    CURRICULUM VITAE
    B. CHINNI
    E-mail : bchinni_sunil AT yahoo.co.in

    Objective :
    To be associated with a progressive organization that gives me scope for a challenging role, to apply my knowledge and skills involve my self as a dynamic personality towards the growth of the organization.

    Educational Background :
    B.Tech (Mech. Engg) with First Class (60.9%), Vitam college of engineering in Visakhapatnam in the year 2007. Diploma Mechanical Engineering with First Class (65.65%) from CR Polytechnic, Chilakaluripeta, Guntur (Dist), A.P.

    WORK EXPERIENCE : (Total 5 years)

    Presently working with ZEPPELIN SYSTEMS INDIA PVT.LTD. (Direct HPCL) VISAKHAPATNAM
    Duration : Since 2012 August to till to date
    Designation : Mechanical Engineer

    FAB-TECH PROJECTS&ENGINEERS LTD. (UNDER HPCL) VISAKHAPATNAM
    Duration : Since 2011 September to July 2012
    Designation : Piping Execution Engineer

    Company : GANNON DUNKERLEY & CO., LTD. (UNDER RELIANCE GAS TRANSPORTATION INFRASTRUCTURE LIMITED& Jamnagar Export Refinery Project Jamnagar, Gujarat)
    Duration : Since July 2007 to September 2011
    Designation : Assit.Engineer

    ** Responsible for planning, coordinating, execution of normal production activities.
    ** Reviewing of piping isometric drawings, P&I Drawings, General arrangement drawings.
    ** Supervising all the work carried out at my site including Erection, Commissioning, and all Piping Erection work of Cooling Water, Compressed Air line, Hot water line, Instrument Air line, Plant Air line including inspection of GA drawing & layout checking
    ** Inspection of fabricated spools with technological collaboration according to piping Isometric Drawing.
    ** Material identification on basis to follow ASME code SEC IIA, IIB, IIC.
    ** Hydro testing of pipe lines as per engineering requirement
    ** Inspection of different type of welding processes for different types of metals like alloy steel, stainless steel and carbon steel (low temperature carbon steel, NACE etc.)
    ** Weld visual inspection as per standards and specification requirement.
    ** Pneumatic test of reinforcement pad with technical collaboration.
    ** Production planning and execution of Fabrication of Piping.
    ** Resource planning, monitoring and Control.
    ** Structural fabrication and erection

    PERSONAL SKILLS :
    ** Determination, ability to work for long hours.
    ** Easily adaptable person.

    PROJECT DETAILS :
    I had done the project in diploma level on “STUDY OF AIR COOLER”.
    I had done the project in engineering on “DESIGN AND ANALYSIS OF MONO COMPOSITE LEAF SPRING”.

    Computer skills :
    ** Ms Office, AutoCAD.

    HOBBIES :
    - playing and watching Cricket
    - Playing Chess
    - Listening to Music

    Personal Profile :
    Name : B.CHINNI
    Date of Birth : 24-06-1978
    Marital Status : married
    Nationality : Indian
    Religion : christain
    Languages Known : English, Telugu, and Hindi

    Date :
    Place:
    (B.CHINNI)

  2. Post Count Number #2
    On probation
    Join Date
    June 12th, 2011
    Location
    KERALA
    Posts
    1

    mechanical engineer/Maintenance Engineer/Piping Engineer

    JOB OBJECTIVE :
    To scale the heights of greatness as a successful professional by associating myself with and organization that provides a challenging job and a dynamic environment to work.

    GRADUATION :
    Bachelor of Engineering in Mechanical (2005 To 2009)
    At Nandha Engineering College, Erode, India, First Class.
    Higher secondary (2003-2005)-85%
    M S P H S S, Malappuram (Kerala State Board), India.

    Secondary School Leaving Certificate (2002-2003)-81%
    M S P H S S, Malappuram (Kerala State board), India.


    Certification Held :
    Having ASNT Level II Certificate in :
    RT (Radiographic Test)
    UT (Ultrasonic Test).
    MT (Magnetic Particle Test).
    PT (Penetrant Test).

    TRAINING & CERTIFICATE COURSE ::
    - Got Training for permit to work system (PTW) At Oryx GTL Shutdown 2013.

    PROFESSIONAL EXPERIENCE :
    Onsite Experience as Piping Engineer/Maintenance Engineer in the field of Oil And Gas. Solid knowledge of mechanical engineering plant construction process piping, Pre-Commissioning and Office Engineering.

    (A) CLIENT : Oryx GTL, QATAR
    Employer : Madina Group W.L.L (Supplied to ORYX GTL)
    Position Held : Mechanical Maintenance Engineer.
    Period : JANUARY 2013 – Till Date (Shut Down)

    Job Responsibilities :
    - Site supervision, Equipment Location Identification.
    - Responsible for the execution of job safely & with quality.
    - Close monitor the progress of work.
    - Attend meeting with the management people regarding the progress of work.
    - Arrange the material, equipment at correct time.
    - Make the daily work progress report and submit to higher authority.
    - Make the maintenance plan.
    - Operation & maintenance of Heat Exchangers, Columns, vessels, Drums , Reactors , Finn Fans ,Valves & all Kind Of static equipment.
    - If any rework or Recommended repair for Heat Exchangers, Columns, vessels, Drums then immediately plan the repair and Arrange the NDT.
    - Preparing work schedule and monitoring.
    - Conducting safety tool box with work crew.
    - Attending co-ordination meeting with Client and internals.
    - Guiding the supervisors and site foreman’s for technical problems.
    - Interacting with Engineering, Purchasing/Store, QC and other supporting departments for the proper execution of the job.
    - Highlighting the important issues to the top management for corrective actions.
    - PSV identification and Tag the PSV for removal.
    - Send PSV for calibration.
    - Make the PTW and Get the Signature from production department.
    - Identify the locations need to be blind.
    - Preparation and finalizing rigging plans for Equipment erection work.
    - Planning & scheduling of preventive maintenance of all the machineries.
    - Make weekly and monthly report.
    - Co-ordination with stores.
    - Arrange the pressure test for Fin Fan and Exchangers, as per the method statement.
    - Co-ordinate with Supervisors and Foreman.

    (B) Name of Company : AL-TEC Fabricators, Trichy, INDIA
    Position Held : MECHANICAL MAINTENANCE ENGINEER.
    Period : June 2012 – December 2012
    Job Responsibilities :
    - Responsible for the execution of job safely & with quality.
    - Close monitor the progress of work.
    - Attend meeting with the management people regarding the progress of work.
    - Arrange the material, equipment at correct time.
    - Make the daily work progress report and submit to higher authority.
    - Make the maintenance plan.
    - Operation & maintenance of Heat Exchangers, Columns, vessels, Drums , Reactors , Finn Fans ,Valves & all Kind Of static equipment.
    - If any rework or Recommended repair for Heat Exchangers, Columns, vessels, Drums then immediately plan the repair and Arrange the NDT.
    - Preparing work schedule and monitoring.
    - Conducting safety tool box with work crew.
    - Attending co-ordination meeting with Client and internals.
    - Guiding the supervisors and site foreman’s for technical problems.
    - Interacting with Engineering, Purchasing/Store, QC and other supporting departments for the proper execution of the job.
    - Highlighting the important issues to the top management for corrective actions.
    - Preparing the daily production report and reporting to the Planning Department.

    (C) PROJECT : MANIFA CORE HYDRO CARBON FACILITIES.
    CLIENT : SAUDI ARAMCO.
    CONTRACTOR : SAUDI ARABIAN SAIPEM.
    COMPANY : Z.M.AL-MADANI EST.
    Position : Site/Piping/Mechanical Engineer.
    Period : JULY’2010 to MAY’2012
    Duties and Responsibilities :
    - Detail study with the piping P&ID, Iso-Metric drawings.
    - Preparation of Bill of materials for the given plant isometric drawings.
    - Material inspection.
    - Checking the availability of work front / drawing / documents / data to ensure that work can proceed without interruption and where materials are not sufficient bringing it to the notice of superior.
    - Preparing work schedule and monitoring.
    - Planning and scheduling the Erection activities.
    - Follow-up of sub-contractors yard and monitor the work progress.
    - Supervising small bore CS & SS fabrication works.
    - Work planning for arranging manpower and other resources.
    - Interaction with work force and maintaining good relationship.
    - Highlighting the important issues to the top management for corrective actions.
    - Utilizing the resources to achieve the target in safe manner.
    - Manpower, Machineries allocation and monitoring their effective utilization.
    - Performing stage inspections, Dimensions check, layout marking.
    - Conducting safety tool box with work crew.
    - Attending co-ordination meeting with Client and internals.
    - Guiding the supervisors and site foreman’s for technical problems.
    - Checking the paint system of lines.
    - Conduct the hydro test and Pneumatic test as per the procedure
    - Internal Inspection of fit-up, Welding of Pipes, Joint checkup of Pipe lines using GAD, P & ID and isometric drawing.

    (C) ORGANIZATION : Prayaga Engineering Construction, Kochi, India.
    CLIENT : Bharat Petroleum Corporation Limited, Kochi, India.
    DESIGNATION : Field Mechanical Engineer.
    DURATION : May 2009 to July 2010.
    Duties and Responsibilities
    - Fabrication, erection, inspection, testing and commissioning various piping systems as per isometrics and GA drawings.
    - Cross checking Isometrics with Plan & P&ID drawings.
    - Monitor progress with Project Schedule.
    - Daily field walk-downs to check on progress and workmanship.
    - Site inspection and respective documentation and control.
    - Witnessing hydro test.
    - Monitored piping materials take off, pre-fabrication and piping erection activities.
    - Conducting daily toolbox meeting
    - Review and analyze construction drawings issued for construction.
    - Incoming material inspection.
    - Preparation (as built) and interpretation of piping erection drawings P&ID’s, Plot Plan, GAD & ISO.
    - Fit-up inspection of Unit-piping and Offsite-piping in piping fabrication and erection stages.
    - Reporting progress of work to Management.
    - Conducting safety tool box with work crew.

    OTHER CREDENTIALS :
    - AutoCAD
    - Ms-Office Tools.
    - Primavera.
    - MS Project
    - Auto CAD MEP

    PERSONAL INFORMATION :
    Date of Birth : 03th April 1988.
    Sex : Male.
    Marital Status : Single.
    Nationality : Indian.
    Languages Known : English, Malayalam, Tamil, and Hindi.
    Email Id : deepeshkaliveettil AT gmail.com

    Declaration :
    I hereby declare that all the above information’s are true to my knowledge and belief.

    Place : Signature

    Date :

  3. Post Count Number #3
    On probation
    Join Date
    February 16th, 2013
    Location
    chennai
    Posts
    1

    Piping Execution Engineer with 4 yrs of experience in the field of power plant and industrial Fire Protection system

    BHARATH.M
    S/O R.MANI
    Mechanical Engineer,
    E-mail ID : mbharath03 AT gmail.com

    OBJECTIVE :
    To be placed in a challenging organization that gives me the scope to update my knowledge and skills in accordance with the latest trends and to be a part of team that dynamically works towards the growth of the organization.

    PERSONAL SKILLS :
    Excellent verbal and written communication skills, ability to deal with people diplomatically, willingness to learn and team facilitator.

    TECHNICAL SKILLS :
    - LAYOUT ACTIVITIES
    Progress monitoring & reporting to management & clients.
    - Scheduling, Planning and erection of Thermal Boilers (25MW & 50MW).
    - Resource management
    - Material tracking
    - Inspection of the structure orientation, alignment and erection.
    - Erection and alignment of drum weighing 240 MT using modern technology (i.e Strand jack).
    - Inspection of drum U-type lifting hoop and drum shell and drum alignment and positioning.
    - Planning and arrangement for hydro test of boiler at a pressure of 140 Kg/cm^2, AFBC type.
    - Pipe line BOXUP with quality Dept.
    - Welding Inspection and Welding Planning.
    - Management of all construction activities including providing all technical input for methodologies of construction & coordination with management activities.

    ACADEMIC CHRONICLE :
    School Education :
    - SSLC
    Name of Institution : Govt. High School
    Location : Thimmapuram
    Percentage : 83%

    - HSC
    Name of Institution : T.E.S. Hr. Sec. School
    Location : Krishnagiri
    Percentage : 83%

    Higher Education :
    Level : : Bachelor of Engineering Percentage : 65%
    Field of Study : Mechanical Engineering
    University : Anna University
    Institution : Adiyamaan College of Engineering, Hosur

    COMPUTER PROFICIENCY :
    Operating Systems : Windows VISTA, Windows XP
    Software Packages : MS. Projects, AUTO CAD, Unigraphics NX 6.0
    Microsoft Office.

    CERTIFICATION & WORK SHOPS :
    - PIPING DESIGN ENGINEERING COURSE conducted at DESIGN TECHNIQUES, BANGALORE.
    - WORK SHOP ON PIPING LAYOUTS AND CONCEPT OF PIPING IN DESIGN TECHNIQUES.

    WORK EXPERIENCE : Total Experience ( 4 years )

    PREVIOUS EMPLOYER : SHADOW GREEN ENGINEERING & CONSTRUCTIONS.
    CHENNAI, INDIA
    POSITION : SITE ENGINEER
    PERIOD : June 2009 to March 2011
    JOB DESCRIPTION :
    - Responsible for the erection and testing of boilers and pressure vessels
    - Planning the day to day activities as per the schedule of the project
    - Material follow-up required for the completion of the project
    - Preparation of test packages for pressure tests as per client’s norms and requirement
    - Monitoring the daily progress and job sequences
    - Development of Piping Study Drawing
    - Preparation of Equipment Layout Drawings
    - Responsible for execution of all field engineering activities
    - Co-ordination with other mechanical departments like QA/QC, Equipments, Steel Structure Etc.
    - Preparation of AS-BUILT Drawings
    - Maintain healthy work atmosphere & safety awareness with in the group

    CURRENT EMPLOYER : ACCRETE ENGINEERING PVT LIMITED
    PUNE, INDIA
    POSITION : PROJECT ENGINEER
    PERIOD : JULY 2011 till date
    JOB DESCRIPTION :
    - Responsible for co-ordination of erection and fabrication activities of utility piping works (Fire fighting, Domestic water line, Compressed air lines).
    - Preparation of Bid Package/materials requisitions/technical bid analysis and purchase requisition
    - Preparation of client & sub-contractor bills
    - Attending MOM(Minutes of Meetings) with clients and getting approval to our job
    - Monitoring the daily progress
    - Co-ordination with client, sub-contractor & suppliers for the betterment of the project
    - Co-ordinate with design department during modification or rework on all piping drawings
    - Providing daily plans to mechanical and site supervisors and monitor their performance

    PROJECTS HANDLED :
    1. Rajasthan Thermal Projects
    Client : Shree Cements
    Nature of Work : Erection of Thermal Boiler (2x25MW and 2x50MW)
    Position : Site Engineer
    Duration : May 2009 to March 2011
    2. Industrial FPS Systems and Utility
    Client : Cosma International India Ltd
    Nature of Work : Fabrication, Erection and Commissioning of FPS and Utility pipe lines
    Position : Project Engineer
    Duration : July 2011 to March 2012
    3. LSC Projects (FPS)
    Client : Caterpillar India Pvt.Ltd
    Nature of Work : Fabrication, Erection and commissioning of FPS Pipe lines
    Position : Project Engineer
    Duration : April 2012 to till date

    PROJECT DURING ACEDAMICS :
    Design and fabrication of mini windmill :
    Client : Yoga Shree Engineering Works.
    Description :
    - The project was mainly concerned about the power generation from a mini windmill which produces the power of 100 to 120 volts.
    - Location : Yoga Shree Engineering works, Hosur.

    I hereby declare that all the details and particulars furnished above are correct to my knowledge.

    PLACE : Chennai (M.Bharath)
    DATE :