Caarpus Technology Services Malaysia : Piping Supervisor

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Caarpus Technology Services Malaysia : Piping Supervisor

    Caarpus Technology Services Pvt.Ltd
    http://www.caarpus.com

    Keywords: Supervisor

    Designation: Piping Supervisor
    Experience: 4 - 9 Years
    Location: Malaysia
    Education: UG - B.Tech/B.E. - Marine, Mechanical
    PG - M.Tech - Marine, Mechanical
    Industry Type: Oil and Gas/ Power/Infrastructure/Energy
    Functional Area: Engineering Design, R&D
    Posted Date: 11 Nov 2008

    Job Description
    Development of Piping system design and calculations. Specification of Material/Equipment. Interface with Construction Team and Vendors

    Desired Candidate Profile
    Degree in Mechanical or Marine Engineering, Competent in Autocad, 3D Software experience is beneficial, Possess analytical skills, good planning and management skills Leadership skills to coordinate and manage engineering tasks

    Company Profile
    Leading Engineering consultancy for process industries and software solutions by providing staffing solutions to process industries and IT companies (CMM Level 5 companies.)

    Executive Name: Yuvarajan. k

    Address:
    Caarpus Technology Services PvtLtd
    5/18, II Floor, Valluvar Salai,
    Ramampuram,
    Chennai
    Chennai,Tamil Nadu,INDIA 600089

    Email Address: contact@caarpus.com

    Telephone: -044-22492057

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : sesere kola
    Email : seserekola1 AT yahoo.com
    Designation / Skillset : piping supervisor.
    I started this career has a fitter to a pipefitter to a pipingforman to a piping supervisor. i have the ability to lead my team so as to achieve agoal,ability to work with the safety proceedures of the company,ability to accept mistakes & corrections,client satisfaction.

    Resume :

    EDUCATION. Kwara State polytechnic 2002-2003
    N.D Mechanical Engineering (Lower Credit)
    H.N.D Mechanical Engineering (Upper Credit) PER-TIME 2005-2006
    Bishop Smith Memorial College, 1992-1998
    Senior Secondary School Certificate.
    St.Barnabars (L.G.A) Primary School
    First School Leaving Certificate. 1985-1991
    CERTIFICATIONAL COURSES ATTENDED
    >IIF Training Programed On Safety.
    >Approaching Others Training programmed On Safety.
    >API570 on Piping Fabrications. [Awaiting]
    >Enhancing The Fabrication Capabilities In Nigeria Oil & Gas Industries.
    [EFCN PROJECT] 2011.
    BRIEF DESCRIPTION ON PIPING SUPERINTENDENT SCOPE.
    >Safety And Sanitary Control (By Ensuring Good Housekeeping Before, During & After the Job)
    >Implementation Of Quality Inspections To Client’s Satisfaction.
    >Supervision Of Activities Performed On Site ,Interpretation Of Results Of Visual Inspection & NDT.
    >Working With The Tracking System, i.e. Daily Reporting. Inspection Reports ,Fabrication Reports etc.
    >Ensuring Compliance & Integrity of Facilities with the Ultimate Control of Industrial Risk.
    >Ensuring Compliance With Regulations For Manifold Skid Piping & Lifting Appliances
    >Ensuring Accurate Interpretations Of P&ID Drawings.
    >Running The Fabrication Workshop, Input Quality Control (Procurement & Control Of Product Supplied By The Client’s) Issuance Of Non-Conformity Certificates.
    >Ensuring Technical Supervision & Training Of Local Staff.
    >Applications Of Industrial Codes & Regulations (Welding & Piping Fabrications)
    >Stress Analysis Of Piping & Pipelines In Accordance With ASME B.31.4,B31.3
    >Pressure Vessel Calculation According To ASME VIII.
    COMPANY : Niger Dock FLZ 2009-2011
    CLIENT : Nigerian National Petroleum Corp. Mobil Producing Nigeria
    ULTD. EXXNOMOBIL
    PROJECT NAME : Itut And Abang Platform Project
    JOB DESCRIPTION & DUTIES : PIPING SUPERVISOR
    DUTIES OF A PIPING FABRICATION SUPERVISOR
    .Interpretation Of Isometric Drawings Been Issued By The Project Engineering.
    .Job Plan And Tasks To Be Given To Fitters On Site.
    .Distribution Of Drawings To Fitters On Daily Bases.
    .Ability To Identify Drawing Codes & Weld Maps.
    .Identification Of Isometrics In Spools & Tagging.
    Dimensional Checks On Fabricated Spools Before Welding
    .Checking Of Materials Required For Job Through Specifications.
    Accurate Check On Tools & Equipment Use For Fabrication.
    JOB DESCRIPTIONS.
    Cellar Deck TOS EL 41`-0``
    TA-F-134 Sump Tank
    Sub-Cellar Deck Tos EL 30`-0``
    Utility Pump Deck TOS EL 22`-9``
    Jacket Walkway TOS EL 17`-6``
    Boat landing MLWS EL 0``-0`` Datum
    Messanine Deck TOS EL51`-0``
    TA Lift -144 Pedestal Crane , Vent Boom, Flame –Arrestors
    TA-M-150 Pig – Launcher ,Vent Boom.
    Project Title. Satellite Field Development Project – Phase 1
    Facility Name. Itut & Abang Project [A] WellHead PlatForm-OffShore.
    Client. Mobil Producing Nigeria ULTD ExxonMobil.
    Company. Niger Dock FZE ,Snake Island P.M.B 1256 Apapa Lagos. 2010
    JOB DESCRIPTION.
    Isometric Line No. EC-7010 -10`` -AAA7( Close Drain) EO-6002-6``-AAA7 (Open Drain) KD-8706-2``-AAJO (Dewaxing Chemical D-8316-2``-AAA7(Diesel Line)
    VT-F134-1(Vessel Trim) GP-8949-2``-AAA-7(Gas Power) GI-8900-2``-AAA7(Gas Instrument) P-2411-6``-AGA7 (Process Hydrocarbon) VA-2021-4``-AGA7-P(Vent Atmospheric)
    Itut & Abang Production Manifold Skid.
    Fabrication Of P-2001-6``AGA7 TO P-2441-AGA7,EO-6080 -1``-AAA7-P TO EO-6083-1``-AAA7-P,EC-7006-10``-AAA7,GI-8910-2``-AAA7.
    Sampling Connection Stainless Steel Piping,(SC-0700A)-ND-ITTSC-0700A.
    COMPANY. Niger dock Nigeria PLC FZE P.M.B 1256,Apapa Lagos, Nigeria. 2007-2008.
    CLIENT. Mobil Producing Nigeria Unlimited
    PROJECT. Pigging Facilities Upgrade.
    TITLE. Arrangement Of 12`` PIG LAUNCHER. .
    DUTIES. Piping Fabrication Supervisor.
    PROJECT. AFAM-SPDC MANIFLOD SKID.
    CLIENT. AFAM-SPDC
    COMPANY.sNigerdock Nigeria PLC –FZE.
    DUITES. Fabrication Supervisor.
    COMPANY.Nigerdock Plc Snake Island Apapa,Lagos 2006
    PROJECT. Shell Buoy Refurbishment[1207]
    DUTIES.
    Interpretation Of Drawing Specification & Standards
    Repair Of Chain Horse Arms Of Buoy.
    Fabrications Of Pipe To ELBOW & Flanch,Pipes For Inlet & Outlet
    Connections To The Buoy.
    Fabrication Of Piping Spools For Central Processing Unit Of Buoy.
    Fabrication Of Diver Platform On The Buoy.
    Installation Of Solar System, Air Winch, Counter Weight Balancing & Water
    Barriers.
    CLIENT. Chevron Buoy [12480]
    CLIENT.Agbami Buoy
    JOB DESCRIPTION.Fabrication Of All Piping Spools In The Buoy.
    COMPANY.Niger Dock Nigeria PLC FZE.
    PROJECT. Module 03s Length 37800mm Width 22250mm Gross WT 608Tons
    PROJECT. Construction & Fabrication Of Jacket For Off-Shore Diecotomy
    PROJECT.Construction & Fabrication Of Flame Bridge
    DUTIES. Interpretations Of Isometries Lines, Preparation Of Pipes For Cutting Checking Of Dimensions On Spools Before Fit-Up Is Made. Fabrication Of Chamber For Gasesous Exchange Fabrication Of Transportation Beams For Modules & Jacket.
    PROJECT.Akpo Buoy Job nos. 17370
    PROJECT.SBM Buoy so 17670.
    PROJECT.USAN Project Riser 1 Tube Supply Assembling.
    CLIENT. TOTAL & HHI .
    JOB DESCRIPTION.S1 LayDown Module-Block 1 Plan View General Arrangement
    S1-LayDown Module- Block Deck Plate Arrangement.
    S1-LayDown Module-Block 1 Structural Elevation 5400 off CL Elev(s)
    S1-LayDown Module –Block 1 Structural Elevation.
    7425 Off C.L ELEV.
    9450
    11475
    15525
    17775
    13500
    19800 Off C.L ELEV.
    Stiffener FR 34 34-750 35-500 37-500
    Category> Special-Deck Leg & Critical Nodes
    Primary1>Lifting Point[Eye] Main Plate Attachment.
    >Crane Member Of Main Structure.
    Category>Secondary Structural Element.
    -Handling Support & Monorails
    -Floor Plate & Gratings
    -Hatch Covers
    -Walkway,DeckDrainage,Gutters,Access & Service PlateForm,Stairs,Ladders,Handrails,
    Exhust Support & Padeyes,Drip Pan,Radiation Shield,Minor Structure Supports & Equipment Support.
    COMPANY.DormanLong & Amalgamated ENG.LTD. 2004-2005
    PROJECT. Construction of Storage Tank For Unilever Nig Ltd.
    CLIENT. Chevron.
    JOB DESCRIPTION. Construction Of Chevron Separator Vessels.
    DUTIES. FAB. SUP.
    PROJECT.Construction & Fabrications Of Piping Spools For Petro Filing Station.
    COMPANY.Mas-Vimas International Nigeria LTD.
    COMPANY.NNPC Subsidiary Atlasco Tarkwabay 2005
    PROJECT. Repair Of Aluminium Top Roof Tank PMS.
    CONTRACTOR.Polmaz Nig Ltd.5 Idowu Taylor Street,2 Floor Victoria Island Lagos.
    LANGUAGES : English & Yoruba

    -------------------------------------------------------
    More Information about this submission and submitter :-
    ___________________________________________________
    Submission ID : 4145910
    Date & Time : 18th May 2011 10:01 AM (UTC)
    IP Address : 41.220.69.34
    Browser Info : Mozilla/4.0 (compatible; MSIE 7.0; Windows NT 6.1; Win64; x64; Trident/4.0; GTB6.6; .NET CLR 2.0.50727; SLCC2; .NET CLR 3.5.30729; .NET CLR 3.0.30729; Media Center PC 6.0; HPNTDF; .NET4.0C; Tablet PC 2.0)
    Predicted Country : Nigeria

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Curriculum Vitae
    Post Applied for : All types Piping / Structural / Fabrication Supervisor
    Name : Halder Suprakash
    Email : halder.suprakash AT gmail.com
    EDUCATIONAL QUALIFICATION : 12th class
    SPOKEN LANGUAGE’S :-Bengali, Hindi, English & Arabic
    WORK EXPERIENCE : Total 24 years experience in the field of Oil, Gas & Refinery, and Petrochemicals, power Planet. Carrying out all types of job like Fabrication & Erection of Pipes, Structural’s, Tank & Vessel etc.
    ALSO EXPERIENCE : in Pipeline Maintenance Service Contracts (OGC, PDO)

    SI.No
    ORGANIZATION
    CLIENT
    DURATION
    DESIGN
    01 Gulf Petrochemical Services & Trading LLC
    Muscat, Oman Oman Gas Company -Sohar Jan-11 to still
    Piping supervisor
    02 Gulf Petrochemical Services & Trading LLC
    Muscat, Oman Oman Refinery, Sohar Dec-2009 to 10/01/2012 Piping supervisor
    03 Gulf Petrochemical Services & Trading LLC
    Muscat, Oman Oman Gas Company 2008-2009 Piping supervisor
    04 Gulf Petrochemical Services & Trading LLC
    Muscat, Oman Petroleum Development of Oman 2007-2008 Piping supervisor
    05 Gulf Petrochemical Services & Trading LLC
    Muscat, Oman Oman Refinery, Muscat Jan2006-Sep2006 Piping supervisor
    06 Descon Engineering, Abu Dhabi Alec Manpower Supply
    P#6202 Ruwais,Abu Dhabi Oct 2004-Jan 2005 Foreman (Shut Down job)
    07 I.S.C.O. WLL
    P.O Box No :3683 Salmiya-22037,Kuwait P.I.C(K.S.C) Kuwait K.O.C.GC.15 North Kuwait
    Feb2001-March 2003 Foreman(Project job)
    08 Schom Borg Shipchalblers LLC
    P.O Box No :27052 Sharjah
    Dewa J & K Power Plant Jebalali,Dubai Shut Down Job Foreman(Shut Down Job)
    09 Macon Mideast Constructors
    P.O Box No :3325 Doha , Qatar
    Qatar Gas Petrochemicals March 1999- May 1999 Foreman(Shut Down Job)
    10 Excellent Project(I) Pvt. Ltd
    New Panvel , New Mumbai RIL Jamnagar NG July 1998- Feb 1999 Site Supervisor (Fabrication & Erection Job)
    11 Subcon
    Vashi, New Mumbai
    Hyundai Heavy Industries Ltd,Chennai 1997- 1998 Site Supervisor(Fabrication Job)
    12 Protocon Engineer Services
    Baitul; Ashrafec,Pal Surat394510
    RIL,Mora,Surat 1995- 1997 Fabrication Supervisor
    13 Sai Krupa Engineers Works Koperkharine,Cidco Colony
    New Mumbai -400701

    MIDC,New Mumbai 1993- 1995 Fabrication Supervisor
    14 Progressive Engineers
    T.T.C Indl. M.I.D.C
    NOCIL ,Thane, New Mumbai 1991- 1993 Foreman
    15 Babu Enterprise
    Anukur Shopping Center,Surat(Gujarat Kakrapada Atomic Power Projects,surat 1989- 1990 Foreman
    16 Sumati Steel Fab.Corp
    Domivali(W)Dist Thane Bombay O.N.G.C CTF Plant at Masana (N.G) 5 Month Only1988 Tank Foreman
    17 Bridge & Roof Co.(India)Ltd
    Alpha Beta Construction
    Chembur, Bombay-71 O.N.G.C CTF Plant at Saij Kolol(N.G) 1986-1987 Forman
    Executed 32M-Dia-Crude Tank Project