    UB Office systems Delhi : Estimation and Design Manager

    UB Office systems
    http://www.ubalpine.com

    Designation: Manager Estimation and Design
    Experience: 3 - 5 Years
    Location: Delhi/NCR
    Compensation:
    Rupees 2,00,000 - 2,25,000
    Bonus extra
    Education: UG - Diploma - Civil
    PG - Post Graduation Not Required
    Industry Type: Architecture/ Interior Designing
    Functional Area: Architecture, Interior Design
    Posted Date: 04 Nov 2008

    Job Description
    #Proficiency in 2 D auto cad.
    #Should be able to work very well on excel sheet.
    #Should be proficient in making Bill of Quantity and Estimation work

    Desired Candidate Profile
    Candidate should be well versed in computers with proficiency in 2D auto cad and work on excel sheet.He would have to prepare drawings and take out Bill of Quantity and do estimation.

    Company Profile
    Alpine Modular Interiors (pvt ) Ltd represents a Hong Kong based company UB Office Systems in India for Modular Office Furnitureall over India..Head office Delhi,Branch Office Bangalore and Pune.

    Executive Name: Ms.ANJU SACHDEV

    Address:
    P8B, Hauz Khas Enclave,
    New Delhi,New Delhi,INDIA 110016

    Telephone:
    Not Mentioned

    Keywords: Auto Cad , estimation and making Bill of Quantity
    Last edited by Guest-IJT; July 26th, 2011 at 01:35 PM.

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : MALLIKARJUN.S.DEVANAGI
    Email : daneshmd AT gmail.com
    Designation / Skillset : Construction Manager/Construction Manager/ Piping, Pipeline, Estimation, etc.
    Application for the post of Mechanical Engineer

    Resume :
    EDUCATIONAL QUALIFICATION
    ________________________________________
    B.E. (Mechanical) – From B.V.B.C.E.T. Hubli, Affiliated to Karnataka University, Dharwar, Karnataka, in 1997.
    EXPERIENCE :13.5 yrs in EPIC Projects (Construction Manager, Sr. Project Engineer, Sr. Estimation Engineer, Sr. Site Engineer, Sr. Piping Engineer, Piping Engineer and Commissioning Engineer)
    ________________________________________
    1. M/s Punj-Llyod Pvt Ltd.
    Position : Construction Manager
    Period : 10-05-2011 to till date
    Client : M/s Gas Authority of India Ltd
    Project : Installation and Commissioning of Dabhol- Bangalore GAS Pipeline. (DBPL)
    2. M/s Manco International Contracting Company Qatar
    Position : Construction Manager
    Period : 15-03-2009 to 29-04-2011
    Client : M/s Qatar Petroleum (QP)
    Project : EPIC of Mesaieed Tank Farm Upgrade Project
    Phase II
    : Fabrication, Installation and Commissioning of Floating Roof Tanks
    : Installation and Commissioning of the Crude oil piping network.
    : Estimation for various Tenders
    2. M/s Tractebel Engineering SUEZ
    Position : Site Manager
    Period : 22-11-2006 to 14-03-2009
    Client : M/s Gas Authority of India Ltd
    Project : Installation and Commissioning of Dahej-Uran GAS Pipeline. (DUPL)
    (This is cross country pipeline project of 490km 30” pipeline from Dahej to Uran for transportation of Natural Gas to the states of Maharastra, Gujarat & Territory of Daman).
    Responsible for Installation and Commissioning of Spread-3 section of 110km of 30” Mainline and 40km of 24” Spur lines.
    3. M/s Consolidated Contractual Intl Company

    Position : Senior Site Engineer

    Period : 21/05/2006 to 21/08/2006
    Client : M/s Qatar Petrochem Company (QAPCO)
    Project : Expansion of QEPE Project
    4. M/s Ario Brothers Engg. Co. Pvt. Ltd. Mumbai
    Position : Project Manager / Estimation Manager
    Period : 14/08/2005 to 14/05/2006
    Client : M/s Mahanagar Gas Ltd. (MGL)
    Project : Installation and Commissioning of Mumbai City Gas Distribution Pipe Line for CNG Stations.
    5. M/s Al-Hassan Engineering Co. Sultanate of Oman
    Position : Sr. Piping Engineer
    Period : 09/06/2004 to 25/06/2005
    Client : Petroleum Development Oman (P.D.O)
    Consultant : M/s S.N.C. Lavlin Canada.
    Project : Saih Nihayda Gas Plant Project & Others Facilities. (SNGP)
    : Installation and Commissioning of Duplex Stainless Steel Pipe Line. (Approx 22.0 km)
    : Installation and Commissioning of Unit Piping and Rack Piping of D.S.S., S.S, L.T.C.S. and C.S
    : Fabrication and Erection of Structure.
    : Installation and Commissioning of Static Equipments and Rotary Equipments
    6. M/s Ario Brothers Engg. Co. Pvt. Ltd. Mumbai
    Position : Sr. Project Engineer
    Period : 1/11/2003 to 31/05/2004
    Client : M/s Mahanagar Gas Ltd.
    Project : Installation and Commissioning of Mumbai City Gas Pipe Line Distribution.
    7. M/s Onshore Construction Co. Pvt. Ltd Mumbai.
    Position : Sr. Site Engineer / Estimation Engineer
    Period : 16/08/1999 to 20/10/2003
    Client : M/s Supreme Petrochem Ltd. Nagothane.
    Consultant : M/s UHDE India Ltd.
    Project : High Impact Polystyrene (HIPS III)
    - Installation and Commissioning of Unit piping and rack piping of Stainless steel and Carbon steel
    - Installation and Commissioning of Static Equipments and Rotary Equipments
    : Specialty Polystyrene (SPS)
    - Installation and Commissioning of 06 (six) nos. Silos and associated stainless steel piping
    : Revamping of HIPS II
    : Rectification of Fire Fighting Pipe Line
    Client : M/s Gharda Chemicals Ltd Panoli (Gujarat)
    Project : Expansion of D.C.D.P.S. & P.A E.K. Plant
    Client : M/s Mahanagar Gas Ltd.
    Project : Installation and Commissioning of Mumbai City Gas Distribution Pipe Line.
    8. M/s Gopinath Engineering Co. Pvt. Ltd. Mumbai.
    Position : Site Engineer
    Period : 1/12/1998 to 20/07/1999
    Client : M/s I.O.C.L Baroda
    Consultant : M/s Kinetic Technology India Ltd. (KTI)
    Project : Crude Oil Charge Heater.
    : Fabrication, Installation and Commissioning of Low Alloy Steel Piping (P5)
    : Fabrication, Installation and Commissioning of Unit Piping and Rack Piping of C.S. & S.S.
    : Fabrication and Erection of Structures
    9. M/s Symec Engineers (I).Pvt. Ltd. Navi Mumbai

    Position : Site Engineer
    Period : 3/10/1997 to 20/11/1998
    Client : M/s B.A.R.C. Trombay
    Project : Wastage Immobilization Project (W.I.P)
    Active Trench Piping (ATP)
    NATURE OF WORK ________________________________________
    - Co-Ordination with design department for execution of the projects.
    - Establishing of joint design and welding symbol for fabrication drawings.
    - Execute the job as per P & ID, GAD (General Arrangement Drawings) & Isometrics.
    - Handling and Utilization of Manpower.
    - Witness of Inspection for NDT.
    - Preparation and Implementation of weld repair procedure.
    - Co-Ordination with radiography Interpretation.
    - Well conversant with welding procedure as per ASME sec IX for carbon steel, Alloy steel-P5, P9, P11, P22, Stainless steel, LTCS (Low Temperature Carbon Steel), Duplex Stainless steel (DSS)
    - Installation and Commissioning of Static and Rotary equipments.
    - Fabrication, Installation and Commissioning of the Piping /Pipeline system.
    - Preparation of Method Statements and Commissioning Procedures.
    - Preparation of As-Built drawings as per job executed.
    - Associated with Hydro testing, Pneumatic testing & Pre-Commissioning and Commissioning.
    - Material Reconciliation.
    SKILLS:
    ________________________________________
    Computer skill : MS WORD, MS EXCEL, AUTO CAD
    Languages Known : English, Kannada and Hindi
    DECLARATION
    ________________________________________
    I affirm that the information in this document is accurate and true to the best of my knowledge.
    Place:
    Date: Mallikarjun.S.D
    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4342251
    Date & Time : 7th Jul 2011 12:54 PM (UTC)
    IP Address : 114.79.148.194
    Browser Info : Mozilla/5.0 (Windows; U; Windows NT 5.1; en-US; rv:1.9.2.18) Gecko/20110614 Firefox/3.6.18 (.NET CLR 3.5.30729)
    Predicted Country : Australia