Help
Home
Search the Forum
You are Here :
Forum
Resume
Resume, CV BioData
Resume CV : Piping designer/PDS Designer/Modeler
Ask Question / Post resume
Post a reply to the thread:
Resume CV : Piping designer/PDS Designer/Modeler
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest;132071][B]RESUME:[/B] [B]NAME [/B]: PATIL SUDHIR DADARAM [B]E-MAIL [/B]: sudhirpatil78 AT rediffmail.com [B]Objective [/B]: Looking for an Executive level position to utilize my knowledge and technology experience along with my leadership, analysis, communications, and teamwork skills to enhance and design new product opportunities and solutions. [B]EDUCATIONAL :[/B] [B]QUALIFICATION [/B]: - DIPLOMA IN K.J.SOMAIYA COLLEGE 57.33% (1997-2001) ELECTRICAL MUMBAI ENGINEERING. - S.S.C. 59.14% (1992-93) - I.T.I. (ELEC.) GOVT. I.T.I 79.14% (1993-97) - N.C.T.V.T. B.S.E.S. LTD.MUMBAI AS A 69.14% (1997-1999) CABLE JOINTER [B]COMPUTER SKILL [/B]:- - COMPUTER- MS-CIT COURSE PASSED (82%) & PRACTICAL KNOWLEDGE OF COMPUTER APPLICATION E.G. WINDOW-98, MS-WORD, EXCEL, INTERNET - AUTO-CAD 2004,2008 - MICROSTATION, - TRACECALC PRO, I-SKETCH, I-CONFIGURE, TSI, I-RUN ETC. Tyco Thermal Controls [B]Designation [/B]: Designer [B]From [/B]: November 2004 till date A division of Tyco, Tyco Thermal Controls stands as the world leader in heat-tracing solutions for the industrial, commercial, and residential markets. Tyco Thermal Controls brings together the knowledge, expertise, products and services of the five leading brands in industrial heat-tracing : Raychem, Isopad, Pyrotenax, DigiTrace and Tracer. They are also involved in specialty heaters and floor heating to wiring, temperature measurement, and leak detection. [B]WORKED ON PROJECT :[/B] - Bechtel, - Voghera, - Vopak, - Akzonobel, - Lurgi, - Dow, - JGC (Japan) - chiyoda (Japan) - Siirtec Nigi - Kashagan Petrofac (powai, Mumbai) - South Hulch, (Perm Refinery), - Phantom-WP2.1, Enterprise Pioneer-WP 2.1, Dow Chemical Phantom-WP6.1, - SHELL-WP6.1. - WGI Qatar Gas-WP1.1 [B] JOB INVOLVEMENT [/B]:- - Power box, junction box and panel location show on over all plot plan - Preparation of line list, - Bill of Material (BOM), - Preparation of Circuit Schedule - Preparation of Single line Diagram (SLD) - Preparation of Wiring Diagram - Draw accurate Isometric’s from GAD with the help of AUTO-CAD software. - Calculate total pipe length, supports and valves of each pipe. - Preparation Co-ordinates list for Power Box & RTD (East, North & Elevation) - Calculating heat loss, tracers and its type used, adders’ length, electrical parameter like operating Amps, Voltages and Load for preparing Single line diagram by using Tracecalc Pro (In-house Software). - Generate isometric drawings from the IDF (Intermediate data files) or PCF files (Piping component files) send by customer, with the help of line list (Spread Sheet) in TSI (Tyco System Identifier). TSI helps in grouping the lines with respect to maintain temperature, operating and exposure temperature. - Designing Heat Tracing Systems that helps to maintain or raise the fluid /material temperature in the Pipes, Instruments and Vessels based on the specification and requirement for the specific project given by customer. - Worked In Pragati Electricals (P) Ltd. New Mumbai Manufacturing Instrument Transformer As A “Testing Engineer” For (2003-04) Testing Of Transformer as Per IS, IEC & ANSI Standards. [B]Worked In Caprihance India Ltd. Thane As A “Trainee Engineer”:[/B](Maintenance Dept.) For One Year (2002-2003) Preparation of Preventive Maintenance Schedule, Maintenance Of Dc & Ac Drives & There Controlling Systems, Boiler Furnace Oil Control By Maintain Temperature Due To Leakage Of Steam, Maintenance Of Substation, [B]Worked In B.S.E.S. Ltd. Mumbai As A “Cable Jointer” For 2 ˝ Years:[/B](1997-99) Joint Various Type Of LV Cables For Example Street Line Cable, Service Line Cables. Fitting Distribution Boxes For Service Line ( Pillar), Complete Maintenance Of Street Line, Maintenance Of Substation, Receiving Statio [B] HIGHLIGHTS:[/B] - Worked in “Japan” for Chiyoda project duration 3 Months. - Worked in “Netherlands-Amsterdam” for Kashagan project duration 6 Months.[/QUOTE]