    Seven Seas BPO Services Pvt Ltd Saudi Arabia : Engineer - Piping

    Website: www.sevenseasbpo.com

    Keywords: Hard Core experience in Piping in Construction engineering field , Erection & Commissioning , Plant Maintenance

    Designation: Engineer - Piping
    Experience: 2 - 5 Years
    Location: Saudi Arabia
    Compensation:
    50000 - 70000 per month
    Education:
    UG - B.Tech/B.E. - Mechanical
    PG - Any PG Course - Any Specialization,Post Graduation Not Required
    Industry Type: Oil and Gas/ Power/Infrastructure/Energy
    Functional Area: Production, Maintenance, Quality
    Posted Date: 09 Feb

    Job Description:
    1)Degree in Mech Engineering
    2) 3 years of experience

    Desired Candidate Profile:
    Hard Core experience in Piping in Construction engineering field,Erection & Commissioning,Plant Maintenance

    Company Profile:
    A leading global BPO outsourcing consultancy services company headquartered in Cochin and with a network of associate offices in several countries.

    Executive Name: Mr.Suresh

    Address:
    Not Mentioned

    Email Address: jobs@sevenseasbpo.com

    Telephone: Not Mentioned

    Keywords: Hard Core experience in Piping in Construction engineering field , Erection & Commissioning , Plant Maintenance

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Piping Engineer Construction Saudi Arabia : Seven Seas BPO

    Dear Sir
    I want to do Piping Engineering BPO jobs from home.

    My CV is noted below.
    Thanking You
    Yours Sincerely
    Sanjoy Roy Gosthipaty

    Curriculum Vitae
    SANJOY ROY GOSTHIPATY Contact Mail Id:sanjoy_rg AT yahoo.co.in,sanjoyrg AT trantor.dclgroup.com
    Tel No (033)24668600(R), +919433434610(M)

    Permanent Address: 1,Nepal Bhattacharjee Street, P.O.: Kalighat, Kolkata, Pin: 700 026, West Bengal.
    Present Address: Same as above

    Career Objective: To work in a globally recognized organization with a challenging job which will satisfy my urge for continuous learning and improvement to achieve excellence and be innovative.

    Experience(s):
    1) Worked as a Diploma Mechanical Engineer in M/S C.T. Boiler Pvt. Ltd. From September 1993 to June 1994.
    2) At present working as Senior Design Engineer (Mechanical) in M/S Development Consultants Pvt. Ltd.,
    24B Park Street , Kolkata 700 016 since June 1994.

    Academic Background:

    Degree Discipline Univ/Collg Year Aggregate Class Subjects Projects
    Diploma in Mechanical Engineering Mechanical Engg State Council for Engineering & TechnologyGovt. of West Bengal 1992 71 % First class Thermal Engg., Engg Mechanics, Strength of Materials, Theory of Machines, Fluid Mechanics, Production Engg. & Industrial Management Air Conditioning & Ventilation of various premises.
    Associate Membership Examination in Mechanical Engineering (Section A & B) Mechanical Engg The Institution of Engineers (India) 2000 53 % - Thermal Engg., Strength of Materials, Analysis & Synthesis of Machines, Fluid Mechanics, Fluid Power Engg., Power Plant Engg., Ventilation & Air Conditioning Capacity Calculation of a Auxiliary Boiler of a TPS

    Experience Summary:
    Total Experience: 15Yrs
    · Pipe stress analysis (static and dynamic analysis)
    · Pipe thickness calculation, Pipe size calculations, pressure drop calculation etc.
    · Vendor drawing review.
    · Piping study.
    · Review of piping GADs and Piping Isometrics
    · Pipe Support marking and detailing.
    · Material take off preparation for piping, valves & fittings
    · Hanger schedule preparation and vendor drawing review.
    · Piping Isometric preparation.
    · Preparation of piping specification.
    · Preparation of Design Basis Report & Specification for Fire Fighting System

    NATURE OF PROJECT -
    · Refineries
    · Power

    WORK EXPERIENCE –
    · 2x103 MW CEBU Power Plant at Philippines by DOOSAN/KEPCO SPC
    Designation: Project Engineer.
    Duration: From April 2008 till date
    Working Exposure:
    1) Preparation of Design criteria & System Description, Tender Specification & P & IDs of Fire Protection Alarm & Detection System.


    · 1x115 MW CFB3 PROJECT at Thailand by DOOSAN/GLOW ENERGY

    Desiiongnation : Senior Design Engineer.
    Duration: From May 2007 till date.
    Working Exposure:
    1) Preparation of Piping Layouts, Isometrics
    2) Preparation of support hardware such as springs, special supports etc.
    3) Preparation of Design basis report, Tender Specification & P & ID of Fire Protection Alarm & Detection System.
    4) Vendor drawing review of P& ID, Layout, Isometrics, Hydraulic Network Analysis of Fire Hydrant & Spray System.
    5) Vendor drawing review of Fire Detection & Alarm System.
    6) Review of vendor drawings & datasheets of Fire Protection System Equipments.

    · 2x300 MW DCR TPS at Haryana by REAL/HPGCL
    Designation: Design Engineer.
    Duration: From May 2006 to April 2007
    Working Exposure:
    1) Vendor drawing review of P& ID, Layout, Isometrics, Hydraulic Network Analysis of Fire Hydrant & Spray System.
    2) Vendor drawing review of Fire Detection & Alarm System

    · 2x210 MW Rayalaseema TPS(Unit# 3 & 4) by BHEL/APGENCO
    Designation: Design Engineer.
    Duration: From June 2004 to April 2006.
    Working Exposure:
    1) Preparation of Piping Layout, Isometrics
    2) Preparation of support hardware such as springs, special supports etc.
    3) Preparation of Design basis report, Tender Specification & P & ID of Fire Protection Alarm & Detection System.
    4) Vendor drawing review of P& ID, Layout, Isometrics, Hydraulic Network Analysis of Fire Hydrant & Spray System.
    5) Vendor drawing review of Fire Detection & Alarm System.
    6) Review of vendor drawings & datasheets of Fire Protection Equipments.

    · 4x70 MW Dhauliganga Hydroelectric Project by ALSTOM/NHPC.
    Designation: Design Engineer.
    Duration: September 2003 to May 2004.
    Working Exposure:
    1) Preparation of Piping Layouts for Fluid Circuits Installation System.
    2) Piping isometric preparation from GA drawing.
    3) Pipe support design.

    · IGCAR, 1 X 500 MW AtomicPower Project, Kalapakkam
    Designation: Design Engineer.
    Duration: January 2003 to August 2003.
    Working Exposure:
    1) Preparation of specification of Low Pressure Piping, valves and specialties, Equipments for auxiliary system.
    2) Cost estimation of the project for balance of plant.
    3) Piping GA checking with the Isometrics and P & ID’s.

    · NPCIL, 2 X 220 Mwe PHWR, RAJASTHAN ATOMIC POWER PROJECT (UNIT # 5 & 6)
    Designation: Design Engineer.
    Duration: August 2002 to December 2002
    Working Exposure:
    1) Preparation of Piping Layout, Isometrics, Stress Analysis of utility Piping (with the use of Triflex & PIPE STRESS software which is usually known as PS+CAEPIPE used for dynamic analysis of Nuclear Piping
    2) Piping GA checking with the Isometrics and P & ID’s.

    · NPCIL, 2 X 220 Mwe PHWR, KAIGA ATOMIC POWER PROJECT (UNIT # 3 & 4)
    Designation: Mechanical Engineer.
    Duration: October 2001 to July 2002
    Working Exposure:
    1) Preparation of Piping Layout, Isometrics, Stress Analysis of utility Piping (with the use of Triflex & PIPE STRESS software which is usually known as PS+CAEPIPE used for dynamic analysis of Nuclear Piping
    2) Piping GA checking with the Isometrics and P & ID’s.
    3) Pipe Support Design.

    · 2 X 210 MW Expansion Of Neyveli Lignite Power Project
    Designation: Mechanical Designer.
    Duration: August 1999 to September 2001
    Working Exposure:
    1) Preparation of Piping Layout inside TG Building, Equipment Layout checking, Support selection & support detail drawings, Vendor drawing review & preparation of piping isometrics along with bill of materials. Piping GA checking with the Isometrics and P & ID’s.

    · 2 X 210 MW Bakreshwar TPS(Unit # 1 & 2) of WBPDCL
    Designation: Mechanical Designer.
    Duration: July1998 to July 1999
    Working Exposure:
    1) Preparation of Ash water piping layout, Bill of materials & Support selection & Support detail drawings .

    · 420 KTA Ethylene Project, HPLE Haldia
    Designation: Mechanical Designer.
    Duration: June1997 to June 1998
    Working Exposure:
    1) Preparation of piping layout, Isometric drawing along with bill of materials & preparation of support detail drawings.
    · 2x210 MW Sanjay Gandhi TPS(Unit # 3 & 4) of MPSEB
    Designation: Mechanical Designer.
    Duration: December 1996 to May 1997
    Working Exposure:
    2) Preparation of piping layout, Isometric drawing along with bill of materials & preparation of support detail drawings.

    · 700 KTA Reliance Naptha Cracker Project, Hazira
    Designation: Mechanical Designer.
    Duration: Middle of June 1994 to Nov1996
    Working Exposure:
    1) Preparation of piping layout, Isometric drawing along with bill of materials & preparation of support detail drawings of Air Conditioning & Ventilation System.
    2) Preparation of Duct layout, support detail drawings of HVAC System.

    · M/S CT Boiler Pvt. Ltd,
    Designation: Diploma Mechanical Engineer
    Duration: September 1993 to Middle of June1994
    Working Exposure:
    1) Preparation of piping layouts, Isometric drawings of Process Steam Piping.
    2) Preparation of GA drawings of Process Boilers, Heat Exchangers, Unfired Pressure vessels.
    3) Site supervision & Inspection.

    COMPUTER SKILLS : MS OFFICE.,AUTOCAD
    ENGINEERING PACKAGES : CAESAR-II (VERSION-4.1),TRIFLEX, PIPE STRESS(CAE PIPE), PLANT 4-D, I-SKETCH.