Alec LLC Bahrain, Doha, Dubai/ UAE, Kuwait, Oman, Qatar, Saudi Arabia : REBAR Plant/Engineering/GCC
Alec LLC
http://www.alec.ae
Keywords: ProductionManager / REBAR / GCC
Designation: ProductionManager/REBAR Plant/Engineering/GCC
Experience: 8 - 13 Years
Location: Bahrain, Doha, Dubai/ UAE, Kuwait, Oman, Qatar, Saudi Arabia
Education: UG - B.Tech/B.E. - Electrical, Mechanical
PG - M.Tech - Electrical, Mechanical
Industry Type: Construction/ Engineering/Cement/Metals
Functional Area: Production, Maintenance, Quality
Posted Date: 21 Oct 2008
Job Description
1.Responsibility of stock & Operational functios of the facility.
2.Raw naterial management,traceability,material composition,work shift management,production output management,ISO standars.
3.Intermediate sub-ordinates are maintenance engineer,work manager & job controller.
Desired Candidate Profile
1.Good experience in Production of REBAR Plant. Gulf Countries experience preferable.
Company Profile
Engineering Contracting Company (UAE)
Executive Name: Nusrat Perveen
Address:
Not Mentioned
Email Address: nperveen@alec.ae
Telephone: Not Mentioned
Reference ID:
ProductionManager/REBAR/GCC
-
January 9th, 2009, 06:13 AM
Post Count Number #2
Send your cv directly to address mentioned in post. Or find the contact address / e-maill id of company from website link provided. If you face any problem or need more details, reply to respective thread.
-
December 9th, 2010, 08:07 PM
Post Count Number #3
QA/QC INSPECTOR(Civil).
CURRICULUM VITAE
Personal Information
Name : Mohammed. Rafiq.Ahmed
Date of Birth : 10-06-1962
Nationality : Indian
E mail : m.rafiqahmed AT yahoo.com
Education Qualification : T.H.S.,L.C.E. (Nebosh),
Radiation protection in industrial applications.
Total Experience : 24 years (18 years in Gulf, 6 years in India)
PREVIOUS EXPERIENCE (INDIA)
I) Organization : K.C.C. Construction, India
Designation : Civil Supervisor - Asst. Engineer
Period : 3 Years (17.09.1982 to 14.09.1985)
Projects : Unit 30 LAC C.K.M. Project and
Construction of Amareswari Cement
Factory up to Machinery erection
II) Organization : J.K.C. Padmalaya, India
Designation : Junior Engineer
Period : 3 Years (04.06.1985 to 14.03.1988)
Projects : Rajghat Dam Project.
PREVIOUS EXPERIENCE (GULF)
III) Organization : Al-Abood Construction Establishment
Al-Hasa, KSA
Country : K.S.A.
Designation : Site Engineer
Period : 4 Years (11.08.1988 to 12.11.1992)
Projects : R.C.C. Villas
Job Responsibilities : Construction of R.C.C. Villas
including all items structural
architectural and handing over also.
IV) Organization : Six - Construct Ltd.,
Country : Dubai - U.A.E.
Designation : Lab Technician
Period : 2 Years (07.02.1993 to 02.01.1995)
Projects : Dubai International Air Port Cargo
Village & Taweelah “B” Water Desalination
& Power generation Project.
V) Organization : Sohar Proton Concrete Products Sultanate of Oman
Country : Oman - U.A.E.
Designation : Sr. Lab Technician
Period : 8 Years (17.04.1995 to 11.07.2003)
Projects : Complete Lab Incharge for pre cast elements.
VI) Organization : Arabtee Construction
Country : Dubai - U.A.E.
Designation : QC Inspector
Period : 2 Years (25.08.2005 to 05.07.2007)
Projects : Dubai world central international Airport Cargo Building, Lake Hotel Building.
VII) Organization : Consolidated Contractors International Company & Teyseer Contracting Company W.L.L.J.V.
Country : Doha Qatar
Designation : QC Inspector
Period : 2 Years (19.09.2007 to 17.09.2009)
Projects : QGX-II,RLPEP
VIII) Organization : ABS Group
Country : Saudi Arabia Designation : QC. Inspector
Period : 6 Months (17.02.2010 to14-08-2010) Project : K. A. U. S .T , Jeddah, K . S . A .
J ob responsibilities As a QA/QC Engineer
1. Preparing PQP for Specific project
2. preparing method statements for structural and Architectural works
3. Preparing quality Control Check sheets.
4. Preparing standard formats for laboratory test.
5. Carrying Preliminary Inspections alone & Final inspection with Consultant
6. Making Inspection Request according to ITP
7. Making QA/QC monthly reports
8. Closing NCR & Site instructions issued by consultant/client
9. Issuing internal NCR’s & Site instructions to concern department
10. Setting of field Laboratory on site
11. Carrying Soil, Concrete tests in the lab.
12. Submitting the Soil & Concrete Reports to Consultant
13. Preparing snag list, attending the comments from consultant prior to hand over the project.
Note : Having Dubai, Qatar valid Driving licences, Computer literate and a knowledge of Seaman C-200 Nuclear density, moisture meter operating is an added advantage.
-
June 17th, 2011, 10:16 PM
Post Count Number #4
Nikhil Maheta
E-mail : krinamisha AT gmail.com
nikhil_mehta2001 AT yahoo.com
Objective To achieve Senior level assignments in the field of Plant Mechanical Maintenance, Expansion & Commissioning with high growth-driven organization.
Power Plant area worked
Siemens make CCPP including SGT5 -4000F GT, Alstom 13E2, HE series SST-3000 Steam turbine, Doosan make triple pressure, unfired, natural circulating HRSG, plant BOP AT DM/RO water treatment plant, Cooling tower, NG skid etc.
MSFEs :
Weir Westgarh Limited (WLL) , Sumitomo Heavy Industries,
Ansaldo-Gie & Fochi, Fisia Itlampia
Sea Water & Brine Pumps :
Weir, Kubota, Fochi, Flow serves, Torishima
Sea Water Intake & screening system, GRP/Bonna piping (Dia 2M),
Electro chlorination plant ,
Professional Synopsis A result oriented professional with more than 15 years of experience in Combined cycle power plant & co-generation plant planned maintenance inspection, forced outages of GT, MSFEs, SW pumps and Balance of plant
Personal attributes - Positive attitude.
- Coordination with inter departments to achieve organisational tasks.
- To keep abreast with latest technologies
- Well versed with quality & safety specification
- Commitment to continuous learning and skill development.
- Ability to communicate clearly with team, managers and customers.
- Understanding of business strategy.
- Willingness to share information and ideas.
- Sense of Ownership of work and ideas.
Achievements
- Handled minor inspection of Siemens GT, major overhauling of MSFEs , SW & BRP, Compressor, meticulously planned, executed, and successfully completed as per planned schedule.
- Carried out Major inspection and rectification of SW intake piping through professional Divers as a special assignment work with duly safety, planning and not affecting running plant.
- Achieved best performer in EMS 14000 & OHSAS 18001 certification.
- Worked as SAP core team and worked to create material master in the system and PM data preparation.
Education
Bachelor of Engineering
1991-95
- Discipline : Mechanical
- Class : Distinction
- University : Saurashtra University,
- State/Nation : Gujarat , India.
Post Graduate Diploma 1996- 1997
- Discipline : Materials Management
- Class : First
- University : Bharatiya Vidya Bhavan
- State : Gujarat , India
Career Progression gression
Manager (Mechanical) Dec 2010-Present
Sugen Mega Power Ltd., India
One of the first private Companies using the most up-to-date technologies CCPP having generation capacity 1200 MW. Plant consist of Siemens make latest SGT5 -4000F (V94.3A/4) single shaft GT with ST.
Duties and Responsibilities :
- Preventive, predictive, major and minor maintenance activities on GT, ST, HRSG, Balance of Plant AT water intake DM, RO water system etc.
- To plan and organize all day to day routine works, breakdown works and outage works with a team of supervisors & technicians
- Plant warranty defect Claims & resolution with contractor for CCPP.
- Condition monitoring and Root cause failure analysis of equipments.
- Management & Control of spares/ spare parts refurbishment
- Follow up with planning & purchase for spares
- Execution of GT minor inspection with OEM team, follow up and co- ordination
- To lead the team of Executives and skilled technicians
- Working in PERMIT TO WORK system for Safe working practice
- SAP – R/3 : PM & MM MODULE
- KKS awareness & execution accordingly
- ISO – 9001 :2008, ISO 14001:2004 & OHSAS 18001:2007 documentation and Audit preparation.
Mechanical Maintenance Engineer Jul 2008-Novemeber 2010
Qatar Electricity & Water Co. (2200 MW with 150 MIGD Desalination capacity) , Doha , Qatar.
One of the first private Companies that Owning and operating power generation and water desalination stations using the most up-to-date technologies in the middle east. Plant consists of Alstom make 13E2, Siemens V94.2, GTs, HRSGs, Desalination plants etc.
Duties and Responsibilities :
- Preventive, predictive, major and minor maintenance activities on HRSG, MSFES, SW Pumps, BRP, Compressors, Electro chlorination plant equipments etc.
- To plan and organize all day to day routine works, breakdown works and outage works with a team of supervisors & technicians
- Plant warranty defect Claims & resolution with contractor for MSFEs & BOP
- Condition monitoring and Root cause failure analysis of equipments.
- Management & Control of spares/ spare parts refurbishment
- Development of vendor for Refurbishment of Compressor & SWP parts
- Follow up with planning & purchase for spares
- Suggestion & implementation of various improvements to improve availability & reduce down time and safe working of personnel.
- Working in Permit to Work & CMMS.
Asst. Manager - Mechanical Maintenance
Jul 05-Jul 08
Nitrex India Ltd., Bharuch (India)
Duties and Responsibilities
Being an Asst.Manager (Mechanical) I had responsibility of project, operation and maintenance of utilities of chemical plant as well as 100MW natural gas based Co-generation power plant . I joined this organization since grass root and successfully commissioned the power plant in March, 2006. It is a green field project. The basic responsibilities I performed as follow :
Water filtration, purification processes and pumping operations, schedule and oversee the maintenance of plant equipment and prepare reports on water supply and water quality.
Operation and maintenance of other utilities like : Air compressor & N2 generation plant,
- Heat Recovery and Steam Generator, Soft water plant, Cooling tower, VAM refrigeration system, & DM water plant operation and maintenance..
- Management & Control of spares/tools with in Budget.
- Effective utilization of SAP PM and MM modules and maintaining history cards for allocated equipments.
Executive - Mechanical Maintenance Sep03-Jul05
United Phosphorus Ltd., Ankleshwar (India)
Duties and Responsibilities
- Plan and prepare material, cost and timing estimates, reports and maintenance record for machinery and systems
- Analyze dynamics and vibrations of mechanical systems by conditioning monitoring.
- Develop maintenance standards, schedules and programs and provide guidance to industrial maintenance crews
- Investigate mechanical failures or unexpected maintenance problems
- Prepare contract documents and evaluate tenders for industrial maintenance
- Supervise technicians, review and approve calculations and cost estimates.
- Co ordination & complying the internal and external customer need satisfactorily by proper shutdown job planning. Manpower handling, cost reduction by recycling of spares , continuous improvement in plant and utility. Preparing maintenance budget.
> Working in SAP R/3 – Plant Maintenance & Materials Management module
Sr. Engineer - Utilities Apr96-Sep03
Videocon International Ltd., (Bharuch), India
Duties & Responsibilities
Being a Sr. Engineer (Utilities) I had responsibility of looking after operation and maintenance of glass plant utilities. The basic responsibilities I performed as follow :
- Looking after the operations of a Effluent Treatment Plant, schedule and direct maintenance
of plant equipment, and prepare reports on water quality.
Awareness & implementing the ISO-9000, 14001 & OHSAS 18001 standards
Worked in SAP – R/3 PM & MM Module.
Performed responsibility of maintenance of Water treatment plant i.e. DM Water, Softening
plant, RO plant and effluent water recycle plant.
Executive - Mechanical Maintenance Sep03-Jul05
Duties & Responsibilities
Being a Sr. Engineer (Utilities) I had responsibility of looking after operation and maintenance of glass plant utilities. The basic responsibilities I performed as follow :
- Looking after the operations of a Effluent Treatment Plant, schedule and direct maintenance
of plant equipment, and prepare reports on water quality.
Awareness & implementing the ISO-9000, 14001 & OHSAS 18001 standards
Worked in SAP – R/3 PM & MM Module.
Performed responsibility of maintenance of Water treatment plant i.e. DM Water, Softening
plant, RO plant and effluent water recycle plant.
Professional Experience
1.Maintenance Planning :
- Budget Planning :
Made Long term Budget Planning for the MSFEs, SW system, BOP Considering Operational & Maintenance Spares, and Planned Inspections & Repair/Refurbishment cost etc.
- Outage Planning :
Made Long term Outage Planning for the MSFEs Considering Inspection schedules/Repair.
- Spares/Tools Planning :
Cross sectional drawings of all allotted equipments studied in detail, O&M spares and relevant Tools Planned, Stock reviewed, Procured & Managed with in Budget.
2 GT/ST/ Compressors /Pumps/Fans/Heat Exchangers /Valves :
- Extensive maintenance and trouble shooting, overhauling experience with different type compressors (Atlas cop co, KG Kholsa, IR, N & E, Boge etc…)
- In-depth knowledge and practical experience with different type of pumps (Torishima, WLL, Kubota, Flowserve KSB, Kirloskar, etc.) maintenance and Overhauling.
- Energy conservation study carried out, Pumps efficiency curves studied well and power saving achieved by impeller trimming & stage reduction
- Hands on experience and exposure with Alfa Laval make Plate heat exchangers, and natural draft cooling Towers.
- Siemens make GT, ST, Doosan make HRSG
3.Health &Safety
- Well versed with a sound understanding of Health & Safety regulations.
- Best performer award for EMS 14000 & OHSAS 18001 certification.
- Actively involved in HAZOP studies, safety audits & conducted safety programs.
Computer skills
- Experience with Microsoft word, Excel, Power point
- Have Very good working Knowledge with SAP PM/ MM Modules which extensively used for Monitoring & Controlling of the Spares and Maintenance activities
- PTW & CMMS system
Training
- SAP training (15 days, 2001)
- Corrosion control & prevention , India. (4 days, 2000).
- ISO & OHSAS training through BVQI, India ( 7 days, 2000)
-
January 26th, 2012, 04:38 PM
Post Count Number #5
Production Manager
.S.NAZEER ALI
E-mail : nazeer_qrc AT yahoo.com
Objective :
Looking for an excellent opportunity to work in management where my engineering skills will come into use (Engineering Manager, Production Manager, Operation Manager, Project Manager or any other suitable position).
Skills :
- Excellent management and leadership skills.
- Ability to take quick decisive action.
- Excellent communication, organizational skills, time management and direction.
- Ability to manage all aspects of civil engineering and related field.
- Ability to work independently as well as being part of a team.
- Ability to plan tasks and delegate them to the appropriate personnel
- Excellent interpersonal abilities for successful interactions with clients, superiors, and subordinates.
- Reasonable level of physical fitness and ready to work overtime as and when the occasion demands.
Work Experience
Having 20 years experience in the Construction Industry (15 years in the GCC), mainly in the Rebar Cutting & Bending Industry.
- Engineering Manager cum Operation Manager with Alam Steel Industries LLC (UK Cares Certification), Dubai from Jan 2007 till date, where the responsibilities involved :
o Leading a team of 20 Design Engineers.
o Supervision of drafting of rebar shop drawings / Bar bending schedules through interactions with clients, scheduling of activities, delegation of activities, contacting vendors and suppliers and placing orders with them.
o Quantity take-off rebars estimation / special length determination.
o Supervision of Production Department and ensuring availability of all necessary materials.
o Coordinating with consultants & clients utilizing the off-cuts while preparing bar bending schedules.
o Supervision of QA/ QC dept for acquiring UK CARES certification.
- Head of Engineering with Qatar Reinforcement Company , Qatar from Nov 1997 to Sep 2006, where the responsibilities involved :
o Leading a team of 9 Design Engineers, providing quality service to our clients as per their construction schedule (shop drawings / Bar bending schedules).
o As Head of Engineering, responsible for solving any technical issues arising from the projects and liaising with Consultant if necessary.
o Responsible for supervising subcontractors (site steel fixing), suppliers and vendors who are working on the site.
o Make appropriate changes in designs according to need of client while maintaining budget and schedules.
o Responsible for site inspection and preparing reports and documentation regarding to inspection.
o Responsible for appraisal, recommendation and giving support to change request and onsite change orders.
o Attending daily production meeting with Production Supervisors for timely delivery of goods as per client’s schedule.
o Responsible for taking correct and proper decisions during projects.
o For reducing off-cuts and scrap, losses prepared proposed drawings to reduce to the company and controlled overtime to enhance productivity.
o Liaised with Project Managers to approve and certify the monthly invoices for payments.
o Handling additional responsibility in the absence of the General Manager.
o Various other duties as a Head of Engineering.
- Design Engineer / Quantity Surveyor with Al-Darwish Engineering W.L.L, Qatar from Sep 1995 to Oct 1997, where the responsibilities involved :
o Project Name : Qatar Umm Bab New Cement Plant Project preparing detail drawings, Bar Bending Schedules for the main Cement plant structures Cement silos, Clinker silos, Pre-Heater, Hopper, Cement Cones and related Cement plant project structures.
o Coordinating with steel fabrication yard for supplies of cut & bend steel.
o Responsible for maintaining records for steels, concretes etc.
o Planning of maintenance activities.
o Responsible for preparing and distributing reports in timely manner.
o Provide training for Junior draftsmen.
o Responsible for various other duties related to engineering.
- Project Engineer with Tri-Star Engineering Consultant, India from Sep 1991 to Sep 1995.
o Executing various Housing Apartment projects.
- Site Engineer with Namachivayam Engineering Consultant, India from Jun 1990 to Aug 1991.
Educational Qualification :
- Bachelor of Civil Engineering, Vinayaka Mission’s Research Foundation, Annamalai University, India.
Computer Skills :
- Microsoft Word
- Microsoft Excel
- Steel Pac RCS and Armaor software (Rebar software)
- AutoCAD
-
February 17th, 2012, 03:44 PM
Post Count Number #6
er vacancy in steel bar cutting & bending machines in gulf countries.
working as maintanance engineer in L & T Steel in India
-
March 13th, 2012, 10:28 AM
Post Count Number #7
QA/QC Mechanical Engineer
JOBY MATHEW
E- Mail : joby_111 AT yahoo.com
Career Objective
To build a career in a progressive organisation where my ability and skills are recognised so that they could benefit mutual growth and success.
Strengths
- Ability to work in a team and inspire and motivate others to excel.
- Positive attitude
- Continual learning.
Career Profile
More than 7 years experience in MEP Projects in UAE.
September 2007 to Till Date
Balfour Kilpatrick (BK Gulf), Dubai, UAE.
http ://www.bkgulf.com
Mechanical Engineer QA/QC
Projects Involved
College of media & communication, Doha, Qatar.
ST.Regis Resort Saadiyat Island, Abu Dhabi.
Downtown, Jebel Ali, Dubai
Gold Crest C2 Tower, Dubai
Experience gained and key achievements :
- Ensure established objectives throughout the project to increase the motivation and involvement.
- Preparation of Installation Method Statements prior to commencement of work. And assistance in the development and review of specific task project method statements
- Co-ordinate on quality matters with project team, suppliers and certification authority representatives.
- Preparations of all relevant project installation check lists.
- Preparation & updating of the ITP as required and developing installation check list where non standards works are included in the specification
- Preparation of MRI (Material Receipt Inspection) formats for incoming plant and materials and carrying out inspection with the consultant or other third parties as required by the contract to ensure that only approved materials are installed.
- Liaising with Construction Managers and carrying out internal inspections of in-process installation work. Carrying out visual Inspection & snag list preparation.
- Liaising with Construction Managers and preparing a weekly WIR (Work Inspection Request) schedule. Ensuring WIR will be carried out in accordance with contract requirements.
- Confirming WIR for in-process works aims to cover 10% of the installation
- Maintaining WIR records and a WIR tracking schedule in order to monitor the status of WIR and monitor WIR performance
- Ensuring that a ‘Benchmarking’ process is applied. Confirming, the first WIR carried out on a particular type of installation shall be benchmarked. (Benchmarks will pass WIR without comment – typically A status and Benchmarks are photographed. Operational staff is advised and are shown benchmarked work to follow the same.)
- Prepare CAR, NCR applicable quality system standards.
- Maintaining the Project Non- Conformity report register.
- Attending site inspections with the consultant and the main contractor.
Nov 2005 to July 2007
Eagle Electromechanical CO LLC.
http ://www.eagleelectromechanical.com
P&D Site Engineer
Project : Discovery Gardens Jebel Ali
Experience gained and key achievements :
- Site execution of mechanical services for multistoried building at Mogul Gardens Project (Mogul-1Gardens, Jebel Ali (Dubai), project of 29 buildings. Drainage System project.)
- Inspection of workmanship and overall observation of log sheet and time.
- Co-ordination with consultant’s architects and Material submittal / Approval from consultants.
- Preparation of R-F-I, T-Q-S & C-V-I-S
- Arranging site inspections and approval from consultants for work finished.
- Distribution of man power for ongoing projects and maintenance.
- Controlling of material wastage at site.
- Preparing daily and weekly progress reports and making schedules to achieve targets.
- To control costs and be aware of financial status of the project.
- Adequate reporting of safety incidents to both internally and externally as required to the client.
- Ensuring the quality policies as required to client.
- To work within the established company policy and procedure.
June 2004 to August 2005
M/s Expert Engineering Corporation, Bangalore, India.
Quality Inspector.
Job Involved :
- Making production drawings.
- Controlling various production processes.
- Quality control of materials.
- Material take-off and requisitions.
Reasons for leaving
- Career Growth
Educational Qualification
Academic : S.S.L.C 1st class (March 1997)
Pre-Degree (March 1999)
Technical : Diploma in Mechanical Engineering
1st Class (May 2004)
Software skills :
Auto CAD, MS Office
Internet and Email Applications.
Declaration :
I hereby declare that the above mentioned information’s are true and genuine to the best of my knowledge.
Yours truly,
Joby Mathew.
-
July 24th, 2012, 11:16 PM
Post Count Number #8
QA/QC Engineer
Looking for a QA/QC Engineer job