QA/QC Inspector Electrical : Resume
P.Ravi
E-mail : ravivel67 AT gmail.com, ravivel67 AT yahoo.com
PROFILE :
Accomplished, proactive Electrical Engineer with core experience in Electrical & QC Engineering in Power Plants, significant experience in construction, project coordination and testing. Possess educational qualifications with Diploma in Electrical Engineering. Recognized for strong adherence to field and ability to work as a team member in various sectors.
ACADEMIC DETAILS :
Qualification : Diploma in Electrical and Electronics Engineering
Year of passing : 1993
Area of Specialization : Power Plant Electrical works
Technical/University : Rajagopal Polytechnic, Gudiyatham, Tamilnadu, INDIA
EXPERIENCE SUMMARY :
As Electrical Engineer and QC Electrical Engineer with more than 18 years of overall experience in field engineering of projects in various sectors include :
- Power Plant
- Petrochemical Plant
- Gas Plant
PROFESSIONAL EXPERIENCE :
- Company : Best Power Construction L.L.C., Muscat, Oman
- Designation : QC Electrical Engineer
- Period : From Dec 2010 to Sep 2012
- Projects Handled :
500 MW Gas based Combined Cycle Power Project, Salalah, Oman worked as QC Engineer in
this Power plant project. It consists of five GE gas turbine generators and two GE steam turbine
Generators with five 102MVA step up TFRs and two 120MVA step up TFRs.
- Scope of Works :
Works as a part of a team of Inspectors and Engineers in ensuring the adherence of the project to client requirements as well as preset quality standards, study and understand the project scope and specifications as well as the ITP’s, Method statements and also responsible for raising and closing NC reports. Having knowledge in standards like IEC (International Electro Technical Commission), NEMA (National Electrical Manufactures Association), NFPA (National Fire Protection Association), NEC (National Electrical Code),UL,IEEE, Hazardous Zone and ISO etc
- Responsibilities :
- Receiving the RFI (Request for Inspection) from the discipline staff and carry out the inspection of the Equipment/Construction as per the ITP, identify any discrepancies and generate the Non Conformance Report.
- Coordinating with the discipline engineers to ensure corrective action on the above thereby ensuring the closure of the NC’s raised.
- Ensuring that necessary levels of reliability in equipment and systems are reached by the correct specification of requirements through to proper installation, commissioning and test.
- Reporting any major Quality issues to the Quality Manager of the Project Management Team.
- Coordinate with the project’s Safety, Environment and Certification Engineer and ensuring that all statutory requirements are met.
- Plan and direct internal quality audits as well as analyses the results, issue audit reports followed by the assessment, monitoring and verification of the implementation of corrective actions.
- Coordinating site installation and commissioning work to ensure strict compliance with specifications.
- Review of all certification and documentation to ensure validity and compliance with specifications, drawings, manufacturing and inspection test plans.
- Liaise with the Engineering Manager for the resolution of construction requests for clarification, site queries and non- conformances.
- Generating daily, weekly and monthly reports on the quality status of all activities with their schedule for completion.
- Carry out any other duties as and when required.
- Co-ordination with client during walk down inspection.
- Company : Deutsche Babcock Al Jabber W.L.L, Doha, Qatar
DEBAJ is a premier world wide Engineering, Procurement and Construction (EPC) company offering to the Power Plants, GIS substations, Aluminum plant and Petro chemical plant.
- Designation : QC Electrical Engineer
- Period : From Oct 2008 to October 2010
- Projects Handled :
- 2000 MW Gas Based Combined Cycle Power Project, Mesaieed, Qatar worked on the site as QC Engineer. Power plant having 6 nos of GE gas turbine generators and 3 nos of GE steam turbine generators, 6 nos of 400/16KV,391MVA step up TFRs, 3 nos of 400/16KV,422MVA step up TFRs, 6 nos of 16/10KV,40MVA auxiliary TFRs and 400KV,220KV,132KV each one GIS substation.
- Qatar Chemicals Project, a 350 MTA PE Unit & 350 MTA Normal Alpha Olefin (NAO) for Chevron Phillips Chemical International Qatar Holdings LLC at Mesaieed City, Qatar. The Q-Chem facility is a world class integrated petrochemical plant capable of producing high-density and medium-density polyethylene (HDPE & MDPE),1-hexene and other products using the state-of-the-art technology provided by chevron Phillips chemicals, a major integrated producer of chemicals and plastics.
- Scope of Works :
- Works as a part of a team of Inspectors and Engineers in ensuring the adherence of the project to client requirements as well as preset quality standards, study and understand the project scope and specifications as well as the ITP’s, Method statements and also responsible for raising and closing NC reports.
- Responsibilities :
- Preparation of Quality Control Plan, Method Statements, Inspection Test Plan, Inspection Point Program and Test Sheets.
- Review and interfacing of vendor technical documents of Electrical equipments such as Power Transformers, HV & LV switchgears, Isolated Phase Bus duct, Neutral Ground resister Panel, Generator Line Accessories Compartment, Generator Neutral Accessories Compartment, UPS & DC System etc.
- Preparing supportive documents for the inspection of Transformers, Panels, cable, Tray etc.
- Coordination with Client during Inspection.
- Preparation of Final Dossier according to Kraftwerk Keneinzhen System(KKS)
- Coordinating with testing team for Testing of Transformers by using CPC 100-Transformer
Winding Resistance Test, Transformer Turn Ratio, CT Winding Resistance Test, CT Ratio & Polarity Test, CT Knee Point Voltage test, Transformer Capacitance & Power Factor test, Transformer Bushing Capacitance and Dissipation factor Test.
- Monitoring of Transformer oil filtration work and testing of Breakdown Voltage Test for oil.
- Panel / LV Bus duct – Contact Resistance test by using CPC 100 equipment.
- Grounding impedance test, Step and touch voltage test.
- Detail Engineering activities including preparation of Data Sheets, Specification, Material Requisition.
- Interact with the Client and Vendors & Coordinating with client during walk down inspection.
- Co-ordinate to get design approvals from Client & to clear design clarification on discrepancies, interfaces and mismatches.
- Assistance to Construction Team with clarifications at various stages of the project through solving Site Technical Queries etc.
- Attending the regular meetings with the clients and regular meeting with the construction people to inform their progress and delay’s and pushing them for the targets.
- Plant start-up activities along with the commissioning people.
- Company : Chennai Engineering Services (India)
- Designation : Electrical Engineer
- Period : From Feb 2000 to October 2008.
- Responsibilities :
- Preparation of Single Line Diagrams, Sizing of Switchgears like Motor control center, Power Distribution Boards, Automatic Power Factor Correction, Automatic mains failure Panel etc.
- Conducting harmonics study and providing filter panels.
- Coordinating with consultants and contracting team
- Providing Engineering Consultancy services to small and medium industrial sectors
- Testing & Commissioning of LV Switchgears, Capacitor panels etc
- Company : Al Moshin Trading company, Muscat, Oman (LNG Project)
- Designation : Electrical Supervisor
- Period : From March 1997 to Nov 1999.
- Responsibilities :
- Preparation and installation of Transformer, Isolated Phase Busduct, MV/LV Panels, MV/LV & Control cable laying, Earthing and installation of cable Trays etc.
- Inter-discipline co-ordination.
- Preparation of weekly schedules, team wise targets, Planning Material requirements, specifications & datasheets, cable schedule etc.
- Co-ordination of on site labor both skilled and unskilled, responsible for ensuring all High Voltage and Low Voltage installation are carried out in accordance with Quality Control International Codes of practice.
- Monitoring projects with respect to safety, cost, Resource Deployment, Time Over-runs and Quality compliance to ensure timely execution of Projects.
- Monitoring day to day activities.
- Company : Jurong Aromatics Corporation, Singapore
- Jurong Aromatics Corporation (JAC) is a firm with interest in manufacturing and sales of aromatics and oil products. Its worth is USD2.4 bln and the location is at Jurong Island in Singapore. The complex is processing 4.5 million tons per annum of condensate feedstock to produce 1.44 million tons per annum of aromatics, consisting of 800 kiloton’s per annum of paraxylene, 200 kiloton’s per annum of Orthoxylene and 400 kiloton’s per annum of Benzene. In addition, it will produce 2.47 million tons of oil products.
- Designation : Electrical Supervisor
- Period : From 1995 to 1997
- Responsibilities :
- Erection of Transformer, MV/LV Panels, MV/LV & Control cable laying and Termination, Eathing and installation of cable Trays etc.,
- Installing of lighting in over the site, major electrical buildings and all the sub stations.
- Preparation of weekly schedules, team wise targets, planning material requirements, specifications & datasheets, cable schedule etc.
- Coordination of onsite labour both skilled and unskilled, responsible for ensuring all High Voltage and Low Voltage installation are carried out in accordance with Quality control and International Codes of practice.
- Monitoring projects with respect to safety, cost and resource Deployment, Time Over runs and
Quality compliance to ensure timely execution of projects.
- Final documents were made after construction and submitted to the client.
- Attending the meetings with clients.
- Inter-discipline co-ordination.
- Company : Chemin Consulting Engineers Ltd, Pondichery (Kalpakkam Atomic Power Project)
- Designation : Electrical Supervisor
- Period : From Oct 1993 to Feb 1995
- Responsibilities :
- Site coordinating for the timely completion of the electrical installation works.
- Erection of LV Panels, Motor Control Centers, Tray erection, Cable laying and Termination,
- Site supervision for installation, testing & commissioning of Motor Control Centers and Power Distribution Boards etc..
- Erection of streetlight poles, cable laying, testing & commissioning