I saw a project on your website for a Team Leader Highways in Uganda, and wish to learn more. My cv is pasted herewith.
Look forward to hearing from you.

1. Name : James William STEWART
2. Date of Birth : 29th July 1948
3. Nationality : British
4. Education :
B.Sc. Civil Engineering, 1973.
Pg. M.Sc., Dip. Construction Project Management (1998)

Computer Skills :
Fully conversant with current UK Health and Safety Regulations/Urban Environmental Standards and various highway computer design suites, eg : MX, Inroads,Microsoft Office Professional, Microsoft Office Word, Excel, M.S. Project and Power Point.

5. Membership of Professional Associations :
Member, Institution of Civil Engineers, UK, 1976
Member of Institution of Highways and Transportation, 1984
Registered Professional Engineer, Engineer’s Registration Board, Tanzania 5th Oct. 2004

6. Other Training :

7. Countries of Work Experience : UK, Tanzania, Ethiopia, UAE, Qatar, India, Kuwait, Bangladesh

8. Languages : Speaking Reading Writing
English Excellent Excellent Excellent

9. Employment Records :
From Feb 2012 to present Roughton International Ltd,
Team Leader - Resident Engineer
From March 2011 to Feb 2012 SMEC International Pty Limited
Team Leader – Resident Engineer
From Jan 2009 to March 2011 H.P. Gauff Ingenieure GmbH & Co – JBG
Team Leader – Resident Engineer
From Apr 2006 to Dec 2008 SMEC International Pty Limited
Team Leader – Resident Engineer
From Mar 2004 to Mar 2006 Roughton International Ltd
Team Leader / Resident Engineer
From 2003 to March 2004 Parsons Brinkerhoff International
Design Reviewer
From 2001 to 2003 Scott Wilson Kirkpatrick UK
Team Leader – Resident Engineer
From 2000 to 2001 Consulting Engineer Services Ltd India
Team Leader / Senior Highway Engineer
From 1998 to 2000 Frederic R. Harris
Project Manager (Building and Roads)
From 1995 to 1998 Full Time Study at Glasgow Caledonian University for Post Graduate
Msc. Diploma in Construction Project Management and Business
Management Course at Clackmannan College, Clackmannanshire,
Scotland, United Kingdom
From 1992 to 1995 Ministry of Municipal Affairs and Agriculture
Project Co-ordinator
From 1990 to 1992 W.A. Fairhurst & Partners Scotland
Senior Highway Engineers
From 1980 to 1990 De Leuw Cather International
Senior Resident Engineer
From 1979 to 1980 Roughton & Partners International
Resident Engineer
From 1977 to 1979 Central Regional Council Local Aurthority
Senior Highways Engineer
From 1974 to 1977 Strathclyde Regional Council, Local Authority Glasgow Senior Highway Engineer

From 1973 to 1974 Grampian Regional Council Local Authority
Assistant Engineer
From 1969 to 1973 Undergraduate student at Paisley University following a four-year full time course of study for Bachelor of Science Degree in Civil Engineering, conferred on 10th July 1973 by H.R.H The Duke of Edinburgh, President of C.N.A.A (Council for National Academic Awards)

From 1971 to 1972 Full-time Industrial Training Periods each of six months duration with Central Regional Council, Scotland, UK within the Motorway Design and Site Supervision Departments.

From 1966 to 1969 Full-time post with Central Regional Council, Scotland, UK, Local Highways Authority as an Assistant Engineer working on all aspects of civil engineering.

From 1965 to 1966 Full-time position as a Cadet Apprentice with Harland Engineering Company, Alloa, Clackmannanshire, Scotland, UK now Weir Pumps (Glasgow), Scotland, UK.

10. Detailed Tasks Assigned : 11. Works Undertaken that Best Illustrates Capability to Handle the Tasks Assigned:

Review Technical standards
Confirm pavement design
Set up a Management System for design documents
1 Set-up performance control system
Mobilize Survey Team
Check reference points/Setting out
Review Laboratory Facilities
Commissioning of Contractor’s testing facilities
Prepare testing program, Quality Assurance Manual and Quality Management System

Introduce reporting and recording system
Review CE’s performance program
Review of items under Provisional sums
Review other CE's programmes (traffic management plan,…)
Organise Contract Administration
Assist in assessment of compensation and Land acquisition
Assist in assessment of removal / relocation of utility services
Review Environmental and social impacts
Liaise with the client

Control field investigations
Review Material Sources
Conduct Design oversight visits
Review and approve General Arrangement Design
Review and approve Drawings, Documents, Specifications
Control final quantity estimates

Measure and certify service levels of finished products
Prepare change proposals (or variation orders)
Adjust scope of works and update budget
Advise Employer on estimated cost to completion

Inspect the works
Test materials
Control workmanship
Supervise the Safety aspects
Advise on technical problems
Monitor the Environment Management Plan
Monitor Social Impacts of road construction
Follow up of HIV/AIDS Policy and Strategy

Monitor the rate of progress and recommend remedial action
Maintain site diaries and all site records
Organize and Conduct Monthly Site Meetings and issue Minutes
Produce Monthly Progress Reports
Produce Special Reports
Ensure Coordination with Third Parties
Review and approve Contractor’s Programme of Performance
Issue Instructions and Variation Orders
Check and certify Payments Certificates
Advise on legal and contractual problems
Mitigate Claims impact
On the Job Training of Counterpart Technicians

Check and Approval As-Built Drawings
Prepare and issue Taking over Certificates of Works
Final Completion Report : Rehabilitation / New Construction Stage
Inspection/Supervision of Outstanding works and Remedying Defec Issue Defects Liability Certificates
Certify Final Payment Certificate
Project Completion Report (or Final Completion Report)

Assistance in Data Road Collection (IRI, FWD, …) and review

Recommendation for overloading compensation
1 Project Name :
Upgradation of Project involving 200km of new
highway between Mekanajo and Dembidolo,
Western Region, for Ethiopian Roads Authority,
Year : Feb 2012 to present
Location : Ethiopian Highlands
Client : Ethiopian Roads Authority
Financing : World Bank/Ethiopian Gov.
Position held : Team Leader - Resident Engineer
Contractor : China Water and Electricity Corp Ltd
2 Project name : Design and Build Buzirayombo – Geita Trunk Road Improvement, Gov..of.Tanz,. funded project (100km) costing US$45m
Year : March 2011 – Feb 2012
Location : TANZANIA
Client :TANROADS
Main project features :
This project was administered under the Plant and Design Build form of Contract with Chinese Contractor and was completed on time and within budget. This is the first time a Design & Build Project Completion Report has been done, since the introduction of this form of contract in Tanzania.
Financing : Government of Tanzania
Positions held : Team Leader/Resident Engineer

Activities performed :
Responsible for preparation of the Final Project Completion Report (after 3 years Defect Liability Period) for the Design and Build Buzirayombo – Geita Trunk Road Improvement


3 Project name : Rehabilitation of the Ambo- Gedo Road Project value US$35m.
Year : Jan 2009 – March 2011
Location : ETHIOPIA
Client :
Main project features :
Project involved the widening and rehabilitation of the existing asphalt road using latest Foam Base Technology.
Financing :Jointly between KfW & Government. of Ethiopia
Positions held : Team Leader/Resident Engineer
Activities performed :
This project saw the introduction to Ethiopia of Insitu Recycling and Stabilisation Methods using specialised equipment specifically designed to minimise cost and time for rehabilitation. South Korean Contractor Keangnam.


4 Project name : Construction Supervision of the Design and Build Buzirayombo – Geita Trunk Road Improvement (100km) costing US$45m
Year :Apr 2006 – Dec 2008
Location : TANZANIA
Client : Government of Tanzania
Main project features :
SMEC International Pty Limited assigned to Bangladesh HQ for short period before acting as the “Engineer” for the Construction Supervision of the Design and Build Buzirayombo – Geita Trunk Road Improvement
Financing : G.O.T. funded
Positions held : Team Leader/Resident Engineer
Activities performed :
The project was administered under the Design and Build form of Contract and several contractors- claims were submitted and settled by advising the Client of the Engineer’s decisions at every stage in accordance with contract requirements. This project was completed on time and within budget. The contractor was Sinohydro.


5 Project name : Construction Supervision of the Design and Build Dodoma–Manyoni Trunk Road Improvement (127 km) costing US$63m
Year : Mar 2004 to Mar2006
Location : TANZANIA
Client : Ministry of Works
Main project features :
Roughton International Ltd, acting as the “Engineer” for the Construction Supervision of the Design and Build Dodoma–Manyoni Trunk Road Improvement.
Financing : G.O.T funded
Positions held: Team Leader/Resident Engineer
Activities performed:
This project was administered under the Plant and Design Build Form of Contract, several claims were submitted by contractor, some of which were supported by the Engineer and resolved timeously. Japanese Contractor Konoike.


6 Project name: First Ring Road Packages 1, 2 and 3 Project (cost US$150m)
Year: 2003 to March 2004
Location: KUWAIT
Client: Ministry of Public Works
Main project features:
Reviewing the Project Design documents for Constructability for the completion of First Ring Road Packages 1, 2 and 3, from Concept to Preliminary and Final Design including tender stages
Financing:
Positions held: Design Reviewer
Activities performed:
Analysis and avoidance assessment of contractual documents for Employer„s potential risks was reviewed and amended to reflect the nature of the complex urban construction works.

7 Project name: Construction Supervision for Four Laning and Strengthening of 42 kms of existing two lanes (Chennai to Tamil Nadu/Andhra Pradesh Border) on NH5
Year:
2001 to 2003
Location: INDIA
Client: National Highways Authority India (NHAI)
Main project features:
Seconded by Scott Wilson Kirkpatrick (UK) Ltd, to act as “Engineer” for domestically funded (Cost US $50m) Construction Supervision for Four Laning and Strengthening of 42 kms of existing two lanes (Chennai to Tamil Nadu/Andhra Pradesh Border) on NH5 in the State of Tamil Nadu (Contract Package TN-1) Chennai formerly (Madras),
Financing: Gov. Of India
Positions held:TeamLeader/SeniorHighway Engineer
Activities performed:
This project involved the construction of concrete pavement for Traffic Toll Plazas. This project was part of the Indian Prime Minister’s Golden Quadrilateral “Dream Project” consisting of 13,000 kms Four Lane National Highways programme. Larson &Toubro contractor.

8 Project name: Four Laning and Strengthening of Existing Two Lane Road (Chandigarh-Ropar-Kiratpur Section of NH-21 (km. 75) and Ambala-Zirakpur Chowk - HP Border
Section of NH-22 (km. 57)
Year: 2000 to 2001
Location: India
Cost: US $ 150m
Main project features: Preparation of Design Documents, Drawings, and Tender documents options for appraisal by client prior to proceeding with selection of final schemes..

Financing: World Bank
Positions held:Team Leader/Senior Highway Engineer
Activities performed:
Prepared Final Detailed Design Report and Project Report

9 Project name: Infrastructure Project
Year: 1998 – 2000
Location: Abu Dhabi, Al Ain, United Arab Emirates,
Client: Public Works Dept.
Main project features: Supervision of contract for the installation of all roads and services for a large low cost housing estate and shopping mall. Co-ordinated meetings with all seven building and road contractors at management/progress meetings.
Financing: Gov. of U.A.E
Positions held: Project Manager (Buildings and Roads
Activities performed:
Supervised the construction of a large Low Cost Housing (No.250)

10 Project name: Infrastructure Project
Year: 1992 - 1995
Location: QATAR
Client: Ministry of Municipal Affairs and Agriculture (MMAA)
Main project features:
Supervised construction of a large Housing Development carried out by the Civil Engineering Department for Senior Ministry Staff consisting of 288 Low Cost Houses and associated infrastructure including all roads and all services, etc.
Financing: Gov. of Qatar
Positions held: Project Co-ordinator (Roads, Housing and Infrastructure)
Activities performed:
On behalf of M.M.A.A co-ordinated and checked the activities of Consultants/ Contractors and sub-contractors and chaired progress meetings to ensure project was run on time and budget, and prepared monthly reports for Client.

11 Project name: A74 Upgrade to M6 Motorway
Year:1990 - 1992
Location: UK
Client: Scottish Office
Positions held: Senior Highways Engineer
Activities performed:
Designed, managed and supervised site supervision works for Site Investigation Contracts consisting of three (3No.) separate Projects for approximately 22 kms. of existing A74 dual carriageway, for the upgrading of the road to full Motorway standards.
Client: Dumfries & Galloway Council, Scotland, United Kingdom.
Also supervised the installation of 1 Km of 1metre diameter
on-line mini-tunnel sewer replacement using the latest No-
Dig Technology, through soft soils, under a heavily trafficked
Main Street, Dumfries

12 Project name: New build highway/bridge projects
Year:1979 - 1990
Location: United Arab Emirates
Client: Gov. Of U.A.E.
Main project features: Transport and Road Improvement Program involving the complete upgrading of all roads on the peninsula of Abu Dhabi Central Business District. Widening of streets and replacement of roundabouts with traffic controlled intersections, and incorporating road bridges, underpasses and tunnels.
Financing: Gov. of U.A.E.
Positions held: Senior Resident Engineer (Roads and Bridges)
Activities performed:
Acted as Resident Engineer on 5No. separate new build highway/bridge projects to redevelop the Capital City's Central Business District under the Transport and Roads Improvement Programme (TRIP) F.I.D.I.C Projects costing approximately +US$200m 120kms for the Municipality of Abu Dhabi.

13 Project name: Various Road Projects
Year:1977 - 1979
Location: SCOTLAND
Client: Scottish Office
Positions held: Senior Highways Engineer (Design and Supervision of Highways Projects)
Activities performed:
Full-time position with a Local Highways Authority, working on the design and construction of a variety of major and minor road improvement projects eg: Drymen By-Pass, Kippen By-Pass, Strathblane Main Street Realignment, etc in the County of Stirling Scotland, United Kingdom.

14 Project name:
Year:1974 - 1977
Location: SCOTLAND
Client: Scottish Office
Positions held: Senior Highways/New Works Engineer (Highway Design and Construction Supervision Works)
Activities performed:
Full-time position with the largest Local Authority in Central Scotland, designing the Southside 6 lane Expressway city orbital route. Other works involved supervision of construction of at grade road realignment and widening schemes within the city, connecting to the new 8 lane city by-pass connecting north and south Glasgow.

12. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience.

Date: September 2012

Full name: James William Stewart