Organisation : Mumbai Metro Rail Corporation Limited MMRCL
Post Name : Recruitment for Winter Internship -2017-18
Reference Number : Advt. No: MMRCL/HR-Intern (W)./2017-18
Notification : http://www.indianjobtalks.com/uploads/77766-WI.pdf
Home Page : https://www.mmrcl.com/en/careers

Winter Internship :
Mumbai Metro Rail Corporation Limited a Joint Venture company of Govt. of India and Govt. of Maharashtra is implementing Colaba-Bandra-Andheri (SEEPZ) Metro Line-3 in Mumbai. MMRCL intends to provide educational & career developmental opportunities to aspiring students through the winter –internship programme.

The discipline wise number vacancies is mentioned as below:
Sr. No. | Department wise vacancy of Interns | Total number of seats

1. Finance 05
2. Human Resource 05
3. Projects(Civil Eng) 50
4. Urban Transport Planning / Public relations / Land & R&R / Environment 20
5. Systems(Electrical / Information Technology) 10
Total 90

Requisite educational qualification :
Finance : Inter CA, CA Fresher
Human Resource : MBA, MMS, PGDM, BMS in HR
Projects(Civil Eng) : Final year students in M.Tech / B.Tech - Civil

Urban Transport Planning / Public relations / Land & R&R / Environment :
UTP- Graduate in Civil Engineering or Architecture/Planning and pursuing PG; ME or M. Tech (2 semesters completed).
PR- Graduate in any field and pursuing PG in Mass media, Mass Communications and PR (2 semesters completed).
Land & R&R- Graduate in any Discipline and pursuing PG MA / MS (2 semesters completed).
Environ- Graduate in Engineering/Planning and pursuing PG; MSc/ M.Tech( 2 semesters completed).

Systems(Electrical / Information Technology) :
Final year students in M.Tech / B.Tech -Elec , Electronics, IT or MCA / MBA-IT

Points to be noted:
1. The details of the required qualification and eligibility criteria’s as mentioned above to be strictly ensured before applying.
2. Interns will not be provided with any stipend/remuneration/reimbursement towards expenses on travel/food/accommodation etc for the internship period.
3. Number of vacancies indicated in the advertisement may increase/ decrease depending on the MMRCL requirements.
4. Applicants must produce endorsement letter / ‘No Objection Certificate’ (NOC) from the concerned HOD / Training & Placement Cell of their institute / college in prescribed format of MMRCL.
5. Interns shall be abided by Terms and Conditions as per the Internship Policy of the corporation.
6. The mode of internship application will be through hard copies sent to MMRC, BKC Office and E-mail submissions to the MMRCL training cell at the E-mail-id- training.hr[AT]mmrcl.com.
7. The Interns shall abide by the safety protocol of the site and site specific instruction regarding timing allocated for visits.
8. Start date of application - 1st December 2017. The last date of receipt of applications (by Post or E-mail) shall be 11th December 2017.

About us :
Mumbai Metro Line - 3 (MML - 3) is one of such key projects to improve the transportation scenario in the financial capital of India i.e. Mumbai. MML-3 project - a 33.5Km. long corridor running along Colaba-Bandra-SEEPZ, envisages to decongest the traffic situation in Greater Mumbai.

Mumbai Metro Rail Corporation Limited (MMRC) is the nodal agency responsible for the implementation of Mumbai Metro Line–3(MML-3) project. It has been constituted as a JV of the Govt. of India(GOI) and the Government of Maharashtra(GOM) on 50:50 sharing basis.

Contact us :
Mumbai Metro Rail Corporation Limited
(A JV company of Govt. of India and Govt. of Maharashtra)
NaMTTRI Building, Plot # R-13, ‘E’ Block,
Bandra-Kurla Complex, Bandra (E),
Mumbai - 400 051