HYUNDAI ENGG & CO. Qatar : QC PIPING ENGINEER
M/s. HYUNDAI ENGG & CO. LTD (of Korea)
http://www.dss-hr.com
Keywords: QC PIPING ENGINEER
Designation: QC PIPING ENGINEER, HYUNDAI - QATAR
Experience: 5 - 10 Years
Location: Qatar
Compensation:
Good salary (negotiable) + free food, single status A/C accommo, med, tpt. No income tax.
Education: UG - B.Tech/B.E. - Mechanical,Diploma - Mechanical
PG - Post Graduation Not Required
Industry Type: Oil and Gas/ Power/Infrastructure/Energy
Functional Area: Production, Maintenance, Quality
Posted Date: 23 Dec 2008
Job Description
Will be required to implement approved QC (Quality Control) plan relating to Piping works during the execution of the project. SEND DETAILED CV, ACADEMIC, EXP CERTS & PHOTO BY E-MAIL / COURIER.
Desired Candidate Profile
B.E (Mech)/Diploma (Mech) with min 5 yrs exp as QC Engr (Piping) at large Petrochem/Oil & Gas project sites. Gulf exp preferred but not mandatory. PC literate. Good English & Passport holder. IMMEDIATE DEPLOYMENT.
Company Profile
Hyundai is known the world over for erection & commissioning of Oil / Gas / Petrochem / Refinery projects. Present site is a very large fertilizer(Ammonia & Urea) plant in Qatar.
Executive Name: Ms. Madhuri
Address:
Dynamic Staffing Services Pvt Ltd
E-40/7
Okhla Industrial Area
Phase ? II
Delhi,Delhi,INDIA 110020
Email Address: dss-job3@dss-hr.com
Telephone: 91-11-26388287
Reference ID:
HYD/QC PIPING ENGINEER/QONE/MADHURI
-
February 22nd, 2011, 01:21 PM
Post Count Number #2
Re: HYUNDAI ENGG & CO. Qatar : QC PIPING ENGINEER
This is Karthik.
Hear With I am Submitting My Bio- Data for Your Kind Consideration.
Regards
S.Karthik
Email : june_karthik AT yahoo.co.in
Mob No : 0091 .
Resume
QC INSPECTOR (WELDING & PIPING)
Professional Summary
Ø 5+ Years Having of Working Experience Related to Quality Control, Welding, and NDT & CONSTRUCTION Work in Oil & Petroleum Refineries.
Ø Mechanical Engineer with GOOD experience in Fabrication, Installation, Testing and Commissioning related to Pipelines/Piping, Structures, etc.
Ø Willing to work as a key team player
Ø Very much interested in continuous learning
Educational Qualification
Professional Qualification :
Ø Bachelor of Engineering (Mechanical) (2002 – 2005)
Technical Qualification :
Ø Diploma in Mechanical Engineering (DME) (1999-2002)
Additional Qualification :
Ø Certified Welding Inspector (CSWIP 3.1 Certificate No : 49755)
Ø ASNT Level II in Radiography Testing
Ø ASNT Level II in Ultrasonic Testing
Ø ASNT Level II in Magnetic Particle Testing
Ø ASNT Level II in Liquid Penetrate Testing
Software Knowledge
Ø AutoCAD,
Ø Microstation
Ø PDS,
Ø MS Office.
FAMILIAR WITH CODES AND STANDARDS
ASME Section IX – Welding and Brazing Qualification.
Section V - Non-destructive testing.
B31.1 - Power Piping
B31.3 - Process piping
ASNT American Society for Non-destructive Testing
Present Experience
Mar 2010 – Till Date QA/QC Inspector (Welding & Piping) AT Moss Engineering Works Pvt. Ltd, Chennai.
Professional Experience in KSA :
MAR 2009 – DEC 2009 QA/QC INSPECTOR AT SHAW STONE & WEBSTER ARABIA CO LTD SHARQ 3RD EXPANSION PROJECTJUBAIL, SAUDIARABIA.
APR 2008 - FEB 2009 PIPING INSPECTOR AT SAIPEM SAUDI ARABIA LTD,KPF PROJECT, KHURSANIYAH, SAUDIARABIA.
Monitoring Quality Inspection of pipe lines,
Ø Checking the incoming materials as per Codes and Process Standard Specifications.
Ø Establishment of PQR & WPS of various materials like Carbon Steel, Stainless steel. (P1, P4, P5A, P8)
Ø Ensure that approved WPS are followed. (SMAW, GTAW)
Ø Qualification of welders and for different types Of Welding Process and materials. (SMAW, GTAW)
Ø Inspect pipe fit-ups, alignment and visual inspection of all welds.
Ø Monitoring of welding activities during fabrication.
Ø Co-ordination with Client inspector for daily welding activities and for stage inspection.
Ø Review of welder qualification records.
Ø Verification of welding consumables handling and storage.
Ø Verification of baking of electrodes & electrode issue register.
Ø Co-ordination with Clients and NDT Sub contractors.
Ø Interpret/Review NDT reports and maintains all related file and records.
Ø Preparation Pressure Test Packages prior to pressure test. Preparation and clearing of Punch items prior to pressure test.
Ø Prepare the documents for the QC activities and Test Packages. Updating all QC activities and prepare the Test Packages Status and Progress reports.
Ø Inspection of Pressure test packages according to the piping class, their test limits and required pressure.
Ø Witnessing of hydro/pneumatic test as per the specification
Ø Checking and preparing As-Built revision drawings of Isometric drawings and P&IDs.
Professional Experience in India :
DEC 2006 – JAN 2008 PIPING INSPECTOR AT DOSHION LTD,CHENNAI PETROLEUM CORP. LTD, CHENNAI.
SEP 2005 – DEC 2006 PIPING ENGINEER AT CHEMLINE & UTILITY ENGINEER,KALPAKKAM POWER PLANT, CHENNAI.
Responsibilities :
Ø Preparation of Pressure test packages for the newly installed pipelines.
Ø Line checking and clearing the punch items before the pressure test on completed pipelines.
Ø Studying the piping and instrument diagram (P&IDs) and identifying pipeline and systems.
Ø Receive the RFI (Request for Inspection) from the discipline staff and carry out the inspection of the painting and insulation.
Ø Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.
Ø Prepare and submit the inspection reports of fit-ups, dimensional, visual and material summary for proper documents and approval.
Ø Inspection of shop fabricated piping spools and supports. Visual inspection of plant piping and preparing the Punch List after installation.
Ø Inspection of Hydrostatic test, Leak test, Gravity test and Service test.
Ø Review of WPS and PQR as per client specification.
Ø Visual Inspection of Fit up and welding.
Ø Prepare Daily Welding Reports.
Ø Review NDT reports from subcontractors and compile them for preparing test packs.
Ø Preparation of BOM for Fabrication Drawing.
Ø Witness final pressure tests, including verification that pressure gauges have adequate dial range and is calibrated.
Ø Responsible for fieldwork monitoring and issuance of site instructions to work groups to highlight deficiency and expedite piping works with respect to target schedule.
Ø Daily job inspection, monitoring progress and maintain daily progress.
Ø Material utilization as per specifications and standards (pipe, fitting, bolts, gasket etc.)
-
July 17th, 2011, 08:42 PM
Post Count Number #3
RESUME
MOHAMMED KASHIF
Email :mohd_kashif34 AT yahoo.com
Piping QA/QC INSPECTOR / MECH ENGINEER
Objective :
I am eager to work for an organization that needs an Engineer with Piping Engineering background, preferably in the field of Chemicals, Petro-chemicals, and Refinery Projects. I would like to utilize the best of my creative & industrious abilities to enhance my career prospects and growth.
Career Summary :
Have an overall experience in Piping installations, supervisions, Quality Control with construction of petrochemical and power generation companies in Saudi Arabia.
Supervised Fabrication, Inspection and installation of Piping. Critical pipe supports, Special pipe supports, Material traceability, dimensional checking, involved in heat treatment, Piping Insulation, Non-destructive testing activities, Line checks prior to hydro testing, Mechanical completion check activities etc. Witness entire piping inspection at fabrication shop and site, Hydro testing, Flushing and cleaning of newly installed facilities, monitor blinding and tagging, de-blinding and tag off, including disconnection, flushing and internal cleaning of facilities and piping prior to installation of blinds.
Involved in Mechanical completion activities, including punch list preparation according to category “A” “B” etc, and punch list follow-up for the close out of the punch items accordingly, prior to final completion Inspection. Review documentation prior to handing over and Prepare As-Built Drawings and compile QA/QC Dossiers. Co-ordinate and follow-up with contractor to rectify the punch items and clear the punch items with client within the time schedule. Familiar with International code, standard and specification like ASME Section II, ASME Section V, ASME Section VIII, ASME B 31.3, ASME Section IX and API 1104.
EXPERIENCE IN SAUDI ARABIA
1) PROJECT : SADAF PETROCHEMICAL COMPANY.
COMPANY : SABIC SAUDI ARABIA CO Ltd.
POSITION : PIPING QA/QC
DURATION : NOVEMBER 2010–31 MAY 2011
2) PROJECT : SAUDI KAYAN PHENOLICS PROJECT.
CLINT : TECNICAS REUNIDAS (TR)
COMPANY : NASIR S AL-HAJRI CORPORATION CO Ltd.
POSITION : PIPING QA/QC.
DURATION : MAY 2010–AUGUST 2010
3) PROJECT : SAUDI KAYAN OLIFINS PROJECT.
CLINT : KBR Saudi Arabia Ltd.
COMPANY : NASIR S AL-HAJRI CORPORATION CO Ltd.
POSITION : PIPING QA/QC.
DURATION : NOVEMBER 2009–APRIL 2010
JOB RESPONSIBILITIES :
1 Involved in Mechanical completion activities, including punch list preparation according to category “A” “B” etc, and punch list follow-up for the close out of the punch items accordingly, prior to final completion Inspection.
2 Verification of all fabrications material conformance as per project drawings and specifications.
3 Fit-up inspections for pressure vessels, Heat exchangers/columns and shop fabricated tanks.
4 Witness final pressure tests, including verification of pressure gauges with adequate dial range and calibrated.
5 Hydro test package review prior to testing and submitting to client for approval.
6 Visual inspection of welded joints and supervision of joint repair if required
7 Verify proper size and schedule of pipe, rating of flanges, proper flange face and fittings.
8 Verify flow direction arrows on valves; also verify that the properly identified of valves are installed in accordance with the flow diagram.
9 Inspections of weld, and verify the disconnection of pipe with the equipment, and vents and drains lines prior to testing.
10 Inspection of piping prior to erection to verify the interior is clear of foreign materials. Edge preparation and fit-ups to verify that areas to be welded are free of contaminants
11 Evaluation of test package contents, lines checking against drawing requirements to ensure completeness and accuracy of the piping system
12 Co-ordinate and follow-up to rectify the punch items and clear the punch items with client within the time schedule.
13 Confirm repairs, re-testing and re-inspection in accordance with specifications. Ensure blinds are removed and correct gaskets are installed.
14 Field measurement & drafting/sketching work for temporary piping & repair package during turnaround.
PROJECT : SHARQ 3rd EXPANSION ETHYLENE PROJECT
CLINT : STONE & WEBSTER (SHAW)
COMPANY : PMC (SEPAM) SAUDI ARABIA CO LTD.
POSITION : PIPING SUPERVISOR.
DURATION : APRIL 2009– OCTOBER 2009
JOB RESPONSIBILITIES :
1 Erection of piping.
2 Erection of fire water line.
3 Installation of Critical pipe supports, Special pipe supports.
4 Installation of field support as per the requirements.
5 Fabrication of piping spool as per Isometric drawings. Monitor and control of piping spool dimension and orientation as per Isometric.
6 Performs as built drawings changes.
EXPERIENCE IN INDIA :
COMPANY : BEST SOFTWAIRE PVT Ltd.
POSITION : MECHANICAL ENGINEER
DURATION : MAY 2008 TO MARCH 2009
JOB RESPONSIBILITIES :
Design of Jigs& Fixture by using AutoCAD
Education Profile :
1 B.TECH (Mechanical Engineering)[2004-2008]
Jawaharlal Nehru technological university, Hyderabad, A.P. -- Aggregate 59.2%
2 Diploma in Process Piping Design & Engineering per ASME B31.3 from Institute of Piping Engineering and Building Services, Hyderabad.
3 Diploma in ASNT NDT LEVEL-II as per American society for Non Destructive Testing Document SNT-TC-IA from Advanced Engineering Studies at Hyderabad.
4 INTERMEDIATE (M.P.C) [2002-2004]
Board of Intermediate education, Hyderabad, A.P. – Aggregate 65%
5 S.S.C [2002]
Board of Secondary education, Hyderabad, A.P. – Aggregate 58%
Software’s proficiency :
1) CAESAR-II (Static Analysis)
2) AutoCAD
3) Ms office
Technical Skills :
Proficient in
- Preparation of G.A Drawings & piping Isometrics from P&ID & Equipments Layout.
- Spam calculations & selection of supports.
- International Design codes & Dimensional standards.
Viz : ANSI/ASME, API, BS, ASTM & there use in design, analysis and calculation.
- Vendor Drawings, Process Equipments, & plants Layout.
Stress Analysis using CAESAR-II
- Prepare the Piping model Ready for Analysis in CAESAR-II
- Support Detailing & Spam Calculations.
- Static load case set-up Wind Load, EXP, SUS, OPE, HGR & HYD.
- Modify the layout to Satisfy Thermal, Weights & Wind Loadings
-
January 30th, 2012, 03:55 PM
Post Count Number #4
Heating Ventilation Air condition Engg Diploma
SAYED MOHAMMAD SAYEEM
Email : hvac.engg.sayeem AT gmail.com
Heating Ventilation Air Conditioning Systems - SITE ENGINEER/ PROJECT MANAGEMENT PROFESSIONAL
- Academically qualified and matured Mechanical Engineer, with over +3 years of experience in Installations Central Plant air conditioners & Package Air conditioning (PAC) Units , Installations and Servicing of power generators Low Horse Power (L.H.P) site supervision and project management.
- Core capabilities in project planning, project design and engineering, scheduling, Mapping requirements of equipment, manpower and materials inputs, defining technical specifications, driving procurement initiatives to ensure interrupted availability of inputs on most competitive rates, reviews and final project delivery
- Expertise in project planning, Scheduling, monitoring, Site Supervision and execution of projects without incidences time/cost overruns.
- Key competencies in Drawing, present construction methodologies and in managing materials & manpower resources to register maximum productive output.
AREAS OF COMPETENCE
Project Management - Site Supervision - Resource Management -Air conditioning, HVAC System - Quality Control - Cross Functional Coordination - Team Management, Operation & Maintenance Power Generators ( L.H.P)
PROFESSIONAL EXPERIENCE
Since September-13-2010
VOLTAS LIMITED (KELLY Services)
JAMSHEDPUR
H.V.A.C Supervisor
Posted Site – TATA STEEL LTD , Jamshedpur
Job Responsibility -
- Handling Ductable AC, Centralized AC, Chillers, PAC Units while facilitating implementation of preventive, planned and predictive maintenance to maximize operational availability of machines and equipments.
- Developing plans, drawings for the project to ensure effective management, including the control of site progress, resolutions of site problems, control of site meetings etc
- Managing resources to create estimates for the project, work breakdown structure, project plan, contingency plan & schedules and identifying risks within time and cost constraints
- Meetings with client/ consultants on project progress or on various technical issues concerned with the project.
- Inspection of materials and site work progress by the consultant and taking approval.
- Organizing meetings with subcontractors/ staff to get maximum operational productivity for the project.
- Overseeing quality control, material wastage control and safety matters on the site and ensuring that regulations are adhered to
- Supervising all construction activities including providing technical inputs for methodologies of construction & coordination with Site Management.
Anchoring site activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the output.
S S COMFORT SYSTEMS PVT LTD, HYDRABAD Oct 2008 to September 2010
H.V.A.C Site Engineer / Supervisor
Posted at – New Delhi .
Successfully completed Site – C.G.D.A ( Delhi ) & MATCALFE HOUSE ( Delhi )
N.R. INDUSTRIAL CORPORATION, KOLKATA July 2007 to August 2008
Asst Manager for Service Odisha
- Provide F.G.Wilson Generator's customers after sales total service support with respect to arranging installation , commissioning and to liaison the service need of our customers and their reported complains from time to time.
- Meetings with client/ consultants on project progress or on various technical issues concerned with the Diesel Generators.
EDUCATION & CREDENTIALS
Diploma in Mechanical Engineering in the Year2007, State Council for Technical Education & Vocational Training, Odisha ( All India Council for Technical Education , New Delhi ) & secure 66%
I.T.I in Electronics in the year 1998, S.C.T.E & V.T, Odisha & secure 78%
Class X, 1996, Board of Secondary Education, Odisha secure 52%