www.bid4career.com Manpower consultancy Pvt Ltd Hyderabad : SAP EP Consultant

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    Super Moderator
    Join Date
    April 18th, 2008
    Location
    Tuticorin
    Posts
    7,026

    www.bid4career.com Manpower consultancy Pvt Ltd Hyderabad : SAP EP Consultant

    Bid4CareerManpower consultancy Pvt Ltd

    Designation: SAP EP Consultant
    Experience: 3 - 8 Years
    Location: Hyderabad / Secunderabad

    Job Description
    Strong SAP EP (Enterprise Portal) experience + Architecture experience.
    SAP Knowledge Management experience
    Knowledge of SAP security
    Exposure to ORACLE DB, JAVA, JBOSS, J2EE, GE Siteminder
    inimum one full project lifecycle implementation experience

    Desired Candidate Profile
    Strong SAP EP (Enterprise Portal) experience + Architecture experience.
    SAP Knowledge Management experience
    Knowledge of SAP security
    Exposure to ORACLE DB, JAVA, JBOSS, J2EE, GE Site minder
    minimum one full project life cycle implementation experience

    Company Profile
    Bid4Career is a fast growing information technology consulting services company providing its services to its clients all over India

    Email Address:resumes@bid4career.com

    Website: http://www.bid4career.com

    Keywords: SAP EP, SAP
    Last edited by Guest-IJT; September 5th, 2011 at 04:58 PM.

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : mithun
    Email : mithunkumarbc AT gmail.com
    Designation / Skillset : o&m engineer
    telcom tower o&m engineer

    Resume :
    Curriculum Vitae

    MITHUNKUMAR B.C
    O&M Engineer

    To boost my career in the field of Telecommunication which gives an opportunity to work with today’s technology, to learn, to innovate, and to meet challenges of good repute that offers demanding and Challenging environment, which will bring the best out of me.

    - 2 years and 5 months of cumulative Experience in Telecom Projects & O&M.

    VIOM NETWORKS
    Dates :MARCH 2009
    Occupation or Position held : o & m Engineer
    Client : viom networks pvt ltd.
    Main activities and Responsibilities :
    - Ensure that preventive maintenances of A.C, DG, and Battery bank, SMPS, Stabilizers, and UPS, as per defined intervals.
    - Verification of contractor works /Vendor works.
    - Monitor/review/evaluate performance of operational support engineers/Field technicians
    - Ensure installation of all energy improvement utility equipments such as fan filters, Fuel optimizers , Fitch catalyst etc & monitor the energy improvements as per the plan
    - Diesel filling, electricity bill verification, fuel verification.
    - Self development plan.
    - Ensure adherence to HR rules & regulations
    - Ensuring & facilitating accident-free operation
    - Review of all power & fuel bills, site wise analysis , corrective actions
    - Review of expenses of my areas include house keeping, facility maintenance & optimize vehicle usage.
    - Project activities – up gradations of equipments as per business needs.
    PREVENTIVE MAINTENANCE : getting electrical preventive maintenance done by vendors & down lines every month every sites
    ALARMS TESTING : checking all external alarms by extending to FMC
    FUEL CONSUMPTION CHECKING : checking fuel consumption which sites consume more than rated rated value.
    DIESEL FILLING FOLLOUP : filling the diesel to every sites after every week by Field engineers & technicians and maintaining proper records of bills.
    B – CHECK & C Check activity : getting b- check done by vendors, after every 250 run hours & C check after every 6000 hours.
    COLLECTING MONTHLY READINGS : every month on 30th collecting readings of dg run hours, like Taco & Controller, KWh, EB & diesel levels.
    COLLECTING EQUIPEMENT STATUS REPORT : collecting on 25th every month every site every equipment status report when it’s become faulty and when rectified
    CHECKING BATTERY BACK UP : checking of battery backup every month by technicians every month whether any cells became faulty.
    MAINTAINING VENDORS : follow up with AC (air conditioner), DG & voltage stabilizers vendors for Preventive maintenance & rectification of A/C, DG & voltage stabilizers every day.
    PM FOLLWING UP LIKE : AC (air conditioner), DG, Battery bank, SMPS, it panel, AMF panel, voltage stabilizers, Security systems, engine & alternators, earth resistance of all sites.
    ELECTRICITY BILLS & DD’S : following up with the vendor for collection of EB Bills & payment of the same to avoid EB disconnections.
    Key Responsibilities.
    - Reports to cluster lead.
    - Accountable for performance of the technicians.
    - responsible for the adherence of process on the field
    - Should be technically sound to understand the problem and try to solve over phone.
    - Always keep a track of statuary requirements like EB bill deposit, pollution control board payment etc, site owner rent & diesel bills
    - Identify the technician’s weakness in technical competence and educate him to improve.
    - In case technicians not able to rectify the problem guide him over telephone to rectify and thus identify his lack of knowledge and educate him.
    - New recruits to be trained with in the time frame decided.
    - Analyzing repeated faults and take necessary action to rectify the root cause of fault.
    - If there are problems in the equipments, which are not falling under the first level of breakdown maintenance, escalate the same to project manager in time and follow up with the third party vendor till the snag is rectified.
    - Ensure Technicians carry out PM every month properly and the readings are recorded in the given format and forward the same to project manager for documentation and further necessary action.
    - Ensure diesel availability in all sites of his zone.
    - Ensure all the Technicians are having proper keys and maintain a register of handing over or taking over of keys in case any body resigns or on long leave.
    - Keep a track of tools, keys and other supportive materials provided to technician and make the accountable for any loss.
    - Before taking over sites proper audit should be conducted of his particular zone & should be documented with the customer present at the time of taking over in the given format.
    - Ensure his visit once in a month to the entire site under him, preferably on the day of preventive maintenance.
    - Verification of all vendor bills.
    - Arranging vendors PO/WO within committed time for avoiding delay of the work
    ..
    - Regularly planning on reduction of opex & capex of the all sites in my zone
    - following up with technicians if any external alarm is not cleared within 45 minutes
    - Enlisting new vendors
    - Requesting for materials & spares to the office.


    Reduced Power consumption : by using fuel optimizers,time delay to automation, modification of dg controller by giving loop signal from SMPS, fan filters, exhaust fans, & Automatic light controller 30 % of power consumption has reduced.

    Integrity, Self discipline, Initiative / Drive, Team Spirit, Dependability, Industriousness, Optimism
    Perseverance, Punctuality / Regularity, Flexibility / Adaptability, Perceptiveness
    Reflex / Quick Response, Understanding / Grasping ability, Versatility, Endurance.


    1. PUC(PCMB) Sacred heart pu college shimoga in 2004.

    2. Diploma in (Electrical &Electronics engg) in Dacg govt polytechnic chikmaglore in 2008

    Attended Training DCEM.

    I here by proclaim that the above-furnished information’s are true to the best of my knowledge and belief.

    Date: Yours Sincerely
    Place: Shimoga

    MITHUNKUMAR B.C
    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4369659
    Date & Time : 14th Jul 2011 7:10 AM (UTC)
    IP Address : 59.164.96.46
    Browser Info : Mozilla/5.0 (Windows NT 5.1; rv:2.0b10) Gecko/20100101 Firefox/4.0b10
    Predicted Country : India