www.fwc.com Foster Wheeler India Pvt Ltd Kolkata : Instrumentation Construction Engineer

+ Ask Question / Post resume
Results 1 to 5 of 5
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    www.fwc.com Foster Wheeler India Pvt Ltd Kolkata : Instrumentation Construction Engineer

    Foster Wheeler India Private limited Kolkata : Construction Engineer - Instrumentation

    Designation: Construction Engineer - Instrumentation
    Experience: 8 - 13 Years
    Location: Kolkata

    Job Description:
    Must have handled the Instrumentation job of large projects. Have good knowledge on preparation of method statement, inspection & test plan based on codes / specification, engineering / detail drawing. Should have knowledge of handling loop tests. Knowledge of DCS & commissioning is preferred. Should have knowledge in piping & tubing work. Must be well conversant with all safety and quality aspects for working in green and brown fields. Should be able to lead a team and provide guidance.

    Desired Candidate Profile:
    Education: Degree / Diploma

    Exp: 8 to 15 years of relevant experience

    Company Profile:
    Foster Wheeler is a global engineering and construction contractor and power equipment supplier, with a reputation for delivering high quality, technically-advanced, reliable facilities and equipment on time, on budget and with a world-class safety record.

    Website: http://www.fwc.com

    Keywords: Construction Engineer Instrumentation, Construction Engineer

    To submit your resume for general consideration, please email to the specific hiring office to which you are applying.
    india_staffing@fwuk.fwc.com

    Chennai Office Address
    Foster Wheeler India Pvt Ltd.
    No:184/187, Temple Steps
    Anna Salai
    Land Mark: Near AG Church, Little Mount

    Kolkata Office Address
    Foster Wheeler India Pvt Ltd.
    9th Floor, Tower I
    DLF IT Park
    08 Major Arterial Road, Block AF
    Rajarhat NT,
    Kolkata – 700156.
    Landmark: Hidco Bus stand

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    SURESHKUMAR.A
    Sureshkumar403 AT gmail.com

    Career Objective :
    To secure a responsible position and rewarding career in challenging environment and to be a part of progressive organization that gives a scope to enhance my knowledge and skills in a productive way for the growth of the organization and as individual.

    Educational Qualification :
    - B.Tech in the field of Electronics and Communication, affiliated to JNTU, HYDERABAD, A.P during2004 – 2008.
    - Intermediate from Board of Intermediate Education during 2002- 2004
    - S.S.C from Secondary School of Education during 2001-2002

    Professional Experience :
    Organization : Newton Engineering & Chemicals Ltd.
    Designation : Asst Instrumentation Engineer.
    Period : July 2009 to till date.
    Project : ONCE THROUGH HYDRO CRACKER UNIT
    Project Consultant : Lurgi India Pvt Ltd.
    Work Site : Indian Oil Corporation Limited
    Haldia Refinery, Haldia, West Bengal

    WORK PROFILE :
    Execution :
    - Field execution.
    - Installation of field instruments.
    - Troubleshooting of field instruments.
    - Expertise on Honeywell Automation system (Dcs&Plc) latest module.
    - Loop checking.
    - Contracting handling and timely reporting.
    - Project co-ordination.
    - Man power sourcing and handling.
    - Dwelled knowledge on MS-Word and Excel.
    Project Skills :
    - Hands of experience in handling large scale projects in the field of oil and gas industry.
    - Area of Expertise :
    - In time delivery of project to the owner.
    - On time reporting for the scheduling contracts.
    - Core knowledge towards the stream of project handling and contract scheduling.
    - Maintaining client’s correspondence.
    - Follow up between the vendors and at client level.

    Employed as a Trainee Engineer in Newton Engineering & Chemicals Ltd from July-2008 to May-2009. Work Site is Silk Road Sugar’s Pvt Ltd, Vakalapudi Kakinada, and Andhra Pradesh.
    Silk Road Sugar Pvt Ltd.

    Responsibilities :
    - Handling of project.
    - Assist the procurement team.
    - Calibration of various field instruments.
    - Installation of instruments in the field.
    - Installation of various miscellaneous and electrical equipments.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    PERSONAL
    Full Name : Sreejit Nair PG
    E- Mail : sreejijithu AT gmail.com

    CURRENT PROFILE :
    Current Location : Bangalore.

    EDUCATION & QUALIFICATION :
    Diploma in Instrumentation Year 2002 to 2005 # 3yrs Scored 63%from Kerala technical Kerala State

    STRENGTHS AND SKILLS :
    Work as team leader in construction activities in which I can push my subordinates to achieve goals within time limitation. This includes scheduling, planning, drawings and other technical clarifications etc. I can well understand P&ID, Isometric Drawings, Hook Up Drawing, Wiring Diagram, Instrument Index, Cable Schedules, Location and cable routing plan. I gained good experience in construction activities such as Instrument installation, control valve installation, Hook up, Analyzer installation, Sampling devices and sample tubing , Power cable termination(LV), Instrument cable termination, Glanding,Grounding, Cable pulling, . Experienced in installing inline instruments such as Pitot tube,Anubbar flow elements, Analyzer Samplers, Vortex flow meter etc

    Computer Proficiency :
    Windows Operating systems, Microsoft office, Internet Surfing .
    AutoCAD and 2Drawing from Educad Centre Bangalore.

    Communication Skills :
    Excellent in English. Also excellent in Indian Languages Malayalam, Hindi and Tamil.

    PROFESSIONAL WORK EXPERIENCE :
    Experience 2 yrs. in Nasser S. Al-Hajri Corporation as Instrumentation Engineer (Schedule making, Field design and control, Testing and Commissioning of E&I, Technical supports) in Heavy Industries Construction.
    Company Profile :
    M/s Nasser S. Al-Hajri Corporation
    A Saudi Arabian based, ISO9001 :2008 & OHSAS18001 :2007 certified company engaged in Heavy Industries construction and maintenance work in Middle East. We are one of the largest construction companies in Saudi Arabia. We where the construction partners of Samsung, KBR,TR, Chiyoda, LG, Daelim, L&T,JGC, in construction of many plants across middle with for Aramco, SABIC, Qatar Petroleum, Saudi Polymers etc.

    GCC Experience : - 02 yrs.
    EXPERIENCE IN DETAIL :
    PREVIOUS PROJECT :
    1. National Chevron Philips Project (Saudi Polymers)
    Jubail Industrial City-1, Al-Jubail, Kingdom Saudi Arabia
    Position : Field Control Engineer (Instrumentation)
    Period : From 15-March-2010 still.....
    Client : National Chevron Phillips Project JGC Japan Gas Company
    Responsibilities :
    LOOP CHECKING and troubleshooting using Delta –V ASSET MANAGEMENT SYSTE Emerson
    Attending client meetings and discuss progress week by week progress in the assigned area. Discuss the constraints that may affect the progress or free flow of the project. Finding a solution for the design conflicts in discussion with other disciplines as to change the design or give a suggestion of possible design change.

    PREVIOUS PROJECT :
    1. Saudi Kayan Poly-olefin Project (Saudi Kayan Petrochemical Complex-SABIC)
    Jubail Industrial City-1, Al-Jubail, Kingdom Saudi Arabia
    Position : Instrument engg (Instrumentation)
    Period : From 22-july-2009 To 13-Mar-2010....
    Client : Saudi Kayan Petrochemical Complex - SABIC
    Kellogg Brown and Roots Saudi Ltd
    Responsibilities :
    Controlling the work force for the desirable output. Doing construction activities such as Instrument installation, Hook up, Analyzer installation, Sampling devices and sample tubing, Power cable termination, Instrument cable termination, Glanding, Calibration &Testing etc
    Responsibilities

    Site installation for the instrument systems for 2 incineration system with vendor. Doing construction activities such as Instrument installation, Hook up, Analyzer installation, Sampling devices and sample tubing. Field design of Location for Instruments and Jb’s as per P&I D, and Hook UP and cable schedules. Installation of Deluge Panel and its loop test (FAP).

    SITE ACHIVEMENTS AND TRAINING :
    1. Permit Receiver for Existing OlifiensPlant
    2. Fire watch and safety standby on SKOP Plant
    3. Team member of 90 Million Safe Man-hours w/o Saudi Kayan
    4. Team member of 45 Million Safe Man-hours w/o Saudi polymers
    5. Lockout Tag Out Trained in SKOP
    6. HSE in Transition Trained in SKOP
    7. HSE in Transition in JGC
    INDIA EXP :-
    Co-Generation (Alkyl Amines), Chennai Petroleum (CPCL),(IPCL)RIL.
    Overall Experience is varied in the field of Project as well as Maintenance, and basics of control system like PLC& DCS, Also exposure in as build drawing, inspection of instruments, commissioning of plant and Analyzer Installation with its basic knowledge.

    PREVIOUS PROJECT :
    1. Alkyl Amines Chemical ltd Daund Mumbai
    Position : Instrument Engineer
    Period : From August 2005 to 2006 Jan
    Job Profile : Console operator In Co-Generation Plant.
    PREVIOUS PROJECT :
    2 IPCL (Reliance Industries limited) Dahej
    Position : Site in Charge (Contract Basis Hyperion it Pvt Ltd) Chennai
    Period : From August 2006 March to 2008December....
    Job Profile : - Execution & Pre commissioning of Instrumentation System of HDPE -2 in IPCL, Dahej.
    (2) Site billing, planning and Measurement work.
    PREVIOUS PROJECT :
    3 CPCL (Indian Oil Corporation) Chennai manali
    Position : Site In Charge (Contract Basis Hyperion it Pvt Ltd) Chennai
    Period : From August 2008 March to 2009 April.....
    Job Profile : - Execution & Pre commissioning of Instrumentation System of Refinery III expansion.
    (2) Site billing, planning and Measurement work

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULUM VITAE
    BIKROM KAASHYAP
    ACADEMIC DETAILS
    1. Pre – Engineering :
    Institute Exam Board Year Percentage
    Dispur Govt H.S.school,
    Guwahati H.S.L.C S.E.B.A 2006 69.5
    Arya Vidyapith College, Guwahati H.S A.H.S.E.C 2008 65.8
    2. Bachelor of Engineering :
    Applied Electronics & Instrumentation Engineering
    Girijananda Choudhury Institute of Management & Technology (GIMT)
    Gauhati University

    G.U Norms B.E Percentage : 55% (upto 3rd semester)
    Semester 1st 2nd 3rd 4th 5th 6th
    Percentage 52.18 52.67 58.69 52.43 57 Result awaited
    Year 2008 2009 2009 2010 2010 2010
    TRAINING / INTERNSHIP
    1 Undertaken a summer training at ALL INDIA RADIO,GUWAHATI for 7 days.
    2 Undertaken a summer training at ASSAM STATE ELECTRICITY BOARD for 10 days.
    3 Undertaken a summer training at OIL INDIA LIMITED,GUWAHATI FOR 30 days.
    HOBBIES / INTERESTS
    1. Playing & watching cricket .
    2. watching discovery channel& nat geo .

    3. Listening to music & playing computer games.
    VISION AND OBJECTIVE
    To gain employment with a company or institution that offers me a consistently positive atmosphere to learn new technologies and implement them for the betterment of the business.

  5. Post Count Number #5
    Unregistered
    Guest

    BISWAJIT MAJUMDER
    EMAIL-ID : majumder.biswajit1 AT gmail.com

    (A)EXPERIENCE :-
    3.5 Years experienced as Instrumentation Engineer in Manufacturing/Process Industries (Paper) and Project.

    (B)Current Employer :-
    M/S. Sharma Fabricators and Erectors Pvt. Ltd. (From August 2012)
    Designation : Instrumentation Engineer ( Project)
    Job Role : Calibration, Installation and Commissioning of Instruments like Control Valves, Pressure Transmitter, Flow Transmitter, Temperature Transmitter, Pressure Gauge, etc.

    Execution :
    - Field execution.
    - Installation of field instruments.
    - Troubleshooting of field instruments.
    - Loop checking.
    - Contracting handling and timely reporting.
    - Project co-ordination.
    - Man power sourcing and handling.
    - Dwelled knowledge on MS-Word and Excel.

    Area of Expertise :
    - In time delivery of project to the owner.
    - On time reporting for the scheduling contracts.
    - Maintaining client’s correspondence.

    Responsibilities :
    - Handling of project.
    - Assist the procurement team.
    - Calibration of various field instruments.
    - Installation of instruments in the field.

    Client : Indian Rayon (Aditya Birla Nuvo Ltd.)
    Project : White Spool Project.
    (C)PRESENT STATUS :-
    Pursuing Group ‘A’ studies of Electronics Engineering With Instrumentation & Control from “The Institute of Engineers India (AMIE)”.

    Worked as Jr. Engineer (Instrumentation) in Indian Pulp & Paper Pvt. Ltd.(IPP) (Naihati)(2 YEARS)
    (D) PREVIOUS EMPLOYER :-

    SUPREME PAPER MILLS LTD. (CHAKDAHA, NADIA). (1YEAR)
    (E)EXPERIENCE DETAILS :-
    Installation, Maintenance, Calibration, Overhauling & Trouble-Shooting of different
    Measuring & Controlling Process Instruments (Pneumatic, Hydraulic & Electronics) like :
    AC Drives. (ABB ACS 150, ACS 800).
    PLC (Mitsubishi FX24MR)
    Vortex Flow meter (Forbes Marshall)
    PID Controller. (Forbes Marshall, HoneyWell, Maxthermo, Yokogawa).
    I/P converter. (ABB TEIP II).
    E/P positioner. (Forbes Marshall).
    Control Valve. (Forbes Marshall).
    Pressure Transmitter, Level Transmitter, Differential Pressure/Level Transmitter, Temperature Transmitter. (Siemens, Yokogawa, Rosemount-Emerson3051).
    Pneumatic Cylinder. (VAAS, Orbinox, Schrader Bellows).
    Basis Weight Control Valve. (DeZurik).
    Consistency Transmitter. (DeZurik).
    Solenoid Valve. (Schrader Bellows).
    Air Pressure Gauge. (GURU, Wika, Mass).
    Digital Panel Meter. (Meco)

    Installation, Maintenance of,
    Digital Timer. (Selectron).
    Relay. (Omran, PLA).
    Proxy Sensor. (ifm, P-fuces).
    Pressure Switch/Differential Pressure Switch. (Indfos, Switzer).
    Direction Control Valve. (Yuken,Vickers,Tokimec).
    RTD Pt100.
    Thermocouple.
    Rotameter.
    Proportional Relief Control Valve. (Tokimec)
    Limit Switch.

    Maintenance of,
    Power Supply Unit 24V DC. (JIGO)
    Hydrulic Central Oil Lubrication System. (HI-Tech, Parason)
    Air Compressor. (Atlas Copco GA37 VSD, GA45 VSD, GA15)

    (F)COMPUTER KNOWLEDGE :-
    MS Office, Excel, SAP BASIS

    (G)TECHNICAL ACTIVITIES :-
    Can make 12v dc/ 24v dc Power supply circuit.
    4~20 mA current source.
    Can make DOL starter.
    Can make Proxy Switch

    (H)TECHNICAL QUALIFICATIONS :-
    Completed Diploma in Electronics & Instrumentation Engineering From A.P.C Roy Polytechnic (Jadavpur) under W.B.S.C.T.E approved by A.I.C.T.E. with 72.4% of marks.

    (I)ACADEMIC QUALIFICATIONS :-
    Passed Higher Secondary from Kataganj Gokulpur Adarsha Sikshayatana (H.S.) with 60.5% under WBCHSE in 2006
    Passed Madhyamik (Secondary) from Kataganj Gokulpur Adarsha Sikshayatana (H.S.) with 74.0% under WBBSE in 2004

    (J)TRAINING :-
    From Kolaghat Thermal Power Station (under W.B.P.D.C.L) dated 15th October 2008 to 12th November 2008 as a vocational trainee.

    (K)AIM :-
    To be a part of a better & bigger organization where I can prove my skills & abilities on its best.

    (L)CTC :-240000PA
    (M)Expected :-As per company norms.

    (N)PERSONAL INFORMATION :-
    DATE OF BIRTH : 12th July,1988
    NATIONALITY : Indian
    KNOWN LANGUAGES :
    6. INTERESTS : Still Photography, Music.

    (O)DECLARATION :-
    I hereby declare that all the statements made by me above are true and complete to the best of my knowledge and belief.

    Place : …………………………
    Date Signature