the materials (H-beams and Channels)for temporary support for heavy wall header lines to connect pumping station, fire water system and cooling tower.
    Altima Contracting Company Saudi Arabia From 2000 to 2007 As Piping Fabricator/Foreman
    (manpower Supply Company)
    Saudi Aramco Gas Plant Project Haradh..as a Pipe Fabricator , Fabrication and Erection of high scheduled S.S pipe lines and Copper Nickel and nickel chromium pipes as per Aramco Procedure.
    - Olayan Descon K.S.A – (One year contract) Fabrication of heat exchangers, columns ,vessels and Diesel storage tanks and roofs, pontoons, ladders, hand drills . fabrication of heavy walls pipe lines from S.S( 304,312,316) Carbon steel in fabrication shop for various project.
    - Regional Petroleum Products. (One year contract) as a Piping Forman for Saudi Aramco Riyadh Refinery No.1 (30 years old) dismantling Work.
    Cordinates and planned secure and safe work followed by Aramco safety procedure. successfully completed the Dismantling and removal of all pipe lines and equipments, structures, control room electrical components and cleared and handover to the client for new construction.
    - Dodsal Saudi Arabia Ltd. (One year contract) for Saudi Aramco Rahima Refinery Expansion Project as a Piping foreman
    Lead the group of technician to erection and hydro test of Fin Fan and connection of suction and discharge pipe lines as per ISOMETRIC Drawing and Aramco procedure.
    - Saudi Binladin Group of Company K.S.A for major shut down job Yanbu Poly Propylene Plant. and Fabrication and erection of S.S pipelines and Plant Service water, plant air, steam and Nitrogen lines as per ISOMETRIC Drawings and field measurement for the expansion project Saudi Fertilizer company.
    - Al Zamil Operation and Maintenance for new small ship (Vessel) building and ship maintenance ,( Accommodation and tools store for Saudi Aramco Offshore Unit ) to supervised fabrication of doors , windows, frames, platforms, stairs and accommodation facilities drainage systems. After the QC inspection, primer coat then installed the proper location as per the drawing and procedure.
    MS Alsuwaidi Contracting Company KSA From 1996 to 1999 Pipe Fabricator
    - Arabian Petrochemical company (Petrokemya) K.S.A as maintenance technician
    To maintain the plant for smooth running ,to attend every three month partial shutdown
    Mannesmann & Siemens Singapore (Singapore Aromatic Project) from 1994 to 1995 Pipe fabricator
    Fabrication and erection of high scheduled pipe lines used for fire water system and cooling water to boiler lines and other pipe lines travel through the pipe racks as per ISOMETRIC and P& ID. Drawings
    Petron Engineering India Limited Project from 1991 to 1993 as Pipe Fitter
    (Manglore Refinery and Petrochemical Project,Karnatak,India )
    Assist to fabricator for the pipe fabrication and erection in Vizbreacker and hydrocracker unit through the pipe racks and connection to columns ,pumps, exchangers , boilers, and other systems.