February 8th, 2009, 06:17 PM
Post Count Number #1
Daewoo Engg Construction Nigeria : QA/QC Civil, Coordination, Piping, Mechanical
Daewoo Engr & Construction Co. Nigeria : QA/QC Civil, Coordination, Piping (Max Trax) Engineer Mechanical
Keywords: QA / QC Civil / Coordination / Piping Max Trax Engineer; Mechanical /
Designation: QA/QC Civil, Coordination, Piping (Max Trax) Engineer Mechanical
Experience: 5 - 10 Years
Location: Nigeria
Compensation:
Best in industry
Education:
UG - B.Tech/B.E. - Civil, Mechanical,Diploma - Civil, Mechanical, Other Specialization
PG - Post Graduation Not Required
Industry Type: Construction/ Engineering/Cement/Metals
Functional Area: Production, Maintenance, Quality
Posted Date: 05 Feb
Job Description:
Will work in their designated field as an Engineer/Inspector (QA/QC) for the execution of the project. Should have good knowledge of international standard codes related to the job title.
Desired Candidate Profile:
B.E/B.Tech (Civil /Mechanical) /diploma in Welding (CWI), Structural, Paint & Insulation / Piping (Max Trax). With min 5 yrs exp in QA/QC at large Petrochem /Oil & Gas/ Refinery / Power Plant project sites. PC literate. Good English & Passport holder. Willing to join immediately. Age below 45
Company Profile:
Daewoo Engr & Construction Co. is a well known South Korean MNC with much exp in EPC projects in Power plants, Oil & Gas. Current requirement is for their GTL project in Nigeria
Executive Name: Ms Madhuri
Address:
Dynamic Staffing Services Pvt Ltd
E-40/7
Okhla Industrial Area
Phase ? II
Delhi,Delhi,INDIA 110020
Email Address: dss-job3@dss-hr.com
Telephone: 91-11-26388287
Reference ID:
QA/QC – Civil / Cordination/Piping Engr; Mech
Keywords: QA / QC Civil / Coordination / Piping Max Trax Engineer; Mechanical /
-
May 21st, 2009, 04:08 PM
Post Count Number #2
Re: Daewoo Engg Construction Nigeria : QA/QC Civil, Coordination, Piping, Mechanical
dear sir ,
i am applying for a position og QA / QC Mechanical Engineer
-
May 26th, 2009, 06:39 PM
Post Count Number #3
Re: Daewoo Engg Construction Nigeria : QA/QC Civil, Coordination, Piping, Mechanical
CURRICULAM VITAE
Name RANJITHKUMAR.K
Date of Birth 31st May 1969
Address for Communication 5 – Nalinakshan
MES Officers’ Quarters
Near Passport Office
Panampillynagar
Kochi-36.
Tele: 0484 2316415
Mob: 09662649776(Baroda) / 09446466415
E-mail: rkchingoli@gmail.com
Permanent Address Vellisserivadakkathil
Chingoli.P.O
Alappuzha(Dist.)
Kerala-690 532.
Qualification B Tech
MECHANICAL STREAM PRODUCTION ENGINEERING
University of Kerala
MBA (Operations Management) - IGNOU
Skills
• Practical Experience in Auto cad
• Proficient in Excel, MS Project, Power Point
Codes & Standard Awareness:
Different ASME, API, ASTM, BS and IS Codes
EXPERIENCE
18Years of Experience, Out of which 14 years in Mechanical Construction/ Consultancy firms like Toyo Engineering Corporation, Praxair India Ltd., L & T Ltd.; and
3 years in Teaching Engineering subjects in School of Engineering at Cochin University and Rai Foundation College.
Career History
Mechanical Engineer with more than 14 years of work experience in the field of project management, preparing detailed drawings, scheduling, monitoring, expediting, project controlling & co-ordination.
Having sound technical and administrative back ground, involved in the execution of various mechanical construction and maintenance project in Petrochemical & Oil industries.
Familiar with various international codes and standards for different systems in the field of Mechanical Engineering, especially pertaining to piping, tanks and welding.
Have experience in estimation & costing, material take off, preparation of bill of quantities, planning, and project control including inspection and commissioning activities.
Present Employment Working as Sr. Engineer of Toyo Engineering India Ltd. for
the for the Residue Up gradation project at IOCL Baroda site
Jan 2008 to Worked as Project Manager of PGC Ltd. for CDU/VDU
July 2008 Modification, Civil and structural works, at Kochi Refineries Ltd.
Ambalamugal Kochi.
Sept2003 to Worked as Academic Head and Senior Lecturer in Rai Foundation
Sept.2007 Colleges Kochi Campus. Coordinator of the MechanicalEngineering
Department and also the Examinations Superintendent of the
Campus.
Sept.1999 to Project Engineer responsible for the fabrication and erection June2003 of piping and structural works, with a subcontractor of BHEL at
NTPC Simhadri Project at Visakhapatnam
Sept. 1997 to M/s TOYO ENGINEERING CORPORATION
June1999 Area Coordinator for Piping works at MRPL Phase II Project.
Coordination of Execution of offsite piping works and Tie-in joints between Phase I and Phase II of Mangalore Refinery and Petrochemicals Ltd.
Feb.1997 to M/s PRAXAIR INDIA PVT. LTD.
Aug. 1997 Piping Engineer at Jindal Vijayanagar Steel Project
Execution and Inspection of piping works for the fabrication and erection of 2500 TPD Oxygen plant at Jindal Vijayanagar Steel Plants. Coordinating with contractors and client, Preparation of detailed drawing etc.
Oct. 1995 to M/s L & T Ltd.
Dec. 1996 Reliance Petrochemical plant and L&T Workshop at Hazira, Surat.
Worked as piping Engineer for the execution of Fabrication and erection of Air Separation Unit at Reliance site under Hitachi Japan as Consultants.
Worked as Inspection engineer for the Fabrication of Offshore platform for ENRON Oil and Gas India Ltd. Inspection and coordination of NDTs, viz. Radiography, Dye penetrant Test, Magnetic particle Test, Ultrasonic Test etc.
Also for the Naphtha Cracker plant at Reliance site as Inspection Engineer to complete the final NDTs to make the system ready for Commissioning.
Jan. 1995 to M/s Hindustan Construction Corporation Pvt.Ltd.
Sept. 1995 as Piping Engineer at ONGC, Uran, Mumbai.
Piping Engineer responsible for the modification of piping works of LPG plants during the Shut down works under EIL’s consultancy.
Fabrication and erection of Piping works for the Replacement of the Cold Box during shut down.
June 1991 to M/s Plustech Engineering Pvt. Ltd. as Site Engineer
Jan. 1995
Worked as Site Engineer in various construction sites. Execution of fabrication and erection of piping and structural works.
RANJITHKUMAR.K
-
May 26th, 2009, 08:31 PM
Post Count Number #4
Re: Daewoo Engg Construction Nigeria : QA/QC Civil, Coordination, Piping, Mechanical
RESUME: email:josesebastian2005@yahoo.co.in
Name JOSE SEBASTIAN
Age & Date of Birth 23 Years(5 NOV 1985)
Educational Qualifications B-TECH in Mechanical Engineering with First
Class (74.5%) from Viswajyothi College of Engineering
& Technology Muvattupuzha(Mahatma Gandhi
University)
ASNT LEVEL II Certificate from Matrix Bangalore in
- RT(Radiographic Test)
- UT(Ultrasonic Test)
- MPT(Magnetic Particle Test)
- PT(Penetrant test)
Working Experience in Industry:-
1. From September 2007-Till Date
Company BHEL Power Sector (Bharat Heavy Electricals Limited)
Project National Aluminium Company(NALCO)
Captive Power Plant Expansion Project , Angul,
Orissa ,India.
Position Quality Engineer for Power Cycle Piping, Boiler
Pressure Parts erection, Boiler integral piping erection & Structural fabrication & erection .
2.January 2007 to March 2007
Company ISRO(Indian Space Research Organization),Thiruvananthapuram
Position Trainee Engineer
Worked in the following areas:-
Power Cycle Piping:-
- Inspection & Quality control of critical lines.
- Construction drawings such as P & ID, Piping Isometrics, Equipment layout, Structural etc.
- Erection of different types of valves, strainers & heat exchangers.
- Line hydro tests & steam flushing.
Power Boilers & Shell Fabrication:-
- Familiar with erection & welding of Drum, Headers, Water wall panels, coils etc.
- Familiar with welder qualification, selection of electrodes (as per WPS), weld visual inspection etc.
- Familiar with the fabrication of heavy cylindrical oil tanks.
.
Familiar with following welding process:-
- S.A.W (Submerged Arc Welding)
- S.M.A.W (Shield Metal Arc Welding)
- G.T.A.W (Gas Tungsten Arc Welding)
- G.M.A.W (Gas Metal Arc Welding)
- CO2 Welding
Duties and Responsibilities:-
- Materiel inspection & dimensional check.
- Documentation as per construction materiel standards of carbon steel, alloy steels& stainless steel( SA106, SA335,API 5L Gr B , 1S 2062, SA 240, SA515,X20CrMoV ,SA182 ,SA234,SA210,SA213 etc)
- Welding visual inspection as per AWS D1.1, ASME IX, ANSI B31.1, API 1104 .
- Controlling all welding activities taking in the shop & erection site.
- Witness of Mechanical test for PQR & Welders performance Qualification test as per BHEL WPS.
- Ensure timely testing of welders.
- Review/Monitoring(Inspection) site activities with approved drawings such as P & ID ,Piping isometrics, Equipment and piping layouts & structural.
- Ensuring that regular checks are made on the handling and storage of welding consumables on the shop & site.
- Monitoring consumables(SMAW electrodes, TIG filler wires, Argon gas purity,CO2 purity, SAW flux, SAW & GMAW wire spools) type and usage.
- Performing surveillance fit-up and edge visual inspection of boiler & piping joints.
- Verifying weld parameters of SMAW, TIG, SAW&GMAW as specified in BHEL WPS .
- Giving joint codes to Boilers and Power cycle piping.
- Monthly welding progress reporting of boilers & power piping to IBR authority from Assistant director level to Director level.
- Monitoring Preheat/Post heat & PWHT of joints.
- Inspection of radiographs as per codes & standards.
- Witnessing NDT tests like UT, MPI,PT & Hardness Tests.
- Proper documentation of all inspection reports & NDT reports.
- Closely monitoring performance of welders, repair of welds, analysis the causes and initiate preventive & corrective actions.
- Performed the welding of SA335P91, X20CrMoV121 materials in Main Steam Line using Induction heating machines at a single cycle of 30 hrs.
- Completed the main steam lines welding of Phase III expansion of NALCO CPP with zero defects.
- Giving proper training to induction heating machine operators & PWHT recorder operators.
- Coordinate all activities for training and testing of 150 welders in the project .
- Co-ordination of company with customer, consultant & subcontractors.
Education:-
YEAR COURSE UNIVERSITY/BOARD MARKS
2003 - 2007
B.Tech in Mechanical
Engineering(M.G University). Viswajyothi College Of Engineering & Technology
74.40%
2001- 2003
Higher Secondary Examination(Class XII),
Board of Higher Secondary Examination
(Govt. of Kerala)
St.Joseph’s higher secondary school Paingotoor Muvattupuzha
78.33%
2001
SSLC,
General Education Department
(Govt. of Kerala)
Iype memorial high school Kaloor
81.00%
Personal Details:-
Name Jose Sebastian
Address Vandanakara House,
Kaloor P.O., Kaloorkad,
Muvattupuzha , Ernakulam,
Kerala, 686668
Tel No.(Res) 04862-267545
Mobile 919861724904
Nationality Indian
Hobbies
Traveling & Photography
Languages Known
English , Hindi, Tamil, Oriya, Malayalam
Strengths
Emotional intelligence, good communicational skills, learning attitude & ability to lead the team.
References:-
1. Arun Kumar Mohanty
Additional General Manager
Bharat Heavy Electricals Limited.
NALCO CPP
Post Box No 1,Banarpal ,Angul District
Orrisa -759128
PH:06764-220292 ,Fax:06764-220280
Mob:09437576792
2. S.N.OJHA
Sr Engineer Construction
MECON LIMITED
NALCO CPP
Post Box No 1,Banarpal ,Angul District
Orissa -759128
Mob:09437792781
I hereby declare that the details furnished above are true to the best of my knowledge and belief.
23ed MAY 2009 Jose Sebastian
-
June 11th, 2009, 02:11 PM
Post Count Number #5
Re: Daewoo Engg Construction Nigeria : QA/QC Civil, Coordination, Piping, Mechanical
Sir,
I'm a BE Mechanical & having an experiance with an EPC firm for 13 years. My overall experiance is 15 years.
I have eperiance in Design as well as Project Management & Site execution also.
I'am attaching my CV below for your ready reference.
SUDHAKAR RAGHUNATH DESHPANDE
B-505 Borgaonkar Towers, Lal Chowky, Ph. 95 251 2202661, (M) 9773065151
Agra Road, Opp.Sharda Mandir High School, Email: sudhirdeshpande AT hotmail.com
Kalyan (w) Pin.421301Maharashtra India
Professional Synopsis
Over 12 years in engineering, project management, procurement & design. Presently working with Haden International Group India Pvt. Ltd. and have previously worked with Bullows Paint Equipments, Mayo India Ltd. & Precision Gears.
Proven ability to swiftly ramp up projects with competent cross-functional skills & special delivery mechanism and handling the complete project activities. Have handled a diverse range of activities, panning from project studies, techno commercial evaluations with vendors, correspondence with clients/ consultants, installation, pre commissioning, & site administration.
- Worked in close coordination with engineering consultants.
- An effective communication & team leader with strong analytical, problem solving & organizational abilities.
Core Competencies
Strategy Planning
- Responsible for overall profitability of project and accountable for strategic utilization and deployment of available resources to achieve objectives.
- Designing and executing systems and processes for enhanced monitoring and control of resources and improved operational efficiency. Planning funds for diverse operations, ensuring adherence to allotted budgets.
- Working in coordination with marketing, engineering, purchase, finance & site.
Project Planning & Management
- Developing financial projections, preparing budgets and performing extensive project costing.
- Handling project activities involving working out various requirements with respect to utilities, machines, manpower & monitoring overall project operations for ensuring timely completion.
- Coordinating erection, commissioning of plants & equipments to ensure the completion of projects within stipulated time/cost parameters and providing technical inputs and developing master specifications with needs assessment.
- Dealing with customers/consultants/ licensors/ statutory bodies for compliance of requirements.
Procurement & Contract Management
- Preparing contract budgets & ensuring that the cost budget is not exceeded.
- Preparing & floating of tenders to contractors, evaluation of offers, techno-commercial discussion & finalization of contract in view of project schedule.
- Managing resources to perform project activities in cost effective manner.
- Providing spares for smooth operations & maintenance of the equipment/ machinery.
- Settlement of techno-commercial disputes/ clarifications with clients during execution of project.
Organizational Experience
- Since March ’05 employed with M/s Haden International Group India Pvt Ltd at Thane as
Manager Projects
- Position reports to Director Operations
The assignment is having responsibility of complete Handling of various projects
Under execution. The post is responsible for Engg; Planning; Supply; QA & QC; Expediting;
Site execution; Payments etc.
SUDHAKAR RAGHUNATH DESHPANDE
B-505 Borgaonkar Towers, Lal Chowky, Ph. 95 251 2202661, (M) 9773065151
Agra Road, Opp.Sharda Mandir High School, Email: sudhirdeshpande AT hotmail.com
Kalyan (w) Pin.421301Maharashtra India
Aug’ 03 - Feb’05 with Bullows Paint Equipments Pvt.Ltd. (Jost’s Engineering Group) Mumbai
- Joined as Manager – Design & Projects
- Position reports to CEO / VP Operations
The Notable Accomplishments;
Worked as Designer & Project Manager for Project Execution for Suzlon Energy Ltd. At Daman & Pondicherry, CGL Bhopal, Galvi Ltd. At Nasik, Nypro Forbs at Hosur.
July’95 – July’03 with Haden International Group India Pvt.Ltd. Mumbai
- Joined as Design Engineer in July’95 & rose to the position of Sr.Engineer wef April’98
- The position reports to Design Manager / GM Operation
The Notable Accomplishments;
- Working in close coordination internally with various departments & externally with clients/ suppliers/consultants and effectively monitored progress considering Client requirements.
- Attended ISI 9000 Dept. Audits.
- Major Projects Designed Escorts Yamaha Surajpur & Faridabad, L&T John Deer Pune, TELCON Dharwad, General Motors Vadodra,Bajaj Auto Aurangabad & Chakan.
- Visited Russia for Izmach Izvesk project.
June’94-Jul’95 with Mayo India Ltd. Mumbai
- Joined as Purchase Officer in July’94
- The position reports to GM Operation
The Notable Accomplishments;
- Working in close coordination internally with various departments & externally with clients/ suppliers/consultants and effectively monitored project progress considering Client requirements.
- Major Project Completed Phytochemical project with RRL Jorhat Asam.
Dec.’92- May’94 with Precision Gears Pvt. Ltd. Mumbai
- Joined as Trainee Engineer in Dec’92, step up as Planning Engineer at confirmation wef Dec.93.
- The position reports to DGM Operation
The Growth Path;
- As Trainee Engineer (Dec’92-Dec.93)
- As Engineer- Planning (Dec’93-May’94)
- As Purchase Officer (June’94-July’95)
- As Engineer Design (July’95-July’98)
- As Sr. Engineer Design (Aug’98-July’03)
- As Manager Design & Projects (Aug’ 03 – Feb’05)
- As Manager Projects (March’05)
SUDHAKAR RAGHUNATH DESHPANDE
B-505 Borgaonkar Towers, Lal Chowky, Ph. 95 251 2202661, (M) 9773065151
Agra Road, Opp.Sharda Mandir High School, Email: sudhirdeshpande AT hotmail.com
Kalyan (w) Pin.421301Maharashtra India
The Notable Accomplishments;
- Worked on numerous projects, involving
- Independently handled project for RRL Jorhat, Assam in 1994~95, was financed by ICICI. The project valued Rs. 100 lacs.
- Involved in General Motors Pvt. Ltd. Halol Project, as a part of Project Team as Manager Projects. Value of the project Rs. 2600 lacs.
- Handled numerous other projects, ranging from Rs. 10 lacks to Rs. 2600 lacs.
- Green Field Projects – L & T John Deer Pune, TELCON Dharwad, Suzlon Energy Ltd. at Daman & Pondechery.
- New Projects in Existing Works – Escorts Yamaha at Surajpur & Faridabad, Bajaj Auto at Aurangabad & Chakan , Nypro Forbes at Hosur, Galvi at Nasik. General Motors at Halol. General Motors at Talegaon.
- Modification Jobs- Bajaj Auto Aurangabad.
Educational Credentials: B.E. (Mechanical) from PUNE University Date of Birth: 27th June 1967
-
June 13th, 2009, 06:14 PM
Post Count Number #6
Re: Daewoo Engg Construction Nigeria : QA/QC Civil, Coordination, Piping, Mechanical
BIO DATA
1. PERSONAL PARTICULARS
NAME : T.J.JOHN, Contact Ph:+965-23711670, Mob:+965-66059963
Position : Sr.Piping Engineer / Construction Coordinator
DATE OF BIRTH : 04/08/1956
NATIONALITY : INDIAN
MARITAL STATUS : Married, (Living with family in Kuwait for 14 years)
Visa Status : Residence visa, Transferable
DRIVING LICENSE : Posses Kuwait Driving License
Membership : Kuwait Society of Engineers (Reg.No.14972)
Salary Expected : Negotiable
2. QUALIFICATION
Bachelor of Engineering (Mech.),
Post Graduate Diploma, D.P.M., (I/S. Project Management).
ISO-9001:2000 internal lead auditor.
ASNT: Level-II (RT).
Computer Exposure:
CAESAR-II (API-610/ANSI B31.3): Equipment / Piping Code stress checks analysis.
Pipe net / Flowmaster: Hydraulic design calculation, Salient surge analysis, M.S.Project, Primavera.
PROFESSIONAL EXPERIENCE:
Accomplished 26 years experience in the execution of LSTK / EPC lump sum projects for Refineries, Oil field development, new construction / expansion projects for Infrastructure, Production Facilities for new construction project for Process / Utility metallic & non-metallic Piping system, Equipments, Pumps, Storage tanks, modification and revamp projects in Refineries, Oil & Gas Sectors, Gathering Centers, Gas Oil Separation Plant, Petrochemical complex, including for re-construction, periodical, emergency shutdown maintenance projects for onshore/offshore crude oil production facilities.
Well familiar with working in coordination with international design & engineering consultants, interface with PMCs to develop FEED, basic and detailed design, field engineering modifications to suit with existing systems at project site ensuring timely detailed design & drawing preparations, review with providing in-puts / feed backs of the site engineering survey reports, working in close coordination with project construction multi discipline team managers / engineers. Conversant with design check as per PFD, P & ID, designed process parameters, equipment specifications, review / comment and approve the engineering design & AFC drawings for piping system, vendor packages, prepare and review accuracy in MTO specification , based on line index, fluid list with reference to P&ID in the aspects of piping material, class, insulated, un-insulated, painting cycle, material quantity, check adequacy of wall thickness calculation of pipe material for the indented service, depending on fluid index, required erosion / corrosion allowance as per project and technical specification, line class, size including field engineering& design modifications, equipment data sheets, develop DM description sheet for piping material and components, check material availability in stock, review and check piping design layout / ISO AFC drawings before released for construction of piping systems / subsystems in the project based on site survey and optimization studies conducted, method statements, shop & site ITP and relevant project specification requirements prior to start construction activities. Familiar with ISO-9001:2000 quality management system, internal auditing, prepare punch list, expedite and follow up the disposition actions and close out.
Conversant with KNPC, KOC, PIC / EQUATE-project management procedures, contract administration, engineering and construction standards, streamlined work procedures, method statement for technically complex construction jobs, provide hot tap connection without interfering with process operation, develop shutdown schedule, pre-commissioning, commissioning procedure, butt weld, full penetration weld joints configuration, WPS, welding procedure and welder qualification, PWHT/ SR requirements and procedure on fabrication job weld joints for higher thickness C.S. and special alloy steel, P5 material for piping in accordance with relevant codes & standards for piping-ANSI/ASME B31, ASME Sec.II & IX ASME Sec.VIII, Div.I for vessels, separators, columns AWS DI- structural steel weld joint design configuration and international manufacturing standards, specification requirements for API 5L, PSL-1 & PSL-2 line pipe material, API 590 / ANSI / MSS flanges, API 600 / API 6D valve material, rotary equipments, API-610 centrifugal pumps, API-618 air compressors, receiver tanks , dryers and, construction standards for API-650 /653 storage tanks, API 510 crude oil heaters, flare stack, flame arrestor, knock-out drums, metering skid, and ANSI B31.3, NFPA-20, FM/UL-142 requirements for fire pumps installation and pumping system. Familiar with welding visual inspection and NDT for critical jobs to ensure and establish maximum possible quality level of jobs being carried out at shop and field in the aspects of pipe fabrication, structural steel fabrication for pipe racks and installation of process equipments , piping site erection mitre joints, stub-ins, profile end cutting for large bore pipes for platform jacket pipes and structure, fabrication and installation of additional nozzles by means of hot tapping on API storage tanks with full penetration radiography quality weld joints and projects for modification / replacement of existing facility structures and piping systems, punch list clearance, hot tap, shutdown piping tie-in joints with existing systems interface, equipment pre-start checks and pre-commissioning activities, mechanical completion, simulation test of equipments in the newly constructed systems to determine its operational fitness with existing facility, start-up / commissioning including update and submission of as-built drawings and project dossiers and turnover the project.
Conversant with develop project execution plan and construction schedule, structuring site construction organization with defined roles for project key personnel to suit the project needs, expedition of project execution activities and monitoring work progress, follow up update project progress schedule, envisage and analyze bottleneck problem areas in the project execution, identify effective and efficient solution depending on the nature, interface, complexity and size of project under execution inline with project scope, technical specifications and complaint with relevant codes & standards, required quality level as per project QAP and HAZOP, PSHER study recommendation and safety procedures including participation in hazop study and recommendation and implementation in project execution, monitoring work progress, follow up update project construction schedule, perform quantity survey, cost estimate and project budget allocation and cash flow projection-S curve, PMS, calculate planned Vs. actual progress for monthly invoicing.
Since1994 till date working in Kuwait being involved in the execution of various EPC lump sum projects for engineering, procurement and installation of piping and equipments for KNPC, KOC, JO-Chevron and PIC/EQUATE on behalf of companies on deputation as well as for PMC/EPC contractors. During the period 1989 to 93, for 4 years worked in Abu Dhabi for Umm-Al-Nar Refinery projects with Deutsch Babcock and from1985 to 89, 4 years worked in engineering and construction projects on secondment as field mechanical engineer for ARAMCO projects in Saudi including for execution of various short form, long term projects for piping system at ARAMCO-Ras Tanura Refinery, Jauyhima Gas plant, Safania Gas & Oil separation plant and on assignment for offshore facility projects in Marjan Oil Fields for rehabilitation / re-construction of collapsed Flare Stack along with 24” seabed gas line running from production platform including 4” purging line as an emergency shutdown project with the support of divers and various new construction and emergency projects in the including replacement of offshore 24”sub sea pipeline and crude oil production platform facilities in the capacity of shift crew team leader.
Areas of Specialization / Major Achievements:
As regard to scope and extend of Piping and equipments EPC-construction projects executed in past and recently completed, my key achievements collectively as follows:
1) From 1994 to 1997, 1 have had worked on deputation (Secondment contract) with M/s. Fluor Daniel international on behalf of Fluor piping suptt. in the EQUATE (EIS), project as OSBL piping in-charge for the construction of new petrochemical project for Ethylene, Glycol and polypropylene manufacturing process plant piping system of various materials including C.S., Special alloy, SS., RTR and HDP material piping up 1300 PSI test pressure. Checked and controlled the piping route, alignment, controlled site erection, fit-up and welding, prepared test packages for hydro test and leak test of the systems, Inspected cement lined pipes field erection welding and joint patch up with cement. Controlled dimensional accuracy, alignment, plumpness, flange face squareness etc., at erection, reviewed test packages, segregated the piping system in such a manner based on line index, fluid list with reference to P&ID and in the aspects of material, insulated, un-insulated, painting cycle etc. Conducted ferrite test on welds and PMI tests with alloy analyser, SS. and C.S. piping surface preparation / chemical cleaning before painting or insulation, prepared and completed the punch list item for pre-commissioning and commissioning. I have executed process, utility piping system including cross country piping EPC projects so far, up to an extend and not less than 800,000 inchdia (approx.) of CS., special alloy, medium and high alloy SS pipe material of various large and small diameter sizes including FEED, prototype and detailed design & engineering, shop and field pre-fabrication, site installation, hydrotest, pre-commissioning, pigging, cleaning, flushing, drying, hot tapping, shutdown tie-in and commissioning works including nonmetallic RTR / GRP, HDPE Process / Effluent / Drain and wash water lines including design packages, code stress check analysis & interpretation, write up for stress analysis conclusion report, hydraulic design calculation, salient surge analysis, technical clarifications for A/G and U/G piping in the aspects of piping design, adequate supports, thrust blocks, selection of piping material, class, design wall thickness calculation, review approval of PFD, final P&IDs incorporating Hazop study recommendation, review, approve AFC drawings, control shop and field fabrication including preparation of WPS, Qualifying welding procedures and welders, installation of HCV,MOV, FCV & ESD valves, including buried valves and providing valve pits, develop, prepare hydrotest packages and conduct hydrotesting, punch list clearance, mechanical completion, shutdown tie-in, commissioning including associated civil, Elec.& Instrumentation, CP., fire proofing, surface preparation, hot insulation and painting works in the previously executed projects.. Executed project for MEW Power house at Subiya for GRP/RTRP 24"piping more than 40 km. linear length and other various size GRP piping from Seawater intake to new desalination plant including 12”,8”,6” GRP piping branch connection / drain lines in the facility in the capacity of site construction manager to sub-contractor M/s. Amiantit, Saudi on behalf of Doosan Engineering & Construction Company. Performed management and overall controlling of site fabrication, installation including site survey, establishing final underground route coordinates & elevation as per AFC drawings by means of re-routing / replacing existing fire water ring mains along with fire-hydrants, butterfly valves, new pipe line trenching, bed preparation, installation of GRP pipe spools along the excavated trench, final alignment, inspection and hydro testing of individual rubber seal 24”, 20” field coupling joints, visual and hardness test inspection of lamination joints, check line integrity and hydrotesting, back fill compaction and pre-commissioning works.
2) Executed EPC project for procurement, installation and commissioning of API 610 centrifugal pumps more than 70 units up to 1050 M3 / hr. capacity including D.E.Pumps, vertical booster pumps of various type & make: Sulzer-Germany, Ebara-Japan, Meckley pumps, Reddy Buffalo and Patterson-USA in previously executed EPC projects for KNPC and KOC including pump selection, proposal, clarifications and approval on final data sheets & drawings for pumps, witness factory performance and string test, construction of pump civil foundation with anchor bolts, site installation works, tie-in with piping system, pre-commissioning / commissioning activities including simulation tests to confirm performance of newly installed pumping system incorporated with the existing fire fighting systems and subsystems in the facility.
3) Executed project for construction of 3 Nos.new API 650 storage tanks 10,000 M3 capacities with
conventional and hydraulic jacking system ( For storage of Gas Oil, Wash water and fire water respectively) for MEW-Mina Al-Zour power house expansion project of 1000MW new GTs Executed rehabilitation project for 4 numbers crude oil storage tanks inside MGC, JO-Wafra, fabrication installation of additional 4 numbers inlet & outlet nozzles on existing tanks shell at SUG, Joint Operations, Wafra. Similarly, executed construction of two product storage tanks of size 22 mtr.Dia., for ADNOC-Abu Dhabi and executed rehabilitation maintenance project for Umm-Al- Nar Refinery in the capacity of client approved P.E. for existing 4 numbers internal floating roof tanks of 32 meter dia.,10,000M3 capacity including replacement of tank bottom plates with cutting out access door on tank shell, shell patch-up repair, replacement of floating roof seal, tank welding, internal / external coating, spray & form cooling system on tank, allied piping for filling, recirculation, 12” return lines respectively to tanks and modification, sectionalization and replacement of piping, refurbish drain pits, replacement of existing crude oil pump house inside / outside headers, bypass, sectionalization, branch lines and drain lines at Umm-Al-Nar Refinery, Abu Dhabi, during the tenure 1989 to 93 with Deutsch Babcock.
Recently executed projects:
Present Company : M/s.Arabi Enertech, Mina Abdullah Refinery, Contract No.CB/FP PD/2001.
Project brief : The scope of above project EPC for upgrading of existing fire
Protection system in and around Shipping pump house, Crude charge
pump house, Inter refinery transfer (IRT) pump house and transfer and
blend pump house in Mina Abdullah Refinery including fabrication
and erection of cement lined A/G. & U/G. piping, pipe supports, fire
proofing works.
Previous Company: KOC / Alghanim International (Oil & Gas Sector),
Period : From Oct.’2006 to April’ 2009
Project brief : KOC, contract No.KOC-23968, replacement and upgrading of existing fire water
pumping and piping systems with higher capacity D.E.pumps-48 Units, fabrication and installation of A/G & U/G piping system with int. epoxy coating, associated instrumentation, electrical and civil works including design, flow calculation, stress analysis, material selection, expedition of procurement and inspection activities, simulation test at 14 GCs and 2 Booster stations, BS-140 & 150 (at 16 locations) in South East and North locations of KOC crude oil production facilities, including the ancillaries, 48 diesel storage tanks, new pump shelters of steel structural material of 600 tons fabrication and erection, Pre-fabrication of more than 2000 newly fabricated piping spools of various sizes (more than100,000 inch dia.),hydrotesting, site installation with valves and inline instruments, provided additional outlet nozzles on fire water storage tanks by means of hot tapping and shutdown tie-in works.
Client / Company : KOC / Combined Group Co., Ahamadi
Period : From Nov.’2003 to Oct’ 2006
Project brief : KOC LSTK project, contract No.12383, (KOC-EF1396), Installation of 36” dia.
Pipe line for R/B Crude from M/F B1 to NTF and GC-27, West Kuwait,
Expansion / modification project for export thru North tank farm, modification /
new piping system for optional segregation / blending of light & medium crude
oil at manifold T-18, CMM and participation in HAZOP study & implementation,
piping code stress analysis, surge analysis, procurement, installation of 3 numbers
new export and booster pumps, metering skid, allied piping system including 36”
and below sizes, MOVs, FCVs, 2 nos. air compressors, air receiver tanks, air
dryer at CMM area, fire fighting ,F & G monitoring and control systems around
newly constructed facility, steel structural shed, Jib crane, over head crane, pig
launcher & receiver, fabrication and site erection of 36”, 24” and below size piping system of linear length 150 km. including fabrication and installation og pig Pig launcher and receiver, Jib crane, pigging operations for cleaning, hydrotest, flushing and drying and application of corrosion inhibitor, replacement
of isolation valves to tanks, structural steel fabrication and erection for shelter
extension works etc.
Client / Company : KOC / ATECO, GC-17, new construction EPC Lump sum project.
Period : From Oct.’2000 to June 2003
Project brief : LSTK project for Procurement, Construction and installation of desalter, booster,
export and wash water pumping and piping system including procurement and
installation of 3 units wash water pumps, 3 units of vertical booster pumps, 3 units
of desalter pumps and 3 units of export pumps with associated civil, electrical and
instrumentation works respectively. Managed to carry out complete basic
and detailed design & engineering with ATESCO in-house facility and
successfully completed and handed over the project in time.
Client / Company: JO/ DG-PNZ, Seconded from KREMENCO,
Position : Construction Co-ordinator (Project-in charge)
Period : From June’1997 to 2000
Project brief :Deputed as site co-ordinator for the existing J.O. service Contractor M/s. Al-
Shauwyer Contg. Company on behalf of JO / PNZ- Development Group (DG) and
was responsible for overall supervision and control directly in the performance of
the contract for the execution of new construction projects on behalf of DG.team
leader and Sr. Design Engineer, JO /DG-American Texaco including field engineering, construction expedition, verify/accept contractors daily time sheets for equipments and manpower. During the tenure I was directly involved and managed execution of various new construction, upgrading /modification and rehabilitation ongoing piping projects concurrently at various Sites location at SC-9, SC-11, SC-18, SC-14, SC-21, SUG and MGC for the crude oil surface production facilities.
Client / Company: EQUATE / Seconded to Fluor Daniel (EIS) project,
Position : Project co-ordinator
Period : From May’1994 to 1997
Project brief : Worked on behalf of Fluor Daniel piping Supdt. Executed complete Utility and
process OSBL piping systems for Ethylene, Glycol and polypropylene plants
including RTRP lines having designed pressure up to 866 PSI and of CS., low/medium and high alloy SS material piping, test pressure up to1300 PSI, line purge out and drying pre-commissioning works, including fabrication and installation of cement lined underground fire water piping, installation of above ground / underground valves, leak testing of newly completed drain lines, pre-
commissioning checks, shutdown tie-in and commissioning works.
-
June 26th, 2009, 02:10 PM
Post Count Number #7
Re: Daewoo Engg Construction Nigeria : QA/QC Civil, Coordination, Piping, Mechanical
Curriculum Vitae
Name : Deepak Arjun Keni
Email : deepakkeni123 AT yahoo.co.in Mobile : +919867992763
Tel : 022-25589124
Career Objective
To establish myself in reputed Organization that provides Career Path and Growth and be able to offer my services to Organization to the best of my abilities.
Qualification
Bachelor of Engineering Degree in Production from Lokmanya Tilak College of Engineering, Navi Mumbai from the Mumbai University in the year 2005.
Educational Background
Exam Percentage Grade/Class Year Board/University
BE 56.83 Pass Class 2005 Mumbai University
HSC 46.50 Second Class 1997 Mumbai Board
SSC 82.42 Distinction 1995 Mumbai Board
Project in BE
I prepared project report on “Designing of Drilling Jig”. The project is cost effective and product operation is easier one.
I also prepared study report on study of ISO: 9000.
Computer skill
Packages : MS-Word, MS-Excel, MS-Power Point.
Operating Systems : Windows 98/XP.
Design Software : Diploma in CAD (AutoCAD, Pro-e, Catia)
Inspection Skill
Inspection : CSWIP 3.1 (Welding Inspector)
NDT level II in UT, LPT, MPT, RT (INT)
Familiarity with codes like ASME SEC II, SEC V, SEC VIII, SEC IX, B31.1, B31.3, B31.5, B16.5, B16.2, ASTM, API.
Working Experience
(1)
Company : Punj Lloyd Ltd.
Duration : 18th June 2008 to till date
Company details:
Designation : QA and QC Engineer
(A) Project: Sabic/Saudi Kayan Project at KSA
(Fabrication and Erection of 8 numbers of Storage Tanks)
Job Responsibilities:
· Work with a position of QA and QC Engineer for Dayim Punj Lloyd Ltd. (EPC contractor) for fabrication and erection of 8 numbers of storage tanks for Sabic/Saudi kayan, KSA with close monitoring of Flour Arabia Ltd.
· Review of WPS, PQR for welder qualification.
· Works involved are material receiving Inspection and report, verification of material for traceability.
· Works includes Dimensional Inspection for fit-up of bottom, shell, roof structures and attachments.
· Visual welding inspection
· Inspection of Dye penetrant test, Penetrating Oil test, Peaking, Banding, Roundness and Plumbness, Pneumatic Pad leak Test, Roof and Bottoms Vacuum Box Test, RT location Map & RT film interpretation, Hydrotesting, tank settlement inspection and Documentation.
· Final Inspection of overall dimension check to ensure compliance with approved drawings.
· Co-ordination with NDT Inspector for NDE testing requirements.
· Rising of surveillance & Non Conformance Report (NCR) of materials and assemblies for corrective actions.
· Raising Final Inspection Report for items inspected and accepted for documentation requirement.
(2)
Company : Offshore Hook-up and Construction Services (I) Pvt. Ltd.
Duration : 20th Nov 2005 to 16th June 2008
Company details:
Involved into Erection and commissioning of E & I items, Piping, Structural and Hook-up of entire offshore platform. Fabrication of pressure vessels for ONGC platforms.
Designation : QA and QC Engineer
(A) Project: Vasai East Development Project
(Fabrication of pipe spools, deck extension & hook up at platforms)
Job Responsibilities:
· Involved into VED project for Samsung Heavy Industries for Modification and Hook up at BPA, BCPA-2, BLQ platform (Offshore) for ONGC, INDIA with close inspection of BVIS and CEIL, Working with a position of QA and QC Engineer.
· Involved into Pipes welder qualification, WPS and PQR making, third party clearance for the welders and WPS and PQR.
· Closed Inspection and QA and QC activities for Raw materials. Review & maintaining test certificates for materials.
· Fit-up & Weld visual inspection for welded / bonded joints.
· Monitoring for pre-heat & PWHT for procedural compliance.
· NDT clearance for welded joints. Witnessing of visual, DPT, MPT, UT & Radiography film interpretations.
· Pipe spool clearance, Painting clearance,
· Involved into fabrication of pipe supports, deck extension and structure clearance.
· Hook-up in overboard lines (Offshore).
· An updates isometric drawing, P&ID, piping layouts on sites in case of field changes & prepares as built drawings at sites if necessary.
· Familiar with offshore safety & work permit system.
· Involved in Hydro testing & N2 leak test for Flow arm lines.
· Prepare punch list for every hydro test packs.
· To assist yard for clearing punch points from QC punch lists.
· Documentation.
(B) Project: ASME U and R Stamp Certification
(Fabrication of Coded Pressure vessel)
Job Responsibilities:
· Involved into project as QA and QC Engineer for fabrication of coded Pressure vessels for ASME with close inspection of LLOYDS.
· Preparation of ITP, QCP, QAP & Procedures.
· Co-ordinate with ASME Team for ASME Audit.
· Closed inspection and QA and QC activities for Pressure Vessel such as Raw material, Fit-up, Weld visual inspection, NDT clearance, Hydro test clearance and painting clearance.
· Assist QA & QC manager & co-ordinates with all departments for Quality work.
· Maintaining of all required test certificates for materials, calibration certificates, Quality records & Documentations.
(C) Project: Topside Modification at NA Platform
(Fabrication of Suction Line, Discharge Line, FCV and Its By-Pass)
Job Responsibilities:
· Involved into project for Topside Modification at NA platform for ONGC, INDIA with close inspection of ENGINEERS INDIA LTD., Worked with a position of QA and QC Engineer.
· Closed inspection and QA and QC activities for Raw material, Fit-up, Weld visual inspection, NDT clearance and painting clearance.
· Maintaining of all required test certificates for materials, calibration certificates, Quality record & Documentations.
(D) Project: Cairn Project
(Fabrication of Conductor Guide)
Job Responsibilities:
· Involved into project for fabrication of Conductor Guide for Cairn Energy Ltd. with close inspection of ENGINEERS INDIA LTD., Worked with a position of QA and QC Engineer.
· Closed inspection and QA and QC activities for Raw material, Fit-up, Weld visual inspection, NDT clearance and painting clearance.
· Maintain Quality Records.
(E) Project: Revamping of 26 well platforms
(Fabrication of Pressure vessel)
Job Responsibilities:
· Involved into project for Revamping of 26 well platform for ONGC, INDIA with the Sub-Contractor as KILBURN ENGINEERING LTD, third party inspection was GLIS AND CERTIFICATION ENGINEERS INDIA LTD., and close monitoring of ENGINEERS INDIA LTD, Worked with a position of QA and QC Engineer / Project Engineer / Production Engineer.
· Involved into Pipes welder qualification, WPS and PQR making, third party clearance for the welders and WPS and PQR.
· Closed inspection and QA and QC activities for Pressure Vessel such as Raw material, Fit-up, Weld visual inspection, NDT clearance, Hydro test clearance and painting clearance.
· Maintaining of all required test certificates for materials, calibration certificates, Quality record & Documentations.
(F) Project: MNW Project
(Fabrication of pipe spools & hook up at platforms)
Job Responsibilities:
· Worked as a material coordinator for Raw material.
· Closed inspection of Raw materials, Prepared MIR.
· Maintaining of all required test certificates for materials & MIR.
(3)
Company : Instrumentation Limited, Andheri.
Duration : 6th Jan 2005 to 20th Nov 2005
Company details :
Client: Mahanagar Gas Limited (MGL), Mumbai. Planning and Execution to lay the gas Pipeline for PNG supply from DRS to SR up to consumer’s appliance.
Designation : Third Party Inspector
Job Responsibilities :
Client: Mahanagar Gas Limited (MGL), Mumbai.
A joint venture company of Gas Authority of India Limited (GAIL), British Gas (UK) and Govt. of Maharashtra, involved in city Gas Pipeline distribution project in Mumbai City.
· Have a part of team surveying site routing and designing the flow of Gas Pressure for Pipe Natural Gas in Medium Pressure (M.P.) & Low Pressure (L.P.) network.
· Planning and Execution to lay the gas Pipe line for PNG supply from DRS to SR up to consumer’s appliance
· Handling Responsibilities of underground M.P. & L.P. network up to charging and conversion.
· Preparation with Contractor of Daily, Weekly and Monthly Work Plan & Reports of Testing,
· Pre –Commissioning and Commissioning Reports.
· Preparation of PNG line As –Laid Drawings and Co –Ordination with Contractors persons, MGL Authority & Consumers.
(4) Six Months implant training in Prabha Engineering (I) Pvt Ltd, Andheri
Personal Information
Name : Deepak Arjun Keni
DOB : 27th March 1979
Nationality : Indian.
Passport No. : G 1723809
Sex : Male.
Languages : Marathi, English, Hindi.
Addresses
Permanent: Rajaram Niwas,
Near chereshwar Mandir,
Trombay Koliwada,
Mumbai-400088
Mobile : +91 -9867992763
Tel : 022 -25589124
Email : deepakkeni123 AT yahoo.co.in
All above information are right and true to the best of my knowledge.
Date :
Place : Mumbai
Yours Truly,
Signature
-
October 17th, 2009, 07:42 PM
Post Count Number #8
Re: Daewoo Engg Construction Nigeria : QA/QC Civil, Coordination, Piping, Mechanical
dear sir
i already worked in daewoo for naif in qchem 2nd project. my id no: d17427
-
September 24th, 2011, 12:53 AM
Post Count Number #9
NINO'S CV
NAME : Nino Nichlous.K
E-mail : nimojnic AT gmail.com ; ninonichlous AT ymail.com
POSITION : Test Pack( Hydro test engineer) ,QA/QC piping inspector & piping engineer
CAREER OBJECTIVE :
On the lookout for a platform to showcase my abilities, technical knowledge and interpersonal skills, thereby making a substantial contribution towards the success of the organization.
PERSONAL SKILLS :
Hardworking and committed, good team player, excel in leadership roles, effective communication, capability of adapting to different situations, courage of conviction, good at event management.
EDUCATIONAL QUALIFICATION :
2003-2007 : Diploma in Mechanical Engineering from GPTC mutton
Polytechnic, under Kerala government.
2002 : Vocational Higher Secondary Education (XIIth) with distinction (76%).
2000 : SSLC (Xth) passed with first class (71%).
COMPUTER SKILLS :
1. Languages : C++.
2. Operating System : Windows.
3. Applications : MS Office, Internet Usage and Terminology
4. Drawing modification using microstation
ADDITIONAL QUALIFICATIONS :
· Certified in Oil Field Engineering and Quality Control (3 Months Post-Graduation Course) from Induscan Petroleum Institute in the following subjects
o Engineering Drawing (P&ID, Isometric Drawing, Structural Drawing, GAD)
o Construction Materials – ASME SECTION II, API, AWS, ANSI. Knowledge in construction materials used in Oil Field and Ability to carry out visual and dimensional inspection of the construction materials with respect to the applicable standards and specifications.
o Welding Engineering – Familiar with various welding standards such as ASME Section IX, AWS D1.1, API 1104 and prepare WPS,PQR & WPQ
· ASNT Level II Certified in Radiographic Testing (RT), Ultrasonic Testing (UT), Magnetic particle Testing (MT), Penetrant Testing (PT).
· Attending the Health Safety & Environment (HSE) course in cochin refinery,
Also HSE certificate
EXPERIENCE :
I FROM 24TH 0CT- 2010 to 20TH APR-2011 : TRAGS QATAR for PROJECT QAFCO 5&6(SAIPEM) as piping Engineeer
Responsibilities
· Test pack preperation of qafco 5&6 project in saipem engg.
· Reviewing the package and clearing the commends from the client.
· Going for the walkdown and thorough checking of P&ID and ISO’S with the client.
II FROM 11th OCT- 2009 to 28th AUG -2010 : TRAGS Qatar for Q.Chem 11 project a as Test Package & Hydro Testing Engineer
Responsibilities
· Total coordination from starting of fabrication until Mechanical handover to Pre-Commissioning of Piping work.
· Provide Company representation in monitoring and coordinating the site activities of Contractor and its sub-contractors. Responsible for daily monitoring and inspection of contractor's pipe fabrication operations, pipe installation
· Review safety standards in the site and issuing work-permits depending on the nature of job e.g. hot work, cold work, naked flame, confined space, need of mechanical /electrical/ process isolation.
· Reporting on the construction activities, progress, and areas of concern and mitigating actions.
· Participate in incident/accident investigation and prevention of recurrence.
· Follow up of Hydro test activities
· Attending the daily and weekly progress review meeting with client, subcontractor, JV management staff like Discipline Const. Manager, General const Manager, Area Superintendent, Site Manager and Project Directors etc, update them with the current site status and reports.
· Preparation of Test Packages , detail coordination in punch list activities with details loop checking
· Coordination between the office and site activities with detailed reporting
· Resolving technical query of contractor & subcontractors
· Interface and coordinate with Project Field Engineering and QC Section
· Preparation of As Built reports and final Documentation.
· Monitor and ensure the correction of non-conformance report items and other issues supporting QA/QC compliance
· Provide assistance and direction in the Mechanical Completion, Pre-Commissioning and Start-up activities of the plant working with all parties to facilitate these activities.
· Preparation of Non availability of material list for the completion, Line-check according to Isometric, P&ID
· Involving the rotating equipment like motor solorun,motor alignment etc
· Also involving the static equipments inspection like installation of internal parts, internal cleaning, etc
III FROM 2nd MAY- 2007 to 31ST OCT-2008 : ALSTOM for BSL- POWER PLANT project as Quality control Engineer
· 1.5 year experience as Quality Control Engineer with ALSTOM PROJECTS INDIA LTD., in their contract for Bokaro steel plant (BSL) , at Bokaro steel city, Jharkhand, India. Have experience in construction of power boilers, erection of structures, pressure parts, main stream pipe lines and ducts.
IV FROM 5TH NOV- 2008 to 30TH SEP-2009 : ISGEC JOHN THOMPSON for BPSCL- POWER PLANT Project as Quality control Engineer
1 year experience as Quality Control Engineer with ISGEC JOHN THOMPSON (Noida) ,in their contract for Bharath petroleum, Kochi, Kerala, India.Have experience in Planning,Quality,Execusion,Material,Documentation,Billing& also Quality engineer for piping and stuctural works
AWARDS AND ACTIVITIES :
· Participated and achieved awards in cultural activities.
· green belt holder in karate, red in kalari
· Member of cricket Team and athletics
-
October 13th, 2011, 12:15 PM
Post Count Number #10
gm Mechanical/operations
KRISHNA MURARI PRASAD
E-Mail : kmp_ei AT yahoo.co.in
________________________________________
Seeking senior managerial positions to head Field Operations (Exploration & Production), New Projects & Ventures with a reputed organisation in the Petroleum/ Oil & Gas industry.
Open for overseas assignments.
Professional Digest
Qualified Executive MBA & Engineer with 26 years of experience in the field of Operations, Maintenance, Project Planning & Execution and Business Development chiefly in the Oil & Gas & related industry. Thrives in planning and executing policies and strategies, aimed at strengthening business operations and facilitating attainment of targets. Strong mechanical engineering experience involving Operations, Maintenance and Repairs of Machinery & Equipment related to Mining, Petrochemical and Oil & Gas Industries. Deft in swiftly ramping up projects well within specified time, cost, quality and safety specifications. Equally comfortable in managing onshore and offshore assignments. An effective communicator with strong leadership, relationship management, analytical and coordination skills. At ease in interacting with people across hierarchical levels in an organisation for smooth project execution.
Core Competencies
Maintenance
- Project Planning & Execution - New Initiatives
- Marketing - Revenue Generation
- Contract Management - Techno-commercial Negotiations - Vendor Management
- Sales/ After Sales Service - Process Management - Business Planning- Strategy Planning - Operations (Field & Base Control) -
- Quality Control
- HSE and Compliance - Cross-functional Coordination
- People Management - Cost Optimisation -SpareParts management
Employment Scan
OFS Petroleum Pvt. Ltd /Singh & Company
Consultant (Operations)
May 2011 to till Date.
Working as senior management project coordinator for field job Operations , liasioning tender preparation, attending the pre bid conference, liaison for other company’s pipe lines with fittings & sucker rods related to E &P oil & gas Private & public sectors, Power sectors .Work along with drilling & work over rigs. Work as senior corporate officer with extensive expertise in on shore field operational responsibilities including financial management. Proven track record in revenue growth, increasing profitability, reducing cost, new business start ups, managing multifaceted & multitalented resources while increasing customer satisfaction. Pipe line Project Management and Operation and Maintenance Skills, layout & other construction related to mechanical field in oil & gas, power sector.
Communicate effectively & respectfully at all levels in order to work in a cooperative & constructive spirit with a variety of disciplines, personalities & cultures. Ready to accept any challenging field job related mechanical engineering in any sector.
- Formulating plans for business development by providing technical feedback to the Director, based in Head Office.
- Planning, scheduling and managing the Maintenance & Operations of equipment in the Petroleum field.
- Supporting Business Development activities, including expansion of the customer base through out Western India Exploration & Production oil fields.
- Giving feedback on a daily basis to the Head Office regarding progress of projects
- Providing relevant information to Seniors & Juniors regarding jobs execution, thereby maintaining transparency in operations/ processes.
- Collaborating with Drilling & Work-over Rig Operations (both onshore oil & gas well sites) in Gujarat region.
- Administering on shore well services using compressors & other equipments.
- Well versed technologies implemented/ introduced for improving productivity.
- Major cost saving measures introduced by proper manpower planning. Cost savings achieved as a result thereof.
- Contributions towards the development of new business .New customers added other than existing.
- Quality/ environment/ safety standards introduced for proper functioning at well site.
- Measures taken for improving the awareness levels of employees towards their safety by providing HSE.
- Can manage all on shore with techno commercial aspects of field operations.
- Knowledge of drilling activities at drill site.
Naithani International ltd. /Kingston oil Field services, Singh & Company Sunrise Industries Ltd. Vadodara oil & gas division. Manager/Sr. Manager D.G.M /Consultant (Operations)
June’02 to April 2011.
Responsibilities
- Rendering technical support to Exploration & Production Companies, related to Operations of reservoir data acquisition & slick line operations through oil & gas service providers. Worked in coordination with drilling & work over rig operations.
- Developing new business and expanding the client base.
- Formulating new contracting strategies and determining the feasibility of new initiatives on the company’s strategic business goals.
- Giving project-related information to the Project Director to facilitate performance review and strategic decision-making.
- Participating in techno-commercial bids for sales of oil & gas equipments.
- Complying with HSE (Health, Safety & Environment) policies, both onshore oil & gas well site during the execution of different operations.
- Maintenance of rotating and static oil field equipments.
Major Highlights
Major achievements in terms of new processes introduced for enhancing operational efficiency. Complete repairing & maintenance of existing wire line units. Induction of better quality well testing equipments.
- Existing processes streamlined for improving productivity by proper manpower planning & induction of highly qualified crew members.
- New technologies implemented/ introduced for improving productivity.
- Added imported well testing equipments & quartz electronic memory gauges in place of strain gauges.
- Major cost saving measures introduced. Curtail expenses in the company. Cost savings achieved as a result increase in the revenue.
- Contributions towards the development of new business. New customers added.(through out country)
- Expand business by signing annual contract with new E&P companies.
- Quality/ environment/ safety standards introduced-
- Measures taken for improving the awareness levels of employees towards their safety by providing HSE training.
- Can manage all on shore oil well field activities like drilling ,cementing ,logging ,well completion, bottom hole studies, slick line operations, perforation ,hydro fracture, work over rig operations,
Sep’01 to May’02 with Jaiprakash Industries Ltd., as Sr. Project Mechanical Engineer (Hydro Power Project, Tala, Bhutan)
Responsibilities
- Managing the spare parts inventory, required for the up keeping & smooth operations of machines & equipments.
- Liaising with Sr. & Junior Management Executives for planning, scheduling and exceuting the repairs & maintenance of the machines and equipments.
- Overseeing the execution of miscellaneous activities in the shop floor/ workshop for fabrication, machineries’ maintenance .
- Plan priorities & organizational requirements maintenance
Oct’95 to August’01 with Drillcon (Rajasthan) Pvt. Ltd., Udaipur, (Rajasthan)
The Growth Path
Oct’95 to May’98 : Mechanical Coordinator
May’98 to Apr’99 : Manager-Mechanical
May’99 to Augl’01 : Group Technical Advisor
Responsibilities
- Managing Sales and After Sales Service Operations of equipment related to Mining, Petrochemical, Petroleum, construction fields.
- Ensuring, achievement of business and revenue generation targets.
- Promoting the sales of spare parts. Developing business by effectively positioning the company’s products with prospective clients as well as expanding the client base.
- Negotiating and finalising the Operations & Maintenance Contract with the company for Construction, Oil & Gas, Mining and Transport & Petrochemical industries.
- Extending technical support to various industries for operations & maintenance of machines and equipment.
Aug’84 to Sep’95 with Hindustan Zinc Limited (A Govt. of India Enterprise), Udaipur.
The Growth Path
Aug’84 to Apr’86 : Engineer Trainee-Mechanical
Apr’86 to Mar’90 : Mechanical Engineer
Apr’90 to Sep’95 : Sr. Mechanical Engineer
Responsibilities
- Receiving Cross-functional Training in different departments like Production, Operations, Maintenance, Personnel & Administration, Stores & Purchase, Finance & Marketing, Plants and Workshops.
- Supporting the planning activity for smooth operations & maintenance. Handling :
- Operations and maintenance of Heavy machineries, Drilling Machines, Cranes, Heavy/ Light Vehicles and Forklifts.
- Repairs and maintenance of Pumps, Compressors, Vibrating screens,(Shale Shakers), magnetic separators, Ball Mills, Belt Conveying Systems, Feeders, Crushers, Milling Plants, Disc Filters and Winder, conveying system,
- Inventory management of spare parts related to machines & equipments including import substitution.
- Routine jobs of shop floor workshop like machining, repairing, welding & fabrication, and automobile light & heavy vehicles including heavy earth machines maintenance & operations.
- Project execution of plant erection & commissioning.
- Preparation & invitation of tender bid for purchasing of raw materials, consumable goods & accessories of equipments, machines & disposal of scraps.
- Successfully managed the central work shop routine jobs as well as specialised overhauling.
Academia
- Executive MBA (Marketing) from Faculty of Management Studies, Mohanlal Sukhadia University, Udaipur in 1996.
- B.Tech. (Mining Machinery) from Indian School of Mines, Dhanbad in 1984.
Courses Completed
- Course on MS Office, Windows 95 from Bits-N-Bytes, Udaipur in 1997.
- Export Marketing & Documentation from Rajasthan Small Industries .Corporation .Ltd & Bureau Of Ind. Promotion Raj.Jaipur at Udaipur in 1997.
Professional Trainings Attended
- Training on Drilling and Related Machinery & Plant Equipment at various units of Coal India Ltd., Kolkata (Duration : 4 months) during college summer vacations. (1980 to 1983).
- 1-month Training on various Onshore Drilling Machines conducted by Uranium Corporation of India Ltd., Jaduguda in 1982.
- 2-weeks’ Training on Surface Drilling Equipment conducted by Hindustan Copper Ltd., Musabani in 1984 for project work completion.
- Intensive training on Computer for Junior Management conducted by Apple Computer Education, Delhi at Udaipur in 1990 (Duration : 3 weeks).
- Field Training on Drilling Machines, Pumps, Fans & Compressors, Material Handling Systems, Plant, Machinery, etc. conducted by Hindustan Zinc Ltd.1984-1885.
- Management training at Small Industry Extension Training Institute, Hyderabad in 1986.
Seminars(Training) Attended
Training on C Programming by Centre for Information Technology ,New Delhi,in 2001
Operation & Maintenance of Letuert Products (like EMG & Sub Surface Sampler) conducted by Leutert-Germany, Mr. H. J. MAYER at Vadodara in 2007.
Operation of ECHO METER for Liquid Level Survey at SRP Wells conducted by well site solution Hamdon Canada,
Mr. Omar Hamdon, at Vadodara in 2007 & 2008.
Training on Shut in tool by Spartek USA, Mr. Troy at Ahmadabad in 2007
Computer Proficiency
Package known : - MS Office. Lotus 123, WP,
Operating system : - Dos, Windows-98/2000/XP
Internet: - Explorer