-
February 27th, 2009, 01:22 PM
Post Count Number #1
Sabari Engineering Mumbai, Pune, Baroda : Construction Civil Engineer
Sabari Engineering Mumbai, Pune, Vadodara/Baroda : Civil Engineers (Site Supervisor/Project Mangement)
Keywords: highways, roadways, construction, site engineering, project management
Designation: Civil Engineers (Site Supervisor/Project Mangement)
Experience: 2 - 7 Years
Location: Mumbai, Pune, Vadodara/Baroda
Compensation:
As per Experience
Education:
UG - B.Tech/B.E. - Civil,Diploma - Any Specialization, Civil
PG - Post Graduation Not Required
Industry Type: Construction/ Engineering/Cement/Metals
Functional Area: Site Engg., Project Management
Posted Date: 26 Feb
Job Description:
Monitoring & managing the construction activities by:
Site Marking
Properly scheduling & getting work done
Maintaining site inventory HANDLING LABOURS
MANAGING STORES
RECIEVING MATERIALS
Coordinating all works with architects
Desired Candidate Profile:
Experience: Candidate should minimum be a Diploma/Degree Civil, with experience in construction of highways, roads and bridges
Company Profile:
Sabari Engineering Co. (SEC) is one of the India's largest integrated construction companies. Headquartered in Navi Mumbai, we conduct business in all states of India. We are engaged in every aspect of the construction industry, including Engineering, Procurement, Construction Management, manufacturing, marketing and transportation, chemicals manufacturing, waterproofing, re-bar coating, pipeline & anticorrosive coating and sales. We are also investing in advanced technologies in Water Industry.
We have earned our reputation as a leading multi-service construction company through our commitment to delivering quality products, our years of experience and our committed team who are industry leaders.
Executive Name: Ms. Pretti
Address:
Sabari Engineering
A/109, 1st floor, Sanpada Railway Station complex
Nodal Side,
Sanpada
Navi Mumbai,Maharashtra,INDIA 400705
Email Address: jobs.sabariengg@yahoo.in
Telephone: 91-22-27612277
Keywords: highways, roadways, construction, site engineering, project management
-
March 6th, 2009, 12:22 PM
Post Count Number #2
Re: Sabari Engineering Mumbai, Pune, Baroda : Construction Civil Engineers
12 years experience in building construction
-
May 10th, 2011, 05:24 PM
Post Count Number #3
IJT addict
Dear Sir,
Willing to join the concern,Forwording CV. Thanks
PRAVIN G. KANADE
315, Ganesh Nagar Nagpur - 440009 (M.S.)
0712-2752274; 09176536048
Pravinkanade315 AT rediffmail.com
Profile
A Graduate in Mechanical Engineering with 9 yrs. of Experience in industrial piping and equipment. Worked in Tata Steel Jamshedpur, WTP Haldia (W.B.) and Reliance Refinery Jamnagar and presently for EIL at CPCL Refinery Chennai EURO IV Project.
Personal Details
Name : PRAVIN G. KANADE
Date of Birth : August 18, 1972
Marital status : Married
Objective and Strengths
Seeking a Challenging position in a progressively growing organization as an incentive to work hard, achieve success and acquire the richness and variety of experience as I move ahead.
Professional Qualification.
Bachelor’s Degree in Mechanical Engineering (B.E.) from V. R. C. E. Nagpur in December 1998.
Computer Skill - MS Office.
Work experience
Total Experience : 9 Years.
1.
Company : Engineers India Ltd.(EIL)
At CPCL Refinery Chennai Project.
Level : Dy.Manager (Mech.)
Duration : 10th Oct. 2009 - till
Assignment
Project : EURO IV (NHDT & DHDT) Project.
Job Responsibilities
: Familiarize the project standards, mechanical procedures and specifications.
: Review of piping isometric and P & ID Drawings.
: Supervision for the erection of above ground and under ground piping works including CS, LTCS, Alloy Steel and IBR piping as per codes and standards.
: Preparation of hydro test package. Witness hydro test, box up & final acceptance with client.
: Erection and Alignment of Pumps & Static Equipments like
Columns and Vessels. Fabrication and Erection of Piping
Supports.
2.
Company : Reliance Engineering Associates (P) Ltd. (REAL)
At Jamnagar Refinery Project.
Level : Manager
Duration : 13th May 2008- 30th Sept. 2009
Assignment
Project : Jamnagar Export Refinary Project. (JERP)
Job Responsibilities
: Familiarize the project standards, mechanical procedures and specifications.
: Review of piping isometric and P & ID Drawings.
: Supervision for the erection of above ground and under ground piping works including CS, LTCS and IBR piping as per codes and standards.
: Erection and Alignment of Pumps
Fabrication and Erection of Structure.
(Pipe supports and Bridges)
: Preparation of hydro test packages. Witness hydro test, box up & final acceptance with client.
3.
Company : Jamshedpur Utilities & Services Company (JUSCO)
A TATA ENTERPRISE.
Post : Asst. Project Engineer
Duration : 9th April 2007- 5th May 2008
Assignment
Project : Augmentation of Water Treatment Plant from 20 MGD
To 25 MGD at Geonkhali, Haldia (W.B.)
Period : 10th April 2007-30th April. 2008.
Job Profile : Responsible for Planning and Execution of job.
Scope of work: Erection and commissioning of new pumps and allied
Piping. Laying of 700 mm. dia. DI (K9) pipe over 9 km.
From WTP to Reservoir. (Rising Main).
Construction of 6 nos. Valve chambers.
Fabrication and Erection of 4 nos. Bridges (50 tons).
Commissioning of the system.
4.
Company : G.A.C. Ltd. Unit: Modern India Construction Company.
Kolkata.
Post : Sr. Mech Engineer.
Duration : 1st Dec. 2004 – 6th April 2007.
Assignments
Project : I.D. Fan Of L D Gas For Converter at LD#1 Shop
TATA STEEL Jamshedpur.
Period : 8 Nov 2006 – 25th Oct 2007. (Worked upto6thApril2007)
Job Profile : Responsible for Fab. & Erection of L D Gas Duct OF Dia
Varies from 2800mm to 1800mm. dia. (500 tones) Fab. & Erection OF Duct Support & ID Fan Shed.700Tons
Installation of ID Fans.
Project : Relining of “E” Blast Furnace 2006 at TATA STEEL
Jamshedpur.
Working volume of the Furnace- 650 cu-m
Capacity - 1500 tones per day.
Period : 29th June 2006- 13th oct. 2006
(Shut down Job of 110 days)
Job Profile : Responsible for Dismantling of Uptakes, Down comer,
Shell & Equipments with related structure.
Assembly of Shell rings, Cone, uptake & down comer.
: Erection of shell, BLT Equipment, uptake & Downcomer.
: Commissioning of Blast Furnace and maintenance for
6 months to ensure smooth running of the plant.
PROJECT : Revamping of Billet Caster at L.D. shop TATA STEEL JSR.
JOB : Augmentation of water System for Billet Caster.
PERIOD : Aug.2005 to Des.2005.
Responsible for Augmentation of complete WATER SYSTEM in
BILLET CASTER” at LD#1 Shop, during shutdown of 60 days in 2005.
Job involve construction of 1 no. of (I.C.W.) Cooling Tower/commissioning,
Refurbishment of of 2nos. of old (I.C.W.) Cooling Towers/commissioning.
Erection & commissioning of new Pumps in three pump houses. Laying & commissioning of Overhead Piping. Equipment Piping and all allied utility Piping.
Once the Plant was commissioned, maintainance of the total Project is
Also undertaken for a period of six months to ensure smooth running
Of plant.
PROJECT : Up-gradation of “G” Blast Furnace at TATA STEEL.
Responsible for Augmentation of Complete Water System in "G"Blast Furnace. During shutdown of 120 days in 2005.
Job involved construction of 2 nos. New (DM & SGP) cooling Towers/ Commissioning, Refurbishment of 2nos. old (ICW & GCP) Cooling Towers/ Commissioning.
Erection &commissioning of New Pumps in all Pump Houses. Laying & Commissioning of Overhead Piping, Equipments Piping and all allied utility Piping. Construction of Emergency Water Tanks for different Grade of water was also carried out under the leadership of the undersigned. Once the Plant was commissioned, maintenance of the total project was also undertaken for a period of six months to ensure smooth running of plant.
New Rebar Mill project (Reheating Furnace) at TATA STEEL in the area of Piping- fabrication, erection and commissioning (Gas line, compressed air)
5.
Company : Southern Construction Co. at TATA STEEL .
Jamshedpur
Post : Site Engineer.
Duration : 20th Oct 2000 - 25th Nov 2004.
Assignments
Worked at “F” Blast furnace.1 MPTA expansion project at TATA STEEL.
Up gradation of oxygen P.R.S. in the area of piping and valves.
Fabrication, erection of pipes and valves. Commissioning of system.
Worked at “D” Blast furnace.1 MPTA expansion project at TATA STEEL.
Up gradation of Steam Line P.R.S. in the area of piping and valves.
Fabrication, erection of pipes and valves. Commissioning of system.
Over yard utility gas piping at L.D. gas holder area. Fabrication, erection and commissioning of Oxygen, H.P Nitrogen, Steam, Comp.air and water pipeline.
Augmentation of water system for continuous billet caster LD-1 TATA STEEL.
Includes pumps, filters, Heat exchanger and related piping.
I hereby declare that all the above mentioned information is true to the best of my knowledge.
Date : 11/11/2009
Place : Chennai Pravin kanade
-
April 8th, 2012, 07:25 PM
Post Count Number #4
apply post for site engineer
Sir,
I apply for site engineer