C. BALAGURU
E-mail :mlrcbguru AT gmail.com

CAREER OBJECTIVE :
- To build a career which challenges my skills, innovativeness and to grow with a thirst for continuous learning.

EDUCATION DETAILS :
- D.E.E.E from S.S.P GOVT POLY TECHNIC COLLEGE (DOTE) with 85% passing at 2007
- Post Diploma in Thermal Power Plant operation & maintenance With 70% passing at 2008, from NATIONAL POWER TRAINING INSTITUTE NEYVELI UNDER MINISTRY OF POWER GOVT OF INDIA.
- HSC from SRI.K.G.S.HR.SEC.SCHOOL with 89%
- SSLC from SRI.K.G.S.HR.SEC.SCHOOL with 83%

WORKING EXPERIENCE :
120MW Combined Cycle power plant named as Lanco Power
Company Limited (formerly Aban Power company ltd.),as GT Engineer.
Total Professional experience – 3yearS with 4 month (from October 2008 to February 2012

LANCO TANJORE POWER COMPANY LTD (120 MW) :
Gas Turbine : 6FA DLN 2 with evaporative cooling system
G.T. GENERATOR : ALSTOM
HRSG : 170 TPH THERMAX BOILER WITH SUPPLEMENTRY FIRING SYSTEM
STEAM TURBINE : SIEMENS
S.T.GENERATOR : BHEL

RESPONSIBILITIES
:
- Gas turbine safe operations of start up and shutdown of 6FA GE machine.
- Carrying out GT online and offline water wash in periodic basis.
- Cold and hot start up of HRSG & STEAM TURBINE operations.
- Involving electrical maintenance activities during major inspection of plant.
- Operations of 110 KV switch yard and switch gear during change over and shutdown period.
- Carrying out of Demineralization and RO plant operations.
- Carrying out an Internal Auditing for to ISO 14001 and OHSAS 18001.
- Responsible for operation and maintenance of battery and battery chargers - 220VDC, 110V DC, 125V DC and 24V DC.
- Responsible for operation and maintenance of SF6,vaccum Circuit breakers
- Adequate knowledge in operating Fire Fighting system - Deluge spray and Single, double hydrants.
- Responsible for operating Air compressors – 340Nm3/hr Make : Ingersoll rand.
Consists of reciprocating and centrifugal type compressors

PRESENT WORKING COMPANY PROFILE :
I'm working in SALINE WATER CONVERSION CORPORATION YANBU DESALINATION AND POWER PLANT PHASE 2 as CCR OPERATOR from April 08.04.12 to till date at kingdom of Saudi Arabia

PLANT BTG DETAILS
:
PLANT TOTAL CAPACITY :2×81mw
BOILER : UNSALDO CALDAIE
TYPES : BOX TYPE FRONT WALL OIL AND GAS FIRING 600 TPH
STEAM TURBINE : UNSALDO BACK PRESSURE MP& LP STEAM EXTRACTION
S.T.GENERATOR : UNSALDO ENERGIA

RESPONSIBILITIES
:
- Boiler& turbine normal start up and shutdown operation activities.
- DCS Siemens SPPA T300 Work bench operating system
- Instruments' loop with DCS interlock checking.
- Monitoring the turbine & boiler parameter everything running under normal value.
- Safe changer over for Boiler feed water pumps, Service air compressors, Turbine lube oil pumps, Secondary condensate pumps, closed cooling water pumps, circulating water pumps, LP& HP dosing pumps.
- Adequate knowledge in operating Multi stage flash desalination and multi effect desalination system .
- Shift operator during plant continuous operation.

PERSONAL DETAILS :
- Age and Date of birth : 25 yrs,20-03-1988
- Marital status : single
- Languages : Read & Write English and Tamil, Hindi Speaking only

DECELERATION :
I hereby declare that all the above mentioned information is true to my knowledge and belief.

Yours Truly
(C.BALAGURU) .