Installation and Commissioning Electrical Engineer : Resume

+ Ask Question / Post resume
Results 1 to 2 of 2
  1. Post Count Number #1
    On probation
    Join Date
    September 18th, 2011
    Location
    Raigarh
    Posts
    1

    Installation and Commissioning Electrical Engineer : Resume

    CURRICULUM VITAE :
    S SHADAB QUADRI
    E-mail :ershadabquadri AT gmail.com

    Objective :
    To be a part of an organization where process of learning & grow never ends and my imagination takes wing to new heights.

    PROFESSIONAL SYNOPSIS :
    - Proven record as Electrical Engineer (Installation and Commissioning) a confident, efficient and professional approach towards work, excellent team worker with a flavor of leading the team, deterministic, dedicated and strong ability to handle work assignment, co-ordination and team management with well known organizations.
    - Execution and Monitoring the Electrical and Instrumentation works under Construction.
    - Expertise in swiftly ramping up projects with competent cross functional skills and on time execution.
    - Strong relationship management, communication skills with the ability to network with project members, consultants, contractors with consummate ease.
    - Extensive experience in installing, commissioning, testing and managing execution of ASH HANDLING SYSTEM (Dense Phase pneumatic conveying ) in Different power plants.

    Industrial Experience : (3.4 Year)
    Currently working with Macawber Beekay Pvt Ltd, New Delhi (BSBK Group of Company), as a Electrical engineer (Installation and commissioning of Ash Handling Plant) since 19th July 2010 till Present.

    COMPANY PROFILE :
    Macawber Beekay Pvt Ltd. is a New Delhi based ISO : 9001 Certified EPC company into the business of Dense Phase Pneumatic Conveying Ash Handling System and High Concentration Slurry disposal (HCSD) System.

    NATURE OF JOB & RESPONSIBILITY :
    - Operation and maintenance of Fly ash handling (Dense phase pneumatic conveying) system.
    - Operation and maintenance of Bottom ash handling system.
    - Operation and maintenance of Ash water recovery system.
    - Operation and maintenance of Silo unloading (Ash conditioners and unloading spout) system.
    - Take the breakdowns of machines & maintaining the stock of spare and consumable part of machine.
    - Man power handling and proper utilization.
    - Maintain log of reported faults and routine preventive maintenance.
    - Making Standard operating procedures (SOP) of Ash handling system.
    - Root cause failure analysis of system.
    - Modifications in the equipments for the improvement of the system.
    - Preparing Preventive Maintenance schedules, Maintenance checklist, Spare part list etc.
    - Installation, testing, commissioning and proofing the performance guarantee parameters of the entire dense phase pneumatic conveying ash handling system, Bottom ash handling system and Remain innovative and explore safe and efficient working practices.
    - Preparations of PLC or DCS logic according to the Control Philosophy & modification of Logic according to the site & Client requirement.
    - Plan and execute Installation Process and Testing over trial runs.
    - Maintain and follow Quality Procedures and Safety work practices.
    - Preparation of procedure & to perform for various activities erection and commissioning protocols and pre-commissioning checks.
    - Coordinating the different department and working people.

    CURRENT PROJECTS :
    - Client : - M/S Hindalco Industries Limited
    - Name : - Commmissioning of Ash Handling Plant (6 X 150MW), Hindalco Industries Limited, Baregawan, MP
    - Duration : - Dec 2012 to till Now
    - My Role : - ASH handling system Commissioning engineer.
    - Location : - Bargawan, MP (Onsite).

    A MERIT OF HANDLING PROJECTS AS FOLLOWS :
    - Kota super thermal power plant (210 MW), Kota, (Rajasthan) : Commissioning of Dense Phase Pneumatic conveying ash handling system, Operation and Maintenance.
    - Power Plant of Sri Cements (2x50) MW, Rass, (Rjasthan) : Commissioning of Dense Phase Pneumatic conveying ash handling system, Operation and Maintenance.
    - Power Plant of Bhushan Steel Ltd (2x150) MW Angul, (Odisha) : Trouble shooting.
    - RRVUNL (2x250) MW, Chhabra, (Rajasthan), Commissioning of Dense Phase Pneumatic conveying ash handling system, Operation and Maintenance,
    - Jindal steel & Power (4x135) MW, Dounghamouha, (Raigarh) : Commissioning of Dense Phase Pneumatic conveying ash handling system, Operation and Maintenance.
    - Maithon Power Limited (2x525) MW, Maithon, (Dhanbad), Commissioning of Mill Reject System, Operation and Maintenance.
    - Jindal steel & Power (6x135) MW, Angul, (Odisha) : Commissioning of Dense Phase Pneumatic conveying ash handling system, Operation and Maintenance.
    - Hindalco Industries Limited, (6 X 150MW), Bargawan, MP, Commissioning of Dense Phase Pneumatic conveying ash handling system, Operation and Maintenance.

    Qualification :
    Professional :
    - B. Tech. (Electrical & Electronics) from United College of Engg & Research, Allahabad, affiliated to U.P. Technical University, Lucknow.
    - Diploma in Electrical Engineering from Aligarh Muslim University, Aligarh.

    Academic :
    EXAMINATION BOARD YEAR AGGREGATE :
    B.Tech U.P.T.U. 2009 64.40
    Diploma A.M.U 2006 77.40
    10th CBSE 2002 74.40

    Extracurricular activities :
    - An Active participation in the techfest of college ENIGMA-07.
    - Won prize in games at school level competitions..
    - Participation at many school and college level functions.

    Computer Skills :
    - Basic Knowledge in Computer Fundamental, MS- Office, Internet.
    - Operating System- Windows XP, Window-7.
    - Basic knowledge of PLC & SCADA..

    Strengths :
    - Leadership quality
    - Positive thinking
    - Self motivated

    Personal Details :
    - Date of Birth 31st jan 1987
    - Sex Male
    - Marital Status Single
    - Languages Known English, Hindi, urdu

    Declaration :
    I hereby declare that the above information is true to the best of my knowledge and belief.

    Date :
    Place : Bargawan, Singrauli

    SHADAB QUADRI

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Electrical Manager/Engineer

    RESUME :
    R. RAMESH,
    Email : rameshrathinam989 AT gmail.com

    Objective :
    Looking forward for a challenging opportunity where in I can utilize my entire skills and knowledge to achieve the organizational goal.

    Experience Profile :
    1. Company : Hofincons Info Tech & Industrial Service Pvt Ltd, Bangalore
    Position : Facility Manager – Operation and maintenance at Mall cum
    Multiplex project at Coimbatore, Tamilnadu.
    (From Aug 2012 to till date)

    Responsibilities of work :
    - Establishing and Leading Technical Team for maintenance & operations on 24x7 service basis for Electrical, HVAC, Plumbing, Fire fighting, fire alarm, PAS, CCTV, Elevators & escalators, STP & WTP.
    - Providing checklists for all the above operations.
    - Preventive Maintenance for all equipments
    - Manpower deployment as per client requirements
    - Trouble shooting and technical briefing to technical team
    - Coordinating with AMC and services contractors
    - Filing and documentation maintain
    - Motivating and encouraging to get better output from team.
    - Quality Management

    2. Company : ISS Integrated Facility Services Pvt Ltd., Chennai.
    Position : Facility Manager – Operation and maintenance at Cognizant
    Technology Solutions India Pvt Ltd., Coimbatore
    (From 2012 Jan to 2012 August)

    Responsibilities of work :
    - Management service providing Technical services, Soft services (House- keeping) and Admin services ensuring Manpower stability for routine 24x7 operations
    - Manager for a team of Electrical supervisors, electrical & AC technicians, Plumbers, Carpenters, House keeping Supervisors, House-men, Chambermaids, Admin helpdesk executives, Front-office executives & EHS Officers
    - Preparing documentations and checklists for all the above categories and also 5S Implementation
    - Manager implementing 4M – Man management
    - Material management
    - Methodology
    - Mechanization

    3. Company : M/S. Mold Masters Technologies Pvt Ltd. Coimbatore.
    Position : Executive (From 2009 to 2011 Dec)

    Responsibilities of work :
    - Erection, testing and commissioning the project
    - Maintenance in involving Setting up a manufacturing plant for Tool
    - & Design production unit right from construction.
    - Coordinated with commercial team to delivering CNC equipments from their parental plant.
    - File and documentation maintain for plant maintenance
    - Assisting house keeping team.

    4. Company : M/s. Indeco Engineers Division of Hofincons Info Tech &
    Industrial Services Pvt. Ltd., Bangalore
    Position : Maintenance Engineer in the client site SpherisIndia (P)
    Ltd. Coimbatore (from 2007 to 2009)

    Responsibilities of work :
    - Monitoring 1000 KVA oil cooled transformer and routine test taken with help from out sourcing agencies.
    - To maintain documents and records of Elec Dept.
    - To follow maintenance schedules and carryout periodic preventive works.
    - To assist Utility Manager to conduct technical audits.
    - To supervise contractors works for electrical additions / alterations to the plant and repair reconditioning of equipment.
    - To enforce use of PPE by workmen
    - To maintain a list of authorized persons to work in our area.
    - Maintenance work for 2 Nos of 80 KVA UPS for entire plant.
    - Preparing schedule for A, B and C check for 2 Nos of 500 KVA DG set and regular monitoring.
    - Maintenance carried out for 2 Nos of 100 Tr water cooled chiller like stainer cleaning, condenser pipe cleaning and etc.,

    5. Company
    : M/s. Delster Electrical Contractor
    Position : Project Engineer (From 2005 to 2007)

    Responsibilities of work :
    - Execution of electrical work at site as per the design drawing and technical specification.
    - Drawing submission, getting approval from CEIG office as per the client requirement.
    - Liaisoing work with TNEB office for getting power supply.
    Firm involved following works : Textile Mills, Educational Institutions, Engineering Industries, Garments & Dyeing Industries, and Commercial Buildings

    6.Company : Geedee Hopt (P) Ltd., Coimbatore – UMS group of Companies
    Position : Electrical Engineer (From 1999 to 2005)

    Responsibilities of work :
    Electrical installations for the whole of group of UMS Companies,
    namely :
    - UMS Radio Factory Ltd., Unit 1 & 2
    - G – Plast (P) Ltd., Unit 1 & 2
    - Rathna Resorts Ltd.,
    - G.D. Naidu Charities
    - Geedee Technical Training Institute
    - D Engineering (P) Ltd.,
    - Water Tec Systems India Pvt. Ltd.,

    1. 7. Company : M/s. Venkatagiri Spinning Mills (P) Ltd., Sulthanpet
    Position : Electrical Supervisor (From 1997 to 1999) Maintenance of H.V. & M.V. Installations and generators.

    8.Company : M/s. SE Consultancy Services, Coimbatore
    Position : Electrical Supervisor (From 1996 to 1997) carried out preparation of drawings and supervision of site works in various industries.

    9.Company : Electrical Contractor ( From 1987 to 1996) Electrical installation, execution, drawing preparation, getting approval from CEIG, and LV & HV maintenance work.

    Computer Skills :
    Auto CADD, MS Office