-
December 25th, 2008, 04:07 PM
Post Count Number #1
litwin PEL Dubai/ UAE : HP Piping erection Inspector
litwin PEL
http://www.litwinme.ae
Keywords: Preparation / reviewing of welding and erection procedures. Co - ordination and Execution and follow - up of NDT activities PT / RT / UT etc in coordination with , Preparation & reviewing of Hydro Test procedure
Designation: HP Piping erection Inspector
Experience: 5 - 6 Years
Location: Dubai/ UAE
Education: UG - Diploma - Mechanical
PG - Any PG Course - Any Specialization
Industry Type: Oil and Gas/ Power/Infrastructure/Energy
Functional Area: Production, Maintenance, Quality
Posted Date: 16 Dec 2008
Job Description
Preparation and submission of final erection and QC documents. HP Piping Replacement under the supervision of Lead Engineer. Review the fabrication / manufacturing drawings. Field study for erection of piping and supports.
Desired Candidate Profile
Diploma in Mechanical, 5-6 years experience as HP Piping Erection Inspector in Oil & Gas / Petrochemical Industry.
Company Profile
Litwin PEL is french based EPC company, having Manpower Division to cater to the need of Technical Manpower requirements of ADNOC groups and other EPC clients across UAE in Qatar
Executive Name: Ziad Mohamed
Address:
PEL
Salam Street
Abu Dhabi,Abu Dhabi,UAE 44715
Email Address: hr@litwinme.ae
Telephone: 971-2-5070117
Reference ID:
SP.08.637
-
July 23rd, 2011, 11:47 AM
Post Count Number #2
IJT addict
Name : Prashant Anerao
Email : pra_025 AT yahoo.co.in
Designation / Skillset : Piping Draughtsman
I have over 9 years of experience in the field of Mechanical, Piping on various projects in industrial, chemical & processing line. Well known experience in AUTO-CAD & AUTO PLANT I am a fresher PDMS (3D Modeling) & completed a course in PDMS piping & looking for the opening for the same, If you have one please revert back to me at the earliest.
Resume :
Career Summary
I have over 9 years of experience in the field of Mechanical, Piping on various projects in industrial, chemical, processing line. Well known experience in AUTO-CAD & AUTO PLANT. Also knowledge of PDMS & PDS 3D Modeling.
Duties & Responsibilities (Design and Drafting)
- Spec. generation and 3D Model using equipment & piping modelling through Autoplant software.Prepare of piping extract for isometric drawing.
- Piping General Arrangement Drawings, Equipment & Pipe Rack Layout, Nozzle Orientation, Pipe Support Drawings through AUTOP-LANT & AUTO-CAD.
- Defining Structure Required for Equipment & Piping System.
- Review and comments on vendor drawing / speciality items Co-ordination witrh inter disciplines.
- Preliminary MTO & Final MTO.
Work Experience
- Company : CMI FPE LTD.- Andheri (E)
Period : Nov. 2002 to Till date
Position : Sr. Executive
Summary of jobs involved :
- Design and model piping and pipe support using AUTO-PLANT software.
- Review pipe support and piping using 3D to avoid clashing and clearance checking.
- Create and modified specs and catalogue using AUTO –PLANT
- Prepare ISO-drawing,GA drawing and pipe support detail.
- Define the materials or services to be purchased for engineering tasks within the allocated
resource budget.
- Company : IIT - Pawai
Period : Aug. 2002 to Oct.2002
Position : Project Assistant
Summary of jobs involved :
- Define the materials or services to be purchased for engineering tasks within the allocated
resource budget.
- Pipe thickness calculation and Tank farm design, Weight Calculations,
- Preparation of drawings for various types of sections which were developed in R & D department.
- Company : Allied Consulting Engg. Pvt. Ltd. - Chembur
Period : Oct. 2000 to Sept.2001
Position : Traniee Draughtsman
Summary of jobs involved :
- Preparation and drafting of Piping and Equipment Layout drawings.
- Preparation and drafting of Piping & Instrumentation diagrams
- Preparation and drafting of Process Flow diagrams.
- Involved in preparation of Inbuilt Layouts, Piping & Equipment Layouts and P& IDs for various chemical plant sites.
Academic & Technical Qualification
Bcom (distance learning program) from Mumbai University (2002) passed with pass class.
I.T.I. (Mechanical Draughtsman) from Patuck I.T.C. Govt. reg. (2000) passed with 67.94%
N.C.T.V.T. (Apprenticeship) from Allied consulting Engineering (2001) passed at 72.70%
Software Skill
- AUTO-CAD : Ver. 2000, 2004 & 2012
- AUTO-PLANT :
- PDMS : Ver. 11.5
Place : Mumbai
( Prashant R. Anerao)
9768720695
-------------------------------------------------------
More Information about this submission and submitter :-
___________________________________________________
Submission ID : 4351560
Date & Time : 9th Jul 2011 5:16 PM (UTC)
IP Address : 59.184.254.90
Browser Info : Mozilla/4.0 (compatible; MSIE 8.0; Windows NT 5.1; Trident/4.0; .NET CLR 2.0.50727; InfoPath.2; yie8)
Predicted Country : India
-
October 25th, 2011, 01:08 AM
Post Count Number #3
piping manager/supervisor
E-Mail : wissem AT gmx.de
Wilms wissem
My work : ISO& PID check,site supervision,precom, hydrotest,coordination
I’m looking for a job alls piping supervisor manager/, coordinator,
10/2010- today : MAN. Project Nouvelle centrale Bellefontaine
(Martinique)
Piping manager
construction of new power plant
09/2009 –10/ 2010 : TECHNIP: project SHELL Wesseling
(Germany)
Supervisor / Tie in engineer
- piping supervision
Tie in supervision/ preparation
Shutdown preparation and site supervision
08/ 2007 – 08/ 2009 ;TECHNIP : project:HDS TOTAL Leuna (Germany)
Supervisor
- piping supervision
- control iso + PID + site coordination
05/ 2007 – ca 07/ 2008 ; WWV Karlsruhe : project ADU/VDU Revamp TOTAL Leuna (Germany)
Supervisor
- piping management
- control iso + PID + Tie-in …...
01/ 2007 – 05/ 2007 ; ABB Lummus global : construction a cold box 27-J-501 Nordon cryogenie Golbey+Nancy (France) for OMV
Supervisor
construction supervision
- Works .coordination
- Reporting, Progress, Respect of the delay
- Solution to problems in workshop
04/ 2006 – 11/ 2006 ; Semts / Tessiga :Reparation of Tanks 1051 /1032 etc… Sogara+Cap lopez Port-Gentil TOTALGabon
Supervisor
- All works supervision
- Reparation of Tanks : 1051et 1032
- piping : Ligne déluge
- Supervision montage internal column
- Modification piping + pump in Lambarene
11/ 2005 – 03/ 2006 ; Kraftanlage München : project REBMAX Miro Rewamp Karlsruhe (Germany)
Coordinator
- Shutdown preparation
- control iso + PID + Tie-in ect..
- Supervision montage piping
08/ 2005 – 10/ 2005 ; Aker kvaerner : Modification blow down system
Gelsenkirchen (Germany)
Project engineer
- documentation
- site isometric
03/ 2005 – 07/ 2005 ; Selas Linde : construction heater at Lavera
Naphtachimie Lavera (France)
Project engineer
- Risk Analyse
- control Isometrie
05/ 2004 – 11/ 2004 ; ABB Lummus global :project D109 construction of unity Ethylène Naphtachimie Lavera (France)
Site manager
- Supervision construction
- Works preparation
- Montage column
- (internal column)
- Montage of 2 exchangers+ tank+pump
- Montage piping
- cold insulation + scaffold
- Electricity+ MSR
11/ 2002 – 12/ 2003 ; E&E verfar/tech : construction of an indus bakery/ Coppenrath&wiese Metingen (germany)
Project engineer
- Erection of PID
- Erection of iso
- Supervision construction
02/ 2002 – 10/ 2002 ; Kraftanlage münchen :project Atofina Gemini construction + rewamp Anvers ( Belgium)
coordinator
- Schutdown preparation
- control iso + PID + Tie-in ect..
- Supervision montage piping & equipment
10/ 2001 – 02/ 2002 ; Kraftanlage münchen : project Holburg
Hamburg (Germany)
Responsible Hydro test
- Hydro test
06/ 2001 – 10/ 2001 ; Kraftanlage münchen :project Atofina Desolventiser construction + rewamp Anvers (Belgium)
Work preparation
- Schutdown preparation
- control iso + PID + Tie-in ect..
- Supervision montage piping & equipment
12/ 2000 – 05/ 2001 ; Lurgi :project Dedalo construction sugar plant Marcolsheim (France)
Supervisor /
- Schutdown preparatio
- control iso + PID + Tie-in ect..
- Supervision montage piping & equipment
06/1983 – 05- 2000 ; different project like : construction part of raffinerie Leuna 2000 en 1996/97 (Germany), construction offshore platform Project ELF exploration Angola 1994/1995(France), construction offshore platform project BP Bruce 1992/1993(France), construction lemonade plant 1990/1991 (Maroc) , revamping Sonatrach Arzew 1989/1990 (Algeria) construction cigare sous pression SN Métal Annaba 1984/1984 (Algeria)
-
November 5th, 2011, 01:31 AM
Post Count Number #4
HP PIPING ERCTION INSPECTOR
ALY MOHAMED ALY AMER.
E-Mail : ali_amer_ali AT yahoo.com
- Professional Career : QA/QC (Piping –Mechanical-steel structures) Inspector.
- Skill : American Welding Society, Certified Welding Inspector.
Certificate of Education :
- B.Sc of Educational Quality - Industrial Technology-. Tanta University1999.
- Certificate of Industrial Metallurgy - Industrial Technology –Tanta University.
Certified OF Qualification :
- Certified interpretation American Welding Society of Non Destructive Testing SNT-TC-1A level II (VT, RT, UT, PT, & MT&AUT) by ASNT NDT Level III No.155516.
- Qualification as American Welding Society / Certified Welding Inspector (In waiting received CWI certificate.
- Certificate of protection (Painting & Coating). By SSPC Co.
- Attendance certificate in (Welding joints design program) at AUC, Cairo.
- Attendance Training As Internal Auditor.
- Attendance certificate in (Heat treatment course) by petrojet.
- Attendance Training As piping designer (G'A, P&ID, Marked Up Drawing &Final As Built By ENPPI Petroleum CO. (Engineering for the petr.and proc.industries).
- Attendance Training As piping Software 3D Model By ENPPI Petroleum CO. (Engineering for the petr.and proc.industries).
- Training Safety Courses At GUPCO ( Defensive Driving, Safety Training Observation, Environment Awareness, Occupational Health, Energy Isolation, Isolation Certificates, Permit to work, Advanced Safety Audit, Helicopter Safety, Hazard Identification, Risk Assessment, Hydrogen Sulphide, Fire Fighting, Work at Heights, Performing Authority For Hot Work Activities, Confined Space, Ground Disturbance, Hot Bolting)
- Driving License is Valid + Def. Driving Certificate.
Skills
Languages :
- Excellent in English written and spoken.
Computer :
- Excellent in using many of the computer software, and have a lot of experiences dealing with software and hardware problems.
- AutoCAD release 14 , 2000 , 2002 , 2004 , 2005
- MS Office 97 - 2000(WinWord, excel, access, outlook ...etc.)
- Windows 95, 98, Millennium, Windows NT A very good user of the “Internet” and all its applications.
Work Experience :
- Ten years experience as site, Q.A/Q.C (piping, mechanical) or very special and critical material coating and protection inspector for all types of process gas-tanks- pressure vessel and spherical tanks with good knowledge of standard cods & specifications gained through working on deferent projects.
Technical Experiences
- Many strategic projects, offshore and onshore, inside & outside Egypt as : -
- Q.A/Q.C of Piping& Mechanical.
- Welder Performance Qualification/ Welding Procedure Specification/ Procedure Qualification record.
- Hydrostatic, Leak and Vacuum test coordinator.
- Sand blasting, painting & coating inspector.
- Materials balance &materials take /off.
Duties and Responsibilities
Quality Assurance :
- Verification of conformity and effectiveness of quality management system through holding internal audits and external audits on sub-contractor.
- Preparation of Project Quality Documents in accordance with company specs that fulfils requirements of I so (9001-2000) principles and Client’s specifications.
- Project quality plan – Inspection and Test plan – NDT procedures – Approved NDT personal – Equipments calibration list…. Etc.
- Reviewing of project Drawings and Preparation of site technical query and concessions if required.
- Issuing bid requisitions for purchasing NDT consumables and welding consumables.
- Check the quality aspects of the procurement requisitions and relevant orders affecting quality, Issue a calibration equipment list of each project.
- Assurance that the QA policies procedures and Instructions are properly implemented.
- Reviewed& Closed pre-punch list &post-punch list and Final documents.
- Interpreted and reviewed all NDE Reports against Codes.
- Inspection and witnessed to piping /PL Hydro test and Reviewed test packages.
- Witness of Welding Procedure Qualification Test to the Specification Including Hydrostatic &Pig Testing Operations.
- Monitor /Report Fabrication Includes, Welding Performance, Material Review, NDT Report Review, Radiographic Film Review, Dimensional Checks, Verify Painting Quality Review for work procedures
- Approving the Procedure
- Review sub-contractors qualification and certification for personnel and equipment.
- To organize NDT sub-contractors activities according to the approved detailed request.
Non-Destructive Examination :
Ultrasonic Examination
- UT Procedure preparation and report writing with conformance of the Applicable code And Specification Thickness Measurement and Lamination Detection using A-Scan equipment such as (Krautkramer USK-7 & USK-6) and Resonance Digital equipments such as (Krautkramer DM4).
- Flaw Detection for all configurations : butt welds and TKY connections Using CRT (Krautkramer USK-7 & USK-6) and LCD Digital (Krautkramer USM-25, USN-52 and USM-35) equipments.
- Dealing with different UT (calibration and DAC) Blocks such as IIW V1, IIW V2, NAVSHIPS, IOW, Step, ASME & DNV Base Metal DAC Block…etc.
Radiographic Examination
- RT Procedure preparation and report writing with conformance of the applicable code and specification.
- Radiographic film interpretation for all configurations welding, casting and forging.
- Dealing with radioactive isotopes in case of emergency, preparation of emergency plan and supervision on its application.
- Shielding design and shooting area safety.
Deal with all RT safety equipments including surveyors, Bleeper's, dosimeters…. Etc.
Liquid Penetrant Examination
- PT Procedure preparation and report writing with conformance of the Applicable code and specification.
- Test performance for both visible and florescent
Magnetic Particles Examination
- MPI Procedure preparation and report writing with conformance of the Applicable code and specification and Test performance for Magnetic Particles.
Visual Examination
- VT Procedure preparation and report writing with conformance of the Applicable code and specification.
- Capable to use all the visual testing tools such as HI-LO gauge, fillet Gauge, Cambridge universal weld gauge…..Etc.
Painting & Coating Inspection :
- All duties of the Painting inspector prior, during and after painting System application (surface preparation, surface roughness, wet film Thickness, dry film thickness, Holiday test…. Etc.
- Repair work of painting and coating.
- Supervision on the installation of pipelines catholic protection facilities.
Piping & Mechanical Activities :
- Review conceptual designs, studies, reports and proposals.
- Independently plans schedules, conducts and coordinates detailed phases of engineering.
- Reviews and checks work of other piping and valve of contractor engineers.
- Assists in on the job training of assigned personnel. Perform supplier document reviews. Implement Process Improvement work process improvement goals.
- Plan and coordinate independent works requiring judgment and experience in the application and substantial adaptation of engineering techniques.
- Independently develop and maintain project piping class sheets.
- Supervising the Prefabrication and Erection of the Pipe Networks at Site with all related Construction, Punch list, Hydrostatic test And Pneumatic test & commissioning.
- To design piping systems and installations in accordance with the relevant codes, standards and client specification.
- To control and monitor expenditure on piping systems relative to budgets.
- To ensure the correct selection of materials plant and equipment, and to quantify, procure and monitor the progress of materials plant and equipment through all stages of projects.
- To design structures and installation in accordance with the relevant codes, standards and client specifications.
- Selecting and procuring of materials plant and equipment, and monitoring the progress of materials, plant and equipment through all stages of projects.
- To support construction activities including issues such as rigging, lifting, and transport.
- To liaise with all members of the Project Team (Discipline engineers, construction personnel.
Employment History.
- Duration : From Mar. 2008 Till Now:
Occupation : EMC Co. As a Client for Khalda Petroleum Co. (E.G.P.C. Group)
- Projects :
- Qasr/Salam 24'' P/L Phase I, II Project.
- Qasr Gas facilities & Production (phase II).
- 18'' Salam/Abuelghardek Chemical Cleaning Project.
- Kalabsha Oil Plant Facility Project.
- New 8” Oil P/L Meliha-Sumpetco Facilities Upgrade.
- Salam Gas Plant - Permanent Slug Catcher.
- Position :
- Sr. QA/QC (welding)
- Sr. Mechanical Engineer.
- Assigned Task : -
- Review all welding logs, welding maps & Radiographic maps.
- Review & Approved WQT’s, PQR’s & WPS are for this project.
- Review Method of Statement for Piping Fabrication, tanks & Welding activities.
- Review & Approved NDT scope & NDT procedures.
- Piping punch listing.
- Reviewing of hydro test packages.
- Witness for hydro test, lay up, reinstatement activates.
- Duration : From Jun 2007 Till Mar. 2008
- Occupation : EMC Co. As a Client for Gulf of Suez Petroleum Company-GUPCO
- Project :
- 24” A/G Western Desert- Dahshour Gas Pipeline Repair Project
- Position :
- Sr. QA/QC Engineer.
- Assigned Task : -
- Review all welding logs & welding maps.
- Review all WQT’s, PQR’s & WPS’s for this project
- Duration : From Mar. 2006 Till Jun 2007:
- Occupation: ENPPI Petroleum CO. (Engineering for the Petroleum.and proc.industries).
- Client:
- GUPCO (Gulf Petroleum Co.)
- Project:
- (Gupco Rehabilitation Projects-onshore/off shore)
- Position:
- QA/QC Engineer.
- Assigned Task: -
- Review all welding logs & welding maps.
- Review all WQT’s, PQR’s & WPS’s for this project.
- Duration: from Nov. 2003 till Mar.2006
- Occupation: DSD Ferro Metal co (Power Station)
- Client:
- PGESCO
- Project:
- Nub aria Power Plant (Combined Cycle) - ANSALDO Boilers- New Talkha Power Plant (Combined Cycle).
- Position:
- QA/QC Engineer.
- Assigned Task: -
- Review all welding logs & welding maps.
- Review all WQT’s, PQR’s & WPS’s for this project.
- Review NDT scope & NDT procedures.
- Duration: from August 2001 to Nov. 2003: -
- Occupation: Petrojet- Technip -Burullus Gas (Oil and Gas)
- Client:
- Burullus Gas CO.)
- Project:
- SEMIAN
- Position:
- Petrojet QA/QC head.
- Assigned Task: -
- Check up the welding joints by NDT.
- Review all documents for this project.
- Project welder qualification, PQR’s & WPS’s preparation.
- Review all welds & NDT procedures.
- Duration: From Sep 1999 to August 2001:-
- Occupation: Daelim-TTIL/TR
- Project:
- Midor (Oil and Gas) .
- Position:
- Welding Inspector.
- Assigned Task: -
- Check up the welding joints by NDT.
- Project welder qualification & WPS preparation.
- Review all welds & NDT procedures.
Personal Advantages:-
- Co-operative and very good in teamwork.
- Have experience in dealing with different types of people.
-
March 25th, 2012, 10:26 PM
Post Count Number #5
PIPINGFOREMAM
Good working piping erection fabrication all type piping works