-
October 29th, 2008, 05:36 PM
Post Count Number #1
www.tvpl.com Teestavalley Power Transmission Delhi : Civil/Electrical/Mechanical Design Manager
Teestavalley Power Transmission Ltd.
http://www.tvpl.com
tvpl.com
Designation: Manager-Engg(Civil/Electrical/Mechanical)
Experience: 8 - 10 Years
Location: Delhi
Job Description
Candidate should have 8-10 years of experience in design and engineering of Transmission line towers, Hardware and accessories upto 400 KV level. Experience in sub-station design will be an added advantage.
Company Profile
The Project
TUL(Teesta Urja Ltd.) a company incorporated under the provisions of the Companies Act, 1956 and having its Registered office at 119 Jorbagh, New Delhi – 110003 is setting up a 1200 MW Teesta-III Hydro Electric Project, in North Sikkim. POWERGRID is the Central Transmission Utility and is, interalia, engaged in the business of construction, operation and maintenance of EHC-AC and HVDC transmission lines, sub-stations, Load dispatch centres and communication facilities for inter-state / inter-regional power exchange and efficient Grid operation. Teestavalley Power Transmission Limited (“TPTL”), the Joint Venture Company wherein POWERGRID would hold 26% of the issued and subscribed equity and the balance equity of 74% shall be contributed by TUL, is a Special Purpose Vehicle incorporated to undertake business of establishing, commissioning, setting up, operating and maintaining both dedicated and common Transmission System for evacuation of power from Teesta-III Power Project at / near Mangan in Sikkim.
The transmission system i.e. i) Teesta – III to Mangan pooling station with 400 kV D/C, Quad Moose conductor (dedicated transmission portion to Teesta –III generating station) and ii) Mangal pooling station to new pooling station at Kishanganj with 400 kV D/C, Quad Moose conductor shall be implemented through TPTL. The project is likely to be commissioned by July 2011 to match with the commissioning of the generating station.
Highlights
Project
· 400KV D/C line from Teesta-III – Mangan Pooling station
· 400KV D/C line from Mangan Pooling station to Kishanganj
· Extension of 2 nos. 400 kV line bays at Kishanganj Pooling point with Line reactors
Location of the Project
Northern part of Sikkim and West Bengal
Beneficiary States/UT
Constituents of NR
Project Cost Rs.700.07 crores at 2nd Quarter 2008 Price Level
Commissioning Schedule July 2011.
Keywords: design in transmission line towers
Last edited by muthukalee; October 18th, 2011 at 05:30 PM.
-
November 27th, 2008, 12:53 PM
Post Count Number #2
Resume (B.E.Civil/60%/2008)
Respected Sir/Madam,
I have come to know that your esteem organization is in the process of recruiting engineering graduates. So in this regard I am applying for the vacancy in your well-known company and attaching my curriculum vitae with this mail. Please kindly provide me an opportunity to work with your organization and prove my skills and hard work.
I have completed my B.E in Civil Engineering with 60% marks in June 2008
Please consider my resume for the recruitment process of your reputed firm.
Thanking you,
Anju Chaudhary 9871690032
-
February 11th, 2009, 12:00 PM
Post Count Number #3
Re: Teestavalley Power Transmission Delhi/NCR : Civil/Electrical/Mechanical Design Manager
Dear sir,
I am B.Tech (ELECTRICAL ENGINEERING)and have 6 month experience in Switchgear. I will be much pleased to work in competitive environment on challenging assignments that should yield the twin benefits of job satisfaction and a steady-paced professional growth.
Expecting a Favorable Reply
Sincerely ,
Deepmala choubey
(9718256580)
-
May 15th, 2009, 11:31 AM
Post Count Number #4
Re: Teestavalley Power Transmission Delhi/NCR : Civil/Electrical/Mechanical Design Manager
Mritunjay Kumar
Contact Information:
Address:
H/N:159 C, Sector 22, Noida
Hand Phone:
09350450151
Permanent Address:
Mritunjay Kumar
C/o S.N. Sharma
Teacher's colony Near Block Office Sonpur-841101.
Bihar.
Mobile: +91-9835282205.
E-Mail:
mrityunjay_1983@hotmail.com
mritunjay.kumar@rotopower.com
Personal Data:
Date of Birth: 30th April 1983
Gender: Male
Nationality: Indian
Marital Status: Single
Languages Known:
English, Hindi, Marathi, Bhojpuri
Interests
Music, Traveling, Analysing, Observing people
Carrier Objective
To excel and explore myself about the upcoming technologies and improve myself at professional and personal level.
Professional Qualification
WORK EXPERIENCE
ORGANIZATION POSITION & NATURE OF WORK DURATION IN MONTHS
Crompton Greaves Limited
Innodata Isogen, Noida
Roto power Project Pvt. Ltd
PPC (AT) Engineer (LT Motor)
September 2006 - July 2007
I & A associate
September 2007- Feb 2008
O & M Manager Telecom Feb 2008- still working
RESPONSIBILITIES In CGL
1. Use of AC & DC drives to fulfill the customer desires for special Indent motors; which allow an operator a means for developing control logic based on the status of other device.
2. Operation, Maintenance of VCBs, 2000 KVA transformer, ACBs, LT Panel and other electrical panels.
3. Execution of production plan for M.T.O. [Made To Order] line, frame size from 80 to132.
4. Material management as per the production plan.
5. Execution three days planning for production.
6. Routine Testing of Induction motor like no-load testing, short circuit test & HV test.
7. Daily line-up confirmation as well as production declaration in SAP.
8. Rejection and rework analysis through communication with
9. Other department.
10. Exposure to MOS.
11. Checking the performance of the worker by applying MOP
a. [Measurement of Performance].
12. Visiting to vendors for material follow up.
13. Reducing the lead-time of job by arranging the material just in time.
TECH SAVVY:
Computers: Complete knowledge of MS-OFFICE & windows 0. S.
Familiar with SAP 4.7/R3, end user of SAP PP & MM module.
PRESENT
ACTIVITIES: 1. Maintenance of BTS sites, Facilities, & AMC of DG Sets.
2. Working on troubleshooting of DG set (Operation, maintenance and troubleshooting of Diesel Engines Generator, Synchronizing Panel, Controlling and Paralleling of D.G. sets through microprocessor based ECP panel.) & HVAC system.
3. Taking physical stock, handovers, EB, Diesel consumption & auditing.
4. Checking the system variance and Quality control of motors.
5. Try to reduce the variance by avoiding physical errors.
6. Maintaining the daily maintenance report concerning AMC, MIS & Condition Monitoring.
PROJECT UNDERTAKEN:
DESIGN ANALYSIS OF DC MOTOR IN CROMPTON GREAVES LIMITED
DC motor offers wide distinct economic & technological advantages like it can be designed for wide ranges of Voltage/Current or Speed/Torque characteristics both for steady state as well as transient state conditions. It's related to manufacturing engineering, new technology & management of resources, which would definitely help us in future.
Academic Record
10th CBSE
Kendriya Vidyalya, Sonpur 1999
10+2
CBSE Kendriya Vidyalya, Sonpur 2001
B.E Electrical
PU P.D.V.V.P. College of Engineering 2006
1. Competencies
2. Fast learner. Adapt well to changes and pressures in workplace.
3. Result oriented.
4. Team leadership.
5. Work effectively with diverse groups of people.
6. Friendly with an upbeat attitude.
7. Sincere with a high level of Integrity.
Declaration
I consider myself familiar with technologies Aspects and confident of my ability to work in a team.
I hereby declare that the information furnished above is true to the best of my knowledge.
Place : Noida
Date : [Mritunjay Kumar]