www.tuv-sud.in TUV SUD South Asia Delhi : NDT RT UT MPT INSPECTION
TUV SUD South Asia : Delhi/NCR : INSPECTION ENGINEER
TUV SUD South Asia
http://tuv-sud.in/careers.asp
Keywords: INSPECTION , QUALITY, plating, forging, NDT, RT, UT, MPT
Designation: INSPECTION ENGINEER
Experience: 2 - 3 Years
Location: Delhi/NCR
Education: UG - B.Tech/B.E. - Electrical, Mechanical
PG - Any PG Course - Any Specialization,Post Graduation Not Required
Industry Type: Oil and Gas/ Power/Infrastructure/Energy
Functional Area: Other
Posted Date: 16 Jan 2008
Job Description
- To contact supplier upon receipt of inspection request and schedule inspection accordingly
- Performance of inspection as defined in client manual
- To prepare inspection report and submission
apply:www.tuv-sud.in/careers.asp
Desired Candidate Profile
BE MECH/ELECTRICAL.Should have prior experience in inspection of engineering machines and equipments like pressure vessels, cross country pipelines, line pipes, plates, castings, forgings etc
Company Profile
TUV SUD South Asia is a wholly owned subsidiary of TUV SUD Group, Germany, the largest of the German TUVs (Technical Testing and Inspection Organisations).
Competence, certainty, quality, neutrality and objectivity are pillars on which
Executive Name: SUNAINA HANJURA
Address:
Not Mentioned
Email Address: careers@tuv-sud.in
Telephone: Not Mentioned
Reference ID:
SH-INS-MEC-1601
-
June 24th, 2011, 01:18 AM
Post Count Number #2
inspection engineer in GSPC GAS CO.
CURRICULUM VITAE
JADEJA INDRAVIJAYSINH K.
E-mail Indravijayjadeja23 AT gmail.com,jadeja_indravijay AT yahoo.in
PROFESSIONAL OBJECTIVE :
- To achieve good position in a good research organization and enhance technical skills.
- To work in the organization with utmost dedication & commitment.
- To assist all senior officials & colleague.
ACADEMICS :
Programme / Standard
Board / University
Passing year
Percentage / PPI / CPI
Class
Diploma
Mechanical
Technical Examination Board Gujarat
Government Pollytechnic college Himatnagar.
NOVE- 2009
52.20%
Second Class
S.S.C.
Gujrat Educational Secondary Board
March-2000
80 %
Distinction
H.S.C
GujratEducational Higher Secondary Board March/Apr
2002
41.23%
Pass
INDUSTRIAL EXPERIENCE
Name of company Gujarat State Petroleum Corporation Limited (GSPCL)
Project Name Rajkot City Gas Distribution project (RCGD)
Name of contractor B.J. PATEL & CO.
Department PE & PNG Project
Designation Project in-Charge
Period of Service 6-months
Location Rajkot, Dist- Rajkot, Gujarat
INDUSTRIAL EXPERIENCE
Name of company Gujarat State Petroleum Corporation Limited (GSPCL)
Project Name Rajkot City Gas Distribution project (RCGD)
Name of contractor Dr. Amin Controllers(iteng engineering)
Department Quality /control
Designation Inspection Engg
Period of Service 01/04/10 to till
Location Rajkot, Dist- Rajkot, Gujarat
- ASNT NDT LEVEL - II in ultrasonic Testing & Radiography Testing From Ultratech, Ahmedabad.
- PE & PNG Project Rajkot City Gas Distribution Project of GSPC Gas :
I had worked as Engineer (Mechanical) for a contractor M/s. B. J. PATEL & CO. Company and deputed to Rajkot City Gas Distribution Project, Rajkot of Gujarat State Petroleum Corporation Limited for PE & PNG of Rajkot City Gas Distribution Network such as PE Laying, Flushing,Testingof PE Network , Handling of PNG Connection for Industry ,Commercial,Domestic & Billing of company, etc. Also Prepared PNG Jobcard & PE layout of all Network for Gujarat State Petroleum Corporation Limited, Rajkot.
- Nature of Work :
Working as Engineer (Mechanical) for M/s B. J. PATEL & CO. and deputed on assignment basis to different projects in Gujarat State Petroleum Corporation Limited (GSPC Gas), Morbi.
- Work Experience :
- Working as Project incharge with our superviser team for B.J.PATEL & CO. of Piped Natural Gas (PNG) Network, of Rajkot City Gas Distribution Project of GSPC Gas. Rajkot City Gas Distribution Project is having , one Main City Gate Stations, 02 Common Pressure Reducing system and Kilometers PE Network and 125 Meter Reading Skid (MRS).
- Working as inspection Engineer in iteng engineering in Rajkot city Gas Distribution Project Rajkot For GSPC GAS CO.
- Attending PE Laying, Flushing Testing ,O2 Purging Gas Commissing.
- Attending Other Industrials, Commercial, Domestic Gas Installations.
- PE & PNG Joint Witnessed.
- Checked PE As Built Drawing, PNG Jobcard, PPT Checklist.
- Checked Riser & all PNG Connections Root.
- Report / Record :
- Daily Progress Report
- Monthly Review and Plan Report .
- Activities Report- PE Laying, Report, PNG Jobcard Report / Training Report.
- Checked the Hot and offline Work Permit At site .
- Overall Exposure :
- Inspection of PE & PNG Gas Distribution Network & Process Control.
- Quality inspection of PNG Pipe Laying Activities
- Management of Manpower and Resources
- Document Control
- Preparation & Submission Daily Progress Reports & Records
Ensuring Quality & Safety of Site Activities as per Client Specifications, Governing Codes and Reference Drawings, Standards & Codes in Practice
Inspection Engineer In GSPC GAS
Site experience in site survey (GI & PE) and PE Charging.
- Professional Training :
- Attended 12 Hours “Fire Fighting Training” at GSPC Gas, Rajkot
- Attended 12 Hours “General Safety Training” at GSPC Gas, Rajkot
- Attended 12 Hours “Leak Surveyor Training” Course and Test at GSPC Gas, Rajkot
AREAS OF INTEREST :
- Power Plant engineering
- Project Management
- Oil & Gas Secter.
- Quality / Control
- Other Details :
Good knowledge of Computer Fundamentals and Internet use related to job, especially in Microsoft Word,AutoCad, Powerpoint and Microsoft Excel as well as basic touch typing speed. God gifted Healthy physic and good Eyesight.
-
July 29th, 2011, 10:40 PM
Post Count Number #3
G.Ramasamy Vinu
E-mail : harinigayathri2002 AT yahoo.co.in
Vinu.ramasamy AT gmail.com
Dear Recruiter,
It was with great interest that I apply for a position in your esteemed organisation. I apply for the position of Piping Engineer, QA/QC or suitable one. Review of my credentials will confirm that I am capable of serving as a catalyst for achieving revenue objectives and organic growth through effective contributions.
I am presently associated with Petro Iran (PEDCO) Salman offshore as a Lead QA/QC Engineer-for Pre-Commissioning, Commissioning, and Start-up on a 28/28 rotation from Mar 2009 to till date. Earlier I was assigned to Statoil (Norwegian oil company) as a Welding Engineer with the rotation of 28/28, for their Hook-up works, Investigations, findings & rectified of all sub-standard qualities of work executed in onshore installed piping’s works, structural’s , & few of Pressure vessel discrepancies of South Pars Development Projects of platforms 7,8&9.
I possess over 20 years of experience in oil, gas and LNG sectors in Construction, Commissioning & Start-up, and inspection of offshore and onshore projects for FPSO vessels, Oil Production Platforms and Exploration Fields. Oversee main Contractor development and implementation of a Project specific Completion Strategy, Mechanical Completion, Pre-commissioning, Commissioning &Hook-up, RFO (Ready for Operation) and Offshore Construction strategies.
Review and verify main Contractors completion input to Project Master Schedule and detailed planning of all Completion activities onshore and offshore.
Ensure main Contractor implement an effective organization for the Completion function and that they manage personnel to ensure a professional execution of responsibilities, therein; quality, timely completion and HSE aspects.
Ensure main Contractor divide the scope of work into relevant commissioning packages and establish
“Master Commissioning Dossier".
In addition, I offer excellent skills, which have proven to be a critical asset in driving operations during the current associations. These qualities, combined with my dedication and tireless work ethic, should enable me to make a positive impact at your organization.
Enclosed is a copy of my resume for your review. I would welcome an opportunity to discuss your needs and objectives and the possibility of working together to meet them. Thank you for your time and consideration.
Synopsis
- Over 20 years of experience in Oil , Gas & LNG Industry in Construction & Commissioning activities dealt with CONSTRUCTION, INSPECTION , PRE-COMMISSIONING , COMMISSIOINING & START-UP of FPSO VESSELS, Onshore Production Facilities, Onshore Gas Development Plants, Ethylene Expansion Plants, Offshore Platforms.
Summary of Experience
- Employed for over 20 years in the onshore & offshore construction & commissioning industry in client, contractor departments. Implementing Quality Systems, reviewing and writing plans and procedures, Supervising Mechanical, Piping & QC systems. Working to Construction Drawings and Pipeline Isometric Drawings. Dimensional Inspection, Weld Procedures, Witness of Mechanical Tests, Parameter checks, NDT Coordination, Line Punching Out, Test Pack System clearances, Punch list, Pressure Testing, Reviewing and Approving Final Documentation and Certification. Preparation of Necessary documents required for pre-commissioning, commissioning and start-up activities in the field.
- Prepare scope of work and site instructions to the subcontractor in accordance with the project specifications; prepare Mechanical Data Sheets and Process Data Sheets, P& ID’s, Piping Material Specifications.
- On hands experience in Pressure Vessels, Columns of various capacities in field of Refurbishment, Inspection , NDT, As-Built Pit Mapping, and in the field of Fabrication, Structures, piping, instrument tubing, underground piping, with Holiday detections and coordinating with Third Party Inspectors, Vendors and NDT professionals.
- Inspection of Internal Riser Mooring turret with all Piping and structural activities including Hydro/ Pneumatic test, drying witnessing, and reinstatements.
- NDT witnessing, RT Film interpretation for all Weldments Including Pressure vessels, piping, structures, storage tanks etc.
- Preparation of Post Weld Heat treatment procedure, witnessing and chart verifications.
- Good working knowledge of all common welding processes used within the industry, Including manual, semi automatic and automatic processes use in precision manufacture of pressure Piping systems, Tank constructions, pipelines, pressure vessel inspection, heavy fabrication and general construction Ability to work unsupervised and maintain Full traceability and document control for individual projects.
- As- Built Isometric Drawing and P&ID preparation, test pack preparation, dossier preparations, final certifications.
- Experienced in full project quality control surveillance from start up to final project close out.
- Experienced at senior clients inspection Engineer level in the quality control offshore fabrication, hook-up works, riser-tie in joints, structural, hydro testing, pressure vessel repair works, painting inspections in well head process, living platforms, piping fabrications and erections, jackets, drilling deck, boat landing, bridges, subsea piping, riser pipe etc.
- Indicator bolt tightening with 0.05 tolerance and stretch calculations,
- Inspection of Duplex stainless and other piping’s of U/G ,GRE piping’s, Ducts, Dampers, Equipment attachment weldings, steel structures, holiday detection of FBE coatings , tape wrappings , alignment of pumps & motors, HVAC piping’s as per client requirements.
- On hands experience in Third party inspection activities of all mechanical, piping, welding, NDT, Structures, pressure vessels storage tanks etc.
- Preliminary Designing Of Nuclear Shells, Dished Ends, Heat Exchanger Components And Nozzles, Drafting Of Manufacturing And Engineering Drawings For Pressure Vessels And Heat Exchangers In Nuclear Engineering Department With The Aid Of AutoCAD Material List Preparation, Inspection Of Nozzles Fit-Up, Welding With Welding Procedure Specification, Claddings.
- The Inspection Of Valves, Seats, Seat Rings, Stems, Bonnet & Body, As Per Client Requirements, Stellite Welding Inspection Of Seat And Wedge Weldings, RT Film Interpretation, And Submersible Pump Inspection.
- Developing Procedures, Manuals, Method Statements, Quality Plans, and Company Standards & Practices in accordance with International Codes & Standards and Client specifications
- Inspection Of Structural Beams, Bracings Box Columns, Ducts, Dampers, Bowl Mills, Nuclear Dished End With The Shells Fit-Up, Welding Inspections With The Pre Heat And Post Heat Treatments As Per Welding Procedure Specification And Client Requirements.
- Ability to Comprehensively review the project quality requirements and convert them into QC documents such as QC Plan, Welding Procedure, Method Statements, Technical Delivery Conditions for materials, assign & lead a team of QC Inspectors, review the dossier, Carryout physical inspection on all pressure retaining items, offshore structures in accordance with drawings, codes & specifications.
- Set standards and expectations for staff, assignment and priorities and promote safety engineering culture
- Fully familiar with the requirements and control procedures for the welding of common steel grades, high strength alloy steel, stainless steel , Inconel and duplex steels.
- Good working knowledge of all common welding processes used within the industry, Including manual, semi automatic and automatic processes use in precision manufacture of pressure Piping systems, Tank constructions, pipelines, pressure vessel inspection, heavy fabrication and general construction.
- Ability to work unsupervised and maintain Document control & Full traceability for individual projects.
- Good working knowledge of international codes and specification.
Key Accomplishments
- Independently handled of, Inspection and repairing of corroded vessels (Coded ) of Dehydrators, Desalters, Degassers, Knock out drums, Separators and Heat Exchangers- corrosion Investigation & pit mapping (Total 24 vessels) in ‘A0” size drawings, repair weldings carried out in shell, Dished ends,
And internals as per repair procedures, I.T.P with SHELL team approval & AI consultation.
DOMAIN EXPERTISE
- To co-ordinate, monitor, inspect the Discipline Field activities for the erection, installation and commissioning of static equipments in accordance with Vendor equipment design and Specifications.
- To ensure that the field activities for Piping and Mechanical are executed to meet all the requirements as laid down in project Specifications, Drawings, Procedures, Safety and Quality documents.
- Preparation of Equipment data sheets for vendor enquiry and Support vendor shop inspection activities.
- Supervise and review Engineering Contractor documentation during the execution of detailed design, procurement and, in a later stage, construction activities, ensuring the quality and cost control of the works according to the contract requirements, and guaranteeing that the project targets (timing, cost and quality) are correctly met.
- Review and raise RFI, NCR, FCN, and SCN of P& IDs for rotating/static equipment in lieu with site survey reports.
- Ensures that Hook-up and commissioning activities as per standards & specifications in FPSO, onshore & offshore production platforms.
CAREER CONTOUR
1) Mar’09 – Dec 2011 Piping &Lead QA/QC Engineer- SPIE-OGS -Salman offshore-Iran-
Duties Summary :
- Preparation of Pre-Commissioning & Commissioning Dossiers for Start-up operations.
- Preparation & Resolving NCR’s, TQ issues with the client with respect to design and engineering concerns.
- Vendor assistance for initial start up and commissioning activities.
- Preparation of Master Punch lists and progress reports for all disciplines.
- Reviewing of Commissioning Test Procedures and test plans required for commissioning.
- Preparation of Material Status Index, Procurement of shortage material required for Start-up.
- Hydro-testing & Leak-testing of piping in the platform with QC activities.
- Preparation of Job Hazard Analysis & Risk Assessment for Start-up.
- Modification works of piping , As-Built preparations
- Reviewing of MC, RFC, Commissioning Dossiers & preparation, clearing of comments.
- Colour coding verifications with directions as per P&ID.
- Insulation both (PP, Hot) verifications,
- Preparation activities, procedure review of hot tapping.
- Reviewing of all contractors onshore NCR’s, TQ’s closures & addressing to client for the deviations with project requirements.
Packages Inspected for Commissioning & Start-up :
Gas Export Facilities, Methanol-Corrosion-Chemical-Produced water treatment Packages, Glycol Regeneration Packages, HVAC system, Fuel Gas treatment Package, Deluge skid, potable water & Sewage treatment package, Pig Launchers, HP & LP Flare Packages,
2) OCT2007 to Feb 2009 SPIE-OGS
- Worked as a Welding Engineer –Statoil-Norwegian Oil Company, South Pars -SPIE-OGS, Seconded to Statoil, Norwegian Oil Company for South Pars Offshore projects, Iran Offshore.
Duties & Responsibilities
- Performed their Hook-Up works of Piping, structural’s Flare lines.
- Risk/failure analysis of existing onshore constructions, rectification of weldolet’s in Inconel claded lines > more than 60% of weldolet’s has been identified with LOP,LOF, Oxidized and Piping Butt welds were welded without purging, of all of which has been cut and re-welded with re-commendations of codes and specifications.
- Preparing Surveillance Report against the any deviation in the sub-contractor work from the Project specification and following up to close out the issue
- Reviewing of ITP & Method of Statements as per the requirement of Project specifications
- Following up OWL (Outstanding Work List) which was prepared by Vendor to close-out at the site.
- Witnessing welder qualification tests preparation & issued of welder Certificates and ID Cards for more than 100 welders according to the relevant codes and requirements.
3) OCT 2005 to SEP 2007 : Single Buoy Moorings (SBM), UAE.
- Working as a Senior Piping Inspector of constructing Barge for Chevron FRADE Brazil Upstream project.
- AGIP KCO, Kashagan Flash gas Compression Barges-FPSO’S - 3 Nos.
- Inspection of piping fabrication and erection
- Inspection of structural’s fabrication & erection
- Film interpretation, NDE witness
- Final Punch listings & clearing
- Hydro/ Pneumatic Testing, re instatement witness
- As-Built drawings preparation, test pack review & approvals, of Barges topsides and below deck.
4) JUNE 2005 TO SEP 2005 : OCEANEERING, UAE
- Working for SINGLE BUOY MOORINGS, Jebel Ali, UAE, For WOOD SIDE AUSTRALIAN ENERGY.
- Inspection of Riser mooring internal turret piping’s.
- Punch List creation, and clearing of structures, Piping’s.
- Hydro & Pneumatic testing witness, flushing, drying witness.
- Test pack preparation, review and approvals
- Liaising with Design Consultant & Internal Departments on Mechanical & Piping issues
- Ensure that all construction checks are witnessed and complete Where applicable ensure that commissioning is carried out as described under Onshore/Offshore commissioning procedures/manual/acceptance criteria as well as Commission and Facilities Handover Procedure
5) FEB2005 TO APRIL 2005 : OCEANEERING, UAE.
- Occidental Petroleum NPCC- OXY –IDD EL SHARGI Oil field Projects , IS-Q08 & IS-U10 Platforms, Qatar
- Inspection of HOOK UP activities in Offshore piping,
- Riser Tie –ins,
- Structural Inspection
- Painting Inspection for all Structural, piping and risers,
- hydro testing in two platforms
- Material Traceability
6) MARCH 2004 TO DEC 2004 : OCEANEERING, UAE
- NPCC- SHELL Iran Offshore ,IRAN
- Inspection of HOOK – UP activities in Offshore piping,
- Riser Tie- ins fit-up ,welding & NDE witness
- Structural Works
- Experienced in survey of mechanical installation to verify mechanical integrity in accordance with specification and good engineering practice.
- Inspection and repairing of corroded vessels (Coded ) of Dehydrators, Desalters, Degassers, Knock out drums, Separators and Heat Exchangers- corrosion Investigation & pit mapping (Total 24 vessels) in ‘A0” size drawings, repair weldings carried out in shell, Dished ends, and internals as per repair procedures ,I.T.P & with SHELL & AI consultation.
7) NOV. 2003 TO FEB2004 : OCEANEERING, UAE
- NPCC- TAKREER – UAE
- Inspections of two (29M Diameter x 20M Height) tank construction,
- Refurbishment of Existing tanks
- Pressure Vessel Fabrication
- Piping’s & Pipelines to Jetty Inspection
- Relevant NDT Testing’s, Pressure (Pneumatic /hydro testing) witness and re-instatements.
8) MAR2003 TO NOV. 2003 : OCEANEERING, UAE
- NPCC- SHELL –NIOC IRAN ONSHORE
- Seconded to TECHNIP/NPCC project. This project involves fabrication erection and installation of 2 well head platforms, 3 process platforms, 2 living quarters’ platforms, 5 jackets, 4 bridges including fabrication and erection of related piping/vessels/Tanks. The total capital investment for this project is around US$830 million.
- Inspection of 4nos. of bridges meant for use between platforms, mechanical activities in the living quarters platforms
- Fabrication activities of pressure vessels &tanks,
- fabrication and erection activities of all decks of 2well head platforms,
- 2 living quarters platform, all related piping activities in the above platforms,
- Offshore jacket, riser pipe, Sub-Sea pipe fabrication,
- punch listing ,hydro and pneumatic test witness with clients and flushing s as per clients requirements
Work Experience - NIGERIA
9) FEB-2001 to FEB2002 : Techint Cimimontubi, Italian co., Bonny Island, Port Harcourt, Nigeria
- TSKJ Joint venture (Technip, Snamprogetti, Kelogg & Japan General Corporation) for Nigeria Liquefied Natural Gas Expansion Project –Train 3& 4
- Worked as a Senior Piping, Welding & NDE Inspector
- Inspection of Piping & Welding Inspections in shop & field (each & every joint with client witness)
- Witness welder qualification tests
- Witness pressure testing
- Heat treatment chart review,
- Preparation,& resolving Non conformance reports & corrective actions.
- Full traceability of pipings ,
- As-Built drawings for the whole projects.
10) JUNE ‘99 to JULY 2000. Consolidated Contractors International Company (CCIC) UAE
- Bechtel / Technip Joint Venture for ADNOC Onshore Gas Development Project Phase-II,UAE
- Senior Quality Control Inspector (Piping & Welding)
- Inspection of all U/G & Field piping
- Punch listing,
- Hydro/ pneumatic Pressure test witness with clients & Third party
- Flushing, reinstatement witness,
- Liaison with NDT crews & third party inspectors,
- Interpretation of RT films, preparation
- Review of test packs & As- Built drawings Preparations.
11) Sep. ‘97 to JULY ’98 : Consolidated Contractors International Company (CCIC), KSA.
- Bechtel, USA for their Aramco Shaybah Producing facilities.
- Quality Control Inspector (Piping & Welding)
- Inspection of Duplex stainless and other piping’s
- U/G ,GRE pipings
- Ducts, Dampers, Equipment attachment weldings
- Steel structures
- Holiday detection of FBE coatings , tape wrappings
- Alignment of pumps & motors
- HVAC pipings as per client requirements.
12) FEB. – 1997 to JUNE –1997 : Consolidated Contractors International Company (CCIC) Kuwait
- Brown & Root International Inc. (Halliburton Group) U.S.A. for their Equate Ethylene Project
- Worked as Quality Control Inspector (Piping & Welding)
- Inspection of structures, equipment attachment weldings, & all related piping’s fabrication &erection
- Indicator bolt tightening with 0.05 tolerance and stretch calculations
- Punch list preparation & clearing
- Hydro/ pneumatic & flushing’s as per client requirements.
13) SEP. –1995 to JUNE –1996 Consolidated Contractors International Company, Qatar
- Technip, France & KTI, Nether Lands for their QAPCO Ethylene Expansion Project
- Worked as Quality Control Inspector (Piping & Welding)
- Inspection of piping’s in fabrication & erection,
- Punch list preparation & clearing
- Hydro, pneumatic testing’s witness
- Flushing & reinstatements witness
- Welding consumable control
- Test pack preparations, review & Approval
- Material Traceability
14) JUNE – 1994 to MAY – 1995 : Consolidated Contractors International Company, UAE
- Bechtel / Technip Joint Venture for their ADNOC Onshore Gas Development Project Phase-I
- Worked as NDT Co-ordinator/Inspector
- Interpretation Of Radiographic Films As Per ANSI B31.3,
- Inspection Of Weldments By Visual Inspection, Ultrasonic Testing Magnetic Particle Inspection And Dye Penetrant Inspection For The Carbon Steels, Low Temperature Carbon Steels, Stainless Steels, Alloy Steels Pipings, Structural Steel Weldings And Equipment Weldings.
- Liaison with third party Inspectors of LLOYDS REGISTER
Experience in INDIA :
15) FEB –1994 to APRIL –1994 : KSB PUMPS & VALVES Ltd.,
- Worked as a Junior Welding Engineer
- Responsible for the Inspection Of Valves, Seats, Seat Rings, Stems, Bonnets & Body, As Per Client Requirements & codes
- Stellite Welding Inspection Of Seats And Wedge Weldings
- RT Film Interpretation
- Submersible Pump Inspection.
16) February –1992 to February – 1993 : BHARAT HEAVY ELECTRICALS LIMITED (BHEL, TRICHY)
- Worked as Diploma Engineer Trainee
- Preliminary Designing Of Nuclear Shells, Dished Ends, Heat Exchanger Components And Nozzles,
- Drafting Of Manufacturing And Engineering Drawings For Pressure Vessels And Heat Exchangers In Nuclear Engineering Department With The Aid Of AutoCAD Material List Preparation, Inspection Of Nozzles Fit-Up, Welding With Welding Procedure Specification, Claddings.
17) JUNE –1988 to DEC. – 1990 : INDO FAB Ltd., Trichy,
- Worked in Various Thermal and Nuclear Power Projects as Quality Control & Welding Inspector
- Inspection Of Structural Beams, Bracings Box Columns, Ducts, Dampers, Bowl Mills, Nuclear Dished End
The Shells Fit-Up, Welding Inspections with the Pre Heat and Post Heat Treatments as Per Welding
Procedure specification and client requirements.
- Dimensional control & NDT Inspections for all of the above products.
- Carrying out stage by stage Inspection as per the project specification for the equipments like
Static & Rotator’s, NDT, Hydro testing, Internals Assembly, piping, Fireproofing, Insulating and
Also coordinating with the THIRD PARTY for various activities as per the supplied by the client from
The arrival, storage yard, preservation, protection, erection and commissioning as per the
Project specification.
- Coordination that all the inspection activities are documented as per the approved ITP.
Coordination with the construction personals, Preparation of Quality Plan, Preparation Inspection Test Plans, Preparation Inspection Reports
ACADEMIA
1.BACHELOR OF TECHNOLOGY –MECHANICAL (BTECH*)
2.POST DIPLOMA IN PLANT MAINTENANCE STATE BOARD OF TECHNICAL EDUCATION 1991-92 75%
3.MECHANICAL ENGINEERING DIPLOMA STATE BOARD OF TECHNICAL EDUCATION 1985-1989 69%
(Both of above (2 & 3) are Full time Education consisting of 1-1/2yrs & 3 yrs )
PROFESSIONAL CERTIFICATIONS
1. CSWIP 3.2 senior welding inspector (Cert no.8925)
2. AWS-Senior Certified welding inspector (Cert no.02070068)
3. European welding specialist Diploma from European welding federation
4. RT, UT, MT, PT Level-II of SNT-TC-1A OF ASNT
TRAININGS ATTENDED
- Basic Survival Course (Abu Dhabi, & Iran Kish safety training Institute)
- Basis Fire fighting and Rescue operation course in Abudhabi & Iran Kish safety training Institute
- Basic Fire Fighting/BA apparatus training by Abudhabi & Iran Kish safety training Institute.
- Basic First Aid and Emergency Response Abudhabi & Iran Kish safety training Institute.
- Helicopter Under water Crash Evacuation.
- Training in Critical Life Activities – Lifting Awareness, Confined Space entry, Lock out/Tag out, Electrical Safety, Mechanical Lifting, NDE examination, Permit to Work.
SOFTWARE SKILLS
- Windows Office – 95/2000/XP/VISTA.
- Diploma in AUTOCADD
SKILLS & COMPETENCIES
- Basic Personnel Management Skills
- Basic financial budget analysis
- Broad engineering experience
- Good communications skills
- Good presentation skills
- Ability to forecast and analyze
- Able to work under pressure
- Able to manage time and resources efficiently
- Able to delegate appropriately
- Able to contribute to staff development
- Excellent Coordination, Monitoring and Supervisory skills.
- Problem solving skills under dead lines and Pressure.
- Team work coordination and leadership skills.
- Extensive knowledge of codes and standards in EPCM Projects.
- Thorough knowledge of Safety and Quality Procedures.
-
November 24th, 2011, 02:57 PM
Post Count Number #4
B.E.MECHANICAL ENGINEER\\ MODDY ERNATIONAL PVT LTD. IN INSPECTION ENGINEER\\EXP.=2+
CARRICULUM VITAE
Akhilesh Atampujya
Email Id : akhilesh.atampujya AT gmail.com
MECHANICAL ENGINEER
Seeking a challenging and rewarding opportunity across the industry with a growth oriented organization, which recognizes and utilizes my true potential my analytical and technical skills.
PROFILE :
- Qualified B.E.Mechanical, accented with the latest trends and techniques of the field, having an inborn quantitative aptitude, determined to carve a successful career in the field of MECHANICAL ENIGINEERING
ACADEMIC PERFORMANCE :
SN Examination Institute Board/University Result
1. B.E. degree(mechanical) S.A.T.I Vidisha(M.P.)( 2009) R.G.P.V Bhopal 65.0%
2. Higher Secondary Govt.h.s.school,Seoni (M.P)(2004) M.P Board 63.1%
3. High School Govt.h.s.school,Seoni (M.P.)(2002) M.P Board 65.3%
WORKEXPERIENCE :
MOODY INTERNATIONAL INDIA : JULY 2010-TILL NOW
Project : CNG & City Gas Distribution MDPE Pipeline.
Location : New Delhi
Position : Inspection Engineer
Client / Owner : Indraprshtha Gas Limited (IGL)
RESPONSIBILITIES :
- Meeting with clients for technical discussions according to the projects requirements and scope of work.
- Looking all activities related to Pipeline field.
- Preparation & monitoring of the Client Requirement Schedule.
- Getting the Job done with Full Coordination with Client & Third Party Inspection.
Job Profile :
- Working experience in the “CITY GAS DISTRIBUTION PROJECT” of I.G.L.
- Carrying out third party inspection at the site of Indraprastha Gas Limited.
- Installation of G.I pipe & copper pipe.
- Testing of pipe using manometer.
- Laying PE pipe medium pressure & low pressure size of pipe 32, 63, 90,125,180(mm).
- Testing : MDPE line/ GI riser/Cu testing medium, pressure gauges, holding pressure & duration
- Supervision of GI/MDPE/Cu/STEEL line. As :route survey, finalization, estimation for required material, location of potential gas supply point ( meter, regulator installation) with safety points & minimum utilities.
- Flushing testing of pipe by using compressor/nitrogen.
- Purging & commissioning of laying pipe.
- Audit of safety in site per day.
- Weekly planning & reporting to the area in charge.
- Audit of pipe network drawing & material consumption.
- Quality control as per company requirement.
- Work performance as per company requirement.
- Checking of RA & Final Bill as per tender book.
M/F RVNCON Pvt. Limited JULY 2009-MAY2010
Project : PNG & City Gas Distribution MDPE Pipeline.
Location : Mumbai
Position : Inspection Engineer
Client / Owner : Mahanagar Gas Limited (MGL)
RESPONSIBILITIES :
- Meeting with clients for technical discussions according to the projects requirements and scope of work.
- Supervision on site.
- Looking all activities related to Pipeline field.
- Getting the Job done with Full Coordination with Client & Third Party Inspection.
Job Profile :
- Working experience in the “CITY GAS DISTRIBUTION PROJECT” of M.G.L.
- Carrying out third party inspection at the site of Mahanagar Gas Limited (MGL) working on experience on the GI, MDPE, HDPE, Cu gas piping and steel gas pipe line.
- Purging, gas charging & commissioning of GI/MDPE/Cu pipe.
- Documentation and reporting.
- Supervision on site.
- Supervision of GI/MDPE/Cu/STEEL line. As :route survey, finalization, estimation for required material, location of potential gas supply point ( meter, regulator installation) with safety points & minimum utilities.
- MDPE Supervision which comprises of trial pits, sketch showing, details of surfaces to be cut , its chain age and length (area),
- Testing : MDPE line/ GI riser/Cu testing medium, pressure gauges, holding pressure & duration
- Purging, gas charging & commissioning of GI/MDPE/Cu pipe
- Civil work : Restoration, compaction, valve chamber.
Technical Skills
Programming languages C
Engineering concepts Thermodynamics, production& strength of materials
Operating systems Auto cad, windows 98/200/xp/vista
Packages MS Office, internet applications
NDT Level 2(RT, UT, MPT, DPT)
TRAINING ATTENDED
- Two Week training from “Bhilai steel plant”, Bhilai (C.G.) :I am study 7 blast furnace
Departments, slag granulation plant and transport & diesel organization.
- Two Week training from J.K Tyre (Gwalior) : I am study tare manufacturing process.
- NDT Radiographic Evaluation & Interpretation testing in Delhi.
- NDT Ultrasonic Testing in Delhi.
- NDT Magnetic Particle Testing in Delhi.
- NDT Liquid Penetrant Test in Delhi.
EXTRA CURRICULAR ACTIVITIES :
- Achieve 2nd place in chess competition.
- Participated in inter school football championship
- Active member of Green Vision (the nature club of SATI).
-
August 13th, 2012, 07:03 PM
Post Count Number #5
CV
I have to submit my CV for the post of inspection engineer.
-
September 13th, 2012, 06:25 PM
Post Count Number #6
welding school
Where can I find competent technical institution that offers programs on welding with globally recognized certification?