www.eragroup.co.in Era group Bihar : BOILER PIPING ERECTION, POWER PROJECT

+ Ask Question / Post resume
Results 1 to 5 of 5
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    www.eragroup.co.in Era group Bihar : BOILER PIPING ERECTION, POWER PROJECT

    ERA GROUP
    Website http://www.eragroup.co.in
    eragroup.co.in

    Company profile
    ERA GROUP is a multi-faceted engineering, construction and services conglomerate, well positioned in the fastest growing segments of the economy viz. construction, infrastructure development, real estate, hospitality & entertainment and pre-engineered buildings.ERA encompasses four entities offering -
    Era Infra Engineers (India) Ltd (earstwhile known as Era Constructions (I) Limited), Era Landmark (India) Ltd. (earstwhile known as Era Infrastructures (I) Limited) Era E-Zone (India) Ltd. and ERA BUILDING SYSTEMS Limited (earlier knows as Era Metal Building Systems (I) Ltd.) all of which represent a synergistic and futuristic business mix. HQ in New Delhi, under the guidance of its promoter and dedicated human assets of over 1600 employees, Era has developed a distinctive niche and credible presence in the industry. Armed with solid experience and track record, a synergistic business model, strong engineering base, technology driven approach, world class execution & project management capabilities and robust internal systems enables Era to deliver cost-competitive and quality projects at record speed. It also collaborates with the best-in-class to enhance its bandwidth of offerings and increasing its competency in building the India of tomorrow.

    The underlying philosophy of Era is to be the first choice in their niche area through committed focus on quality, innovation, technology, stakeholder growth and social responsibility. Era has consciously endeavored to build a portfolio of businesses that harmonizes with one another and facilitates the delivery of a comprehensive one point solution, there by making them the preferred partner of choice.

    Designation GENERAL MANAGER -BOILER/PIPING ERECTION

    Job Description
    ERECTION THE BOILER

    Desired Profile
    DEGREE/DIPLOMA - MECHANICAL ENGINEERING
    EXP -10-18 YEARS IN BOILER & PIPING ERECTION AT POWER PROJECT

    Experience 10 - 18 Years
    Industry Type Construction/ Engineering/Cement/Metals
    Functional Area Engineering Design, R&D
    Education UG - B.Tech/B.E.,Diploma - Mechanical
    PG - Any PG Course - Any Specialization,Post Graduation Not Required
    Compensation: Rupees 8,00,000 - 15,00,000

    Location BIHAR

    Keywords BOILER & PIPING ERECTION

    Contact
    MANISH KUMAR
    Era Group
    370-371/2, Sahi Hospital Road,
    Jungpura,
    Bhogal, New Delhi - 14
    Delhi,Delhi,INDIA 110 014
    Telephone 09968051965

    Email mkumar@eragroup.in


    Job Posted 09 Feb
    Reference GENERAL MANAGER -BOILER/PIPING ERECTION
    Last edited by muthukalee; November 5th, 2011 at 11:29 AM.

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Piping Engineer Josbs

    RANJEET MOHAN BISHOYI
    ranjeet.bishoyi AT gmail.com
    Career Objective
    To excel as a Piping Engineer and give my best for the betterment of the organization and nation, preferring to work in a congenial environment with a scope for expression, creativity and innovativeness.
    Educational Qualification
    - Certificate Course in PDMS(Plant Design Management System) from MIT,Pune
    - Master in CAD/CAM in Central Tool Room & Training Centre(CTTC),Bhubaneswar
    1. AUTO CAD(2D & 3D Modeling)
    2. PRO-E(Part Modeling, Assembly, Drafting & Detailing, Sheet Metal, Mould)
    3. CATIA(Part Design, Assembly, Surface Design, Drafting& Detailing, Sheet Metal)
    4. UNIGRAPHICS(Part Design, Assembly, Drafting& Detailing, Manufacturing)
    5. ANSYS(Linear Static Analysis)
    6. Basic Machining Processes(Turning, Milling, Fitting, Grinding)
    7. Engineering drawing, Metrology
    - B.tech in Mechanical Engineering from SCITM Semiliguda under BPUT,Rourkela with 67.1%
    - Intermediate from V.S.Vidyalaya, Sunabeda-2 under CBSE with 54.4%.
    - Matriculation from V.S.Vidyalaya, Sunabeda-2 under CBSE with 58.2%.
    Trainings and projects undertaken
    Project on Design & Manufactring of a “Model for V8 ENGINE” in CTTC in BBSR
    #Design & Manufacture of (i) Bush-2nos. (vi)Crank shaft(Cross Plane)
    (ii)Base Plate (vii)Connecting Rod
    (iii)Top Block-2nos. (viii)Piston
    (iv)Upper Base(V-Shape) (ix)Piston Pin
    (v)Bars-4nos.
    Project work on “Turbo cooling of an I.C engine”in B.Tech.
    Skills and Domain knowledge

    - Principles of Plant Layout and Piping Engineering
    - Basics of Preparation of Drawings and Documents
    - Knowledge on Plot Plan/Plant layout/Equipment Layout
    - Study the P & I Diagrams using Legend Sheets, Process Flow Diagrams(PFD), Line Lists,
    Piping Material Specifications(PMS)
    - Codes and Standards used in Piping
    - Knowledge on Piping Elements/Components.
    - Workshop practice on 1. Conventitional Turning
    2. Conventitional Milling
    3. Conventitional Grinding
    4. Reverse Engineering
    5. CNC Milling & CNC Turning for the manf. of Hand Injection
    Mould
    Achievements

    Got a Score of 497 in GATE 2010.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    STEPHEN JOHN MULLIN info AT stevemullin.co.uk
    DRIVING LICENSE : FULL UK
    PROFILE :
    A hard working multi skilled and conscientious individual, who is capable of using his own initiative when necessary, and works well in multinational & multifunctional teams, yet is equally at ease on his own, being proactive, takes initiative also has ability to work under pressure and meet deadlines.

    EDUCATION :
    Diploma of Higher Education in Engineering 2011 in Progress
    Working towards BA/BSc Open University Degree
    Bewsey High School Warrington : 1978-1984
    Art, English, Maths and Technical Drawing CSE -GCSE
    Further Education :
    North Cheshire College (Padgate)
    C & G Engineering 1987-1988
    Deeside College Chester :
    AutoCAD LT 98 Design & Construction 1999
    Business IT & Computing Knowledge :
    Microsoft : Word, Excel, PowerPoint, MS Project 98 & 2007
    Autodesk : AutoCAD 2000, AutoCAD 2007, Autodesk Inventor Essentials,
    Autodesk Navisworks
    Additional Information
    - Welding experience to date has been working with Stainless & Carbon Steel’s using TIG, MIG and MMA 1mm – 30mm thickness.
    - CSWIP 3.0 Visual Welding Inspector (23.06.2011)
    - Conversant with AMSE, BS EN 5817-1, EN 970, EN 12952, EN 13480
    - SCATS (CCNSG) No - 583195
    EMPLOYMENT HISTORY
    AE&E Inova AG – Progressive Germany Ltd

    Water Steam Cycle Pipe Erection & Pressure Testing Supervisor Jan 2011 – Present
    On completion of the 2 boilers I was transferred to assist with the erection and pressure testing of the entire pipelines on the WSC systems, reviewing the P&IDs and all ISOs for correct installation of all systems prior to final inspections with the client and then releasing the systems for pressure testing to BS-EN 13480-5, finally completing the PT Test Pack Documents for hand over to the client.
    Boiler Supervisor Aug 2010 – December 2010
    During the role of Boiler Supervisor Stephen was employed after the project had already started which meant he had to get involved very quickly with the coordination off all daily boiler erections activities and work schedules, working very closely with the site management team Duro Dakovic Croatia. (at times over 100 men on site working on the 2 boilers)
    Successful boiler pressure test line 2 in Newhaven!!!! (Information from AE&E)

    Today we have successfully passed the boiler pressure test for the second boiler!!!
    Despite a delayed start on site in mid March, the Newhaven project team has managed to execute the two boiler pressure tests now two weeks ahead the contractual schedule. This second pressure test is a big client payment milestone and it was important to achieve it in November so that the payment can be made in 2010. The already tight schedule with a 11 month erection time for a two line plant was accompanied by the usual difficulties of late deliveries, interrupted working progress and unprepared subcontractors for English construction sites.
    Our special thanks go to the Newhaven Site Team which did anything possible in the last month to achieve the milestones.
    ASL Industrial Solution Co, Ltd (Thailand)

    Project/Installation Engineer Feb 2009 – January 2010
    Final structuring of the new company in Rayong, offering the services of Air Cooled Heat Exchanger & Fin Fan Optimization, Service/Installation & Repair.
    Completing site surveys within the oil and gas industry in all parts of Asia (Malaysia-Philippines-Indonesia & all other parts of Thailand) submit site proposals and complete RFQ –Tenders for the clients.
    Supervising & overseeing the installation of Air Cooled Fin Fans and all associated piping systems.
    Employing the new engineering staff for the company and setting out the new quality and engineering procedure documents and the new marketing strategy for the procurement of new orders.
    ASL Air Exchanger Service Ltd (Middleborough)
    Quality Manager/Assistant Project Manager July 2008 – Feb 2009
    N.U.R Power Station - Kulim Hi Tech Park, (Malaysia)
    Duties : Project Management & Supervision of the refurbishment on an ACC (Air Cooled Condenser – under vacuum).
    This project is the first of its kind (that we know of) ever to be completed on a GEA A-Framed vacuum condenser; it consisted of installing 8736 stainless steel repair sleeves by means of the Hydro Loc Expansion Process.
    The sleeves have been installed in the condenser due to the corrosion of the existing condenser tubes.
    Tasks involved producing the project engineering schedule and updating weekly, submitting weekly and monthly reports to the clients On-Site Engineering Consultants (SKM – Sinclair Knight Merz).
    Produce the quality plan and arrange welding procedures in conjunction with the local welding inspectors so that the welding could be completed in line with the clients site procedures, all welding completed was with T.I.G manual welding process (2,112 mtrs of C/S & 1,344 mtrs of 0.5mm St/St to 25mm C/S).
    Arrange meetings with local sub-contractors and place orders for the engineering work to be completed, control of all engineering staff on site.
    Over see the hot commissioning by others and sign off all the QA documentation for the project ready for hand over to the client via approval from the clients On-Site Engineering Consultants (SKM – Sinclair Knight Merz).
    RJM International ltd (Winchester) Aug 2007 – June 2008
    Mechanical & Installation Supervisor/Assistant Site Manager
    AES - Kilroot Power Station (Belfast)
    Duties : Management & Supervision of all mechanical installation works within the boiler and coal crushing mills, commissioning and mill balancing and boiler optimization, completion of as built drawings. Attending daily and weekly site meetings, updating the client with weekly reports and progress schedules, supervision of all mechanical fitters and welders, submitting method statements & Risk assessments for approval, and compiling the Project CDM H&S File ready for the final handover via approval from the clients On-Site Engineering Consultants PB Power (Parsons Brinckerhoff.) to be passed on to the client for contract completion.
    N G Johnson LTD & Ensign Site Services (Ellesmere Port) Jan 2006 – Aug 2007
    Mechanical Erection Supervisor/Project Engineer : (London)
    Duties : Supervision of the installation of a new Clinical Waste Incinerator for Grundons Waste Management Ltd in London, work scope encompassed, attending daily and weekly site meetings, updating the client with weekly reports and progress schedules, supervision of all cranage heavy lifts, Steel erectors, mechanical fitters and welders, method statement approval, receiving and updating drawings to suit new plant modifications, hot commissioning and final plant hand over to the client.
    NPTC – ASL (Thailand) Oct 2006 – Dec 2006
    Mechanical Supervisor
    Duties : Supervision of the refurbishment off air cooled heat exchangers at IRPC Petro Chemical Plant & PTT Petro Chemical Plant Rayong on their annual turnaround assisted by the NPTC Mechanical work force based in Rayong.
    Ensign Site Services (Ellesmere Port) May 2005 – Oct 2006
    Position : Mechanical & Installation Supervisor
    Schott Jena Glass, GmbH, Germany - Cleanaway Incineration Plant, Ellesmere Port
    Corus Strip Steel Plant, Deeside - Sanden, Die Cast plant, France
    Various fabrication/installation and commissioning works on a Camlaw Furnaces/Clinical and Chemical Incinerators during the annual plant shutdowns at the above sites
    Henkel Consumer Adhesives (Winsford) March 2004-March 2005
    Position : Projects Engineering Draughtsman & Sub Contractor Coordinator CDM-Project Connect 4, Construction of new 110,000 sq ft machinery and distribution centre
    Duties : To produce machinery drawing layouts for the positioning of new plant and relocation of existing plant, including new Stainless Steel vessels, pumping systems, air, water and gas services for the plant and machinery.
    To produce layout drawings for the planning supervisor to approve prior to submission to the local authorities for acceptance of the new building and also change of use notices, including the following, new effluent pit c/w new foul drainage, compressor/transformer house, sprinkler system, water holding tanks and subsequent services for the distribution centre and toilet block extension.
    To procure fixed price quotations from manufacturers for the supply of new Stainless Steel vessels, new pipe work and pumping systems, place subsequent purchaser orders, expedite/inspect and sign off the manufactured items at the supplier manufacturing base.
    Also appraise and obtain fixed price quotations for the installation and re-siting of all plant and machinery from sub contract site installation companies.
    Produce working programmes of installation of all items of equipment, ensure receipt of all necessary method statements and risk assessments from sub contract companies and carry out random contractor safety audits, control and issue permit to work and hot work permits to contractors.
    SJM Projects Ltd Wrexham 1999-2004

    Design and installation of Stainless Steel and Carbon Steel vessels, pipe & pumping systems, supervising all trades including coded welders, fabricators, fitters and riggers, procure materials and organise daily work schedules for fabrication and plant shutdown on client sites, marketing and bringing in new enquiries/tenders, estimating and converting tender documents into firm orders.
    Chester Fabrications Ltd (Wrexham) 1997-1999
    Employed as workshop manager, duties included supervision of the manufacture of water cooled extraction ducting and water cooled panels for the steel industries, procurement of materials, produce and implement manufacturing schedules for multi skilled workforce, liaise with drawing office regarding design changes to issued drawings, also liaise with on site erection teams to ensure timely deliveries to site
    Dolphin Fabrications Ltd (Flintshire) 1993-1996
    Employed as Mechanical Fitter/Welder, Supervising a day works contract on the Pet foods site at the Prosper De Mulder Granox Plant in Widnes Merseyside, duties consisted of, setting up and alignment of process pumps and designing site run pipework systems and the installation and subsequent commissioning of whole process plant systems.
    G W Engineering (Boiler valve Maintenance Ltd - Liverpool) 1991-1993

    Employed as Mechanical Fitter, refurbishing medium pressure steam boilers on client sites within the UK, overhauling steam valves, safety, safety relief, main stop and blow down valves, refurbish boiler feed pump systems.
    Play Structures Ltd (Warrington) 1990-1991

    Employed as Construction Supervisor on various sites in the UK and Ireland, setting out and installing structural steel modules in leisure centres
    Worsley Site Services Ltd (Leigh) 1988-1990

    Completed final two years as apprentice Mechanical Fitter, carrying out refurbishment and the commissioning of high pressure water tube boilers, overhauling coal crushing equipment, coal feeder conveyor systems, working with rigging crews setting up heavy lifting winching systems for lifting equipment in excess of 30 ton units, carry out boiler breakdown repair work at very short notice working shifts of 24 hours to minimise boiler down time for the client.
    In the final year I was selected to be placed on the permit to work issuing procedure system
    CEGB Fiddlers Ferry Power Station, Apprentice (2 year scheme) 1986-1988

    Craft training in Mechanical Fitting, encompassing College and course work, shown all aspects of safety awareness whilst working on an operational power station, working with tradesmen on the day to day maintenance of the plant and machinery
    End Systems Commissioning Ltd, Apprentice Engineer 1985-1986
    Redpath Dorman & Long, Apprentice Draughtsman

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Dear Sir/Madam,
    Please accept my letter and resume in response to Junior Engineer vacancy for your Organization.
    In Oct 2009, I had completed Diploma in mechanical engineering from DOTE Chennai, State : Tamilnadu, India.
    I would like to begin my career with a company where I will have effective environment for knowledge, where with my skills and knowledge I will able to know about new things, and where my performance will be meet to company's goals/needs.
    As a Site engineer, I am perfect in engineering principles, applied tools and practices, Planning, Reading Drawing, Safe work and Quality Audit.
    My key strength includes leadership, creativity, troubleshooting skills and quick problem solving ability.
    I believe that I could make significant contribution to your firm. If you are interested in interview, please contact me at above telephone number or e-mail me on Mukesh.thangapandian AT gmail.com .
    Thank you for reading my letter and resume.
    Sincerely,
    T.Mukesh
    mukesh.thangapandian AT gmail.com .
    Mukesh. T
    Diploma in Mechanical Engineering in the year of 2009.

    Key Skills : Fabrication, Raw Material Handling, Fabrication Planning (Structures & Ducting)
    Career Objective :
    To attain a peek position in my professional carrier and enhance the organization.
    Brief Profile
    Current Employer (Designation)
    : BHAVISHYA ENGINEERING WORKS [Engineer]
    Functional Area (Role)
    : Construction(Site Engineer)
    Industry : Power plant
    Highest Degree : Diploma in Mechanical Engineering
    C
    Education

    Diploma : 75% in Diploma in Mechanical Engineering in DOTE, Tamilnadu (state).
    X : 60% in Tamilnadu State Board Education.

    Work Experience
    Duration : 1st JAN 2010 - Till Date
    Company : BHAVISHYA ENGINEERING WORKS
    Designation : Engineer
    Job Profile : Fabrication and Erection of Boiler, ESP, Pipe lines & Pressure Parts.
    Responsibility
    : Material management, Planning, Work allocation to Sub contractors, Man power management, Preparing cutting plan, Scrap & Off cut segregation, Selection of Welding Electrode as per WPS for NPP & PP, Preparing Inspection Report for Fabricated components, Acting as per the schedule, Ensure the Quality & Safety in site.
    Project I :
    Duration : JAN 2010–JAN 2011
    Project Name : Fabrication & Erection of 4x105 TPH Fluidized Bed Combustion Boiler
    Company : Prakash Industries Limited
    Team Size : 3
    Location : Champa,Chhattisgarh
    Details : Fabrication of Structures & Ducting, Erection of Fluidized Bed Combustion Boiler, ESP
    Role : Site Engineer
    Project II :
    Duration : JAN 2011–Till date
    Project Name : Erection of 50 TPH Waste Heat Recovery Boiler
    Company : Prakash Industries Limited
    Team Size : 3
    Location : Champa,Chhattisgarh
    Details : Erection of Waste Heat Recovery Boiler, ESP
    Role : Site Engineer

    Software Skills:
    - Solid Works
    - AutoCAD
    - MS office
    Extra Curriculum:
    - Cultural Representative in school and college.
    - Foot ball Player.
    Hobbies
    - Listening Music.
    - Cooking.
    - Gardening.

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    BE Mechanical with 2+ Year Experiance in Piping Design Engineering , Design Codes & Standard , Fire Fighting system (TAC)

    ADITYA KUMAR
    Email : - adityaamba AT gmail.com
    CAREER OBJECTIVE :-
    Seeking a challenging position as Piping Design Engineer with a well known organization of repute where I can utilize my skills and abilities for the growth of self and company.
    SYNOPSIS :-
    - Currently working as Piping Design Engineer with Flowgain Engineering Pvt. Ltd.
    - A Mechanical Engineer with sound experience of software’s like AutoCAD, PDMS,
    Basic of PDS.
    - Done a 15 days Industrial Training at Steel Authority of India Limited, Durgapur
    - Have also done a short 7 days Industrial PLC training course at Godrej And Boyce
    Manufacturing Company Limited
    - Have given Paper Presentation on the topic called “Biogas from Dairy Waste” at
    National Conference on Environment Engineering and Management (NCEEM)
    in 2008.
    EDUCATIONAL QUALIFICATION :-
    - Have done B.E. in Mechanical Branch from Tatyasaheb Kore Institute of Engineering
    and Technology, Waranagar in Batch (2004-08) with 60%
    - Have done SSC from A.N. College, Patna in 2000 with 58%
    - Have done HSC from H.S.Chilki, Amba in 1998 with 67%
    WORK EXPERIENCE :- TOTAL – 2+ years
    - Current Organization : Flowgain Engineering Pvt. Ltd., Sarita Vihar
    Current Designation : - Piping Design Engineer
    Tenure : - February 2011 to till date.
    - Previous Organization : Global Economic Advantage Pvt. Ltd., Gurgaon
    Designation : - Piping Design Engineer
    Tenure : - July 2009 to February 2011.
    JOB DESCRIPTION :-
    - Preparation of GAD for fire fighting system.
    - Calculation of water requirement for fire fighting system such as Cable spreading area, Conveyor belt, Storage tanks, Other Equipments and Various Buildings.
    - Preparation of Equipment and piping layout Drawings
    - Preparation of Piping Isometric Drawings for Fabrication
    - Preparation of Nozzle orientation drawing
    - Knowledge of various Piping codes and Standards
    - Interpret client’s reviews and create Auto Cad drawings accordingly.
    - making piping GAD
    - Involved in calculation of Pipe Thickness
    - Involved in preparation of line list, valve list, bill of materials and MTO
    - Involved in project co-ordination and execution.
    PROJECTS UNDERTAKEN :-
    - Project 1 :- Parli Thermal power station 1x250 MW
    Owner :-Mahagenco
    Owner’s consultant : - Desein pvt. Ltd.
    Epc bop Contractor : - Sunil Hitech engineers Ltd.
    Software used : - AutoCAD
    Job Responsibility : - Prepare GAD for fire fighting system, Prepare BOQ & Isometric
    - Project 2 :- Jorethang Loop Hydro electric project (2x48 MW)
    Client Name : - Dans Energy Pvt. Ltd.
    Contractor : - Alstom projects India limited.
    Software used : - AutoCAD
    Job Responsibility : - Prepare GAD for fire fighting system, Prepare BOQ & Isometric
    - Project 3 :- Ngoi phat hep, 3 x 24 MW, Vietnam.
    Client Name: - Northern Electricity development and investment joint stoke company No 2.
    Epc Bop Contractor: -Andritz Hydro Pvt. Ltd.
    Software used: - Auto CAD
    Job Responsibility: -Prepare GAD for fire fighting system, Prepare BOQ & Isometric
    - Project 4:- Rajpura Super Thermal Power Project (3x700 MW)
    Client Name: - Nabh Power Project
    EPC Contractor: - L & T
    Software used: - Auto CAD
    Job Responsibility: - Prebid engineering
    - Project 5:- Ghorahi Cement Plant
    Client Name: - Ghorahi Cement Plant, Nepal
    Software used: - AutoCAD
    Job Responsibility: - Equipment layout, Piping GAD, Isometric Drawings, Support details
    - Project 6:- Tata LD3
    Client Name: - Tata Steel Limited, Jamshedpur
    Software used: - AutoCAD
    Job Responsibility: - Isometric Drawings, Support details
    - Project 7:- Pantnagar silver Plant
    Client Name: - Hindustan Zinc Limited
    Software Used: - AutoCAD
    Job Responsibility: - Equipment layout, Piping GAD, Isometric Drawings, Support details
    - Project 8:- NTPC Super Thermal Power Project
    Client Name: - NTPC Kahalgaon
    Software used: - Auto CAD
    Job Responsibility: - Isometric Drawings, Support details
    SOFTWARE KNOWLEDGE:-
    - Auto-Cad
    - PDMS
    - Basics of PDS
    - MS Office(MS Word, MS-Excel, MS-Power Point)
    - Operating System:- Windows 98,XP