JAGADEESH
E-mail : jagadesh_surathu AT yahoo.com, jagadeshsurathu AT gmail.com

SKILLS SUMMARY :
Project manager with extensive experience in bridge and highway construction projects. Excellent background and knowledge in construction techniques, means, methods, cost management, scheduling and planning. Experienced in project management, Construction supervision, Quality control, Post tensioning for bridge superstructure and contract execution. Ability to co-ordinate and manage various team players in the construction Industry. Experienced in dealing with teams involving individuals from various cultures and back grounds. Ability and experience in developing and implementing safe working practices.

EMPLOYMENT :
Organization : M/s Nagarjuna construction company International LLC, Oman, Feb2010 to present.
Project Name : Batinah Coastal Road Project (4-Lane)
Post hold : A G M (Structures).
Project Cost : OMR 136.0 Million.
** Scrutiny of prepared drawings. And get approved by the consultant.
** Guidelines of formwork and staging as per the requirement.
** Site investigation as per the given drawings, if any deviations observed bring to the Client’s notification.
** Joint site inspection with Client/Consultant for any deviations to Detailed Project Report to site location.
** Estimate the quantities from approved drawings. Highlight the deviations.
** Steady the topography and drawings and fix the founding levels/floor levels.
** Material procurement and get the approval from the management as well as Clients.
** Good knowledge / monitoring in errection and fabrication of formwork.
** Allot the staging and shuttering material to the concerned agencies as per the priority
** Effective / Optimum utilization of man power and machinery.
** Organized the steel yard as per the bar bending schedule and priority as well.
** Managing the store pertaining to materials procurement and allotment.

Organization : M/s SIMPLEX INFRASTRUCTURES LTD., KOLKATTA, INDIA, April2009 to Feb2010.
Project Name : Construction of Barrage on Baitarani River at Anandpur, Orissa.
Client : Central water commission.
Post hold : Project Manager.
Project Cost : 251.94 Cr.
** Aim to finish the project in a profitable way
** Handling the Quarry, Crusher, Batching Plant and heavy Machinery with the support of Mechanical and Electrical Heads as well.
** Office administration, Planning, Project Presentation, Billing and QA/QC.
** Lassoing with various Departments pertaining to clearance for initiating the project work.
** Utilization of Staff, Man Power and Machinery etc.,
** Preparation of Submittals, Material reconciliation etc.,

Organization : M/s SIMPLEX INFRASTRUCTURES LTD., KOLKATTA, INDIA, June2008 to April2009.
Project Name : Construction of Flyover in Bangalore at Yashwantapur Circle.
Client : Bruhat Bangalore Mahanagarapalika (BBMP) Karnataka State Government, India.
Post hold : Project Manager
Project Cost : INR 19.30 Cr.
** Overall responsibility to successfully finish the project.
** Responsible for contract administration, on-site cost management, developing safety program and quality control.
** Involved in planning alternate and temporary traffic routes.
** Researched and developed construction techniques, involved in establishing batch plant, material procurements, scheduling.
** Utilization of Staff, Man power and machinery etc.,
** Office administration, planning and QA & QC.

Organization : M/s SIMPLEX INFRASTRUCTURES LTD., KOLKATTA, INDIA, Nov2007 to June2008.
Project Name : Srilanka Tsunami reconstruction Project, Srilanka.
Client : Road development Authority, Pottivil, Srilanka.
Funded by : US Governament.
Consultant : CH2M Hill International Services Inc. USA.
Post hold : Project Manager
Project Cost : INR 40.0 Cr.
** Responsible for resource planning, material procurement, manpower utilization, safety and health on-site and scheduling.
** Developed execution methods and monitored installation of precast deck panels, galvanized steel girders and foundations. Developed and executed plans for approach road. Reviewed and approved shop drawings from various contractors.
** Developed procedures for preparation and finalization of interim payment bills. Responsible for finalizing and approving subcontractor invoices.

Organization : M/s CONSULTING ENGINEERING SERVICES (INDIA) Pvt.LTD., Aug2006 to Nov2007.
Project Name : Construction of Bridges along MDR between Bijapur to Utter Kannada.
Client : Karnataka Road Development Corporation Ltd., Bangalore.
Consultant : Consulting Engineering Services (India) Pvt. Ltd.,
Post hold : Bridge Engineer
Project Cost : INR 43.0 Cr.
** Construction supervision of all the bridges along the Major District Roads.
** Developed and monitored the daily schedule. Proposed solutions for bottlenecks in the project following thorough analysis. Developed and planned effective construction techniques for activities along the critical path.
** Conducted meetings with clients for design review, explaining technical aspects and construction planning for improving decision making process.

Organization : M/s CONSULTING ENGINEERING SERVICES (INDIA) Pvt.Ltd., Dec2002 to Aug2006.
Project Name : Up gradation National Highway 5 from two lane to four lane;
Client : National Highway Authority of India.
Consultant : Consulting Engineering Services (India) Pvt. Ltd.,
Post hold : Field Engineer. (Structures)
Project Cost : INR 68.0 Cr.
** Construction supervision of highway and major bridges between Srikakulam and Ichapuram. Supervision of well sinking operations, piling and open foundations. Involved in construction of both sub structure and super structure
** Monitored pre-stressing of beams (42M) cast in site and supervised launching. Implemented void slab and RCC deck slab construction techniques. Analyzed and calculated safe bearing capacities of soils
** Developed quantity take-offs for concrete and steel. Also developed bar bending schedules for improving reinforcement installation time.
** Proposed and implemented rehabilitation of existing bridges along the highway. Strengthened sub and super structure by epoxy and cement grouting. Replaced damaged bearings using hydraulic jack for lifting superstructure.
** Proposed and implemented rehabilitation of existing bridges along the highway. Strengthened sub and super structure by epoxy and cement grouting. Replaced damaged bearings using hydraulic jack for lifting superstructure.

Organization : M/s CONSULTING ENGINEERING SERVICES (INDIA) Pvt.LTD. Sept’1998 to Dec2002.
Project Name : Chennai Bypass project connecting National Highway 45 and 4.
Client : National Highway Authority of India.
Consultant : Consulting Engineering Services (India) Pvt. Ltd.,
Post hold : QA & QC Engineer.
Project Cost : Rs. 64.0 Cr.
** Responsible for testing of various materials such as soil, cement, steel, aggregate and asphalt.
** Performed field density tests for embankment, sub-grade, dense bituminous macadam and bituminous concrete. Evaluated proportions for sub grade mix, mix design of dense bituminous macadam, bituminous concrete and bituminous mastic.
** Evaluated the mix for high strength grade concrete and conducted workability and cube strength tests.
** Involved in analyzing and calibration of wet mix plant, hot mix plant and batching plant.

Organization : M/s CONSULTING ENGINEERING SERVICES (INDIA)Pvt.LTD., April’1997 to Sept’1998.
Project Name : Andhra Pradesh State Highway Project.
Client : Government of Andhra Pradesh, India.
Funded by World Bank; Worked for a joint
Venture with Snowy Mountain Engineering Corporation, Australia.
Consultant : Consulting Engineering Services (India) Pvt. Ltd.,
Post hold : Asst.Engineer.
** Responsible for developing reports for sub soil investigations, trial pit study for existing bridges and analysis and Benkelman beam deflection study.
** Performed dynamic cone penetration tests and analysis. Performed tests for various materials like soils, gravel and WBM. Performed tests at proposed quarries to evaluate material properties against specification standards.

Organization : M/s Progressive Constructions Ltd., Hyderabad, INDIA, June’1996 to April’1997.
Project Name : Conversion of National Highway 2 from two lane to four lane Between Mathura and Agra.
Client : Government of Uttar Pradesh, Public Works Department,
Funded by : The Overseas Economic Cooperation Fund, Japan;
Consultant : Consulting Engineering Services (India) Pvt. Ltd.,
Post hold : QA & QC Engineer.
Project Cost : Rs. 72.0 Cr.
** Studied and implemented many standard testing procedures for concrete, Steel asphalt and soil testing prescribed by Indian Standard Codes.
** Involved in conducting slump tests and collecting test samples for concrete mixes used.

Organization : M/s Progressive Constructions Ltd., Hyderabad, INDIA, April’1994 to June’1996.
Project Name : Construction of a tunneling for a new broad gauge line,.
Konkan Railway Corporation Ltd., Maharashtra, Ratnagiri.
Client : Konkan Railway Corporation Ltd., Belapur, Bombay.
Post hold : Site Engineer.
Project Cost : Rs. 8.5 Cr.
** Responsible for tunnel surveying, open cut excavation surveying. Was responsible for execution and erection of steel sections and concrete lining inside the tunnel.
** Responsible for construction of tunnel portal arch with concrete using a placer. Involved in piling using direct mud circulation method and bailer/chisel operation.
** Preparation of bar bending schedule for various structural locations as per approved drawings.

Organization : Panchayat Raj Dept.Machilipatnam, Feb’1992 to April’1994.
Project Name : Construction of WBM road near Machilipatnam
Client : Panchayat Raj Dept
Post hold : Work Inspector.
Project Cost : Rs. 3.5 Cr.
** Responsible for site survey. Developed conceptual and working drawings.
** Maintained bill of quantities.
** Developed as-built drawings.

Education :
AMIE, The Institution of Engineers, Kolkatta Civil Engineering, India, 1993.
Diploma in Civil Engineering, Machilipatnam, 1988

Professional :
Memberships The Institution of Engineers, Kolkatta, MIE- 125920/7 Indian Road Congress, New Delhi, India, LM-28276

Languages :Telugu, Hindi, English

IT skills
: MS Office, Primavera version3.0

Place
: Secunderabad
Date : 9/12/2012.

Jagadeesh