Help
Home
Search the Forum
You are Here :
Forum
Jobs
Gulf, Dubai Saudi Arabia UAE
Dide Belgium : Instrumentation Detail Engineer
Ask Question / Post resume
Post a reply to the thread:
Dide Belgium : Instrumentation Detail Engineer
Your Message
Your Username:
Click here to log in
Notes:-
1) You can copy and paste your full resume in the box below.
2) Or you can ask your question. We try to answer, as far as possible.
Title:
[QUOTE=Guest-IJT;105097][b]Name [/b]: Pavankumar Patil [b]Email [/b]: pavan3881 AT gmail.com [b]Designation / Skillset[/b] : Instrumentation engineer with 4 yrs exp [u][b]Resume[/b][/u] : [b]CAREER OBJECTIVE [/b]: To Excel at Work with New Endeavor & Take up New Challenges & Responsibilities. [b]Present Employment [/b]: Emerson Export Engineering Center. Pune Jan 2011 to Till Date Instrumentation Engg. [b]Company Profile [/b]: EEEC provides Daniel measurement & control Flow measuring skid for oil & gas projects. [b]Job Profile & Responsibilities [/b]: Detailed Engineering of Flow metering skid 1. Planning, coordination and control of instrument engineering activities for Daniel measurement & control as per work pack. 2. Preparation of control scheme and philosophy for Fiscal & Custody transfer metering skid. 3. Preparation of P&ID for Fiscal & Custody transfer metering skid. 4. Preparation of instrument data sheets. 5. Preparation of DANPAC control panel wiring drawings. 6. Preparation of FAT/SAT & test certificate. 7. Preparation of utility consumption for metering skid & control panel. 8. Preparation of hookup drawings and operation & maintenance manual. [b]Previous Employment’s [/b]: Praj Industries Ltd., Pune Oct 2008 to Dec 2010 Instrumentation Engg. [b]Company Profile [/b]: A public limited, Process technology company strongly focus on Project of Ethanol, Distillery, Brewery, allied waste water treatment and Bio diesel and supplier of turnkey projects for automated- world class plants having more than 300 references in 52 countries. [b]Job Profile & Responsibilities [/b]: A. Detailed Engineering 1. Planning, coordination and control of instrument engineering activities as per Internal Work Order. 2. Preparation of Design basis and Micro activity schedule as per project schedule. 3. Preparation of Instruments List as per Process & Instrument Diagram. 4. Preparation of control scheme and philosophy as per process/client requirement. 5. Preparation of technical specifications (Enquiry) of the instruments as per process data sheets and as per P&ID. 6. Selection of Vendors for the instruments. 7. Selection of instruments in Hazardous & non Hazardous Area 8. Preparation of order specifications of the instruments with respect to the vendor calculations. 9. Control Room drawing as per Plot Plan. 10. Preparation of cable schedule and cable tray routing fixation with respect to G.A. drawings. 11. Site File to Erection contactor. 12. Inspection of control system as well as critical instruments including FAT. 13. Preparation of hookup drawings & operation & maintenance manual. 14. Technical Support B. Commissioning 1. Pre-commissioning checks as per P&ID. 2. Project Co-Ordination (E&I) & commissioning. 3. Loop check with respect to PLC/SCADA/DCS 4. Loop Checking Activities 5. Site Acceptance Test .SAT 6. Plant start up. 7. Troubleshooting of PLC/DCS as well as field instruments. 8. Plant stabilization. 9. Operator training. 10. Plant handover (Electrical & Instrumentation) Finolex Industries Ltd. Jul 2007 to Sep 2008 Instrumentation Engg. I have worked in erection and commissioning of SEA WATER (DESALENATION) project, 100m3/hr production capacity. Worked on erection activity for 1 X 45MW power project. This is coal based plant. [b]Job Profile & Responsibilities [/b]: Instrument Erection & commissioning activities with reference to the following. 1. Preparation for check sheets and other documentation procedures. 2. Preparing of Electrical and Instrumentation Plans, Schedules, Drawings, Junction Box Details, Loop Diagrams for project. 3. Pre-Commissioning system check ups, Loop Testing from DCS Centum CS3000 system. 4. Troubleshooting of field instruments with analysis of root causes & finding alternative solutions. [b]Achievements [/b]: 1. Handled over about 30 projects. Detailed engineering of 25 projects and commissioning assistance of Instrumentation for 5 projects of various capacity for distilleries and ethanol in India. 2. Adopted & successfully implemented new technologies of Instrumentation in our projects. 3. Involved in value engineering Group to increase plant efficiency with cost reduction. 4. Selection of vendors as per CE & IEC certifications to execute jobs in Europe. 5. Awarded for Achieving engineering documentation accuracy. [b]Software Skills [/b]:- [b]1. Flow elements sizing [/b]: FlowCalc32 CE Orifice calculation program. [b]2. Control valves sizing [/b]: SAMSON VALVE SIZING 4.5 3. Emerson Instrument Tool Kit for field instrument sizing & selection. 4. MS Office 5. AutoCAD, Microsoft Visio (Preliminary Checking Level) 6. SAP based ERP system. [b]Educational Qualifications [/b]: B.E. (Instrumentation Engg.) P.V.P.I.T, BUDHGAON ,SANGLI. Shivaji University, Kolhapur 2007 61.38 % DIPLOMA (Instrumentation) S.E.S.POLYTECHNIC, SOLAPUR M.S.B.T.E 2003 60.86% S.S.C SIDDESHWAR HIGH SCHOOL, SOLAPUR PUNE Board 2000 50% SIGNATURE (PAVANKUMAR P PATIL) ------------------------------------------------------- [b]More Information about this submission and submitter [/b]:- ___________________________________________________ [b]Submission ID [/b]: 4183126 [b]Date & Time [/b]: 28th May 2011 2:47 AM (UTC) [b]IP Address [/b]: 115.118.232.20 [b]Browser Info [/b]: Mozilla/5.0 (Windows NT 6.1; rv:2.0.1) Gecko/20100101 Firefox/4.0.1 Predicted Country : India[/QUOTE]