PIPING FABRICATION, ERECTION ENGINEER : Saudi Arabia

+ Ask Question / Post resume
Results 1 to 4 of 4
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    PIPING FABRICATION, ERECTION ENGINEER : Saudi Arabia

    A LEADING GROUP IN PROJECTS& HEAVY FABRICATION.
    http://www.iosr.com

    Keywords: PIPING ENGINEER WITH PLANNING KNOWLEDGE.

    Designation: PIPING ENGINEER
    Experience: 5 - 7 Years
    Location: Saudi Arabia
    Compensation:
    BEST IN THE INDUSTRY
    Education: UG - Diploma - Mechanical
    PG - Post Graduation Not Required
    Industry Type: Oil and Gas/ Power/Infrastructure/Energy
    Functional Area: Site Engg., Project Management
    Posted Date: 20 Nov 2008

    Job Description
    EXP. IN FABRICATION OF PIPING AS PER ASME CODES;
    PLANNING&SCHEDULINGFOR PROJECTS&SHUTDOWN JOBS
    WITH PRIMAVERA &M.S.PROJECTS.

    Desired Candidate Profile
    DEGREE/DIPLOMA IN MECHANICAL ENGINEERING WITH
    KNOWLEDGE OF PRIMAVERA& M.S.PROJECTS AND ABILITY
    TO READ ENGINEERING & FABRICATION DRAWINGS.

    Company Profile
    A LEADING GROUP ENGAGED IN PROJECTS;HEAVY FABRICATION;SHUT-DOWN&PLANT MAINTENANCE JOBS.

    Executive Name: MR. SUNDARAM/MR. SRIDHARAN

    Address:
    Not Mentioned

    Email Address: recruit@iosr.com

    Telephone: 022-66442723

    Reference ID:
    PEPALKSA

  2. Post Count Number #2
    On probation
    Join Date
    February 14th, 2009
    Location
    kerala
    Posts
    1

    Re: PIPING FABRICATION, ERECTION ENGINEER : Saudi Arabia

    RESPECTED SIR,
    i am NADHEEM V(BE in mechanical engineering)
    Mifthah manzil,thazhe vakeri,parropadi,
    (PO)velllimadukunnnu,calicut,kerala.
    ph 09995525121,09447751415
    nadheemvt@yahoo.com)

    Good knowledge in construction drawing such as P&ID,Piping isometrics,equipment,structural,GAD.

    Familiar with material inspection,Dimensional check and documentation as per construction material standards such as ASTM/ASME SA 106,SA 515,SA 516,SA 105,SA 312,SA 240,SA 234 etc and with ANSI standards of B 36.10,36.5,B 16.9 etc.

    Through knowledge in welding standards of ASME section IX and and API 1104.Familiar with Welding procedure qualifcation,P numbers,selection of electrodes,Weld visual inspection etc.

    Good knowledge in radiographic interpretation of weld joints,ultrasonic inspection,magnetic particle inspection and penetrant testing,reporting and documentation.

    Fabrication of pipping,structure,pressure vessels & other Equipments,documentation of history sheet,Test pack clearing etc
    confident to handle the construction and quality control activities as specified in the drawings and applicable standards and specifications.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: PIPING FABRICATION, ERECTION ENGINEER : Saudi Arabia

    CURRICULAM VITAE
    7/54, pillaiyar koil north street,
    Keezha natham (post)
    Thimmrajapuram
    Tirunelveli:-627353
    Tamilnadu
    India
    P.SUDALAI RAJAN
    Mail- sudalai1979 AT gmail.com
    Mobile no: +96899839258
    OBJECTIVES:-
    Having more than 10years of experience in construction & projects execution in the field of Refinery, Chemical plant, Petrochemical and Oil & Gas Projects like as with exposure to piping fabrication and erection, fabrication and installation of supports etc,.
    General Responsibilities

    Planning and manpower controlling material handling, Co- ordination with client, Co-ordination with inspection. Technical support to team worker and following the protection rules and Regulation
    Professional Background:-
    - DME (Diploma in mechanical Engineering ).
    - Attended in several training related piping
    - H2S PDO Training
    - HSE PDO Training
    - PTW(Permit to work)
    - HSE Tools&skills
    Computer Knowledge:-
    - Auto cad R-14
    - MS Office
    Educational Qualification:-
    Diploma mechanical engineering from MSP velayuthanadar polytechnic Tirunelveli in April 1999 with 76.4%
    Passed 10th in MN Abdur rahmanHigher Secondary School-Tirunelveli with 82%

    Work Experience

    Present Employment
    At present I am working in Arabian industries L.L.C (Oman)

    Organization : Arabian industries L.L.C
    Muscat (Oman)
    Project : Amal steam project
    Petroleum development OMAN (PDO)
    Designation : Field engineer piping
    Duration : 03/07/2010– Present
    Key Responsibilities.
    Nature of work:
    - Daily and Monthly Work Planning
    - Equipment planning like Crower /tire mounted
    - Mobilization of Material and Man Power to Site.
    - Work Schedule Preparation for forman,supervisors
    - Daily Progress preparation and Monitoring.
    - Scope of work Amal east 41 kilometer off plot ,on plot piping.
    - BOQ and Billing Study of Isometrics and P&ID drawings.
    - Hook up activities in well pad area.
    - Prefabrication of spools in well pad area
    - Erection of beam pump and selection manifold as per GA
    - Erection of oil production flow line , steam lines, service water lines ,and air lines as per drawings.
    - Knowledge of CS, LTCS, Alloy Steel, Stainless Steel, and GRP Pipes.
    - Supporting and alignment checking of pipe lines and equipments.
    - Monitoring Health and Safety Environment of the working area.
    past employment

    I was working in Satnam global Infraprojects ltd. India
    Designation : piping engineer
    Duration : 25/02/2010-24/06/2010
    Project : Numaligarh Refinery ltd (NRL) ASSAM

    Nature of work
    Shutdown work
    S.s, cs pipe line fabrication, dismantling of existing pipeline erection &pressure test for all pipe.
    Past Employment
    I was working in Galfar engineering & contracting L.L.C (Oman)
    Organization : Galfar engineering contracting co SAOG with loss
    Muscat.
    Project : Harweel Cluster phase II upstream facilities.
    Petroleum development OMAN (PDO)
    Designation : piping engineer
    Duration : 18/9/2009– 21/12/2009
    Key Responsibilities.
    Nature of work:
    Pmc work and modification of HP and LP flare system.
    - Daily and Monthly Work Planning
    - Equipment planning like Crower /tire mounted
    - Mobilization of Material and Man Power to Site.
    - Work Schedule Preparation for forman,supervisors
    - Daily Progress preparation and Monitoring
    - MTO Query and Billing Study of Isometrics and P&I drawings
    - Erection of carbon steel,Ltcs,alloy steel, stainless steel,CRA pipes in crude separation units.
    - Checkup fit up , dimensions ,orientations as per Iso.
    - Erection of service pipe racks pipe supports pipe lines.
    - Pmc of Valves and loops as per test pack.
    - Reinstatement (Box up) of loops and valves.
    - Monitoring of Health and Safety Environment of the working area.
    - Supporting and alignment checking of pipe lines and instruments.
    Past Employment
    I have worked in REAL Jamnagar An ISO 9001: 2000 firm with a group of Reliance Industries Ltd.
    Organization : Reliance Engineering Associates Pvt. Ltd
    Reliance Industries Ltd., Jamnagar,
    Gujarat, INDIA.
    Project : JERP (Jamnagar Export Refinery Project)
    Designation : Construction Engineer (piping)
    Unit : Crude cracking unit (CDU/VDU)
    Duration : 27/7/2007 – 31/7/2009
    Key Responsibilities.
    - Monthly Work Planning
    - Consumable Material Requirement Planning for 90 days.
    - Equipment planning like Tower / Boom Crane.
    - Mobilization of Material and Man Power to Site.
    - Work Schedule Preparation for Supervisors.
    - Daily Progress preparation and Monitoring
    - MTO Query and Billing Study of Isometrics and P&I drawings
    - Shop floor fabrication of carbon steel, alloy steel
    - Checkup fit up, dimensions, orientations as per Iso.
    - Erection of service pipe racks / pipe supports/ pipe lines.
    - Mechanical Box up of Valves and instruments.
    - Loop clearance of pipe lines.
    - Hydro testing of loops, Box up.
    - Monitoring of Health and Safety Environment of the working area.
    - Supporting and alignment checking of pipe lines and instruments.
    - Material reconciliation.
    Previous Employment :
    1. Concern : M/S PANDEY ERECTOR
    Project : JERP (Jamnagar Export Refinery Project)
    Designation : Mechanical engineer (piping)
    Working period : 06/04/2005-21/05/2007
    Key Responsibilities
    - Material Control, Handling, Planning & Splitting of Activity and allotment to Contractor.
    - Fabrication and Erection of Carbon Steel, Alloy Steel, Pipe as per Approved Plan & Drawings.
    - Check the Fit up, Dimension & Orientation as per Engg , Standard.
    - Making structural support as per piping layout
    - Erection of Various Type of valves, Line checking, Pneumatic, Hydro Testing and Installation, PreCommissioning.
    - Execute the Shop Fabrication and Erection Activities to achieve the Target in the time.
    - Co-ordinate with QA/QC Engineers.
    - Preparing the Actual materials requirement as per Drawing & Design.
    - Check the Fit up, Dimension & Orientation as per Engg, Standard.
    - Coordinate with supervisors and Project Superidentent.
    - To provide effective supervision and quality of work as per specification.
    - Report periodically on the progress of work.
    - To provide effective supervision and quality of work as per specification.
    - Team Spirit, Regular Safety Meeting and Punctualities.
    2. Concern : Ganges Internationale Pvt.Ltd,
    Pondicherry.
    Client : M/S DCW Limited (Dharangathara Fertilizer)
    Sahupuram, Tirunelveli dist
    Tamilnadu
    Designation : piping supervisor
    Working period : 16.09.2002 to 04.03.2005
    Key Responsibilities
    - Proper site planning of the execution, considering the availability of work fronts.
    - Studying isometric and fabrication of Carbon steel, Alloy steel, utilities line pipes.
    - Material verification as per drawing and arrangement, after preparing the MTO.
    - Day to day spool fit up & checking alignment as per drawing.
    - Co-ordination with quality persons for NDT clearance & ready for dispatch.
    - Checking/clearing the sub-contractors bill as per drawing.
    - Educate the labours for proper house keeping & safety observance at site.
    - Knowledge about Process piping code B : 31.3 for construction of piping.
    - MOC (Material of Construction) of piping material.
    - Proper utilization and handling of P&M Machinery.
    - Involvement with Hydro test and Box up.
    3. Concern : Auromac International Pvt Ltd, Pondicherry.
    Designation : Mechanical engineer (piping &structure)
    Working Period : 02.09.1999 to 05.08.2002
    Client : WORKED WITH NUCLEAR POWER CORPORATION
    INDIA LIMITED, as a MECHANICAL ENGINEER in Kudankulam, Tirunelveli (Dist), Tamilnadu.
    Key Responsibilities
    - Production schedule preparation, Job allocation, Monthly production achievement, Quality Control and fit up checking as per iso &drawing.
    - Erection of cs and erw pipes as per iso.
    - Loop clearance as per loop file
    - Fabrication of Welded Beams, dome, Welded Boxes and Truss works.
    - Structural Fabrication & erection of Column, Welding Beams and Bracings on reactor building and auxiliary buildings.
    - Erection of civil steel structure, equipment structure.
    - Inspection Co-ordination of internal and other external Inspection Agencies.
    - Visual Inspection of the Weld orientation and Welding defects.
    Personal Profile :
    Father’s Name : P. Pandia Konar
    Date of Birth : 05-03-1979
    Gender : Male
    Marital Status : Married
    Nationality : Indian
    Religion : Hindu
    Permanent Address : 7/54, Pillaiyar Koil North Street,
    Keezha Natham (Post)
    ThimmarajaPuram,
    Tirunelveli,
    Tamilnadu - 627353.
    Language Known : Tamil, English & Hindi
    Pass port No. : F2768468
    Declaration:
    I here by declare that the particular mentioned above are true to the best of my knowledge.
    Thanking you,
    Yours Faithfully,
    Place :
    Date: P.Sudalai Rajan

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Mechanical&Piping Field Engineer

    Permanent & Contact Address
    Ahamed Rifayee Amutti


    E – mail - arifayee AT yahoo.com , arifayee AT rediffmail.com , arifayee AT gmail.com
    Position Wanted - MECH- PROJECT ENGINEER / SITE ENGINEER/ EQUIPMENT & PIPING
    Objective
    To be an active member of a reputed organization where there will be ample exposure to input my skills and experience to achieve the organizational goals and also to gather more experience enabling me to improve my knowledge base.
    Educational Qualification
    Passed 3 years Diploma - Mechanical Engineering in 1st Class (74%) in the Year 1989 from (DOTE) Department of technical Education, Tamilnadu, India. Completed certification course of ASNT Level II in RT-UT-PT-MPT in the year of 2007.

    Brief of Experience : Total 20 years 2 month as detailed below (10 years India +10 years Abroad)
    Having substantial project Engineering / construction experience in high value capital projects for Oil & Gas,Petrochemicals,fine chemicals Plants in India, Oman, Saudi Arabia,UAE,Sudan and Libya. Very well acquainted with Oil & Gas Industry, Petro-chemical, Refinery and Power Projects. Knowledge of various Equipments of Static & rotary and process and utility piping. Hands on experience in field management of Shop Floor, construction works & Project execution /Shutdown cycle. Execution of mechanical Static and rotary Equipments, piping, Structural works from mobilization through to pre-commissioning & final hand over. Liaise closely with clients, consultants & other TPI agents on day to day basis. Preparation of Method statements/Specifications/data sheets, ITP and QC Documents.
    EXPERTISE&SKILLS :
    Started the career as a Site Supervisor with M/s Gheeta Enterprise (mechanical Erection contractor for Thermal power Plants) in India and having 20 years steady state experience as “Mechanical Project Engineer / Site Engineer / Supervisor for Mechanical Equipments & Piping” (of which 09 years abroad experience), Experienced in various projects construction and maintenance activities with respect to the execution of Projects, Shut down jobs and Tie-in jobs as furnished below.

    Guide a team of construction Supervisor / Engineers for execution of new and shutdown projects.
    Plan & execute shut-down jobs, co-ordinate for pre-shutdown planning & activities
    Co-ordination with foreign vendors, consultant, design department &various agencies.
    Assist Project engineers / project managers for construction planning, procurement &other issues
    Review Design engineering package (DEP) and Project Documents and Drawings.
    Manage/supervise sub-contractors for the construction/installation of Equipments & piping
    Reviews of the all quality requirements as per contract documents and specifications.
    Prepares project method statements/work procedures.
    Prepares Project Quality Plan, Inspection and Test Plan both manufacturer works and site works.
    Coordinate with various Vendors and Suppliers for major equipments commissioning and testing.
    Review, comments and approval of Engineering drawings / documents/procedures and Specifications.
    Conducts regularly site inspection and evaluation of welding activities for compliance of
    Specification requirements.
    Identifies/mitigates critical activities to ensuring an orderly integration of producing facilities
    between construction and operation phases
    Performs/conducts punch list identification and formulate resolution to any lacking/missing items
    Involved in particular machines/equipments for operational commitments.
    Demonstrate a positive and pro-active commitment to HSE through the personal application of
    Safety critical behaviors.
    Applying the company’s HSE policies and Management system requirement .
    Ensure strict implementation of Permit to Work (PTW) System that remains in force
    Creating Environmental awareness & taking active part in monitoring & Evaluating Company’s
    Policy management.
    Recommend disciplinary action to safety violators who unnecessarily expose themselves or other
    Personnel to injury or property damages.
    Initiates immediate stoppage of any operation that in his judgment could cause death injury, extensive
    damage to property and notifying concerned, especially Forman ,Supervisor and Workers for
    Immediate corrective measured to eliminate the hazard.

    Knowledge of Codes & standards
    Knowledge over relevant international codes & standards such as ASME section II A/B/C ,ANSI, BS, API, ASTM,ASME B 31.1, 31.3,31.4, ASME Section VIII Division 1 and section IX .Good Knowledge of General Engineering Specifications.(GES)
    DETAILS OF PROFESSIONAL EXPERIENCE :
    From March 2010 to March 2011 worked as Mechanical Engineer(Projects) with Sirte oil company at Brega in Libya (supplied through Teknica UK Ltd) for their Sweet condensate stabilizer project .Reviewing of Engg documents, Monitoring site activities, coordinating with EPC Contractor to solve the Engg problems, modifications in site erection activities. Monitoring of contractors during Engineering, procurement and construction phase accordance with project specifications. Progress reporting & solving of technical queries.
    RESPOSIBILITIES & ROLE

    Executing Naphtha based project, posted as Mechanical Engineer, in-charge of mechanical & Piping, leading a team of engineers supervisors for construction, inspection, Engineering, commissioning & all project related activities.

    To guide a team of construction Supervisor / Engineers for execution of project,
    To plan & execute shut-down jobs, to co-ordinate for pre-shutdown planning & activities
    Co-ordination with foreign vendors, consultant, design department &various agencies.
    To assist Project engineers / project managers for construction planning, procurement & other project related issues.
    To review Design engineering package (DEP)
    To associate with operation group during commissioning & trial –run.
    To monitor the construction scope of work including the sub-contractors performance & To see that they fulfill their contractual obligations.
    To ensure a cost-effective & timely execution of construction scope of work as-built documentation.
    To conduct pre-commissioning & commissioning activities in a safe & secure manner with all necessary safety precautions identified &put in place.
    To ensure that pre-commissioning & commissioning activities are planned well in advance & are fully integrated with project construction planning.
    Execute completion activities in such a manner that the plant can be handed over to the operators in full confidence.
    To improve the overall efficiency of a project by adopting a SYSTEM / SUB-SYSTEM.
    Approach & by improving logistics through forward planning of manpower & materials requirement.
    To ensure that all contractors, sub-contractors & vendors provide completion documentation that Conforms to a standard & is presented in a consistent format.
    To improve the overall economy of a project by bringing the plant on line in the shortest possible time.
    September 2007 to November 2009 worked with SNAMPROGETTI – EPCC (Eni Group) in Abu Dhabi as Mechanical completion supervisor / Punch list Co coordinator for Mechanical completion work), for 3RNGL project at Ruwais in Abu Dhabi. (NGL Gas Plant for GASCO).Taking care of Mechanical completion & involved pre-commissioning activities as per the planned commissioning schedule of Subsystem & System wise to completing the work. Preparation mechanical completion package & Commissioning Dossier hand over to End-user. Involved in preparation and closing of Punch list items and maintaining its records & certification documents with company database as PCOS (Project completion system) & SICON.
    Responsible for coordinating, monitoring all aspects of Mechanical Completion work of civil, piping, equipments (static &Rotary) steel structures and E&I, and reporting to System Completion Manager. Co ordinate with PMC-PMT and internal personnel for site walk down. Prepare & Receive original punch list from discipline Dept head and record them on the punch list record logbook. Assure that the punch lists are entered onto the Mechanical Completion Database; Supply a work printout of the punch list to the discipline Supervisor/subcontractor on request Take punch list from file for responsible signature when the job on the field is completed. Maintain updated progress of closed punch list item.
    July.2006 to July 2007 : Worked as Site Engineer Piping and Mechanical with Consolidated Contractor International company at KGP project (NGL train) for ARAMCO in Dammam, Saudi Arabia. Responsible for piping fabrication & Equipment / piping erection activities. Coordinate with client Bechtel technip JV. .
    Executing NGL project, posted Site Engineer of mechanical & Piping, leading a team of supervisors, Foremen for construction, inspection, Precommissioning and testing activities.
    Static Equipments : Foundation preparation, Equipment Erection ,alignment,grouting,internal installation, final cleaning and box up of the static Equipments like splitting column, absorber vessel,KO drum,reboiler,Heat Exchanger,Airfincoolers, Suction and discharge drums etc.
    Rotary Equipments : Foundation preparation, Equipment Erection, Skid alignment, pocket grouting,Mottor pump shaft alignment,grouting,final alignment, coupling installation,De couple, check direction of rotation, solo run of motors.
    Foundation preparation ,Skid alignment, pocket grouting,Mottor Gear box shaft pre alignment alignment, Gear box and compressor shaft prealignment,Pocket grouting, check gear box tooth contacts, final alignment, dry gas seal installation, coupling installation,De couple, ,check direction of rotation, solo run of motors. Supervising mechanical activities(alignment, dry gas seal check,blowing,flushing,inspection of the lube oil tank, rundown tank, filling oil, coupling installation, seal gas, nitrogen and air filter check.Checing and clearing the punch list prior to start up.
    Functioned as Area Piping Engineer for fabrication and erection of 1,40,000 DI CS, LTCS, Alloy steel & S.S. piping for different units. Arrange the resource in correct time for avoid delay the production. Coordination meeting with client for production, material, site constraints.
    Responsible for controlling piping erection operations and pipe support installation in accordance with schedule, procedures, specifications, priorities and construction drawings
    August.2005 to April 2006 : Worked as Site Engineer piping / Mechanical with Bentini-Namfatt Energy JV (EPCC) At Melut Basin Oil Development Project (Down Stream) Booster station in SUDAN. Responsible for Supervision of Equipment Erection contractor & piping sub-contractor during preparation and erection of Equipments & fabrication, installation and testing of carbon and stainless steel process pipe work in accordance with project specifications. Progress reporting, monitoring & solving of construction technical queries. Coordinate with PMC PETRONAS
    Study of drawings like GAD, P & ID, Piping plot Plan Isometrics and other associated drawings.
    Site Management since Mobilization, and planning for the completion of the Jobs as per Schedule.
    Material identification as per the spec and preparation of cutting plans for the fabrication of the spools Lifting plan, preparation for the erection of Equipments and pipe spools using different type of cranes
    Preparation of the job break-up schedule and implementing the same
    Planning for mobilization of Manpower and Machinery as per the regular job schedules and Shutdown Requirements
    Inspection and arrangement of Tools & tackles to avoid delay in fabrication and erection
    Ensure the compliance of the Safety procedures observed during the execution of the job with respect to the HSE standards by conducting Safety Tool-box talks.
    Foundation Preperation,Equipment erection,alignment,Grouting and internal cleaning ,installation Inspection and final box up
    August 2002 to June 2005 : Worked as Mechanical & Piping Supervisor with Bahwan Engineering company in Sultanate of Oman.
    Project 1 : QALHAT LNG TRAIN –3, Sur, Sultanate of Oman.
    Supervision of Mechanical preassembly of internals & installation works to install major process equipment, supporting structures and associated process pipe work. Supervision of Pre-assembly and erection of equipments i.e. Fired Heater, Air Fin Cooler, Heat Exchanger, Absorber, Process Columns, Vessels and its Internals. Good knowledge in Equipment Plan Drawing, assembly Drawing. Preparing the Equipment Foundation and Packer Plate Setting. Scheduling and Planning of Erection activities. Preparing Riggings plans, mobilizing and allocating works for the site crew, and co-coordinating site related activities with client Coordinate with client Chiyoda Foster Wheeler JV.
    Project 2 : DHDS AND SRU for Oman Refinery Co. sultanate of Oman.
    Fabrication & Installation of process piping, Raising site generated technical queries and initiating field modifications. Updating piping isometrics to as-built status. Punching of process and utility piping systems prior to hydro-test and Initiation of field modifications if required as per client requirements. Reporting to Project control management personnel for daily and weekly progress, and the scheduling of site based works. Coordinate with client SK Engineering and Construction, South Korea.
    Process and utility piping & pressure parts erection and welding, ensure work to be carried out in accordance with relevant method statements & Project procedures
    To study the drawing for priority fabrication, Erection and testing activity, provide the technical service to the skilled manpower.
    To plan and monitor construction activity, to ensure the availability of sufficient resource to execute the job to meet the target on date.
    To execute the piping prefabrication and erection work in all aspects of QC requirement HSE Matters, schedule, and progress.
    Secondary responsibility liaises with and assists the Field Engineering Manager to develop practical resolution to Engineering problems found during the installation work.
    Witness of HYDRO / PNEUMATIC TEST/Flushing, air blowing and reinstatement of pipings.Involved in precommissioning activities of equipments. Cleaning and final box up of equipments and pipings.
    Project 3 : 180 MW Power Plant for Dofar Power Co. at Shalala in Sultanate of Oman
    Responsible & involved with Site Inspection activities of Piping materials, prefabricated spools.
    Timely Rendering of Inspection Services, correctness of Inspection services.
    Reporting the conformance of result for acceptable jobs. Issuing rejection report for rectification and raising non-confirming report for further resolution.
    Overall record keeping and its monitoring for each of the job inspected to cross check before releasing final acceptance.All incoming material inspection, dimension, fit-up, welding, NDT, Testing activities
    Monitor subcontractor's performance for compliance with quality requirements. Identify and raise NCR"s for Non conformities. Witnessing of hydro/pneumatic test. Flushing ,air blowing and reinstatement of pipings.Involved in precommissioning activities of equipments and piping.
    September 1993 to August 2002 : Worked as various positions as mechanical supervisor. inspection Engineer,Shop floor Engineer & Site Engineer with Ell Ess Engineering Pvt Ltd in Mumbai India for various Petrochemical, Chemical &pharmaceuticals plant equipments & Piping works done under the supervision of Technimont ICB Ltd &UDHE India Ltd.
    Development of vendors for fabrication of various process equipments like Pressure vessel, Heat exchanger, reactor, Mixer, Autoclave, Filters, Separators etc. Planning & scheduling of fabrication activities to ensure timely completion of the equipment.
    Allotment of Job Work either to our own staff or to our Sub-Contractor, According to the Quantum of Work. In-charge of overall Production system, planning and distributing fabrication activities with the focus on optimum utilization of operational resources. Effectively supervising the Shop floor and monitoring & motivating a team for achieving scheduled project targets.
    Emphasizing on minimum wastage of materials & manpower and inculcating the theme on workmen at every stages of manufacturing process. Constantly monitoring the process to avoid mistakes and repetition of work.
    Reviewing shop drawings, following up material procurement, identifying and providing solutions to process problems. Preparation of Job, Process & Procurement status documents. Evaluation of Manpower, conducting interviews for hiring employees and selecting talented individuals.
    Preparing BOQ based on client supplied drawings and providing preliminary material/manpower breakdown for costing to Marketing/Sales department for bidding new projects & Equipments. Interacting with senior management on project status and Design department on technical issues.
    Ensuring Quality measures compliance by maintaining appropriate requisite documentation/records. Imparting training to all workmen pertaining to quality implementation and compliance. Planning and conducting Internal Audits at regular intervals to maintain standards.
    Fabrication and erection of CS, SS, Alloy steel, CS with Rubber lined, Steam & Condensate Piping, Cold & hot water Piping, Flue duct & exhaust chimney &GRE in plant piping done in various chemical &Pharmaceutical industries. Erection of Rotary & static Equipments and its alignment.
    Summary of Major Projects handled in India :-
    M/s. Century Chemicals Ltd., Mumbai, M/s. TATA Chemicals Ltd., Gujarat, M/s N.R.C. Ltd., Mumbai, M/s. Kothari Petro Chemicals Ltd., Pondichery, M/s. Orchid Chemicals Ltd., Tamilnadu, M/s. Mradia Chemicals Ltd., Gujarat. M/s. Dr. Reddy’s Laboratories Ltd., Hyderabad. M/s Hindustan Ciba geigy Ltd, Cibatul Ltd, Medicorp Ltd etc.
    October 1991 May 1993 : Worked as Mechanical supervisor with Asmak Engineering company in Tirunelveli.Responsible for machining components related for coir &paper plant machinery.
    September 1990 to September 1991
    Employer : Kattabomman Transport corporation
    Position : Apprenticeship Training as Technician for State transport corporation,Tamilnadu
    September 1989 to August 1990 : Worked as Site supervisor with Geetha Enterprises in Tuticorin for 210 MW Thermal power plant construction & shutdowns. Responsible for Piping work with the boiler.

    Computer skill &Other Experience :-
    Exposure MS Office (Familiar with MS OFFICE- WORD, EXCEL and POWER POINT) in preparation of Engineering Documents. Extensively traveling in world for execution purposes. Maintenance of different types of valves used in process piping.
    Availability : Immediate.
    Expected salary :Negotiable
    Salary Drawn : NA at present I am searching job.