Al Banna Engineering Dubai/ UAE : Piping Fabrication Supervisor

+ Ask Question / Post resume
Results 1 to 6 of 6
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Al Banna Engineering Dubai/ UAE : Piping Fabrication Supervisor

    Al Banna Engineering - Interviews will be in Mumbai on 20th of Feb Dubai/ UAE : Piping Supervisor

    Website: http://www.albanna-eng.com

    Keywords: Piping Supervisor, Piping Foreman, Pressure Piping, Unit Piping

    Designation: Piping Supervisor
    Experience: 4 - 9 Years
    Location: Dubai/ UAE

    Job Description:
    Responsible to ensure the correct execution of the project quality plan and quality procedure and productivity related to his scope of works in accordance with program of work on site.

    He will be reporting to Project manager and receiving reports from Foreman/Technicians.

    Duties & Responsibilities:
    1. Be based full time at site.
    2. To be fully aware of the project specification, drawings and BOQ.
    3. To Plan and Carryout all site activities as per shop drawings, method statements, specification and work plan.
    4. Report to the Site Engineer / Project manager for any technical problem or inquiries in the project.
    5. Identify the Overtime for labors under him.
    6. Requisition material, tools and equipment needed.
    7. Control the use of material and avoid damages and waste.
    8. Ensure safe work environments

    Desired Candidate Profile:
    Must have Degree or Diploma in mechanical.

    Minimum 5 year of experience in pressure piping in refinery / oil & gas installation / Chemical / Fertilizer installation.

    Candidate Shall have Computer knowledge(Microsoft Word and Excel), Knowledge of English both oral and written.

    Company Profile:
    Established in the year 1976, the Albanna Group has rapidly developed and established itself in United Arab Emirates as an integrated commercial, industrial and services organization, positioning itself as one of the leading business houses in the Gulf region. The Albanna Group comprises a diverse range of operating subsidiaries and associated companies, structured to give them the flexibility and versatility to keep ahead of local competition with ever-evolving global business scenario.

    The Albanna Group's operational divisions are:
    * Engineering and Turnkey contracting for Oil & Gas
    * Pre-engineered Buildings & Structures
    * Civil Construction
    * Electromechanical
    * Printing & Publishing
    * Steel Trading
    * Logistics & Forwarding

    In addition to the above diverse business portfolio the Group has many divisions by providing sponsorship

    Address:
    Office No 9, Ground Floor
    Punit Tower 2, Next to K Star Hotel
    Sector 11, CBD Belapur,Navi Mumbai
    Mumbai,Maharashtra,INDIA 400614

    P.O.Box 2606. Dubai - UAE,
    E-mail : albannae@emirates.net.ae
    Website : www.albanna-eng.com

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    piping supervisor

    CURRICULUM-VITAE
    MOHD. AAMIR SHOHIL
    E-mail :aamir_apt AT yahoo.com
    Post Applied For………………………………………………..…….……Supervisor Piping
    Objective :
    Seeking a position in the organization that provides me ample opportunity to explore & excel in the field of Mechanical Engineering (Piping) while carving out the niche for personal, professional as well as organizational goals
    Job Profile and Responsibilities :
    - To develop and follow accurate project incorporation & all significant project variables
    - Fabrication of pipe and spool as per isometric drawing
    - Erection of piping and other equipments as per drawing and relevant standards
    - Supervise erection of all fabricated parts in job site
    - Survey for installation and erection of piping and pipe support
    - To carry out dimensional and visual inspection of pipe and pipe support after fabrication
    - All types of fabrication, Erection, Welding inspection & Hydro test for mechanical clearance
    - Direct manpower handling for all type of jobs
    - Have good co-ordination with subcontractors
    - To provide daily & weekly progress report to the seniors
    - Co-ordination with sub-contractor
    WORKING EXPERIENCE
    - (06)Six years experience
    - Working as a Supervisor Piping for Jaihindproject ltd at Gayle Power generation
    Project, Haryana, India.
    - Worked as a Supervisor piping for C.C.I.C.(Consolidated Contractors International
    Company) 3rd N.G.L.Train project Ruwais Abudhabi, U.A.E.
    - Worked as a Foreman piping for L&T (Larson and Toubro) Reliance Petro Chemical Project, Jamnagar, India.
    WORKING DETAILS :
    Designation Company Name Work Period
    Supervisor Piping Jaihind Project Ltd. 15-10-2008 to till date
    Supervisor Piping
    C.C.I.C. (Consolidated Contrs.
    International Company 07-11-2006 to12-04-2008
    Foreman Piping L&T (Larson and Toubro Ltd.) 11-05-2004 to 27-03-2006
    EDUCATIONAL QUALIFICATION :
    - Diploma in Mechanical Engineering (DME) from Karnataka Institute of Engineering & Technology, Bangalore.
    - Matriculation (10th) from Bihar Secondary School Examination Board, Patna.
    TECHNICAL QUALIFICATION :
    - Auto CAD (Mechanical)

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Dear sir,
    I am B.KAMALAMOHAN DME holder.Am Worked in Fabrication line at Tamil nadu Ranipet BHEL Sub contractor Company Supervisor.Am Intersted in your constrction.please Sutabile job offerd to one chance.I have do the needfull.
    S.B.S.KAMALAMOHAN
    Email Id :kamal.kamal.2005 AT gmail.com
    Objective :
    To work in a competitive environment among highly motivated individual’s, towards continuous personal and professional improvement through hard work and the application of knowledge.
    Strengths :
    ** Good Written and oral communication
    ** Able to work under pressure and adapt according to situation
    ** Willingness to learn
    ** Self confidence

    EXPERINCE :
    FARHAAN FABRICATIONS., SERKADU
    COMPANY PROFILE :
    Approved Sub-Contractor to BHEL for General and Heavy Fabrication Works.
    Designation : Supervisor in QC
    Duration : January 2012 to Till Date.
    SMA ENGG. WORKS., THIRUVALAM
    COMPANY PROFILE :
    Approved Sub-Contractor to BHEL for General and Heavy Fabrication Works.
    Designation : Supervisor in QC
    Duration : September 2010 to December 2011
    KISHORE ENTERPRISES., KARNAMBET
    COMPANY PROFILE :
    Sub Contractor for Fabrication Works.
    Duration : May 2009 to September 2010
    WORK : Column, Panels, Hopper Walls,
    M/S.AUSTRIAN ENERGY & ENVIRONMENT CHENNAI WORKS LTD, CHENNAI – 56.
    COMPANY PROFILE :
    The Company has been specialized in the field of Boilers, Pressure parts for power
    And process industries.
    Customer in Indian market as well as in global market, Certificate Company and has approved by American Society of Mechanical Engineers (ASME) for use “S” Stamps.
    Designation : QC – Supervisor
    Duration : 20Feb 2008 to 05 Feb 2009.
    M/S. GB ENGINEERING ENTERPRISES (P) LTD., TRICHY -15.
    COMPANY PROFILE :
    The Company has been specialized in the field of Boiler, Pressure Vessels,Deaertors,Desalination Plants etc.for power and process industries.GB has served prestigious Customer in Indian market as well as in global market.GB is an ISO 9001 :2000 Certified Company and has approval by American Society Of Mechanical Engineers (ASME) for use of “S” and”U” stamps.
    Designation : QC – Supervisor
    Duration : 14 May 2007 to 17 Feb 2008.
    M/s.SRI KM FAB., RANIPET -03.
    COMPANY PROFILE :
    Approved Sub – Contractor to BHEL for General and Heavy Fabrication works and also
    Non-Pressure parts, Duct fabrications.
    Designation : QC – Supervisor.
    Duration : 14 Aug 2003 to 05 May.
    M/s.VENKATESWARA ENTERPRISES. RANIPET -03.
    COMPANY PROFILE :
    Approved Sub – Contractor to BHEL for General and Heavy Fabrication works and also
    Non-Pressure parts, Duct fabrications.
    Designation : QC – Supervisor.
    Duration : April 2001 to July 2003

    Professional History :
    # Fully involved as nominated QA/QC task, Which controls Manufacturing process successfully with reference to Drawing, Quality Plans, System procedure, Codes and standards.
    # Co-ordination with clients (BHEL, NTPC, ALSTOM, PETROBRAS, PRATT)
    # Co-ordination with third party inspection agencies (BVIS, LLOYDS, TPL)
    # Expertise in inspection of various equipments at shop Viz. Pressure Parts, Piping Structure, etc.
    # Have through knowledge on GTAW, SMAW, GMAW and FCAW
    # Involved in
    - Raw material inspection, verification of Raw material test certificates
    - Evaluation of NDEs (PT,MT,UT,RT)
    - Qualification of Welders, welding procedures as per ASME SEC IX.
    - Stage inspection viz.,
    (i) Dimensional Inspection
    (ii) Hydro Test
    (iii) Heat Treatment
    - Final Inspection
    - Stage by Stage documents like
    (i) Raw material inspection in pressure parts and non- pressure with respect to TC,TDC,Heating Valve Dimensions and ASME SEC-II
    (ii) Welding Booklets WPS, PQR, WPQR and applicable WPS verification with reference to ASME SEC IX, IBR format.
    (iii) In process control documents preparation like.
    1. Layout report
    2. First of trial
    3. LPI report
    4. Fit up report
    5. Visual inspection
    6. Final dimension inspection
    7. Dispatch clearance report and MDR report preparation.
    # The work involves structural fabrication of Boilers supporting structures like plus column and bore columns.
    # Fabrication of Air Pre-heater, different types of ducts and silencer assembly.
    # Follow the work status and ensure the customer requirements and standard and give the drawing clarification when required.
    # Take the responsibility of job to the final inspection conducted by the third party inspection agencies and customer.
    # wide ranging skills with ability to grasp new technologies rapidly.
    # Excellent team-worker and ability to cope up with demanding work-Schedules.

    Educational Qualification :
    Technical Qualification : Year of passing 2000
    : Percentage 64 %
    : Diploma in Mechanical Engineering
    : Priyadarshini Polytechnic
    : Vaniyambadi
    SSLC : Year of passing 1996
    : Percentage 65 %
    : Hindu Hr.Sec.School.
    : Vaniyambadi
    Personal Details :
    Date of Birth : 06-06-1981
    Father’s Name : S.Balasubramanian
    Nationally : Indian
    Languages Known : English, Tamil
    Marriage Status : Married
    DECLARATION :
    I hereby declare that all the statement furnished above is true to the best of my knowledge and behalf. Expecting your favorable reply.
    Thanking & Regards
    (S.B.S.KAMALA MOHAN).

  4. Post Count Number #4
    Unregistered
    Guest

    CHRISTOPHER TAN
    Email : christophertan_211973 AT yahoo.com

    PIPING SUPERVISOR

    OBJECTIVE :
    To secure a challenging position with a leading corporate on hi -tech environment where I can be given the chance to perform, utilize and impart my ability, knowledge and experiences as well as an opportunity to advance my skills to the fullest potential.

    SUMMARY OF SKILLS & EXPERIENCE :
    14 years experience in Engineering and Construction related to Petrochemical, Oil and Gas, Utilities / Power Plant, Petroleum refinery, Water treatment plant, Pumping station and other related industrial projects. Exposed on different types and materials of pipe and pipe supports fabrication, installation, supervision, inspection and testing and pre- commissioning.

    Conversant with the international codes and standards such as ASME, ASTM, API and project design Engineering specifications and Procedure.

    EMPLOYMENT HISTORY :
    Position held : Piping Supervisor
    Company : Qatar Electric and Water Company
    Place : Ras Abu Fontas, Doha Qatar
    Period : September 20, 2010 to June 09, 2012
    Job Description :
    Coordinate piping fabrication activities for shut down activities
    Coordinate piping spools pressure tests.
    Submit the work permit in a daily safety meeting.
    Coordinate piping installation according to the refurbishment schedule.
    Check the piping NDT status as per needs.
    Check the piping painting and insulation status as per schedule
    Hand over the piping systems to the client.
    Interface with other department : Engineering, QS, Civil Construction, Support Services Construction etc.
    Monitor equipment/ materials availability at the store.
    Attend production meetings.

    Position held : Piping Supervisor
    Company : Atlantic Gulf & Pacific Company
    Project : Foster Wheeler
    Place : San Roque, Bauan, Batangas Philippines
    Period : May 05, 2008 to Aug. 15, 2010
    Job Description :
    Supervises, assigns, and coordinates the piping works activities of subordinates.
    Reviews daily plans of the jobs to be performed and schedule jobs in accordance with operating requirements and priority.
    Prepares daily reports of work progress and man power utilization.
    Prepares weekly program for pipelines and related equipment and submit weekly reports to the Operations Superintendent for further action.
    Ensures compliance with company Health, Safety and Environment as well as work permit, policies and procedure.
    Supports the Superintendent in solving technical and management problems encountered in the area of responsibility

    Position held : Material Engineer
    Project : Goro Nickel Project
    Place : Southwest Pacific, New Caledonia (Onshore)
    Period : August 30, 2006 to February 28, 2008

    Job Description :
    Checks / verifies the summary of materials as per Bill of Materials or Material List
    Review and study the general specification of the project
    Prepare material tracking for proper material control
    Coordinate with E&I Superintendent, Supervisor, Field Engineer, Foreman and engineering for the materials problems encountered pertaining to project
    Coordinate with the custom bonded warehouse and the import export department for the estimated time of arrival of the materials
    Weekly meeting with the E&I Superintendent, Planning Superintendent (clients) and the E & I team for the progress report and the availabilities of materials and also the outstanding balance materials
    Prepares procurement Action of Electrical and Instrumentation Materials based from the summary of materials
    Prepares P.A summary reflecting the priority based on schedule then update status weekly
    Prepares summary of E&I instrumentation materials received – Customer supplier and AG&P supplied materials and update based on the issuance
    Allocates materials to drawings release by engineering
    Maintain knowledge of safety policies and procedures and perform assigned duties in safe manner.

    Position held : Piping Foreman
    Company : Atlantic Gulf & Pacific Company
    Client : Daewoo Shipbuilding and Marine Engineering Co. Ltd (DSME)
    Project : Chevron/ Benguela Belize Development
    Place : Cabinda, Angola West Africa - Offshore
    Period : July 10, 2004 to July 15, 2006
    Job Description :
    Directs and supervises activities of the assigned subordinates for the overhauling
    Of static equipment, valves, pipe works and repair activities on off shore barges/ super complex during the shutdown.
    Receives job cards and discussing/consulting with the supervisor to set priorities and allocating works to subordinates.
    Arranging and obtaining work permits and materials/ spares as required.
    Ensures that tools are well maintained and kept in safe working condition.
    Plan the sequence of jobs (preparation, lifting, installations, welding, etc.)
    Obtains safety equipment for personnel, arrange for standby services as required and ensures compliance with company’s safety regulations.
    Checking and inspecting completed work. Ensures good housekeeping of the work area.
    Performs other related duties as by the supervisor such as; identifying training needs for subordinates, preparing necessary reports etc.

    Position held : Piping Foreman
    Company : Industrial Maintenance International
    Place : Chad Africa, Onshore
    Period : October 08, 2002 to April 26, 2004
    Job Description :
    Preparation of all drawing on site, fabrication and review, check standard procedure required in the project.
    Coordination with Project Manager, Piping Supervisor, and Superintendent, prior for daily and weekly work forecast & schedule.
    Delegates work to foreman and other subordinated to carry out daily work and target work production.
    Supervise of installation of structural and piping construction and pipe sleeper, .pipe rack and piping around equipment.
    Confirm latest drawing, vendor instructions are in field modification changes in scope, execute design work to provide drawings material list and requisition.
    Check drawings are issued on schedule and develop as “built drawing”
    Make all preparation of materials lay-out, fabricate of spool as per drawing requirement.
    Checking construction report on assigned task on daily basis and monitor, control on site safety concern.
    Coordination with the operation people regarding the revision to be made in piping works.
    Review all scope of work drawing for fabrication provided by the client.
    Responsible for erection of pipe/plumbing lines to ground level/upper structure from tank to tank age area.
    Position held : Piping Foreman
    Company : Engineering Equipment Incorporated
    Project : Malampaya Onshore Gas Plant
    Place : Batangas Shell Tabangao Philippines
    Period : November 18, 2000 to April 20, 2002
    Job Description :
    Coordinate and check the work carried out by personnel, directly acting during more difficult stages (pipeline routes, check of depths, lifting operations, etc.)
    Inspect documents, check available assembly material and delegate work to subordinates
    Define the assembly welding jobs, identifying the parts to be pre-fabricated at the workshop and the welding jobs to perform upon assembly.
    Prepare as-built drawings, with all variations made during works, giving the superior all data for correct accounting
    Comply with detailed program for the use of personnel and equipment made available; promptly report any interference with and/or variations to the work of other parties
    Control the execution of works, whilst guaranteeing quality, ensure the operative programmer is complied with and check that applicable safety standards are observed.

    Position held : Pipe fitter
    Company : Atlantic Gulf & Pacific Company
    Place : San Roque, Bauan, Batangas, Philippines
    Period : November 22, 1995 to November 15, 1999
    Job Description :
    Performs specific duties that Foreman, Supervisor may direct.
    Familiar in Interpreting Isometric and Plan Drawings.
    Responsible for checking of materials to be used base on the List.
    Assigned in Pipe Shop Fabrication of Pipes and its Fittings base in Isometric in proper fit-up.
    Assigned in Field Works, Installation and Erection of Pipe Spools, Valves including supports.
    Responsible for the proper alignment of Pipes and Fittings together with the existing pipes and proper reference line and elevation.

    PERSONAL DETAILS :
    Address : Batangas, Philippines
    Age : 39 years old
    Place of Birth : Manila, Philippines
    Nationality : Filipino
    Gender : Male
    Status: Married
    Height: 175cm
    Weight: 77 kg
    Language known: English (intermediate)

    EDUCATION QUALIFICATION:
    Bachelor’s Degree in Mechanical Engineering
    Western Philippine Colleges (University of Batangas)
    Batangas City Philippines
    June 1989 ~ March 18, 1994

    Secondary Education
    San Pascual National High School
    San Pascual, Batangas, Philippines
    June 1985 ~ March 21, 1989

    Primary / Intermediate Education
    San Pascual Elementary School
    San Pascual, Batangas, Philippines
    June 1979 ~ March 19, 1985

    Trainings/ Certifications:
    First Aid Training – Oct. 4 & 6, 2006 - Goro Nickel Project, New Caledonia
    Confined Space Safety Seminar – Oct. 11, 2006 – Goro Nickel Project Caledonia

    20 Million man hours Lost Time Injury Safety Award – March 2003 – Chad
    Development Project, Africa

    Quality Training Module - Title: Piping Fit-up and Erection - Feb. 16, 2002
    Foster Wheeler Philippines

    Special Skills:
    Pipe Fitting/ Welding/ Structural, Rigger, Fabrication.

    Relevant Skills:
    Knowledge and experience in studying Plant and Piping Layout, Isometric and P& ID drawings, etc.
    Knowledge of the mechanics of operation of equipment such as pumps, boilers, heaters and other plumbing components.
    Ability to work in a multicultural environment and has a sense of responsibility.
    Quick learner & Flexible, can handle time pressure works.

    Other Skill:
    Proficient in operating Microsoft office word, excel, and PowerPoint.

    I hereby declare that all the information mentioned above is true and correct to the best of my knowledge.

    Christopher Tan

  5. Post Count Number #5
    Unregistered
    Guest

    Mr.A.Pream Bharath
    Madurai- 625009.
    INDIA

    Email : preambharath AT gmail.com

    CAREER OBJECTIVE :
    To excel in the field of mechanical by applying my skills to grow with the organization and transform vision into reality.

    ACADEMIC PROFILE :
    COURSE INSTITUTION BOARD/ UNIVERSITY YEAR OF PASSING CLASS :
    B.E [MECH.ENGG] JEPPIAAR ENGINEERING COLLEGE ANNA UNIVERSITY 2009 FIRST

    WORK EXPERIENCE : 4 years
    INSPECTORATE GRIFFITH INDIA PVT LTD.,
    PERIOD : JANUARY 2013 TO PRESENT
    Role : Inspection Engineer
    Key Projects :
    Project #1 :
    Third Party Inspection of structural painting Projects, Chittorgarh, Chittorgarh District, Rajasthan, India
    Client : M/S HINDUSTAN ZINC LIMITED, Chanderia.(Rajasthan)
    Role : Inspection Engineer
    Technology : IS standards and Client Requirement standards
    Responsibilities :
    - To continuously inspect the structural painting work at chanderiya smelting complex, which has been performed by the contractor (i.e.,) from surface preparation to the applying of finished coats.
    - To check the surface preparation of cleaned structures as per ISO 8501-1 :1988
    - To suggest the colour code of pipe lines as per IS 2379 :1990
    - To check initial, intermediate and final reading for thickness of coats such as DFT, WFT and to submit weekly, monthly reports to the client.
    - Rechecking of works/rectification suggested and completed by the contractor and re-recording the paint thickness.
    - Certification of contractor bills for quantity and quality for the payment purpose.
    - Inspecting Columns Erection for Sprinkler pipe fitup as per drawing.
    - Preparation of NDT test for the pipe lines of Sprinkler System welding as per client requirement .
    - Preparing Reports on each stages of work and reporting to IOCL (A.P)

    SGS INDIA PVT LTD.,HYDERABAD :
    PERIOD : JUNE 2011 TO DECEMBER 2012
    Role : Quality Assurance & Quality Control Engineer
    Key Projects :
    Project #1 :
    Quality Inspection Services for Providing SPRINKLER System for All Tanks at Kadapa Depot, Kadapa District,Andhra Pradesh,under IOCL AP State Office
    Client : M/S INDIAN OIL CORPORATION LTD, A.P.STATE OFFICE,HYDERABAD
    Role :
    Quality Testing Inspector
    Technology : IS standards and Client Requirement standards
    Responsibilities :
    - Inspection Of Incoming Material.
    - Planning the Erection work and getting approval from Depot Manager.
    - Inspecting the Sprinkler Pipe Fitup as per drawing.
    - Inspection of Surface Cleaning.
    - Inspecting Painting as per client reqirement.
    - Inspecting Columns Erection for Sprinkler pipe fitup as per drawing.
    - Preparation of NDT test for the pipe lines of Sprinkler System welding as per client requirement .
    - Preparing Reports on each stages of work and reporting to IOCL (A.P)

    Key Projects :
    Project #2 :
    Third Party Quality Assurance for GandiKota C B R Lift Irrigation Projects, Pulivendula, Kadappa District, Andhra Pradesh, India
    Client Andhra Pradesh Irrigation CAD Department
    Role :
    Quality Testing Inspector
    Technology : IS standards and Client Requirement standards
    Description : Third party Quality Control/Quality Assurance for Pipe line and allied Works, Hydro- Mechanical, Electro- Mechanical Works of 6 stages pumping of water from Gandikota reservoir to Chitravathi Balancing Reservoir.
    Responsibilities :
    - Preparation of ITP's, field inspection procedures, inspection check list.
    - Conducting welder qualification as per approved WPS.
    - Control and ensure that calibration certificate for machineries/gauges are available for Inspection checking alignment of pipes
    - Checking of weld defects like extra penetration, Lack of fusion, porosity e.t.c.
    - Checking Cleaning Procedures (Sand Blasting)
    - Checking DFT
    - Checking Ovality of the pipe.
    - Preparation of material identification and dimensional reports before start of piping/tank work.
    - Preparation of fit-up and welding inspection report.
    - Preparing stage wise inspection as per approved ITP's.
    - Guiding, controlling, monitoring, supporting a team of various discipline QC Inspectors.
    - Welding inspection requirement and NDT plan.
    - Verification of personal qualification of NDT personnel and welders.
    - Inspection Of Erection Work of Electrically Operated Crane and Semi Portal Crane.
    - Checking Load test on the erected Crane.
    - Inspection of Roof Truss Material Fabrication Work as per drawing.
    - Inspection of Roof Truss Erection Work.
    - Checking the EOPD & HOPD erection matching with Flanges of Pipe.
    - Inpection of Incoming Liner,Impeller ,Shaft of Pump as Per drawing.
    - Reporting each stages of PUMP ERECTION to client.
    - Witnessing and Inspecting the pump after erection such as clearance between liner, Defection etc.,
    - Issue of non –conformance report and ensure that corrective action taken.
    - Attending weekly progress meeting with client representing QC team.
    - Prepare internal audit and conduct auditing as part of ISO 9001 requirement.
    - Witnessing of hydraulic Pressure test.
    - Preparation of quality certificate for execution work.
    - Uploading project monitoring system.

    Additional Knowledge :
    o Inspection of E&M Equipments
    o Erection of Pumps & allied equipments
    o NDT methods.

    ESJAY ENGINEERING WORKS, HOSUR
    Period : June 2009 to June 2011
    Manufacturer :Specialist in industrial fabrication
    Role :Production Planning & Quality Engineer
    Client : ION EXCHANGE INDIA LTD.,
    CK AIRTECH (P) LTD.,
    BHEL RANIPET

    Main Projects :AIR POLLUTION CONTROL EQUIPMENT
    MIXING CHAMBER
    CLEAN GAS DUCT
    UNIVERSAL DUST COLLECTOR
    BOILER ANCILARIES
    SIDE PANEL
    MIDDLE PANEL
    HOPPER LOWER
    APH PANEL
    NTPC COLUMN
    WATER TREATMENT EQUIPMENT
    PRESSURE VESSEL
    LAMELLA CLARIFIER
    SS LATERAL

    Job responsibility :
    - PRODUCTION PLANNING ENGINEER
    - Compile detailed worksheets and specifications from customer orders
    - Setting production targets
    - Ensuring proper Planning & execution of complete sampling activity
    - Optimum utilization of man & machine
    - Estimate type and quantity of materials and labor required for production
    - Consult with production fitter to schedule production runs in a cost and time-efficient manner.
    - Meet regularly with other purchasing and inventory clerks, to co-ordinate activities between production floors and stores.

    - QUALITY ENGINEER :
    - Visual inspection :
    - Dimensions, tolerances, preparation, fit-up and alignment are in accordance with the Approved drawings and standards.
    - Tack welds, bridging pieces, clamping
    - Preheat in accordance with procedure
    - Inspection before welding :
    - The drawings are clear with Welding symbols
    - Welding procedure sheets (specifications) are available, have been approved and are employed in production
    - Parent material identification is verified against documentation and markings.
    - Inspection during welding :
    - Preheat and interpass temperatures monitoring
    - Interpass cleaning - chipping, grinding, gouging monitoring
    - Root and subsequent run sequence
    - Essential variables such as current, voltage, travel speed
    - Filler metals, fluxes and shielding gases are correct.
    - Welding is in compliance with weld procedure sheet and application standard.

    - Inspection after welding :
    - Visual inspection to be carried out to ascertain acceptability of appearance of welds
    - Dimensional accuracy to be ascertained
    - Conformity with drawings and standards requirements.
    - Post weld heat treatment, if any, monitored and recorded.
    - NDT carried out and reports assessed.
    - Assess defects as to either repairing

    MECHANICAL DESIGN SOFTWARE :
    - CATIA V5
    - ANSYS

    CERTIFICATED IN :
    - ASNT LEVEL 2 (UT,RT,MPT,PT)

    AREA OF INTEREST :
    - Fabrication
    - Welding

  6. Post Count Number #6
    Unregistered
    Guest

    piping supervisor

    i am 15+ years experiences this field