-
February 3rd, 2009, 07:02 PM
Post Count Number #1
Al Banna Engineering Dubai/ UAE : Piping Fabrication Supervisor
Al Banna Engineering - Interviews will be in Mumbai on 20th of Feb Dubai/ UAE : Piping Supervisor
Website: http://www.albanna-eng.com
Keywords: Piping Supervisor, Piping Foreman, Pressure Piping, Unit Piping
Designation: Piping Supervisor
Experience: 4 - 9 Years
Location: Dubai/ UAE
Job Description:
Responsible to ensure the correct execution of the project quality plan and quality procedure and productivity related to his scope of works in accordance with program of work on site.
He will be reporting to Project manager and receiving reports from Foreman/Technicians.
Duties & Responsibilities:
1. Be based full time at site.
2. To be fully aware of the project specification, drawings and BOQ.
3. To Plan and Carryout all site activities as per shop drawings, method statements, specification and work plan.
4. Report to the Site Engineer / Project manager for any technical problem or inquiries in the project.
5. Identify the Overtime for labors under him.
6. Requisition material, tools and equipment needed.
7. Control the use of material and avoid damages and waste.
8. Ensure safe work environments
Desired Candidate Profile:
Must have Degree or Diploma in mechanical.
Minimum 5 year of experience in pressure piping in refinery / oil & gas installation / Chemical / Fertilizer installation.
Candidate Shall have Computer knowledge(Microsoft Word and Excel), Knowledge of English both oral and written.
Company Profile:
Established in the year 1976, the Albanna Group has rapidly developed and established itself in United Arab Emirates as an integrated commercial, industrial and services organization, positioning itself as one of the leading business houses in the Gulf region. The Albanna Group comprises a diverse range of operating subsidiaries and associated companies, structured to give them the flexibility and versatility to keep ahead of local competition with ever-evolving global business scenario.
The Albanna Group's operational divisions are:
* Engineering and Turnkey contracting for Oil & Gas
* Pre-engineered Buildings & Structures
* Civil Construction
* Electromechanical
* Printing & Publishing
* Steel Trading
* Logistics & Forwarding
In addition to the above diverse business portfolio the Group has many divisions by providing sponsorship
Address:
Office No 9, Ground Floor
Punit Tower 2, Next to K Star Hotel
Sector 11, CBD Belapur,Navi Mumbai
Mumbai,Maharashtra,INDIA 400614
-
October 6th, 2011, 07:00 PM
Post Count Number #2
piping supervisor
CURRICULUM-VITAE
MOHD. AAMIR SHOHIL
E-mail :aamir_apt AT yahoo.com
Post Applied For………………………………………………..…….……Supervisor Piping
Objective :
Seeking a position in the organization that provides me ample opportunity to explore & excel in the field of Mechanical Engineering (Piping) while carving out the niche for personal, professional as well as organizational goals
Job Profile and Responsibilities :
- To develop and follow accurate project incorporation & all significant project variables
- Fabrication of pipe and spool as per isometric drawing
- Erection of piping and other equipments as per drawing and relevant standards
- Supervise erection of all fabricated parts in job site
- Survey for installation and erection of piping and pipe support
- To carry out dimensional and visual inspection of pipe and pipe support after fabrication
- All types of fabrication, Erection, Welding inspection & Hydro test for mechanical clearance
- Direct manpower handling for all type of jobs
- Have good co-ordination with subcontractors
- To provide daily & weekly progress report to the seniors
- Co-ordination with sub-contractor
WORKING EXPERIENCE
- (06)Six years experience
- Working as a Supervisor Piping for Jaihindproject ltd at Gayle Power generation
Project, Haryana, India.
- Worked as a Supervisor piping for C.C.I.C.(Consolidated Contractors International
Company) 3rd N.G.L.Train project Ruwais Abudhabi, U.A.E.
- Worked as a Foreman piping for L&T (Larson and Toubro) Reliance Petro Chemical Project, Jamnagar, India.
WORKING DETAILS :
Designation Company Name Work Period
Supervisor Piping Jaihind Project Ltd. 15-10-2008 to till date
Supervisor Piping
C.C.I.C. (Consolidated Contrs.
International Company 07-11-2006 to12-04-2008
Foreman Piping L&T (Larson and Toubro Ltd.) 11-05-2004 to 27-03-2006
EDUCATIONAL QUALIFICATION :
- Diploma in Mechanical Engineering (DME) from Karnataka Institute of Engineering & Technology, Bangalore.
- Matriculation (10th) from Bihar Secondary School Examination Board, Patna.
TECHNICAL QUALIFICATION :
- Auto CAD (Mechanical)
-
February 13th, 2013, 12:17 PM
Post Count Number #3
Dear sir,
I am B.KAMALAMOHAN DME holder.Am Worked in Fabrication line at Tamil nadu Ranipet BHEL Sub contractor Company Supervisor.Am Intersted in your constrction.please Sutabile job offerd to one chance.I have do the needfull.
S.B.S.KAMALAMOHAN
Email Id :kamal.kamal.2005 AT gmail.com
Objective :
To work in a competitive environment among highly motivated individual’s, towards continuous personal and professional improvement through hard work and the application of knowledge.
Strengths :
** Good Written and oral communication
** Able to work under pressure and adapt according to situation
** Willingness to learn
** Self confidence
EXPERINCE :
FARHAAN FABRICATIONS., SERKADU
COMPANY PROFILE :
Approved Sub-Contractor to BHEL for General and Heavy Fabrication Works.
Designation : Supervisor in QC
Duration : January 2012 to Till Date.
SMA ENGG. WORKS., THIRUVALAM
COMPANY PROFILE :
Approved Sub-Contractor to BHEL for General and Heavy Fabrication Works.
Designation : Supervisor in QC
Duration : September 2010 to December 2011
KISHORE ENTERPRISES., KARNAMBET
COMPANY PROFILE :
Sub Contractor for Fabrication Works.
Duration : May 2009 to September 2010
WORK : Column, Panels, Hopper Walls,
M/S.AUSTRIAN ENERGY & ENVIRONMENT CHENNAI WORKS LTD, CHENNAI – 56.
COMPANY PROFILE :
The Company has been specialized in the field of Boilers, Pressure parts for power
And process industries.
Customer in Indian market as well as in global market, Certificate Company and has approved by American Society of Mechanical Engineers (ASME) for use “S” Stamps.
Designation : QC – Supervisor
Duration : 20Feb 2008 to 05 Feb 2009.
M/S. GB ENGINEERING ENTERPRISES (P) LTD., TRICHY -15.
COMPANY PROFILE :
The Company has been specialized in the field of Boiler, Pressure Vessels,Deaertors,Desalination Plants etc.for power and process industries.GB has served prestigious Customer in Indian market as well as in global market.GB is an ISO 9001 :2000 Certified Company and has approval by American Society Of Mechanical Engineers (ASME) for use of “S” and”U” stamps.
Designation : QC – Supervisor
Duration : 14 May 2007 to 17 Feb 2008.
M/s.SRI KM FAB., RANIPET -03.
COMPANY PROFILE :
Approved Sub – Contractor to BHEL for General and Heavy Fabrication works and also
Non-Pressure parts, Duct fabrications.
Designation : QC – Supervisor.
Duration : 14 Aug 2003 to 05 May.
M/s.VENKATESWARA ENTERPRISES. RANIPET -03.
COMPANY PROFILE :
Approved Sub – Contractor to BHEL for General and Heavy Fabrication works and also
Non-Pressure parts, Duct fabrications.
Designation : QC – Supervisor.
Duration : April 2001 to July 2003
Professional History :
# Fully involved as nominated QA/QC task, Which controls Manufacturing process successfully with reference to Drawing, Quality Plans, System procedure, Codes and standards.
# Co-ordination with clients (BHEL, NTPC, ALSTOM, PETROBRAS, PRATT)
# Co-ordination with third party inspection agencies (BVIS, LLOYDS, TPL)
# Expertise in inspection of various equipments at shop Viz. Pressure Parts, Piping Structure, etc.
# Have through knowledge on GTAW, SMAW, GMAW and FCAW
# Involved in
- Raw material inspection, verification of Raw material test certificates
- Evaluation of NDEs (PT,MT,UT,RT)
- Qualification of Welders, welding procedures as per ASME SEC IX.
- Stage inspection viz.,
(i) Dimensional Inspection
(ii) Hydro Test
(iii) Heat Treatment
- Final Inspection
- Stage by Stage documents like
(i) Raw material inspection in pressure parts and non- pressure with respect to TC,TDC,Heating Valve Dimensions and ASME SEC-II
(ii) Welding Booklets WPS, PQR, WPQR and applicable WPS verification with reference to ASME SEC IX, IBR format.
(iii) In process control documents preparation like.
1. Layout report
2. First of trial
3. LPI report
4. Fit up report
5. Visual inspection
6. Final dimension inspection
7. Dispatch clearance report and MDR report preparation.
# The work involves structural fabrication of Boilers supporting structures like plus column and bore columns.
# Fabrication of Air Pre-heater, different types of ducts and silencer assembly.
# Follow the work status and ensure the customer requirements and standard and give the drawing clarification when required.
# Take the responsibility of job to the final inspection conducted by the third party inspection agencies and customer.
# wide ranging skills with ability to grasp new technologies rapidly.
# Excellent team-worker and ability to cope up with demanding work-Schedules.
Educational Qualification :
Technical Qualification : Year of passing 2000
: Percentage 64 %
: Diploma in Mechanical Engineering
: Priyadarshini Polytechnic
: Vaniyambadi
SSLC : Year of passing 1996
: Percentage 65 %
: Hindu Hr.Sec.School.
: Vaniyambadi
Personal Details :
Date of Birth : 06-06-1981
Father’s Name : S.Balasubramanian
Nationally : Indian
Languages Known : English, Tamil
Marriage Status : Married
DECLARATION :
I hereby declare that all the statement furnished above is true to the best of my knowledge and behalf. Expecting your favorable reply.
Thanking & Regards
(S.B.S.KAMALA MOHAN).
-
March 12th, 2013, 07:31 AM
Post Count Number #4
CHRISTOPHER TAN
Email : christophertan_211973 AT yahoo.com
PIPING SUPERVISOR
OBJECTIVE :
To secure a challenging position with a leading corporate on hi -tech environment where I can be given the chance to perform, utilize and impart my ability, knowledge and experiences as well as an opportunity to advance my skills to the fullest potential.
SUMMARY OF SKILLS & EXPERIENCE :
14 years experience in Engineering and Construction related to Petrochemical, Oil and Gas, Utilities / Power Plant, Petroleum refinery, Water treatment plant, Pumping station and other related industrial projects. Exposed on different types and materials of pipe and pipe supports fabrication, installation, supervision, inspection and testing and pre- commissioning.
Conversant with the international codes and standards such as ASME, ASTM, API and project design Engineering specifications and Procedure.
EMPLOYMENT HISTORY :
Position held : Piping Supervisor
Company : Qatar Electric and Water Company
Place : Ras Abu Fontas, Doha Qatar
Period : September 20, 2010 to June 09, 2012
Job Description :
Coordinate piping fabrication activities for shut down activities
Coordinate piping spools pressure tests.
Submit the work permit in a daily safety meeting.
Coordinate piping installation according to the refurbishment schedule.
Check the piping NDT status as per needs.
Check the piping painting and insulation status as per schedule
Hand over the piping systems to the client.
Interface with other department : Engineering, QS, Civil Construction, Support Services Construction etc.
Monitor equipment/ materials availability at the store.
Attend production meetings.
Position held : Piping Supervisor
Company : Atlantic Gulf & Pacific Company
Project : Foster Wheeler
Place : San Roque, Bauan, Batangas Philippines
Period : May 05, 2008 to Aug. 15, 2010
Job Description :
Supervises, assigns, and coordinates the piping works activities of subordinates.
Reviews daily plans of the jobs to be performed and schedule jobs in accordance with operating requirements and priority.
Prepares daily reports of work progress and man power utilization.
Prepares weekly program for pipelines and related equipment and submit weekly reports to the Operations Superintendent for further action.
Ensures compliance with company Health, Safety and Environment as well as work permit, policies and procedure.
Supports the Superintendent in solving technical and management problems encountered in the area of responsibility
Position held : Material Engineer
Project : Goro Nickel Project
Place : Southwest Pacific, New Caledonia (Onshore)
Period : August 30, 2006 to February 28, 2008
Job Description :
Checks / verifies the summary of materials as per Bill of Materials or Material List
Review and study the general specification of the project
Prepare material tracking for proper material control
Coordinate with E&I Superintendent, Supervisor, Field Engineer, Foreman and engineering for the materials problems encountered pertaining to project
Coordinate with the custom bonded warehouse and the import export department for the estimated time of arrival of the materials
Weekly meeting with the E&I Superintendent, Planning Superintendent (clients) and the E & I team for the progress report and the availabilities of materials and also the outstanding balance materials
Prepares procurement Action of Electrical and Instrumentation Materials based from the summary of materials
Prepares P.A summary reflecting the priority based on schedule then update status weekly
Prepares summary of E&I instrumentation materials received – Customer supplier and AG&P supplied materials and update based on the issuance
Allocates materials to drawings release by engineering
Maintain knowledge of safety policies and procedures and perform assigned duties in safe manner.
Position held : Piping Foreman
Company : Atlantic Gulf & Pacific Company
Client : Daewoo Shipbuilding and Marine Engineering Co. Ltd (DSME)
Project : Chevron/ Benguela Belize Development
Place : Cabinda, Angola West Africa - Offshore
Period : July 10, 2004 to July 15, 2006
Job Description :
Directs and supervises activities of the assigned subordinates for the overhauling
Of static equipment, valves, pipe works and repair activities on off shore barges/ super complex during the shutdown.
Receives job cards and discussing/consulting with the supervisor to set priorities and allocating works to subordinates.
Arranging and obtaining work permits and materials/ spares as required.
Ensures that tools are well maintained and kept in safe working condition.
Plan the sequence of jobs (preparation, lifting, installations, welding, etc.)
Obtains safety equipment for personnel, arrange for standby services as required and ensures compliance with company’s safety regulations.
Checking and inspecting completed work. Ensures good housekeeping of the work area.
Performs other related duties as by the supervisor such as; identifying training needs for subordinates, preparing necessary reports etc.
Position held : Piping Foreman
Company : Industrial Maintenance International
Place : Chad Africa, Onshore
Period : October 08, 2002 to April 26, 2004
Job Description :
Preparation of all drawing on site, fabrication and review, check standard procedure required in the project.
Coordination with Project Manager, Piping Supervisor, and Superintendent, prior for daily and weekly work forecast & schedule.
Delegates work to foreman and other subordinated to carry out daily work and target work production.
Supervise of installation of structural and piping construction and pipe sleeper, .pipe rack and piping around equipment.
Confirm latest drawing, vendor instructions are in field modification changes in scope, execute design work to provide drawings material list and requisition.
Check drawings are issued on schedule and develop as “built drawing”
Make all preparation of materials lay-out, fabricate of spool as per drawing requirement.
Checking construction report on assigned task on daily basis and monitor, control on site safety concern.
Coordination with the operation people regarding the revision to be made in piping works.
Review all scope of work drawing for fabrication provided by the client.
Responsible for erection of pipe/plumbing lines to ground level/upper structure from tank to tank age area.
Position held : Piping Foreman
Company : Engineering Equipment Incorporated
Project : Malampaya Onshore Gas Plant
Place : Batangas Shell Tabangao Philippines
Period : November 18, 2000 to April 20, 2002
Job Description :
Coordinate and check the work carried out by personnel, directly acting during more difficult stages (pipeline routes, check of depths, lifting operations, etc.)
Inspect documents, check available assembly material and delegate work to subordinates
Define the assembly welding jobs, identifying the parts to be pre-fabricated at the workshop and the welding jobs to perform upon assembly.
Prepare as-built drawings, with all variations made during works, giving the superior all data for correct accounting
Comply with detailed program for the use of personnel and equipment made available; promptly report any interference with and/or variations to the work of other parties
Control the execution of works, whilst guaranteeing quality, ensure the operative programmer is complied with and check that applicable safety standards are observed.
Position held : Pipe fitter
Company : Atlantic Gulf & Pacific Company
Place : San Roque, Bauan, Batangas, Philippines
Period : November 22, 1995 to November 15, 1999
Job Description :
Performs specific duties that Foreman, Supervisor may direct.
Familiar in Interpreting Isometric and Plan Drawings.
Responsible for checking of materials to be used base on the List.
Assigned in Pipe Shop Fabrication of Pipes and its Fittings base in Isometric in proper fit-up.
Assigned in Field Works, Installation and Erection of Pipe Spools, Valves including supports.
Responsible for the proper alignment of Pipes and Fittings together with the existing pipes and proper reference line and elevation.
PERSONAL DETAILS :
Address : Batangas, Philippines
Age : 39 years old
Place of Birth : Manila, Philippines
Nationality : Filipino
Gender : Male
Status: Married
Height: 175cm
Weight: 77 kg
Language known: English (intermediate)
EDUCATION QUALIFICATION:
Bachelor’s Degree in Mechanical Engineering
Western Philippine Colleges (University of Batangas)
Batangas City Philippines
June 1989 ~ March 18, 1994
Secondary Education
San Pascual National High School
San Pascual, Batangas, Philippines
June 1985 ~ March 21, 1989
Primary / Intermediate Education
San Pascual Elementary School
San Pascual, Batangas, Philippines
June 1979 ~ March 19, 1985
Trainings/ Certifications:
First Aid Training – Oct. 4 & 6, 2006 - Goro Nickel Project, New Caledonia
Confined Space Safety Seminar – Oct. 11, 2006 – Goro Nickel Project Caledonia
20 Million man hours Lost Time Injury Safety Award – March 2003 – Chad
Development Project, Africa
Quality Training Module - Title: Piping Fit-up and Erection - Feb. 16, 2002
Foster Wheeler Philippines
Special Skills:
Pipe Fitting/ Welding/ Structural, Rigger, Fabrication.
Relevant Skills:
Knowledge and experience in studying Plant and Piping Layout, Isometric and P& ID drawings, etc.
Knowledge of the mechanics of operation of equipment such as pumps, boilers, heaters and other plumbing components.
Ability to work in a multicultural environment and has a sense of responsibility.
Quick learner & Flexible, can handle time pressure works.
Other Skill:
Proficient in operating Microsoft office word, excel, and PowerPoint.
I hereby declare that all the information mentioned above is true and correct to the best of my knowledge.
Christopher Tan
-
March 12th, 2013, 08:25 PM
Post Count Number #5
Mr.A.Pream Bharath
Madurai- 625009.
INDIA
Email : preambharath AT gmail.com
CAREER OBJECTIVE :
To excel in the field of mechanical by applying my skills to grow with the organization and transform vision into reality.
ACADEMIC PROFILE :
COURSE INSTITUTION BOARD/ UNIVERSITY YEAR OF PASSING CLASS :
B.E [MECH.ENGG] JEPPIAAR ENGINEERING COLLEGE ANNA UNIVERSITY 2009 FIRST
WORK EXPERIENCE : 4 years
INSPECTORATE GRIFFITH INDIA PVT LTD.,
PERIOD : JANUARY 2013 TO PRESENT
Role : Inspection Engineer
Key Projects :
Project #1 :
Third Party Inspection of structural painting Projects, Chittorgarh, Chittorgarh District, Rajasthan, India
Client : M/S HINDUSTAN ZINC LIMITED, Chanderia.(Rajasthan)
Role : Inspection Engineer
Technology : IS standards and Client Requirement standards
Responsibilities :
- To continuously inspect the structural painting work at chanderiya smelting complex, which has been performed by the contractor (i.e.,) from surface preparation to the applying of finished coats.
- To check the surface preparation of cleaned structures as per ISO 8501-1 :1988
- To suggest the colour code of pipe lines as per IS 2379 :1990
- To check initial, intermediate and final reading for thickness of coats such as DFT, WFT and to submit weekly, monthly reports to the client.
- Rechecking of works/rectification suggested and completed by the contractor and re-recording the paint thickness.
- Certification of contractor bills for quantity and quality for the payment purpose.
- Inspecting Columns Erection for Sprinkler pipe fitup as per drawing.
- Preparation of NDT test for the pipe lines of Sprinkler System welding as per client requirement .
- Preparing Reports on each stages of work and reporting to IOCL (A.P)
SGS INDIA PVT LTD.,HYDERABAD :
PERIOD : JUNE 2011 TO DECEMBER 2012
Role : Quality Assurance & Quality Control Engineer
Key Projects :
Project #1 :
Quality Inspection Services for Providing SPRINKLER System for All Tanks at Kadapa Depot, Kadapa District,Andhra Pradesh,under IOCL AP State Office
Client : M/S INDIAN OIL CORPORATION LTD, A.P.STATE OFFICE,HYDERABAD
Role :
Quality Testing Inspector
Technology : IS standards and Client Requirement standards
Responsibilities :
- Inspection Of Incoming Material.
- Planning the Erection work and getting approval from Depot Manager.
- Inspecting the Sprinkler Pipe Fitup as per drawing.
- Inspection of Surface Cleaning.
- Inspecting Painting as per client reqirement.
- Inspecting Columns Erection for Sprinkler pipe fitup as per drawing.
- Preparation of NDT test for the pipe lines of Sprinkler System welding as per client requirement .
- Preparing Reports on each stages of work and reporting to IOCL (A.P)
Key Projects :
Project #2 :
Third Party Quality Assurance for GandiKota C B R Lift Irrigation Projects, Pulivendula, Kadappa District, Andhra Pradesh, India
Client Andhra Pradesh Irrigation CAD Department
Role :
Quality Testing Inspector
Technology : IS standards and Client Requirement standards
Description : Third party Quality Control/Quality Assurance for Pipe line and allied Works, Hydro- Mechanical, Electro- Mechanical Works of 6 stages pumping of water from Gandikota reservoir to Chitravathi Balancing Reservoir.
Responsibilities :
- Preparation of ITP's, field inspection procedures, inspection check list.
- Conducting welder qualification as per approved WPS.
- Control and ensure that calibration certificate for machineries/gauges are available for Inspection checking alignment of pipes
- Checking of weld defects like extra penetration, Lack of fusion, porosity e.t.c.
- Checking Cleaning Procedures (Sand Blasting)
- Checking DFT
- Checking Ovality of the pipe.
- Preparation of material identification and dimensional reports before start of piping/tank work.
- Preparation of fit-up and welding inspection report.
- Preparing stage wise inspection as per approved ITP's.
- Guiding, controlling, monitoring, supporting a team of various discipline QC Inspectors.
- Welding inspection requirement and NDT plan.
- Verification of personal qualification of NDT personnel and welders.
- Inspection Of Erection Work of Electrically Operated Crane and Semi Portal Crane.
- Checking Load test on the erected Crane.
- Inspection of Roof Truss Material Fabrication Work as per drawing.
- Inspection of Roof Truss Erection Work.
- Checking the EOPD & HOPD erection matching with Flanges of Pipe.
- Inpection of Incoming Liner,Impeller ,Shaft of Pump as Per drawing.
- Reporting each stages of PUMP ERECTION to client.
- Witnessing and Inspecting the pump after erection such as clearance between liner, Defection etc.,
- Issue of non –conformance report and ensure that corrective action taken.
- Attending weekly progress meeting with client representing QC team.
- Prepare internal audit and conduct auditing as part of ISO 9001 requirement.
- Witnessing of hydraulic Pressure test.
- Preparation of quality certificate for execution work.
- Uploading project monitoring system.
Additional Knowledge :
o Inspection of E&M Equipments
o Erection of Pumps & allied equipments
o NDT methods.
ESJAY ENGINEERING WORKS, HOSUR
Period : June 2009 to June 2011
Manufacturer :Specialist in industrial fabrication
Role :Production Planning & Quality Engineer
Client : ION EXCHANGE INDIA LTD.,
CK AIRTECH (P) LTD.,
BHEL RANIPET
Main Projects :AIR POLLUTION CONTROL EQUIPMENT
MIXING CHAMBER
CLEAN GAS DUCT
UNIVERSAL DUST COLLECTOR
BOILER ANCILARIES
SIDE PANEL
MIDDLE PANEL
HOPPER LOWER
APH PANEL
NTPC COLUMN
WATER TREATMENT EQUIPMENT
PRESSURE VESSEL
LAMELLA CLARIFIER
SS LATERAL
Job responsibility :
- PRODUCTION PLANNING ENGINEER
- Compile detailed worksheets and specifications from customer orders
- Setting production targets
- Ensuring proper Planning & execution of complete sampling activity
- Optimum utilization of man & machine
- Estimate type and quantity of materials and labor required for production
- Consult with production fitter to schedule production runs in a cost and time-efficient manner.
- Meet regularly with other purchasing and inventory clerks, to co-ordinate activities between production floors and stores.
- QUALITY ENGINEER :
- Visual inspection :
- Dimensions, tolerances, preparation, fit-up and alignment are in accordance with the Approved drawings and standards.
- Tack welds, bridging pieces, clamping
- Preheat in accordance with procedure
- Inspection before welding :
- The drawings are clear with Welding symbols
- Welding procedure sheets (specifications) are available, have been approved and are employed in production
- Parent material identification is verified against documentation and markings.
- Inspection during welding :
- Preheat and interpass temperatures monitoring
- Interpass cleaning - chipping, grinding, gouging monitoring
- Root and subsequent run sequence
- Essential variables such as current, voltage, travel speed
- Filler metals, fluxes and shielding gases are correct.
- Welding is in compliance with weld procedure sheet and application standard.
- Inspection after welding :
- Visual inspection to be carried out to ascertain acceptability of appearance of welds
- Dimensional accuracy to be ascertained
- Conformity with drawings and standards requirements.
- Post weld heat treatment, if any, monitored and recorded.
- NDT carried out and reports assessed.
- Assess defects as to either repairing
MECHANICAL DESIGN SOFTWARE :
- CATIA V5
- ANSYS
CERTIFICATED IN :
- ASNT LEVEL 2 (UT,RT,MPT,PT)
AREA OF INTEREST :
- Fabrication
- Welding
-
January 20th, 2023, 07:49 PM
Post Count Number #6
piping supervisor
i am 15+ years experiences this field