www.punjlloyd.com Punj Lloyd Ltd Chennai, Delhi, Mumbai : Cross Country Pipeline
Punj Lloyd Ltd
http://www.punjlloyd.com
Designation: Cross Country Pipeline Professionals
Experience: 7 - 12 Years
Location: Chennai, Delhi, Delhi/NCR, Ernakulam / Kochi/ Cochin, Haldia, Jamnagar, Mangalore, Mumbai, Panipat
Job Description
We have been awarded the Engineering, Procurement, Installation, and Commissioning of Strategic Gas Transmission Project, worth USD 800 million, from Qatar Petroleum. The project includes laying of 211 km of pipeline with associated stations and infrastructure. The project will transport 2000 MMSCFD1of sweet lean gas from Ras Laffan to different consumers via 36 inch diameter pipelines. Work on the project is expected to be completed in 32 months.
Punj Lloyd has major presence in Qatar and is executing key EPC projects including the Doha Urban Pipeline Relocation and the Multi-Product Pipeline from Qatar Petroleum Refinery to Doha Depot for Qatar Petroleum, and fuel systems for the New Doha International Airport.
We are looking for professionals at all levels (Senior, Middle and Junior management). Please send your profiles in Ms-word format with the following details:
a) ‘Position applied for’ in the subject line of your email?
b) This is an international posting, your willingness to relocate to Qatar?
c) What is your present salary?
d) What would be your salary expectations?
e) What is the minimum time you need to join?
Desired Candidate Profile
Project Manager, Contracts Engineer, Permit Coordinator, Project Control, PCM, Construction Manager(Pipeline/Station/Civil), Engineer Coordinator, Discipline Engineers, Engineer - Pipeline, Electrical, Instrumentation, Civil Engineer, Piping Engineer, Procurement Manager (Novation/LLI),
Procurement Engineers, Expeditor, Project Coordinator, Project Control Manager, Planning Manager, Planning Engineer, Planning Asst, Material Engineer/Material controller, Store Keeper, Store Asst, HSE Manager, HSE Engineers, HSE Supervisors, Environmental Engineer, Doctor/Paramedic, Male Nurse, Administration Manager, QA/QC Manager, QA Manager, Welding Engineer, QA/QC Engineer, NDT Coordinator, QC Inspectors, Welding Inspector, Coating Inspector, Painting Inspector, Civil Inspector, E&I Inspector, Commissioning Manager, Hydrotesting Manager/Engineer, Construction Suprintendant, P&E Manager, P&E Engineer-Mechanical, P&E Engineer-Electrical, P&E Engineer-Workshop, P&E Foreman, System Assistant-P&E, Document Controller
Company Profile
The Group, with a turnover of US $2 billion, comprises Punj Lloyd headquartered in India, Sembawang Engineers & Constructors in Singapore, and Simon Carves in the United Kingdom along with their respective subsidiaries. A strong multinational and multicultural workforce of over 15,000 employees strives to attain the group's vision of being amongst the top five EPC companies in the segments and markets it serves by 2012.
Punj Lloyd Limited is a transnational company specialising in the energy and infrastructure sectors. Our operations spread across the Middle East, Africa, the Caspian, Asia Pacific and South Asia. As a reflection of our international quality standards, construction and project management techniques, Punj Lloyd holds ISO 9001:2000, ISO 14001:1996 and OHSAS 18001:1999 certifications.
Email Address: hrdme@punjlloyd.com
Keywords: Project Manager, Contracts Engineer, Permit Coordinator, Project Control, PCM, Construction ManagerPipeline / Station / Civil, Engineer Coordinator, HSE, Quality, Engineer - Pipeline, Electrical, Instrumentation, Civil Engineer, Piping Engineer
-
March 8th, 2010, 10:15 PM
Post Count Number #2
CURRICULUM VITAE
SHAHID HUSSAIN
E-mail : shahidrizvi110 AT gmail.com
Career Objective :
To work in such a dynamic and progressive organization that enhances my technical expertise as well as provides a broad range of skills to prove my ability as an innovative individual and an enthusiastic team member.
Knowledge :
A total of 19 yrs. experience in the office & administration field, the last Nineteen years committed in the document control specialty in the engineering, procurement & construction of Petrochemical and Oil & Gas sectors.
Fields of Experience include establishing, supervising and consulting on document control / record management and retention activities in the Engineering and Construction fields.
A Team player with ability to work under pressure and to meet time constraints, close co-ordination with Client/ Contractor for smooth running of the project work, Good knowledge on ISO 9000, 2000 & 2001 working practices for project documentation, Sound computer knowledge, hands on experience on E-DMS , FTPP & e-COSMOS environment.
Total Abroad Experience :
Total Nineteen Years Abroad Three Years Indian Sixteen Years
Abroad Experience :
I. Worked with Chiyoda Technip Joint Venture (CTJV) Qatar. since 14th January 2007 to 31st October 2009 in Ras Gas, Ras Laffan, Qatar.
Project : Ras Gas Onshore Expansion Project Phase-2 (Train-6&7) & Al-Khaleej Gas Project Phase-2 (AKG-2).
Site : Ras Laffan, QATAR.
Position : (Acting Chief) Document Controller
Principal Client : Ras Laffan Liquefied Natural Gas Company Ltd
Responsible for managing the following operations :
In-charge of complete and full-fledged Documentation Management System. The documentation required to be managed by this system includes, complete range of Technical documentation like Drawings, Reports, Calculations, Technical Specifications, Purchase requisitions generated from the Design / Construction phase, which are further utilized for As-built documentation / Final Hand-over Dossiers.
Control of drawings and other technical documents accordance to with the ISO 9000, 2000 & 2001 standard document procedure.
Control all Incoming and Outgoing Drawings /Ø Documents etc. Ensure timely issuance & distribution of all the Drawings / Documents with correct revisions to all parties as detailed in the distribution matrix contained in project procedures.
Produce reports as required byØ management & other parties time to time. Ensure all project documents/drawings & correspondences are available in paper version & electronic version (scanned & native format).
Responsible for document receiving (mainly Drawings, Procedures, Specifications, Data Sheets, Isometric Drawings, Material Requisitions, Technical Bid Analysis etc.), checking / preliminary reviewing as per the document quality checklist requirements, registration, transmittal preparation, distribution / dispatch of hard copies and electronic transmission / notification to Client, focal points, other members of task force, internal to other sections / departments and construction sites as per the distribution matrix.
Plan, control and manage the quality development of project documentation system for providing maximum support service to the project management /Project Task Force (PTF).
Download / upload all the project related drawings / documents from/ to EDMS/FTTP Server
Co-ordination with Client, Engineering Contractors, Joint Venture Partners, Subcontractors & Project Management Team and other Internal Departments for Documentation related issues.
Strictadherence to the internal & client provided documentation procedures.
Highlight areas of concern, define and / or assist in definingcorrective action plan.
Prepare FinalØ Dossiers Indices for Client approval. Arrange Final Handover Dossiers as per the approved indices for onward submission to client through Company Certification Engineer.
Responsible for organizing and conductingØ Archiving & disposal of Project Files as per contractual requirements & in-house procedures at the end of the Project.
Courses & Training :
Fire Warden Training From RAS GAS EMERGENCY MANAGEMENT SERVICES, QATAR
Fire Safety Awareness From RAS GAS EMERGENCY MANAGEMENT SERVICES, QATAR
HSE Training From CTJV, Qatar
Fire team Leader Course From CTJV, Qatar
Advanced Fire Fighting Course From CTJV, Qatar
Basic First Aid Training From CTJV, Qatar
Risk Assessment Training From CTJV, Qatar
Manual Handling Trainer From CTJV, Qatar
Computer Literacy :
Operating System : WINDOWS VISTA/XP/2000/9X
Software : E-DMS , FTPP & e-COSMOS
Designing Tools : Photoshop, Page Maker
Multimedia : Flash
Application : MsOffice Xp / 2007 / 2003
Indian Working Experience :
In Iron and Steel Company
Worked as a Sr.Document Controller at Tata Iron and Steel Company Limited, Jamshedpur Since11th October, 1999 to 06th December 2005 under the temporary basis.
JOB SUMMARY :
To establish a logical and systematic system of numbering & filing project documents :
Registration & routing of documentation.
Maintain document distribution matrix’s for deliverables.
To design document numbering system that includes project code, area of work, nature of work, type of document, sequence number, revision number along with alternate number for reference.
Assure document quality to include completeness, accuracy & compliance with established QA policies and procedures :
Ensure all documents (correspondence, documents, drawings, etc.) are filed according to procedures.
Ensure all files are backed-up twice daily.
Ensure to keep a hard copy in central file for reference.
Manage Electronic Database Management System (EDMS) :
Respond to queries regarding revision status of issued drawings / documents from engineering & drafting personnel.
Maintain and follow up Project Distribution Matrix (PDM) ITP, MS, MAR, FDC, TQ, Minutes of meeting, Specification register, welding procedure specification (WPS) procedure qualification record (PQR).
Coordination with Engineering team allocating numbering system & filling as the procedure.
Approving documents for adequacy prior to issue at site and sub contractors.
In Barauni Oil Refinery under the Construction Company :
Worked as a Sr. Document Controller at Barauni Oil Refinery, Begusarai-14 from Since 24th July.1995 to 20th September, 1999 under the Petron Engineering Construction Limited.
JOB SUMMARY :
Maintain record of all incoming drawings/documents supplied by clients/ vendors. And Preparing Letter and Transmittal
Forwarding all incoming drawing/document for approval to various engineering disciplines, in co-ordination with Site Manager.
Download / upload all the project related drawings / documents from EDMS.
Follow up of construction drawings such as IFC, AFC, IFA is maintained in separate Master register.
Maintaining Vendor Drawings, Manuals, Data Books, As Built Mark-ups, Method Statements, and Codes & Standards etc.
Maintain latest electronic copy of drawing in the common drive as the programmed available in company.
Master drawings and documents are stamped ‘ SITE MASTER’ copying of Master documents will be strictly controlled by document controller, old revision are stamped as ‘SUPERSEDED’ and received back from site and obsolete.
Maintain separate database for onsite documentation like method statement, procedure, material approval, NCR, safety reports etc., and follow-up for review and approval.
Supervision for the document reproducing facilities, scanning, binding, stationary control and tracking of incoming / outgoing courier.
All the drawings, documents shall be given identification, reliable storage, protection, easy retrieval, retention time & disposal of records.
In Haldia Oil Refinery, under the Construction Company :
Worked as a Document Controller at Haldia Oil Refinery, Midnapur-25, West Bengal. (India) from 10th April, 1992 to 06th May, 1995 under the United Constructions Co.
JOB SUMMARY :
Maintain record of all incoming drawings/documents supplied by clients/ vendors. And Preparing Letter and Transmittal
Forwarding all incoming drawing/document for approval to various engineering disciplines, in co-ordination with Project Manager.
Download / upload all the project related drawings / documents from EDMS/FTTP Server
Distribute drawings and documents for review / approval as per the distribution matrix.
Prepare and maintain transmittal for distributing drawings /documents to Client/engineering team/vendors.
Maintain the central filing system master / superseded documents and drawings
Follow up review/approval comments of engineer to review the documents /drawings.
Preparation and distribution of “Action Pending’ list / report to the concerned parties on weekly basis and related follow-up.
Responsible for the establishment and maintenance of project filing system & archiving of original hard copies and it’s electronic data.
In Manufacture of Hydraulic Equipment :
Worked as a Document Controller in VANKOS & COMPANY. (An ISO 9001Company) Industrial Estate Patna -13 since 15th December, 1990 to 18th Feb,1992
JOB SUMMARY :
Maintain and control the documentation of all documents and drawings and files for the project.
Receives, register and stamping of all incoming and outgoing correspondence, drawings, specifications, minutes of meetings and other project documentation and filling accordingly.
Established and maintained an up to date Document Control System.
Ensure that controlled copies of latest revisions/approved documents and drawings are distributed appropriate
Prepares transmittals for drawings/documents to be sent to the Shipyard and Suppliers upon approval of drawings/documents.
Liaise with suppliers & shipyard’s document controller on transmission of documents & drawings.
Scanning of documents for distribution as PDF copies to designated recipients.
Ensure distribution, filing, amendments & updating of all projects documents.
Organized and manage filling of all drawings / documents for safe keeping and easy retrieval.
Maintaining the files and control logs as required by the project.
Electronically upload and download files to and from external suppliers.
Producing regular reports of outstanding actions and responses on correspondence.
Higher Qualification :
Passed B.Sc. (Graduation in Mathematics) in 1989 secured 2nd Division, obtained 45.2% from Magadh University, Bodh-Gaya, Patna. (BIHAR).
Academic Qualification :
Passed I.Sc. (10+2) in 1984 secured 2nd Division, obtained 45.6% from B.I.E.C Patna. (BIHAR).
Passed Matriculation (10th) in 1982 secured 2nd Divi. Obtained 49.11% from B.S.E.B Patna. (BIHAR).
Working Ethics :
Ability to work under pressure, flexible & self motivated
Ability to deal with confidential information.
Good customer service / communication skills
Strong interpersonal skills at all levels
Persistent and oriented
Personal Details :
Father’s Name : Mr. Syed Manzar Hussain
Date of Birth : 15th July, 1966
Religion : Islam
Marital Status : Married
Nationality : Indian
Gender : Male
Language Known : English, Hindi, Urdu
Declaration :
I do hereby declare that all the information furnished above is true and complete to the best of my knowledge. I am confident that will be fully conformable in your demand. I hope you will call me for an interview. I shall be grateful to you and oblige.
Thanking You,
With Regards.
Signature
Place : Mumbai
Date : 08-03-2010
Shahid Hussain
-
June 30th, 2011, 10:26 PM
Post Count Number #3
HREKESH DEV K
hrekeshdev AT gmail.com
Pipeline engineer CV
Objective :
Looking for a progressive career in the pipeline field in well reputed organization those offers opportunity for future career advancement and to use the knowledge and experience which I gained from my previous placements and studies.
Education :
Msc in pipeline engineering from Newcastle University.(2011)
B.Tech in mechanical engineering from LBS College of engineering.(2007)
Member of pipeline engineers
Additional Skills :
One Month Intensive Training in Piping Engineering from Design Techniques, Bangalore.
Trained in AUTOCAD 2007 package.
Academic Projects :
MSc comparative studying of dent in a weld in Ansys
B.TecH Completed a project on “Design, Fabrication and Testing of Light weight Portable Coupling Jig for JAGUAR Metal drop Tank” at Air Craft Division, Hindustan Aeronautics Ltd, Bangalore.
Mini project on “Design and Development of Sterling Engine
Training Details :
Underwent an in plant training at “Western India Plywood, Kannur.
Undergone Training in Safety, Fire Fighting and Scaffolding.
Experience :
QA/QC inspection engineer in AL AHLIA OIL FIELDS DEVELOPMENT CO.( UAE)
Ability in pipeline field :
Design Submarine Pipeline Route, Wall Thickness, Stability Analysis, Riser and On-bottom Vortex Induced Vibration (VIV), Free-Spanning, Cathodic Protection, Pipeline Expansion, Crossing Design including Pipeline Installation Analysis.
Coordinate /contact with clients, vendors, subcontractors and other concerned parties regarding all design, construction activities and system turnover.
Prepare Construction Work Estimate (CWE) and Cost, Time, Resources (CTRs) for Pipeline Engineering Works.
Estimate the overall project cost & budget control for all kind of construction work and supervise general field modification work and prepare Extra Work Order (EWO) back charge notice.
Generate, review and / or comment on all kinds of construction procedures and prepare construction system packages.
Supervision for installation and start-up the process equipment, gas and steam turbine generator including the associated mechanical equipment system.
Scheduling, planning & progress report for construction work.
Perform Hazard Evaluation by Job Safety Analysis (JSA)
Manage & supervise direct labours and subcontractor for fabricate piping work including pipe support and steel structure work.
Supervise the additional, modification, commissioning and maintenance works which comprised of piping, steel structure, rotating & static equipment works until the plant achieved Guarantee Test Run and continue Warranty period.
Safety Courses :
First aid, fire Fighting, Environment protection, and permit to work
Work Locations :
Are you willing to move or relocate-
Yes I will travel domestically
Yes I will relocate domestically
Yes I will travel internationally
Yes I will relocate internationally
-
August 11th, 2011, 07:40 PM
Post Count Number #4
ELANGO ANGAIYAN
elangoa1972 AT gmail.com
Career Objective :
To be a part of the organization in pursuit of excellence and to contribute to the growth of the concern and self by putting in the best of efforts
Educational Profile :
Degree Institute Percentage Year of passing
B.Tech Electrical & Electronics Enggineering
Diploma in Electrical & Electronics Engineering
KSOU,Mysore,Karnataka
Vinayaka Missions,Salem
Studying
82%
Studying
2008
I.T.I Electrician Kongu industrial training institute, Erode 86% 1996
Current Work Profile :
Company : Kharafi National Company,Kuwait
Site : Kuwait Oil Company (KSC) ,Kuwait.
Designation : Senior electrical technician
Duration : 25.09.10 TO till date
Previous Work Experience
Company : PAVIN POWER CONTROLS
(Electrical consulting & Contractors)
TIN NUMBER : 33832224233
CST NUMBER : 904682
Designation : Electrical Supervisor
Duration : 01.06.07 to 20.09.2010
Company : HOFINCONS INFOTECH INDUSTRIAL SERVICES Ltd, CHENNAI
Site : THE MADRAS ALUMINIUM COMPANY, Mettur Dam
3X75 CAPTIVE POWER PLANT(Chineese technology)
Designation : Senior electrical technician “A”
Duration : 01.08.05 TO 24.05.07
Site : S.J.K STEELS Ltd ,TADIPATRI,ANDHRAPRADESH
Designation : Senior electrical technician
Duration : 01.07.2003 to 11.06.2005
Site : JINDAL VIJAYANAGAR SEELS Ltd, HOSPET, KARNATAKA
Designation : Technician “A”
Duration : 01.05.1999 to 11.06.2003
Company : CHEMPLAST SANMAR LIMITED
Location : Mettur Dam
Designation : Electrician (Company Apprentice)
Duration : 21.04.’98 to 20.04.1999
Company : CHEMPLAST SANMAR LIMITED
Location : Mettur Dam
Designation : Govt Apprentice
Duration : 21.02.97 to 20.04.98
MAINTENANCE EXPERIENCE :
The project involved Installation , testing, commissioning , troubleshooting, maintenance of the following equipments
Maintenance of Electrical power system Equipment's as per safety
Rules and work permit system in oil industries.
Routine work of test & run Fire water engine, Essential generators (3250kva in 3.3kv), Emergency Gensets (325kva in 440volt) and battery maintenance.
Experience of using sophisticated Equipment's like H.T. & L.T. megger, earth megger,
Cable route locator, Cable burning kit, Hipot test kit & BDV Test kit.
H.T. & L.T. Switchgears, Ranging from 440V, 3.3KV and 11KV ACB, OCB, Vacuum
Magnetic contactor, vacuum circuit breakers (Hawker siddley, ABB) and Air circuit breakers.
Under ground L.T. Control cables & Power cables laying, jointing and termination for PVC, XLPE, lead covered MICC Cables single & double compression glanding.
Under ground cables route locating, fault finding and rectification.
3.3KV, 440V Motor control centers & Sub-station panels with all types of protection Relays of Gold start MPC 2000, MPR 2000, UVAU, ALSTOM and ABB.
Power & Distribution Transformer Maintenance 11KV/3.3KV, 3.3KV/440Volt.
H.T. Motor maintenance work using RTD, sensor for Temperature control & L.T. Motor maintenance work.
Maintenance of UPS Systems, Battery Chargers and Battery banks (Lead acid battery and alkaline bettery).
Maintenance of De Salter Transformers and Recycle Pumps.
Over hauling of 500, 415, 380 & 220V. 0.5kw to 150kw, L.T. induction motors knowledge in DCS.
All types of industrial & Domestic Lighting Systems and Earthing Systems.
Maintenance of DB, LDB, MLDB, PDB & MPDB.
Maintenance of H.T. motors upto 500kw in 3.3kv.
Maintenance of motor manager system at L.T. side.
Maintenance of motor protection control at H.T. side.
Protection of control relays at H.T. & L.T. motor.
Protection of control relays at H.T. & L.T. transformer.
Maintenance of star delta & D.O.L. starters.
All Panel Board wiring and Maintenance.
OCB, MCB, ACB, MCCB, VCB and SF6 switch Gears
Power transformer up to 7.5MVA 33/11KV, four 11/3.3KV (2.5MVA), 3.3/0.440 KV (2MVA) transformers.
Industrial & Domestic Wiring Like :
FOUNDRIES
STEEL ROLLING MILLS
CRUSHER UNITS
LATHES
CNC UNITS & CRANES
APARTMENTS
HOSPITALS
INDIVIDUAL HOUSES
HOTELS
IT PARKS & STREET LIGHTING
-
August 17th, 2011, 10:02 AM
Post Count Number #5
DEIVA SUBRAMANIAN. K.
E-Mail : deiv_vkarai AT yahoo.com
Seeking good positions in Civil / Construction Project Management with leading organisations.
Professional Profile :
Diploma in Civil Engineering with over 19 years rich experience in Project Planning, Site & Construction Management, Coordination and Team Management.
Currently functioning as a Site Agent at Bahrain Motors Company, an Infrastructural contracting Company in Kingdom of Bahrain.
Holds the distinction of managing diverse projects for construction of Residential Condominiums, and Commercial Buildings.
Extensive experience in Civil Engineering Works with specialisation in Foundation, Structural works, Architectural and M&E Works.
Strong relationship management, communication skills with the ability to network with Project Members, Consultants, Contractors with consummate ease.
Sound knowledge in Ground Monitoring Instruments; Architectural finishes and flooring i.e. Marble and Granite external facade etc.
Areas of Expertise :
Project Planning :
Conceptualising detailed project reports and project execution plans after thorough discussion with clients, selection of sites, project evaluation in terms of outlays and profits attached.
Establishing time span of project execution as per client specifics.
Monitoring project status during the course of periodic project review meetings.
Preparing Method Statements including inspection and test plans.
Evaluating Designs; coordinate with Consultants and Sub Contractors for changes in the same.
Site & Construction Management :
Supervising all construction activities including providing technical inputs for methodologies of construction & coordinating with site management activities.
Interacting with Site Purchasers and Suppliers for achieving cost effective purchase of equipment, accessories, material with timely delivery so as to minimise project cost.
Coordinating with Main Contractors; monitor their performance in view of project schedule. Settle all techno commercial disputes / clarifications during execution of project.
Implementing QA / QC procedures, Total Quality Management principles and checks. Conduct Audits to ensure adherence to Quality and Safety norms across the entire course of project execution.
Co-ordination :
Networking with Consultants, Contractors, Clients to ascertain technical specifications, construction related essentials, based on the prevalent rules.
Relationship management with Statutory Authorities for availing mandatory sanctions.
Coordinating for Ground monitoring Instrumentation etc.
Career Highlights :
Bahrain Motors Company, Bahrain Jan’09 – May’11 Project Engineer (Head)
Job Details :
BIW Labour Accommodation Project Jan 09 – March 10 :
Consultants : GEMAC
Client : Al Khaleej
Being a professional in a 4.5 million (BD) project with a team of Site Engineers, surveyors, Foremen and workers.
Dealt with all Infrastructure works such as preparation of Roads, Kerb fixing, H.V & L.V cable laying, Water, Sewerage, Irrigation and Telephone services.
Doing the house connections for sewerage through chambers to main lines.
Doing asphalt roads, Brick paving Roads and Foot path constructions.
Construction of substations with Single and Double Transformers and connection with Ring Main Units and L.V Boards with Electricity Distribution Directorate specifications.
Preparation of all types of manholes and chambers with required water proofing works, and connections by laying ducts.
Preparation of Inspections, Method Statements, Material Approval requisitions, Weekly Work progress tracking schedules, Monthly Progress Reports, attending Weekly Progress meetings.
Preparation of Programmes, updating and split in to monthly based, in order to achieve required progress.
Preparation of as built drawings, attending snag works and handing over of the project.
BIW Infrastructure Project Apr 10 – June 10
Consultants : Hyder
Client : Bahrain Investment Wharf
Preparation of Roads for wearing course and snagging.
Laying of L.V, Street light and M.V Cables, Fixing of Feeder Pillars, Snagging and Handing over Substations.
East Riffa Sewerage Project E3 and E4 July 10 – Dec 10 :
Consultants : WHK Konji
Handing over the project after completing the maintenance period of one year all the sewerage manholes and chambers are checked and snags are attended and finished successfully.
Monitoring the work of vast area sewerage network, planning for week basis work schedule, Record sheet submission, attending snags and handing over as portion by portion.
Handing over of Pumping stations, check all the records before submission, De silting the pump room and handover to the ministry.
Knowing the safety measures to be follow while get down in to the manholes with proper permission etc.
Approaching the roads and traffic authority to get the required time to time permission to continue the work.
Louzi, Domiston. Aug 10 – Dec 10
Client : Al Khaleej
An Eight kilometre roads project by making the area levelled with required slopes, filling with Type A material, Testing with Laboratory and Field Density at the site. Asphalting with GB28 comply with Ministry of works Road specification requirements.
Roads Project, Juffair Dec 10 – Till date
Client : Ministry of works – Roads Division
Developing with new roads and the required duct crossings for a six kilometre inside the newly developed area of Juffair.
Making Trial holes for the existing services for more than 100 locations and getting approved from the relevant departments.
Preparing the design schedule based on the specification, considering the water table for the Construction of Holding Tanks and get the approval.
Sea filling with approved Dredged sand for 340 Mtr. Length and Rock Armour work in the sea side. Arranging for testing by the ministry laboratory.
Asphalting with base course of variable thickness and arrange for testing with core samples by the ministry of roads laboratory.
Geosan Construction Dynamics, Doha Qatar Oct’07-Nov’08 Site Manager
Significant Highlights :
Khaleefa Sports City
Falcon Project :
Consultants : Projacs
Client : Ministry of works, Qatar
Worked in a 25 million (QR) project, including Civil, structural, GRP and Landscaping works.
Assisting the Planning Engineer to prepare and update the programme, considering the site progress and try to fix with them.
Undergone with Inspection including compaction tests, Welding tests, Pressure tests for water and fire pipelines and for Block works and plastering.
Doing all necessary Infrastructure works of Sewerage, Electrical, Telecommunication, Chill water lines and Irrigation pipe laying.
Doing all required Asphalt road works for the approach roads and Foot path with the bricks.
Steel fabrication works with shuttering and scaffolding, preparation of bar bending schedules and check after fabrication.
Involved with GRP fixing design, welding methods, Tests on welding strength, Fire proofing etc.
Monitoring Structural steel works, welding tests and Fire proofing works etc.
Using RMD scaffolding materials
Swami Builders, Tirunelveli. Nov’97-Sep’07 :
PROPRIETOR
Significant Highlights :
Managed the gamut of tasks including Project Execution; QA/QC; Coordination with Supervisors, Contractors and Consultants etc.
Supervised the implementation of works as per approved Method Statements and Designs.
Used Value Engineering concepts and significantly reduced costs.
Interacted with Consultants / Sub Contractors on Project Progress and Quality issues; Designs, Method Statements etc.
Responsible for preparation of drawings, design coordination with HO, management of materials like Rebars, Building Material etc.
Pivotal in executing projects on time and within budgets by closely monitoring Sub Contractors and guiding them in day to day tasks.
Introducing new techniques, procedures, practices and processes.
Handled financial and budgetary responsibilities on each major project.
Credited for increasing revenues and profits in the organisation.
Shiva & Associates, Tirunelveli. Jun’93-Oct’97 :
SITE ENGINEER :
Involving with the construction of budgeted individual houses with attaractive elevations.
Check the quality of finishing such as Plastering, Flooring, wood works and Painting.
Make the work as customer satisfactory, within the budgeted cost.
Blue Bell Constructions, Chennai Jun’90-May’92 :
CONSTRUCTION SUPERVISOR :
Significant Highlights :
Preparing Method statements including inspection and test plans.
Handled preparation & checking of Rebar schedules and ensured timely delivery of right rebars.
Effectively resolved critical issues through timely decisions on alternative designs after discussion with Consultants.
Member of team that undertook Foundation works.
Planning and scheduling work and keep records of the materials used and the progress made on a project.
Education :
Diploma in Civil Engineering Gomathy Ambal Polytechnic, Tirunelveli Tamil Nadu in 1990.
Primavera 3.1 in 2008.
AutoCAD 2008 in 2008.
-
August 22nd, 2011, 09:53 PM
Post Count Number #6
Curriculum Vitae
MD.YAQUINUL HAQUE
(Mechanical engineer)
Email y_yaquin AT yahoo.com
CAREER OBJECTIVES :
I want to be a part of an organization that appreciates hard work and guides to a new high position. I have the confidence and enthusiasm in working as a team and achieve organization goals.
TECHNICAL QUALIFICATION :
Having a First Class of Bachelor of Engineering (Mechanical) from K.B.N. College of Engineering, Gulbarga under Visveswaraiah Technological University, Belgaum, Karnataka, India in June 2009.
Having Certificate Course in Piping Engineering from I.I.T Powai, (Mumbai).
BASIC QUALIFICATION :
10th B.S.E.B Patna Board (First Division)
12th From B.S.E.B. Patna Board (First Division)
B.S.C In Chemistry From Aligarh Muslim University In July 2005.
WORKING EXPERIENCE :2 years
Having experience in pressure vessels, storage tank, client (HPCL) of company prashant project Ltd.CBD balepur Mumbai.
I have skill knowledge in piping and also have one year experience in transportation pipline.
I also have great knowledge about codes,Standrad of piping.
SEMINAR & PROJECT :
Prepared And Delivered a Seminar Report on "Analysis of Turbulent flow with and without struts satisfactorily in 8th semester as a part of curriculum prescribed by Visveswaraiah Technological University.
Area of Interest (Piping, Production Manufacturing, QA, QC, Industries)
COMPUTER SKILLS :
MS Office, Internet Surfing.
CAD SOFTWARES
Auto cad 2D
PERSONAL STRENGTH :
Communication Skills
Hardworking Sincerity and Honesty
Convening ability
Pleasing Personality
Individual working capability
-
May 26th, 2012, 08:18 AM
Post Count Number #7
Job code : /POST APPLIEDAssist. Manager safety
Mail id :upendra.hse AT rediffmail.com/upendra.hse AT gmail.com
NAME :UPENDRAKR.JHA
EXPERIENCE :10Years.10Month. Civil 5.6Years. POWER (T&D)5.4Years. Highest Qualification:BSC (PHY.HONS) BHAGALPUR UNIVERSITY BIHAR.& POST GRADUATEDIPLOMA IN INDUSTRIAL SAFETY MGT.PATNA UNIVERSITYBIHAR Salary drawn (Annum) : Rs.5.8 lacks Salary Expected : Negotiable.
preferred location in INDIA : BIHAR/WEST BENGAL /JHARKHAND/UTTAR PARDESH
PROFILE : HANDS ON PROFESSIONAL with ten years experience in the Areas of
Occupational safety and health management, construction/power project
MGT. services, Safety prevention programs, and worker’s compensation
claims management, certified ISO, IMS & FIRST AIDER, Associate in risk mgt.
OBJECTIVE : To do better use of our knowledge, experience and effort to
make and maintain safe working place, healthy environment and create zero
accident working climate through better use of available resources by human
beings. Due to we deserve most priority of saving human beings. Human
beings are the most valuable and precious in our concern. Safety and
production are inseparable and both are the need of present global world.
AIM : Accident rate zero.
TARGETS : Minimum one thousand Worker’s conduct Induction training
&Awareness Program in next month.
WORK EXPERIENCE : SYNOPSIS
Name of IVRCL Ltd. Harji engineering. Simplex Indramani pathak & Companies works Ltd India ltd Combine construction BIHAR
Designation Sr. Officer (HSE) Assist. Safety Officer SAFETY ENGINEER TRAINEE SAFETY Sr. SUPERVISOR
Period 06 DEC 2006 to TILL DATE 26 AUG 2OO4 NOV. 2OO6 1 MAY 2OO2 25 AUG 2OO4 O5th sep 2oo1 30 APR 2002
Project’s Power Division (A1 & A2) (JANTRA MANTRA & (AJMERI Gate, Patel Chowk, Canaught Place.) Fabrication, welding, Gas cutting
132/22O KV T/L &Reconducting CANAUGHT PLACE) DMRC New Delhi Building work in IOCL BRTS
Project’s PATNA.(BIHAR) & DMRC New Delhi BEGUSARAI BIHAR
ASSAM POWER PROJECT (A2 &A3)
400KV T/L SILCHARMELERIHAT (AIZAWL),
SILCHARIMPHAL (MANIPUR),
132KV SILCHAR HAILAKANDI
Nature Tower Foundation, Erection, Fabricating, Gas Cutting, Welding Excavation, PlatePiling, Gas Cutting, Welding, feting, civil work of WorkStringing & ReConducting work Welding, Scaffolding Excavation, Erection, Fabrication
WORK EXPERIENCE : Present
Name of Company :IVRCL Ltd. (HYDERABAD)
Designation :Sr. Officer (HSE) /G 7/EMP CODE 6846 Period :06 DEC 2006 to TILL DATE
Project’s :Power Division (A1 & A2) 132/22O KV T/L &Reconducting Projects
PATNA. (BIHAR) &ASSAM POWER PROJECT (A2 &A3)400KV T/L SILCHAR
MELERIHAT (AIZAWL), SILCHARIMPHAL (MANIPUR), 132KV SILCHARHAILAKANDI, Nature of Work :Tower Foundation, Erection, Stringing & ReConducting work. Salary Monthly:32,000/ AT Award from Client:in transmission H/V Line Best Safety practices Awarded from
Client PGCIL Chief .Manager .Manager BEGUSARAI (BIHAR) # Long Province Award :Five years expression of appreciation & Good will from
IVRCL LTD (by Chair man) JAN 2012
WORK EXPERIENCE : Previous
2. Name of Company : Harji engineering works Ltd. (DMRC New Delhi)
Designation : Assist. Safety Officer
Period : 26 AUG 2OO4 NOV. 2OO6
Project’s : (JANTRA MANTRA &CANAUGHT PLACE.) DMRC New Delhi
Nature of Work : Fabricating, Gas Cutting, Welding,
3. Name of Company : Simplex India ltd( DMRC New Delhi)
Designation : SAFETY ENGINEER Trainee
Period : 1 MAY 2OO2 25 AUG 2OO4
Project’s : (AJMERI Gate, Patel Chowk, Connaught Place.) DMRC New Delhi
Nature of Work : Excavation, PlatePiling, Gas Cutting, Welding, Scaffolding
4. Name of Company : Indramani pathak const. Begusarai BIHAR
Designation : SAFETY Sr. SUPERVISOR
Period : O7th JAN 2oo2 30 APR 2002
Project’s : Building work in IOCL BRTS Begusarai BIHAR
Nature of Work : civil work, Excavation, Erection, Fabrication .
5. Name of Company : Combine construction Jamshedpur.JHARKHAND
Designation : SAFETY SUPERVISOR
Period : O5th Sep 2oo1 o6th Jan 2002
Project’s : Fabrication, welding, Gas cutting
Nature of Work : Welding, feting, civil work.
JOBPROFILE : with ROLE&RESPONSIBLITIES
Conduct induction training to each & every personnel prior to start the work at Site.
Conduct tool box meeting & safety training for site work.
Implement & administration of safety programme .
Preparation of site safety plan & its proper implementation.
Hazards identification & adopt controlling measures during site inspection.
Arrangement & monitoring of PPES.
Provide update information of safety requirements regarding various type of works.
Organising safety promotional activities like display of safety posters , slogans & others educative materials competitions & awards as well as safety day celebrations etc.
Arrangement of each & every activities through completion of checklists & keep records
preparation of accidents / incidents /near misses /dangerous occurrences reports.
Formation of safety committee & organize monthly meeting on regular basis.
Safety audit & prepare reports for improvements of working culture.
Mobilization of PPES & Check their suitability.
Identify Potential hazards & its elimination.
Conduct IMS safety audits and prepare reports .
Preparation of Accident Investigation & suggest Control measures
Maintain records of all accidents/incidents/ Near Misses.
Report to Site In charge & Safety Mgr. (HSE).
Maintain The HSE Emergency Services.
coordinates with all always comply with the client and regulation &projects departments on safety matters.
Check specified precaution in work permits
Erect, transport, shift materials with in safe working load.
Implement of fire fighting and accident handling system
Check all T&P for safety matter
T&P testing proper way the competent authorized person. Display safety posters & literature the job site. Always use care & be responsible the PPE. Maintain firstaid box. Implementation &.motivation of HIRA,JSA,MSDS, EMS,QMS,OHSAS & IMS TOPIC.
QUALIFICATION :
SL.NO. Examination Passed Board/ University Year of Passing % of Marks
01. SECONDARY SCHOOL EXAM B.S.E.B. , Patna 1988 72.40%
02. Intermediate(Science) B.I.E.C , Patna 1990 62.47%
03. Graduation ( PHY HONS) T.M B, University. Bhagalpur 1995 57.50%
Professional Qualification :
04. Diploma in Industrial Safety Management.Patna University. Patna 1999 59%
TECHNICAL Qualification :
05. DCA,WINDOW,ADOBE,DBASE SUPERIOR COMPUTER CENTER BARBIGHA BIHAR 2OO02001
Training Programs : SL.NO. Nature of Training Authority
01. PROJCT WORK IN Baruni Thermal Power Station BIHAR TRAINING DEPT Baruni Thermal Power Station BIHAR
02. Lifting Supervisor IMCC (DMRC) Safety Department.
03. Learning & development Special program in HSE Mgt ISO IVRCL Infrastructures & Project Ltd.
Environment on 12th July 2oo72o July 2oo7 Through Management Team.
04. IMS(Integrated Management Systems) Auditor Training IVRCL Infrastructures & Projects Ltd. Through ISC(International Standards Certification) Pvt. Ltd at Patna on 26th Dec 2oo828thDec 2oo8 05. RED CROSS (ST JOHN AMBULANCE ASSOCIATION) Through DELHI EXAMINER IN PATNA (BIHAR)
4thMARCH 2008 IVRCL Ltd.
-
May 22nd, 2013, 10:55 AM
Post Count Number #8
Civil Engineer
DEBASISH MAJUMDER
Experiance : Experiance near about 12 years 5 months in Civil Engineering field. Construction of building, Industrial building, Bridge, soil testing and geotechnical Investigation work and pile foundation & pre-cast pilling work.
Industrial : Vocational training in the project Ichamoti Bridge under Gammon Exposure India Limited for PWD roads department Government of West bengal as a student trainee.
Worked as a J,E Civil in P.K.De & Associated pvt.Ltd. from December 2000 to Jan 2002in the project Construction of building, soil testing & piling work Client under GAIL, SE Railway,NF Railway.
Worked as a site Engineer in OBER Construction Enterprises Pvt.Ltd. from Feb 2002 to Apr 2006 in the field construction of building & piling work Client under MES.
Presently Now working as a Engineer in Simplex Infrastructures Limited from May working 2006 to till date in the field construction of industrial building, Bridge & Piling work Client under Vedanta Alumina Limited, Tata Bluescope Steel Ltd.and IOCL digboi MSQ upgrading project(AOD), 3X150 MW IPC(H)L power project,Haldia.
Academic Passed Madhyamik Examination in the year 1993 from W.B.B.S.E with 1st divition
Qualification (62.6%),
Passed Higher Secondary Examination in the year 1995 from W.B.C.H.S.E with
Pass divition (40.00%)
Passed Diploma In Civil Engineering in the year 2000 from W.B.S.C.T.E with 1st class
(71.6%)
PERSONAL INFORMATION :
Fathers Name : Mr. Jasoda Jiban majumder
E mail : majumder.debasish AT ymail.com
Date of Birth : 01.10.1976
Nationality : Indian
Marital Status : Married
Pass port No. : G0I00044
Language Known : English, Bengali & Hindi
Date :- 22.05.2013
Place :- KOLKATA
DEBASISH MAJUMDER
-
May 25th, 2013, 10:25 AM
Post Count Number #9
cv
CURRICULUM VITAE
RAKESH KASHYAP
Email : rakesh_ramky AT yahoo.co.in
Career Objective :
To be associated with progressive and reputed organization which provides me a platform to apply my skills and knowledge into practice and to be part to team that mutually works together for the progress of organization.
Works Experience :
TOTAL WORK EXPERIENCE : 13 Years
1. Ramky Infrastructure Ltd (Store Keeper - 02/02/2000 To 30/04/2011 – 11 Years
** Receiving equipment, materials, or supplies ordered verifying against specifications on requisition or other documents.
** Counting inventory periodically and reconcile with records
** Storing materials, supplies, equipment, etc. according to weight, temperature, size, safety precautions or other concerns.
** Advising users/customers regarding stock items or supplies suitable for needs using knowledge of and experience with goods or materials.
** Resolving problems or complaints presented by staff and users/customers.
** Keeping record of standard inventory, cost, prices and quantity on hand.
Projects Involvement at Ramky :
** 60” Sewarge Project in Patiala Punjab. (55. Cr.)
** 100M.L.D S.T.P Jalandhar Punjab Project. (Value of project 90. cr.)
** SWD Duct Project. (Ahmedabad Municipal Corporation). (Value of project 48. cr.)
** Rajasthan’s Jaipur MNIT Housing Project (Proposed boys & girls Hostel) near cancer hospital. (190.Cr.)
2. Simplex Infrastructure Ltd ( - 09/05/2011 To As Per Working Till Date) Reliance
Industrial Project in Silvassa.(Value of project (1200 .cr.)
** Preparing the comparative statement with regards to the previous purchase as well as the budget
** Raising the purchase order on the item approved from the purchase comparative statement by the project Manager.
** Following up for material s deliveries as per schedule.
** Issuing Equipment Receipt.
** Reporting to Store In charge directly.
** Making entry in the indent control register for all the indent s from the site.
** Enduring upkeep of store documentation
** On receipt of material at store s, verifying the document s with purchase order and examines the material physically, if needed, sending the material for weighing in presence of project Manager.
** Preparing the monthly stock statement and sending to the project in charge, project coordinator and CO purchase dept. for their further action.
** Maintaining the scrap stock register and taking the entries of the material s which are declared scrap by project in charge.
** The material should be sent out by presenting the Non Returnable gate pass and the details are entered Non Returnable item register
** Sending the materials out for repairers or for some other purpose by presenting the returnable gate pass. And thus the register for Returnable material should be mentioned.
** Issuing tools to site personnel for executing the work on daily basis by entering in the Daily tools register preparing a monthly statement for pending item.
** Preparing GAIR and send to the project manager QC engineer and project in charge signature .Original GAIR & sent to Account department.
** Informing QC engineer for quality check.
** Approvals materials are taken into stock register
Knowledge, Skills and Abilities :
** Knowledge of goods or materials in assigned storeroom.
** Knowledge of basic buying and purchasing practices.
** Knowledge of inventory principles and practices.
** Knowledge of supervisory principles and practices.
** Skill in appropriate use of goods and materials in storeroom.
Highest Educational Qualification :
** Diploma in Computer Software
** Diploma in Material Management
Computer Skills :
** MS-WORD, MS- EXCEL , INTERNET
** SAP, ERP
PERSONAL DETAILS :
NAME : Mr. Rakesh Kashyap
AGE & DOB : 30 years ( 02 April 1980 )
SEX : Male
MARITAL STATUS : Married
NATIONALITY : Indian
RELIGION : Hindu
I hereby declared that the above information is true to my knowledge.
Rakesh Kashyap
-
May 27th, 2013, 11:48 PM
Post Count Number #10
BIODATA
NAME : NIMSHAD.S
Email :Nimshadakkal786 AT gmail.com
DATE OF BIRTH : 07-05-92
SEX : MALE
RELIGION : ISLAM
COMMUNITY : MUSLIM
RESERVATION CATEGORY : OBC
QUALIFICATION : DIPLOMA IN MECHANICAL ENGINEERING
[result waiting]
+2 WITH 72%
SSLC WITH 92%