Gulf Spic Contracting Company Kuwait : Piping Construction Engineer

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Gulf Spic Contracting Company Kuwait : Piping Construction Engineer

    Gulf Spic Contracting Company, Kuwait.

    Keywords: PCE

    Designation: Piping Construction Engineer
    Experience: 10 - 12 Years
    Location: Kuwait
    Education: UG - B.Tech/B.E. - Mechanical
    PG - Post Graduation Not Required
    Industry Type: Oil and Gas/ Power/Infrastructure/Energy
    Functional Area: Other
    Posted Date: 12 Nov 2008

    Job Description
    Should have more than 10 years experience in piping line as a construction Engineer for a leading petrochemical Industry at Kuwait.

    Desired Candidate Profile
    Piping Construction Engineer should have more than 10 years experience for a leading petrochemical, Oil & Gas industry at Kuwait. Qualification in Mechanical and the salary is based on their experience. should have more than 10 yrs

    Company Profile
    It is a leading Petrochemical industry at Kuwait and they are having various branches in Kuwait, Dubai, India etc,

    Executive Name: Ms. Helan Mary

    Address:
    5056,
    21st Main Road,
    Annanagar,
    Chennai,Tamilnadu,INDIA 600040

    Email Address: rajamanpower@yahoo.co.in

    Telephone: 91-44-26164730

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Email :shifa2529 AT gmail.com
    Resume Mohammad shifa salim
    Piping Engineer
    CAREER OBJECTIVE

    To be part of a highly motivated team which gives challenging work life where my skills and abilities will greatly enhance the companies growth. Also feel that being a hardworking engineer with 6 years of experience shall contribute to the fulfillment of the goal of the organization I am working for
    EDUCATIONAL QUALIFICATION
    - Bachelor of Technology with First class in MECHANICAL ENGINEERING Kannur University, from L.B.S College of Engineering, Kerala, India (from 1999-2003)
    - Certified course in PIPE STRESS ANALYSYS using CAESAR II (5.00) from KLG SYSTEL LTD. Chennai, India
    - Certified course in PIPING ENGINEERING from Design techniques Bangalore, India
    - Certified course in PDS (plant design system) from sivabalan engineers and Consultants, chennai, India.
    - Certified course in NDT Level II in radiographic testing from Thane Maharashtra India.
    Technical Skills
    P&ID Study, Plant co-ordinate System readout. Prepare isometric & spool drawings. Preparation of MTO-Material Take Off.
    Pipe support selection and span calculations. Isometric to Ortho Conversions, Ortho to Isometric Conversion, knowledge in Pump Piping Layout.
    3D Modeling of Plant Equipment & Piping using PDS
    Generation of isometrics and G.A drawings using PDS
    Knowledge in fabrication of pressure vessels
    PROFESSIONAL EXPERIENCE
    Position : PIPING ENGINEER
    Company : M/S. CRISTAL GLOBAL. Yanbu, Saudi Arabia.
    Project : CEP II, P-07 (Plant Expansion Project),6th line expansion project
    Duration : November 2008 to till date
    JOB PROFILE
    - Responsibilities involves the activity of project in the field of Engineering, Technical Queries, drawing review, executing the project
    - Line routing for instrument air, service water lines, slurry lines, tickle lines, liquid oxygen and nitrogen discharge lines, gaseous oxygen lines ,acid lines, process gas lines and all other utility lines for the plant improvement project. Considering process requirement, operating level, head room level, Maintenance space, walkway spacing and economic route.
    - Prepare piping plan as per P&ID and Prepare isometric drawing for plant maintenance project
    - Prepare MTO (material take off) for piping Isometric drawing according to crystal piping material specification standards.
    - Selection of piping supports, span calculation and assign proper pipe support
    - Co-ordinate with stress group for finalizing pipe-routing and placing of Supports., for critical lines
    - Prepare material requisition for piping materials and evaluating quotation of different vendors and preparing technical recommendations for materials.
    - Piping of metallic and nonmetallic piping(cpvc &bonstrand)
    - Monitoring the installation of piping and preparing as built drawing for the maintenances project
    - Resolve the site queries made by the construction team regarding site problems.
    - Generating the Tie in drawings coordinating with process engineers.
    - Reviewing plant model using Plant Design Management System (PDMS) according to the P&ID and Process Flow Diagram. Updating according to the site condition in the model as per review comments and generates new isometrics to issue for construction for the plant expansion project
    - Review isometric Drawing, piping plan, equipment drawing and structural drawing. for the plant expansion project.
    - Reporting the daily progress of the project activity to the Engineering manager
    Position : Piping Engineer
    Company : M/S. HITACHI Plant Technologies Saudi Arabia.
    Client : Saudi Aramco
    Project : Petro Rabigh Project (Petro chemical), Rabigh, K.S.A
    Duration : Dec 2006 to August 2008
    JOB PROFILE
    - Design review of drawings I.e. isometrics and piping plan with respect to P&ID,piping specification and standards
    - Check the piping plan with respect to the p & id and prepare technical queries regarding design problems
    - Check the bill of materials in the isometrics with respect to Aramco material specification standards.
    - Identify problems in the isometric drawing and make corrections and issue for fabrication
    - Make piping isometrics from piping plan for utility and underground services.
    - Prepare spool drawings of piping isometrics for fabrication
    - Resolve the site queries made by the construction team regarding site problems.
    - Line routing for instrument air, service water lines for the project. Considering process requirement, operating level, head room level, Maintenance space, walkway spacing and economic route.
    - Verify the availability and adequacy of piping material requirement with the help of material controller and make requisition for for shortage materials
    - Monitoring the erection of piping and preparing as built drawings
    - Coordination of engineering department, fabrication yard, site construction team and other external vendor inspector and expedition

    Position : MECHANICAL/ PIPING ENGINEER
    Company : M/S. FURNACE FABRICA (INDIA) LTD, INDIA
    Duration : SEP 2003 to Nov 2006
    JOB PROFILE
    - Production of various process equipments like heat exchangers, columns, reactors, gas driers, knocks out drums etc. My responsibilities involves forming planning schedules for execution, estimation, raising PR’s, following fabrication procedures etc.
    - Plans, Organizes and executes fabrication works in accordance with project schedule and sequence.
    - Supervise all mechanical/piping construction activities to ensure all the works are carried out as per project specification and schedule
    - Organizes materials and equipments for upcoming jobs in advance
    - Prepares daily progress reports and forward to planning department.
    - Receives drawings and schedules and bill of materials checks for correctness and completeness of the materials.
    - Supervises fabrication crew.
    - Prepare work schedules of all related activities to ensure smooth operation of the task/project
    - Assign manpower and equipment in accordance with priorities..
    - Managing and controlling the resources required for the production progress.
    - Managing and controlling production as per quality specification.
    - Maintaining records and registers as per ISO 9001 :2000 standards for identification and trace ability.
    - Take part in the internal audit with Production Department.
    - Preparing, Updating and systematic arrangement of all documents like Quality Policy, Flowcharts, Bar charts, Manpower Planning, Process map, Objective, Registers, Drawings, Organization Chart, Documents list, Work Instructions etc for satisfying the requirement for the impletion of ISO 9001-2000 quality management system
    Computer skills
    - Caesar -II (version 5.0)
    - Pds software.
    - Primavera Project planner (P-3, 3.1), AutoCAD - 2004,
    - Knowledge of OS/Platforms like Windows 9X/NT/2000/XP.
    - Working Knowledge of MS OFFICE
    Professional Attributes

    - Ability to work for the best improvement of the company under pressurized conditions.
    - Excellent analytical skills
    - Able to work within in the framework of established workplace regulations and Policies
    - Good communication skills

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CURRICULUM VITAE

    CURRICULUM VITAE
    U.RAGU
    E-mail Id : ragu.udhayakumar AT gmail.com
    ragu.udhayakumar AT yahoo.com

    OBJECTIVE
    To settle with a requited organization industry and to work hard to achieve goals integrating my technical skills,
    Educational Qualification : S.S.L.C., (Passed)
    Technical Qualification : I .T .I (Instrument Mechanic)
    Percentage of Marks : 88.6 %
    Year of Passing 2004
    Computer Knowledge : DOM (Diploma in Office Management)


    EXPERIENCE DETAILS
    Present Employer : PETROKEMYA (SABIC GROUP). K.S.A
    Through JAL INTERNATIONAL
    Designation : Technician
    Period : 11 May 2008 to 02 June 2011
    Location : Jubail Industrial city, Saudhi Arabia.
    Previous Employer : SIIL (Sterlite Industries India Ltd)
    Through HIISL (Hofincons Infotech Industries & Service Pvt Ltd)
    Designation : Technician
    Period : Feb 2007 to Feb 2008
    Location : Sipcot Industrial complex, Tuticorin.
    Previous Employer : E.I.D Parry India Limited,.
    Through Aerotech Electrical & Instrumentation Eng Works,
    Designation : Technician
    Period : July 2004 to July 2005 & Nov 2006 to Feb 2007
    Location : Nellikuppam, cuddalore Dt. 607 105.
    FIELD EXPERIENCE

    Carried out of Instruments Routine maintenance in petrochemical plant.
    Carried out of yearly and monthly preventive maintenance of compressor critical instruments.
    Carried out of preventive & corrective maintenance of all types of instruments, Like Transmitters, Control valves, Pressure switches, Vibration Probes & proxymitor, pressure & Temperature Gauges and SOV, Limit switches etc….
    Calibration and Maintenance different types of process control Instruments.
    Calibration and Maintenance of different types of control valves and control valve accessories.
    Trouble shooting and Calibration of SO2, CO2 & O2 analyzer, Makes NGA 2000 Rosemont Emerson and AO2020 Limas UV 1 ABB analyzer’s.
    Troubleshooting, Maintenance & Calibration of Vibration probes and Vibration Transmitters with Bentley Nevada 3500 & 3000 series Monitoring System.
    Maintenance and Calibration of Pneumatic Transmitters and Pneumatic Controllers. ( Pressure & Temperature )
    Troubleshooting & Maintenance of Blow Back type Transmitters and Integral Orifice type Transmitters.
    Worked in Micro motion mass flow meter and Vortex flow transmitters.
    Troubleshooting and Loop checking in DCS and PLC systems.
    Basic knowledge in CCC, ESD & TCS.
    INSTRUMENTS WORKED
    TRANSMITTERS :
    Yokogawa, Rosemount, yamatec, (Honeywell), Endress+ Hauser, Foxboro, Moore & Wicka.
    REMATIC TRANSMITTER & CONTROLLER :
    Yokogawa & Foxboro.
    CONTROL VALVES :
    Masoneilan, IL, MIL, Fisher, Valtek, Nakakitta, Dambla & Mazda.

    LEVEL TROLL :
    Foxboro & Fisher.
    PLC :
    Triconex (TS 1131), Allen Bradley, Siemens & ABB.
    DCS :
    Yokogawa (CS3000) & Honeywell (TDC3000)
    DOCEMENTS :
    Data sheets, Specification Sheets & Manuals.
    DRAWINGS :
    P&ID (Piping & Instrument Diagram)
    ILD (Instrument Loop Diagram)
    Logic Diagram
    PFD (Process Flow Diagram)
    HFD (Hedder Flow Diagram)
    Hook Up Diagram
    WORKED CALIBRATION EQUIPMENTS :
    HART Communicator (375 & 275)
    SFC (Smart Field Communicator) Honeywell
    BT (Brain Terminal 200) Yokogawa
    RTD Calibrator (ALTEC)
    T/C Calibrator (ALTEC)
    Frequency Calibrator (ALTEC)
    SM-10 (MCIH)
    Loop Calibrator (ALTEC)
    Vibration & Proxymity Calibrator (TK-3 & EK-3)
    Basic Knowledge of SAP Management system.
    Completed Class – B Safe Work Permit authorization approval for
    Maintenance satisfaction in petrokemya CS Department.
    Handling Shifts Independently.

    APPRENTICESHIP TRAINING :
    Worked as an Apprenticeship Trainee in Indian Coast Guard (Base Maintenance Unit) Chennai, Ministry of defense from 2005 to 2006.
    Job Profile:
    Functional checks of various components, like less Transistors and other components by using QT 200 mixed functional tester.
    Repairs of PCB’s various Equipments like RADAR, Gyro and other Communication / Navigational and main engine control by pin level cold checks method.
    Repairs of various equipments on board ICGS Ships.