Sabari Engineering Mumbai, Pune, Baroda : Construction Civil Engineer

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    Sabari Engineering Mumbai, Pune, Baroda : Construction Civil Engineer

    Sabari Engineering Mumbai, Pune, Vadodara/Baroda : Civil Engineers (Site Supervisor/Project Mangement)


    Keywords: highways, roadways, construction, site engineering, project management

    Designation: Civil Engineers (Site Supervisor/Project Mangement)
    Experience: 2 - 7 Years
    Location: Mumbai, Pune, Vadodara/Baroda
    Compensation:
    As per Experience
    Education:
    UG - B.Tech/B.E. - Civil,Diploma - Any Specialization, Civil
    PG - Post Graduation Not Required
    Industry Type: Construction/ Engineering/Cement/Metals
    Functional Area: Site Engg., Project Management
    Posted Date: 26 Feb

    Job Description:
    Monitoring & managing the construction activities by:
    Site Marking
    Properly scheduling & getting work done
    Maintaining site inventory HANDLING LABOURS
    MANAGING STORES
    RECIEVING MATERIALS
    Coordinating all works with architects

    Desired Candidate Profile:
    Experience: Candidate should minimum be a Diploma/Degree Civil, with experience in construction of highways, roads and bridges

    Company Profile:
    Sabari Engineering Co. (SEC) is one of the India's largest integrated construction companies. Headquartered in Navi Mumbai, we conduct business in all states of India. We are engaged in every aspect of the construction industry, including Engineering, Procurement, Construction Management, manufacturing, marketing and transportation, chemicals manufacturing, waterproofing, re-bar coating, pipeline & anticorrosive coating and sales. We are also investing in advanced technologies in Water Industry.
    We have earned our reputation as a leading multi-service construction company through our commitment to delivering quality products, our years of experience and our committed team who are industry leaders.

    Executive Name: Ms. Pretti

    Address:
    Sabari Engineering
    A/109, 1st floor, Sanpada Railway Station complex
    Nodal Side,
    Sanpada
    Navi Mumbai,Maharashtra,INDIA 400705

    Email Address: jobs.sabariengg@yahoo.in

    Telephone: 91-22-27612277

    Keywords: highways, roadways, construction, site engineering, project management

  2. Post Count Number #2
    On probation
    Join Date
    March 6th, 2009
    Location
    pune
    Posts
    1

    Re: Sabari Engineering Mumbai, Pune, Baroda : Construction Civil Engineers

    12 years experience in building construction

  3. Post Count Number #3
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Dear Sir,
    Willing to join the concern,Forwording CV. Thanks
    PRAVIN G. KANADE
    315, Ganesh Nagar Nagpur - 440009 (M.S.)
    0712-2752274; 09176536048
    Pravinkanade315 AT rediffmail.com


    Profile

    A Graduate in Mechanical Engineering with 9 yrs. of Experience in industrial piping and equipment. Worked in Tata Steel Jamshedpur, WTP Haldia (W.B.) and Reliance Refinery Jamnagar and presently for EIL at CPCL Refinery Chennai EURO IV Project.

    Personal Details

    Name : PRAVIN G. KANADE

    Date of Birth : August 18, 1972

    Marital status : Married

    Objective and Strengths

    Seeking a Challenging position in a progressively growing organization as an incentive to work hard, achieve success and acquire the richness and variety of experience as I move ahead.

    Professional Qualification.

    Bachelor’s Degree in Mechanical Engineering (B.E.) from V. R. C. E. Nagpur in December 1998.

    Computer Skill - MS Office.

    Work experience

    Total Experience : 9 Years.

    1.
    Company : Engineers India Ltd.(EIL)
    At CPCL Refinery Chennai Project.

    Level : Dy.Manager (Mech.)

    Duration : 10th Oct. 2009 - till


    Assignment

    Project : EURO IV (NHDT & DHDT) Project.

    Job Responsibilities
    : Familiarize the project standards, mechanical procedures and specifications.
    : Review of piping isometric and P & ID Drawings.
    : Supervision for the erection of above ground and under ground piping works including CS, LTCS, Alloy Steel and IBR piping as per codes and standards.
    : Preparation of hydro test package. Witness hydro test, box up & final acceptance with client.
    : Erection and Alignment of Pumps & Static Equipments like
    Columns and Vessels. Fabrication and Erection of Piping
    Supports.

    2.
    Company : Reliance Engineering Associates (P) Ltd. (REAL)
    At Jamnagar Refinery Project.

    Level : Manager

    Duration : 13th May 2008- 30th Sept. 2009


    Assignment

    Project : Jamnagar Export Refinary Project. (JERP)

    Job Responsibilities
    : Familiarize the project standards, mechanical procedures and specifications.
    : Review of piping isometric and P & ID Drawings.
    : Supervision for the erection of above ground and under ground piping works including CS, LTCS and IBR piping as per codes and standards.
    : Erection and Alignment of Pumps
    Fabrication and Erection of Structure.
    (Pipe supports and Bridges)
    : Preparation of hydro test packages. Witness hydro test, box up & final acceptance with client.
    3.
    Company : Jamshedpur Utilities & Services Company (JUSCO)
    A TATA ENTERPRISE.

    Post : Asst. Project Engineer

    Duration : 9th April 2007- 5th May 2008

    Assignment
    Project : Augmentation of Water Treatment Plant from 20 MGD
    To 25 MGD at Geonkhali, Haldia (W.B.)
    Period : 10th April 2007-30th April. 2008.

    Job Profile : Responsible for Planning and Execution of job.

    Scope of work: Erection and commissioning of new pumps and allied
    Piping. Laying of 700 mm. dia. DI (K9) pipe over 9 km.
    From WTP to Reservoir. (Rising Main).
    Construction of 6 nos. Valve chambers.
    Fabrication and Erection of 4 nos. Bridges (50 tons).
    Commissioning of the system.
    4.
    Company : G.A.C. Ltd. Unit: Modern India Construction Company.
    Kolkata.

    Post : Sr. Mech Engineer.

    Duration : 1st Dec. 2004 – 6th April 2007.

    Assignments

    Project : I.D. Fan Of L D Gas For Converter at LD#1 Shop
    TATA STEEL Jamshedpur.
    Period : 8 Nov 2006 – 25th Oct 2007. (Worked upto6thApril2007)

    Job Profile : Responsible for Fab. & Erection of L D Gas Duct OF Dia
    Varies from 2800mm to 1800mm. dia. (500 tones) Fab. & Erection OF Duct Support & ID Fan Shed.700Tons
    Installation of ID Fans.

    Project : Relining of “E” Blast Furnace 2006 at TATA STEEL
    Jamshedpur.
    Working volume of the Furnace- 650 cu-m
    Capacity - 1500 tones per day.
    Period : 29th June 2006- 13th oct. 2006
    (Shut down Job of 110 days)

    Job Profile : Responsible for Dismantling of Uptakes, Down comer,
    Shell & Equipments with related structure.
    Assembly of Shell rings, Cone, uptake & down comer.
    : Erection of shell, BLT Equipment, uptake & Downcomer.
    : Commissioning of Blast Furnace and maintenance for
    6 months to ensure smooth running of the plant.


    PROJECT : Revamping of Billet Caster at L.D. shop TATA STEEL JSR.

    JOB : Augmentation of water System for Billet Caster.

    PERIOD : Aug.2005 to Des.2005.

    Responsible for Augmentation of complete WATER SYSTEM in
    BILLET CASTER” at LD#1 Shop, during shutdown of 60 days in 2005.
    Job involve construction of 1 no. of (I.C.W.) Cooling Tower/commissioning,
    Refurbishment of of 2nos. of old (I.C.W.) Cooling Towers/commissioning.
    Erection & commissioning of new Pumps in three pump houses. Laying & commissioning of Overhead Piping. Equipment Piping and all allied utility Piping.
    Once the Plant was commissioned, maintainance of the total Project is
    Also undertaken for a period of six months to ensure smooth running
    Of plant.

    PROJECT : Up-gradation of “G” Blast Furnace at TATA STEEL.
    Responsible for Augmentation of Complete Water System in "G"Blast Furnace. During shutdown of 120 days in 2005.
    Job involved construction of 2 nos. New (DM & SGP) cooling Towers/ Commissioning, Refurbishment of 2nos. old (ICW & GCP) Cooling Towers/ Commissioning.
    Erection &commissioning of New Pumps in all Pump Houses. Laying & Commissioning of Overhead Piping, Equipments Piping and all allied utility Piping. Construction of Emergency Water Tanks for different Grade of water was also carried out under the leadership of the undersigned. Once the Plant was commissioned, maintenance of the total project was also undertaken for a period of six months to ensure smooth running of plant.
    New Rebar Mill project (Reheating Furnace) at TATA STEEL in the area of Piping- fabrication, erection and commissioning (Gas line, compressed air)
    5.
    Company : Southern Construction Co. at TATA STEEL .
    Jamshedpur
    Post : Site Engineer.

    Duration : 20th Oct 2000 - 25th Nov 2004.

    Assignments

    Worked at “F” Blast furnace.1 MPTA expansion project at TATA STEEL.
    Up gradation of oxygen P.R.S. in the area of piping and valves.
    Fabrication, erection of pipes and valves. Commissioning of system.
    Worked at “D” Blast furnace.1 MPTA expansion project at TATA STEEL.
    Up gradation of Steam Line P.R.S. in the area of piping and valves.
    Fabrication, erection of pipes and valves. Commissioning of system.
    Over yard utility gas piping at L.D. gas holder area. Fabrication, erection and commissioning of Oxygen, H.P Nitrogen, Steam, Comp.air and water pipeline.
    Augmentation of water system for continuous billet caster LD-1 TATA STEEL.
    Includes pumps, filters, Heat exchanger and related piping.


    I hereby declare that all the above mentioned information is true to the best of my knowledge.

    Date : 11/11/2009

    Place : Chennai Pravin kanade

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    apply post for site engineer

    Sir,
    I apply for site engineer