Simon India Ltd Ahmedabad : Piping Fabrication site engineer

+ Ask Question / Post resume
Results 1 to 5 of 5
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Simon India Ltd Ahmedabad : Piping Fabrication site engineer

    Simon India Ltd
    http://www.simonindia.com

    Keywords: Experience in Piping erection work

    Piping site engineer at Dahej ( Gujarat)

    Experience: 2 - 5 Years
    Location: Ahmedabad
    Compensation: Rupees 2,25,000 - 3,50,000
    Free housing at site is provided + site allowance, Salary will depend on experience. For exceptional candidates higher compensation can be considered
    Education:UG - Diploma - Mechanical
    PG - Post Graduation Not Required
    Industry Type: Chemicals/ PetroChemical/Plastic/Rubber
    Functional Area: Site Engg., Project Management
    Posted Date: 14 Jan

    Job Description
    The job involves supervision of various piping and other fabrication works at a Chemical plant site at Dahej in Gujarat.Candidate should have experience in chemical plants of refineries doing piping erection work--welding standards for special materials, NDT testing etc etc Send application to anil.hari@simonindia.com

    Desired Candidate Profile
    Mpiping erection. Must be familiar with welding standards, welding of special materials, and other aspects of erection such as safety etc etc

    Company Profile
    Simon India is the engineering arm of the Chambal-Zuari-Paradeep Phosphates group--all a part of the the KK Birla Group.The group has diversified interests in the areas of fertilisers, phosphoric acid, agri-inputs & seeds, agri-biotechnology, textiles, information technology and shipping. They are the sixth largest producer of fertiliser in the world. Simon India is the engineering arm having experience in Feasibility studies,Design Consultancy,EPC contracting as well as Project Management mainly in Process Plants, Refineries, Chemical Plants etc. The present job is in Saudi Arabia and being done for SABIC.

    Executive Name:
    Anil Hari

    Address:
    Contact : Anil Hari
    Email : anil.hari@simonindia.com
    Ph : 011-42602214 or 011-26436804
    Mobile : 9818879507

    Telephone:
    011-26436804,42602232,9818879507

    Reference ID:
    Dahej site piping



    Offices:

    Simon India Limited
    4th Floor, Devika Towers
    6, Nehru Place, New Delhi - 19
    (Behind Paras Cinema)
    Tel : 011-42602222
    Fax : 26002220
    e-mail : tk.nandy@simonindia.com
    Contact : Tapan Nandy

    COO's Office


    Simon India Limited
    2nd Floor, Devika Towers
    6, Nehru Place, New Delhi - 19
    (Behind Paras Cinema)
    Tel : 011-42602222 Fax : 26237230
    e-mail : bhaskar.chatterjee@simonindia.com
    Contact : Bhaskar Chatterjee


    Operations & Engineering Office


    Director (Operations & Engineering)
    Simon India Limited
    1st Floor, Devika Towers
    6, Nehru Place, New Delhi - 19
    (Behind Paras Cinema)
    Tel : 011-42602222 Fax : 26237230
    e-mail : ashok.grover@simonindia.com
    Contact : Ashok Grover


    Regional Office (Mumbai)


    Simon India Limited
    901, Raheja Centre,
    Nariman Point,
    Mumbai - 400 021
    Tel : 022 - 2204 0105
    Dir : 022 - 2204 0106
    Fax : 022 - 2284 2273
    e-mail : zuaribom@hotmail.com
    Contact : P G Bhandarkar

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: Simon India Ltd Ahmedabad : Piping Fabrication site engineer

    hello
    MECHANICAL ENGINEER

  3. Post Count Number #3
    On probation
    Join Date
    March 9th, 2011
    Location
    india
    Posts
    1

    BE(Mechanical ) with 2 years of total experience

    CURRICULAM VITAE

    Name :
    ASHWIL D’SOUZA
    E-mail : ashwilsouza AT ymail.com

    Hobbies :
    - Drawing , painting, Cartooning, &Photography
    - Reading books, Short stories.
    - Listening to music, playing cricket.
    Extra Curricular Activities
    - Played at Mangalore zone and secured runner up at high school level.
    - Participated in VTU level cricket Tournament at Shimoga2005/06.
    Languages Known :
    - English, Hindi, Kannada, Konkani & Malayalam. Education :
    Bachelor of Engineering - B.E
    Mechanical Engineering
    ST. JOSEPH ENGINEERING COLLEGE VAMANJOOR.
    V.T.U
    Karnataka.
    Skill Set :
    Operating System : Windows-98/2000 /XP
    Languages : Pascal and C .
    Packages : AUTOCAD 2007
    SOLID EDGE, ANSYS.
    MS-Office (Word, Excel &
    Powerpoint), Photo shop.



    Career Goal :
    Looking for a corporation where I can use my skills and knowledge to contribute towards company objectives.
    Educational Qualifications :
    SI
    NO. Course Institution Year Of
    Pass Percentage
    1.
    Engineering
    ST. JOSEPH ENGINEERING COLLEGE ,VAMANJOOR
    2009
    53.10%
    2.
    PUC
    PADUA PRE UNIVERSITY COLLEGE, MANGALORE.
    2004
    53.17%
    3. SSLC SRI MAHALINGESHWARA ENGLISH MEDIUM SCHOOL , SURATHKAL 2002 66.67%
    B.E. Academic Record
    Semester Percentage
    First 48.129
    Second 53.16
    Third 48.22
    Fourth 47.77
    Fifth 51.11
    Sixth 48.62
    Seventh 55.33
    Eighth 72.56
    Aggregate : 53.08%
    Seminar Presented
    - Presented seminar on “Aerodynamics in automobiles” and “Aerodynamics in Aeroplanes ”
    Project Undertaken (Academic)
    Currently undertaken the project titled : ELECTRIC POWER GENERATION FROM FOOTSTEPS.
    TECHNICAL QUALIFICATION :
    CERTIFICATE SUBJECT INSTUTION/ORGANISATION YEAR OF PASSING
    ASNT LEVEL - II Radiographic Testing Geecy Industrial Services Private Limited 2010
    ASNT LEVEL - II Ultrasonic Testing Geecy Industrial Services Private Limited 2010
    ASNT LEVEL - II Magnetic Particle Inspection Geecy Industrial Services Private Limited 2010
    ASNT LEVEL - II Dye Penetrant Testing Geecy Industrial Services Private Limited 2010
    - Worked as a NDT ENGINEER in GEECY INDUSTRIAL SERVICES PRIVATE LIMITED, MAHAPE, NAVI MUMBAI
    Carried out following NDT Techniques on various jobs
    1. Radiographic Testing
    2. Ultrasonic Inspection
    3. Advanced Ultrasonics
    4. Magnetic Particle Inspection
    5. Dye Penetrant Testing
    6. Hardness Testing
    7. Helium Leak Testing
    8. Halogen Leak Testing
    9. Vaccum Leak Testing
    10. Positive Material Identification
    11.Vibration Testing
    12. Paint Thickness Guaging
    13. Ultrasonic Thickness Measurements
    14. Radiation Contamination Examination
    15. Digitisation Of Radiographs Using RHYTHM ACQUIRE 3.0
    Work Experience :
    Name of the Company Working from – To Designation Working Area
    G.R Engineering Pvt. Ltd ,
    MRPL site.
    25/05/2009
    30/1/2010
    Production and Quality Engineer
    - Production of Gas containers of length
    97325mm and inner diameter 7000mm at MRPL.
    - Assisting Senior Engineer in the fabrication of bullet vessels(Gas containers)
    - Quality maintenance as per ISO standards .
    - Estimation of work involved in the project.
    - Maintaining of documents on daily basis as
    per ISO standards
    Responsibilities
    - Estimation and costing of all the materials required for fabrication.
    - Preparing bill of all the required materials and welding consumables as per drawing or design given by the client.
    - Preparing indent for the required materials.
    - Preparing work schedule and planning.
    - Responsible to complete site survey and specify the scope of work.
    - Mobilization of necessary equipments, materials and manpower on respective sites.
    - Coordination between the higher authority and subordinates.
    - Executing the work as per drawing and design.
    - Preparing WPS (welding procedure specification) and WQT (welder qualification test).
    - Quality control of all the equipments as per ISO standards.
    - Quality control as per the design & drawing standard.
    - Submitting daily progressive report to the office.
    - Organize, Inspection and testing and examination of all products and components as specified in quality plan.
    - Welding inspection , radiography testing , UT testing , magnetic particle testing.
    - Review and witness for various inspections performed.
    - Controlling the quality of products and manufacturing records as per quality plan.
    - Preparation of internal quality control reports and manufacturing record data at various stages of job.
    Name of the company Working (from –to) Designation Working area
    C.R Asia, PetroChem
    services Pvt. Ltd ,
    Mumbai 1/07/2009
    To 30/06/2010 Maintenance
    Engineer
    (QA/QC) - Loading of catalyst
    - Unloading of catalyst
    - Maintenance of all pressure vessels.
    - Quality maintenance of all equipments, especially BA equipments.
    - Maintenance of reactor, exchangers, reformers, columns and pipe lines
    - Documentation of all the work at the
    site as per ISO standards

    Responsibilities
    - Estimate and plan about the resources required at the site.
    - Estimation of the man power, tools and equipments and sub-contractors.
    - Estimation of the time and resources required to complete the job.
    - Loading and unloading of the catalyst
    - Screening of the catalyst and reloading it into vessel.
    - Chemical cleaning of the pressure vessel
    - Sludge cleaning of the pipe line using Rotomol cleaning process.
    - De-coking de-scaling technology (DDT) is used to clean the entire pipe line of a plant.
    - Cleaning process also includes pegging
    - Responsible to complete site survey and specify the scope of work.
    - Quality control of all the equipments as per ISO standards.
    - Supervision of subordinates to ensure that all work is carried out efficiently and safely.
    - The performance of safety audits within work area is been conducted.
    - Every day safety tool box talk before starting work is been conducted.
    Name of the company Working from -to Designation Working area
    A B F Engineering, Pvt international ltd. 1/07/2010 – 1/12/2010 QA/QC engineer - Production of structures and
    pressure vessels.
    - Estimation of the project .
    - Inspection of the structures an
    pressure vessels.
    - Maintaining of documents on daily basis as per ISO standards.
    - And practice of NDT at the shop floor where fabrication is done.
    Responsibilities :
    - Quality control inspection and hydrostatic pressure testing of fabricated and installed process piping, tanks, and vessels.
    - Quality control inspection on sandblasting and painting operations.
    - Coordination and monitoring on non-destructive testing requirements on completed weld joints.
    - Executing the work as per drawing and design.
    - Preparing WPS (welding procedure specification) and WQT (welder qualification test).
    - Quality control as per the design & drawing standard.
    - Control of Incoming material inspection report.
    - Review and witness for various inspections performed, Welding inspection, radiography testing, UT testing, magnetic particle testing.
    - Submitting daily progressive report to the office.
    - Estimation and costing of all the materials required for fabrication.
    - Preparing indent and purchase order for the required materials.
    - Preparing bill of materials as per fabrication required.
    - And also knowledge in pressure piping B36.1 and B36.6.
    Name of the company Working from - to Designation
    ROWAN DRILLING COMPANY , KINGDOM OF SAUDI ARABIA Jan 1st to Till date Materials engineer - Maintaining daily log sheet.
    - Preparing purchase requisition on the given quotation.
    - Maintaining daily work record.
    Responsibilities :
    - Maintaining daily work log sheet of the consigned rig.
    - Maintaining all the records of drilling materials at the ware house and the respective yard .
    - Preparing PR (purchase requisition) for the assigned quotation as per company norms using SAP software.
    - Preparing work force report and categorizing it with the Saudi nationality and non Saudi nationality as per required by the company and ARAMCO officials.
    - Collecting daily reports of B.E (Barge Engineer) report, Aram co report, and maintenance report on daily basis from each rig.
    - Looking after the supply of required materials to different rig from the warehouse.
    - Verify quantities and contents of all shipments to, from and between the rig(s).
    - Ensure that all materials received on rig are properly stored in accordance with storage and preservation procedures.
    - Issue materials to rig personnel and ensure delivered materials are documented
    - Communicate with Customer / Operator or Service Company personnel to facilitate management of materials.
    - Preparing bidding document for consigned drilling contract tenders of each rig.
    I declare that the information given above is true to the best of my knowledge. Original Educational and Experience Certificates can be presented upon request.
    PLACE : MANGALORE
    DATE : (ASHWIL D’SOUZA)

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    RESUME
    Rahul.R.Thakkar
    E-mail ID : rahuler108 AT yahoo.com
    Career Objective :
    Intend to become good engineer with improvement of knowledge, with leading corporate environment where I can realize my potential and can update my self fully with latest technologies and where I can work as key player in fabrication or maintenance.

    Educational Qualification :
    Qualification Board/University Year Percentage
    DIPLOMA IN MECHANICAL ENGINEERING (SEMESTER SYSTEM) GTU,
    GUJARAT STATE,AHMEDABAD 2011 64.50%
    6th Sem Result Pending
    H.S.C. GSHSEB 2008 40.00%
    S.S.C. GSHSEB 2006 73.67%
    Experience :
    1 Fresher

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    resume

    RESUME

    ANOOP KUMAR NARAYANA PILLAI
    PIPING ENGINEER/ SUPERVISOR
    E-mail :- anoopkumar187 AT gmail.com

    CAREER OBJECTIVES :-
    To be associated with a progressive organization that gives scope to learn and constantly improve my knowledge and skills, and to be the part of a team that dynamically works towards the growth of the organization.
    EDUCATION :-
    - Bachelor of Engineering in Mechanical Engineering,(May-2008)
    - Diploma in Mechanical Engineering, State Board of Technical Education and
    Training, Tamil Nadu (April -2005)
    CERTIFICATION :-
    - Diploma in PPM Using primavera 6.

    COMPUTER SKILLS AND SOFTWARE USED :-
    - Microsoft word/ Excel/ Power point
    WORK EXPERIENCE : - (3.6 Yrs in Petrochemical Engineering)
    1. SEEH AL SARYA ENGINEERING LLC, OMAN.
    DESIGNATION : Mechanical supervisor
    PROJECT : Construction of flow line &Water injection lines
    CLIENTS : Occidental of Oman
    DURATION : From Aug 2011 – to till date
    SEEH ALSARYA ENGINEERING LLC is one among the leading Construction and Maintenance Companies located in Oman having various projects at oil and gas sector


    JOB RESPONSIBILITIES : - .
    - Supervise and coordinates activities of all foreman under their responsibilities
    - Assist in manpower and resource scheduling and deployment and coordinate in all site issues.
    - Monitor job progress and ensure quality work at targeted schedule.
    - Prepare reports on job status and project completion
    - Oversee of project drawing and clarify any errors in drawing with clients.
    - Conducting safety meeting and observes all safety rules and procedures.
    - Conducting daily and weekly meeting with all foreman regarding with all site activities.
    - Coordinate with client and solve all the issues.
    - Try to get maximum productivity with quality and safety
    2. PAULOSE GEORGE CONSTRUCTION COMPANY PVT
    DESIGNATION : PIPING ENGINEER
    PROJECT : CDU II FLOW LINE WORK.
    CLIENT : BPCL, Kochi Refinery, Ambalamugal, Kochi
    DURATION : From NOV 2010 TO AUG 2011
    PAULOSE GEORGE CONSTRUCTION COMPANY is one among the leading Construction Company located in Kochi having various projects at Refinery, Petrochemical.
    JOB RESPONSIBILITIES : -
    - Monitored piping materials take off, pre fabrication and piping Errection activities.
    - Coordinate with client engineers on pipeline engineering issues
    - Inspect and check daily progress report
    - Supervision of installation , erection of pipes and pipe supports as per layout location
    - Piping alignment checking, pipe rout and pipe support modification works , pre punch works, line checking with test packages, punch clearing, witness and inspection of hydro testing and reinstatement works.
    - Attending punch list items and getting approval from the concern person.
    - Perform other duties and responsibilities and or function, which the immediate superior may assign time to time.
    3. NASSER AL-HAJRI CORPORATION
    DESIGNATION : PIPING ENGINEER
    PROJECT : NATIONAL CHEVRON PHILIPS
    CLIENT : JGC ARABIA LTD
    DURATION : From Nov 2009 –Nov 2010
    NASSER AL-HAJRI CORPORATION is one among the leading Construction Company located in Saudi Arabia having various projects at Refinery, Petrochemical, and Chemical
    JOB RESPONSIBILITIES : -
    - study and understand the blueprints of designs prepared by planners.
    - Coordinate with client engineers on pipeline engineering issues
    - supervise the supervising installation works properly.
    - plan and schedule the work within the given deadlines.
    - Ensuring the job progresses as per schedule timely.
    - Interact with the planners to discuss plans and clarify installation process as well.
    - Ensure the safety measures and procedures at the work place and needs to implement them as well.
    - prepare the documents at the various stages of development of the project.
    4. NASSER AL-HAJRI CORPORATION
    DESIGNATION : PIPING SUPERVISOR
    PROJECT : SAUDI KAYAN OLEFINS PROJECT-ETHYLENE CRACKER UNIT
    CLIENT : KBR, SINGAPORE
    DURATION : From Nov 2008–Nov 2009
    NASSER AL-HAJRI CORPORATION is one among the leading Construction Company located in Saudi Arabia having various projects at Refinery, Petrochemical, and Chemical
    JOB RESPONSIBILITIES: -
    - Monitored piping materials take off , pre fabrication and piping Errection activities.
    - Coordinate with client engineers on pipeline engineering issues
    - Inspect and check daily progress report
    - Supervision of installation , erection of pipes and pipe supports as per layout location
    - Piping alignment checking, pipe rout and pipe support modification works, pre punch works, line checking with test packages, punch clearing, witness and inspection of hydro testing and reinstatement works.
    - Attending punch list items and getting approval from the concern person.
    - Perform other duties and responsibilities and or function, which the immediate superior may assign time to time.
    DECLARATION:-
    I, hereby declare that all the informations furnished above are true to the best of my knowledge.
    Place: Oman
    Date: ANOOP KUMAR