Designation: Junior engineer Experience: 1 - 5 Years Location: Chennai
Job Description
Must be 2 years system cadd mechanical drawing knowledge , able to handle new projects, 2D,3D moduling
Desired Candidate Profile
cadd drawing knowledge with job setting knowledge tool design, 2D, 3D moduling , minimum 2 years exp.
Company Profile
The company is one of the unit of Shriram Group of companies which is operating successfully for more than 50 years in Manufacturing Precision turned components to Auto Majors
Dear Sir,
Please accept this letter and the accompanying resume as an expression of my interest in a position with your esteemed organization
As my Resume indicates, in NOVEMBER 2008, I have receive a Bachelor of Engineering in MECHANICAL ENGINEERING & I am having experience in DESIGN,R&D . I would like to begin employment with an organization in witch my effective performance will be with recognition and growth.
I am proficient in the use of various automated solutions including current releases of Auto Cad, Pro-e 2001 & CADian .
I have applied classroom learning to innovative and successful projects in B.E and DME. Additionally, I have been done a 2 mini design project in Pro-E 2001 and CADian. I have done my BE project successfully in “Improving process capability of brake block component manufacturing by using SIX SIGMA (6?) concept” ( by reducing the CASTING DEFECT ).
I am certain I could make significant contributions to your organization, and I would Welcome the opportunity to meet with you to discuss how my education and abilities might best be employed by your esteemed organization.
And also I attached my resume with this letter.
Thanking you for your consideration. Iam looking forward to your response.
Sincerely,
S. GANESH KUMAR
OBJECTIVE :
To be a part of a team oriented environment and to utilize my skills for the betterment of the organization I work for. EDUCATION :
• B.E MECHANICAL ENGINEERING under ANNA UNIVERSITY, with 66 % of mark in Sudhersan Engineering College, Pudukkottai
• DIPLOMA (D.M.E) IN MECHANICAL ENGINEERING, with 71 % of mark in Venkatesvara Polytechnic, Pudukkottai WORKING EXPERIENCE :
ORGANIZATION : M/S. SHRI RAMANA HEAVY ENGINEERING (P) LTD., CHENNAI. PERIOD : JUNE 2007 TO PRESENT DATE ( 1.6 YEAR ) DESIGNATION : DESIGN & PROPOSAL ENGINEER..
ROLE & RESPONSIBILITY :
• Pre-Design the material handling equipments (conveyors).
• Research and Development the material handling equipments..
• Preparing Lay Out & General Arrangement DRAWING Preparation For Conveyors.
• Design Calculation & Estimate the cost of material handling equipments.
• Preparing foundation load data for handling equipments plant.
• Interact With Purchase and Project Department. SOFTWARE EXPOSUR :
• CAD Packages : AUTO CAD , CADian2004 B, Pro-E • Basic Knowledge : ANSYS PROJECT : • B.E PROJECT :
Improving process capability of M1 brake block component manufacturing by using SIX SIGMA (6s) concept.
DESCRIPTION : The project deals with the REDUCING the CASTING DEFECT TO ZERO LEVEL by using DMAIC methodology in SIX SIGMA concept • D.M.E PROJECT : Pneumatic auto feed drilling machine. • MINI PROJECT ON CAD PACKAGE : • CADian 2004 B : Flange Coupling Design. • PRO-ENGINEER 2001 : Shaping Tool Head Design
TRAINNING & SEMENARS :
• I have undergone training on “ADVANCED CERTIFICATE COURSE IN COMMERCIAL VEHICLE SERVICING” conducted by MADURAI TVS & ACSL. (30 DAYS)
• I have undergone training in “RECONDITIONING OF AUTO MOBILE VEHICLES” AT TAMIL NADU STATE TRANSPORT CORPORATION, PUDUKKOTTAI (15 DAYS) CONFERENCE & PAPER PRESENTATION : • Presented a paper in NATIONAL CONFERENCE on Improving Process Capability Of M1 Brake Component Manufacturing By Using Six Sigma Concept at JAYAM College OF Engineering and technology , DharmapuriEXTRA & CO - CURRICULAR ACTIVITIES :
• Won 2nd place in NATIONAL LEVEL DESIGN CONTEST at Shri Angalamman College of engineering and technology.
• Participated in NATIONAL LEVEL SOFTWARE MODELING at Alagappa College of Engineering and Technology.
• Participated in STATE LEVEL SOFTWARE MODELING at Dr. Mahalingam College of Engineering and Technology.
AWARD, MEMBERSHIP AND POSITION HOLD :
• BEST STUDENT AWARD 2006 in CADD CENTRE Pudukkottai
• President of ROTRACT CLUB in Venkatesvara polytechnic college
PERSONAL DETAILS :
FATHER’S NAME : S. SHANMUGA SUNDERAM. DATE OF BIRTH / AGE : 10 JAN 1985 / 23 LANGUAGES KNOWN : Tamil, English (To read, write, and speak)
DECLARATION
Hereby i declare that all the above-furnished details are true to the best of my knowledge.
PLACE : CHENNAI Yours Truly, DATE : 16.11.2008 S.GANESH KUMAR
Last edited by Guest-IJT; May 12th, 2011 at 05:15 PM.
RESUME
R. PRABU
prabu_vijayarani AT yahoo.co.in OBJECTIVE :
To become a part of the Organization, establish myself for achieving corporate goals and Grow with it. EDUCATION :
QUALIFICATION INSTITUTION YEAR OF
PASSING
D.M.E (Mechanical
engineering) Venkateshwara
Polytechnic College, Pudukkottai. 2005-07
XII STANDARD Government Boys
Higher Sec. School, Pallathur. 2003-04
X STANDARD
Punitha Arokiya Annai
Higher Sec. School, Punalvasal. 2001-02 PROJECT DETAILS :
1 Fabrication of Parting off Tool Cutter.
2 Reversible Pump. ADDITIONAL QUALIFICATION :
1. DMO (MS Office) CSC, Peravurani.
2. Cell phone Service Training at Seshasayee Institute of Technology, Trichy. EXTRA CURRICULAR ACTIVIES :
- Member of National Cadet Corps (NCC) during SSLC.
PROFESSIONAL SKILLS : Modeling Software : Catia, Pro-e, Solid Works, AutoCAD Inventor 2009. Drafting Software : Auto Cad 2007 & 2008 EXPERIENCE :
1 Worked as a Draftsman in C.GOPAL NAICKER & SON FOUNDRY at Basin Bridge, Chennai 26, from April 2007 to July 2009. JOB RESPONSIBILITY :
- Product of the Organization, Manufacturing of Grey & SG Iron Components.
- Preparing of manufacturing drawing using Auto CAD 2007.
- Preparing of assembly drawing in Core box & Mould Pattern.
- Preparing of Bill of material requirement for given project.
- Quality Checking. EXPERIENCE :
2 Worked as a Design Engineer in TOOL & MACHINE TOOL ENGINEERING at Ambattur, Chennai 58, from August 2009 to February 2010. JOB RESPONSIBILITY :
- Product of the Organization, Manufacturing of Sheet Metal & Don Racks Components.
- Preparing of manufacturing drawing using Auto CAD 2008.
- Preparing of assembly drawing in steel structures.
- Preparing of Bill of material requirement for given project.
- Development Drawing Sheet Metal.
- Preparing of Layout Drawing.
- Costing and Quotation with Work order preparing. EXPERIENCE :
3 Working as a Design Engineer in POSEIDON LIGHTING PVT.Ltd. at Gummidipundi, Chennai 601201, from March 2010 to Till Date. JOB RESPONSIBILITY :
- Product of the Organization, Manufacturing of Sheet Metal & LED Lighting Components.
- Preparing the manufacturing drawing using AutoCAD 2007.
- Preparing the 3D drawings and drafting for sheet metal components using Pro-E WF4.
- Preparing the Pro-E Assembly and Detailing drawing.
- Preparing Electrical Wire Routing Drawing.
- Development drawing calculations for Sheet Metal components. ELECTIVE SUBJECT :
- Ref & Air conditioning
- Automobile Technology
September 13th, 2011, 04:52 PM
Post Count Number #4
Senior level assignments in Manufacturing production machine shop
Subject ; Application for Senior level position in operations, Machine shop, Manufacturing,
Production, Assembly .
Dear sir,
I am a Diploma Holder in Mechanical Engineering and have completed Diploma in Management, Having 27 years experience in Operations, Manufacturing , Production, Machine shops, Planning, Assembly, Quality and vendor development of precision engineering, Auto components Manufacturing, valves manufacturing , Pumps divisions , Gears and Gear Box manufacturing industries ,machine tool manufacturing and Tool Room areas.
Well versed with latest manufacturing techniques like JIT, KANBAN, 5S, SPF, LEAN MANUFACTURING,TPM and ISO/TS Concepts, API 6a standards and EMS , OH & S systems.
Trained in Germany and Japan.
Experienced in implementing projects and establishment of manufacturing set up..
Recently , I have established a Very Good manufacturing unit for a German based MNC in Coimbatore, with latest manufacturing technology and systems.
Established a Green field manufacturing shop floor for a reputed 100% EOU valve manufacturing unit.
If I have been given an opportunity to work in your organization, I will perform my duties to your entire satisfaction .
Expecting your favourable reply. E mail : vijayapandi65 AT yahoo.com
Vijayapandi .U E Mail : vijayapandi65 AT yahoo.com
Senior Level Assignments in Plant Operations/Manufacturing/Project management/Production/Machine shop/Assembly/ Production Planning & Control/Vendor Development /Quality/maintenance.
EXECUTIVE SUMMARY
1 A competent professional with nearly 27 years of rich experience in Plant Operations, machine shop, Assembly, manufacturing, Production, Project Managements, Production Planning & Control, Quality, vendor development, Erection / Commissioning & Maintenance Operations.
2 Presently working with “ Magana Electro castings Ltd” in the Machining Division, as General Manager ,from January 2010, Responsible for operations, manufacturing, Machine shop Production, QC, maintenance ,Planning, Vendor development, New product Development dept etc.
3 Resourceful at strategizing techniques for maximum utilization of manpower/machinery.
4 Effective communicator with assertive and strong leadership qualities and analytical
5 A strategic planner with competency in devising significant solutions, and implementing safety management systems for maintaining sound environmental and safety conditions.
6 Extensive experience in managing inventory for maximum utilization of available resources, material management etc.
7 Expertise in implementing lean manufacturing , JIT,SPF, and TPM concepts in manufacturing areas.
8 Hands on experience in erection & commissioning of various equipments, assembly, project work etc.
Present Assignment at Magana
1. Overall responsibility for the operations of machining division which includes Planning, In-house production ( Machine shop with Precision machining and Turning operations in CNC and conventional machine environment ), subcontracting, New Product and process engineering department, QC, Maintenance etc.
2. Driving the above team for achieving following actions and objectives on monthly/ weekly/daily basis for the output. .
a. Receipt of Monthly schedule from marketing.
b. Monthly capacity planning and preparation of List of parts for subcontracting.
c. Preparation in-house Machine Loading plan .
d. Preparation of Supplier machine loading plan.
e. Cell wise plan vs Actual reports generation and review.
f. Gap analysis.
g. Forwarding the casting requirement plan to foundry.
h. Daily machine loading and follow Daily Work Management systems for daily output.
i. Implement 5S and TPM concepts.
j. Achieving OEE to above 75%.
k. Timely maintenance actions Like B/D , Preventive, reconditioning, Spares management etc.
l. Forming SGA ( Small Group activities) to focus on Problem solving methodology like 7 Steps of problem solving Techniques by using 7 QC tools.
m. Customer interactions on Technical issues.
n. Forming CFT for continuous improvement projects and review team presentations
o. Implement suggestion schemes and create Total Employee Involvement in all activities and latest manufacturing techniques.
p. For new product management, follow the activities like costing sheet preparation , Feasibility review and report preparation , Conducting design review meetings and planning for facilities like man, machine, Jigs and fixtures, Cutting tools etc.
q. Implement TS 16949 systems and to follow the requirements Like APQP, PPAP, Control plan, FMEA, Poka- Yoke , Kaizen improvements etc
r. Supplier assessment and vendor rating.
3. Preparation of MIS reports and forwarding it to MD.
4. To improve Monthly sales target of the company
5. To identify and recruit competent people along with HRD.
6. To Improve the margin of the product by doing optimization in process.
7. To make Lean layout of machines and to reduce Over all lead time of the product.
8. To Coordinate with Foundry , Marketing, HRD, Finance for respective requirements.
CORE COMPETENCIES
Plant Operations
1 Coordinating plant activities for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.
2 Preparing & maintaining operations, delivery & quality and maintenance related reports.
3 Responsible for Overall divisional turn over achievement.
4 Business planning, resource requirement identification(capacity planning) and planning for resources.
5 Improve OEE of plant and equipments.
6 Improve Morale of People and Create TEI through TQM activities.
Project Management
2 Managing the projects from concept to commissioning stage & handling project activities involving working out various requirements with respect to planning, utilities, machines, manpower & monitoring overall project execution for ensuring timely completion.
3 Developing financial projections, preparing budgets and performing extensive project costing.
Production Planning & Control
4 Managing overall operations with a view to ensure timely accomplishment of production targets within the time and cost parameters.
5 Overseeing overall Procurement activities, implementing effective techniques to bring efficiency in operations, improve quality standards & achieve maximum cost savings.
6 Continuously preparing Annual plan, monthly plan, weekly plan and daily plan and track the achievements through Daily work Management. Initiate cAPA for the failures.
Erection & Commissioning
6 Ensuring effective site management and discipline to ensure safe execution of the projects.
7 Erection, testing and commissioning of equipments, also providing utility services to the equipments.
8 Troubleshooting problems arising in the total execution of job with minimum time lag.
9 Taking stringent quality measures including preparation / maintaining necessary documents and to ensure compliance with standards.
Operations & Maintenance
10 Identifying areas of obstruction/breakdowns and taking steps to rectify the equipments through application of trouble shooting tools.
11 Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in O&M Expenditures and work within the budget.
Quality Assurance
12 Monitoring adherence to quality systems & comply with ISO quality standards along with maintaining the requisite documents.
13 Implementing quality systems in the organisation to reduce rejections and ensure zero defect products.
14 Familiar with SPC and control charts .
15 Experienced in Quality control process control charts and control plans.
Man Management
16 Managing a team of workmen, supervisors, Engineers , managers and guiding them to address and resolve performance bottlenecks along with imparting in house training.
17 Planning effective manpower deployment & works scheduling of qualified workforce; addressing training needs of staff to enhance skills and productivity.
18 Supervising workmen on the floor and ensuring optimised production output and quality of products manufactured.
19 Maintaining Discipline in the shop floor by imparting training to follow latest manufacturing techniques and smooth running of the plant.
Previous Experience
Name of the organization Period of Employment and year of joining
Position Held
Company Profile
Area of Experience
GTN Engineering India Ltd
Coimbatore
13 months/ December 2008
Senior Head –Operations GTN Engineering is 100 % EOU company , manufacturing Valve assemblies for FMC Technologies for their world wide Requirements They are Certified with Integrated manufacturing systems like ISO 9000, EMS & OH &S, API 6( a )etc. Following Lean 6 Sigma, 5S and TPM concepts. In charge for machine shop ( Machine shop is having more than 25 CNC machines)
Responsible for Production, maintenance , QC , Vendor development etc.
Establishment of machine shop in New premises including layout, shifting of Old machines, Purchasing new machines , Commissioning etc.
Involved as a Key person in the system implementation in the company.
Eppinger Tooling Asia Pvt Ltd ( A German MNC)- Coimbatore
2 Years/ 2006
Works Manager Eppinger Tooling Asia Pvt Ltd is a German MNC, is the leader in manufacturing Tool holders and Turret assemblies, Live Tool Holders, Preci flex Tool applications etc for World wide CNC manufacturers.
Indian Manufacturing Plant is a newly Established Unit and has developed rapidly. In charge for the Over all Technical plant activities.
Involved in setting up the plant from scratch. Established a World class machine shop. Established the Assembly shop. Recruited the total strength of 250 Employees .System Establishment, Productionisation of the plant , Creating supplier base for the machined components and developed about 20 suppliers in Coimbatore. Achieving the Target as per The Parent company( based at Germany).
India Nippon Electricals Ltd( ATVS Group)- Hosur
7 Years/ 1999
Assistant Manager- Machine shop and Assembly section. India Nippon Electricals is a Collaborated company among with Lucas TVS and a Japanese company named Kokusan Denki- Japan. They are the manufacturer of Two wheeler and Three wheeler Fly Wheel Magnetos, and other Electrical Items like IG Coil , RR ,Wiring Harnesses etc. Main Suppliers to TVS Motors, Hero Honda, Kinetic Honda, Honda motors etc. Also doing export.
They are following Latest manufacturing Techniques Like Lean Manufacturing, SPF, etc Incharge for Machine shop and Assembly shop. Responsible for Production planning and control, Target Achievements, Labour control, Improve efficiency of operators, Improve OEE, Forming SPF layout and implementing Single Piece Flow of manufacturing .
To run and achieve the production as per Takt time in the cells.
Implementing Team building activities like SGA ( Small Group activities) , Establishing CFT functions, Implimenting TPM, KANBAN, 5S Activities.
Autolec Industries- Chennai.
3 years/ 1996
Superintendent – Machine shop. Autolec Industries is presently called as TVS –Autolec. They are manufacturing Oil Pumps and Water Pumps for Automobiles.
They had established Lean Manufacturing concepts with Cell Concepts. Responsible 3 machining Cells and assembly production.
Had trained in Module Leader / Cell leader functions.
Responsible for Cell planning and Cell output, Rejection control, Setting time and cycle time reduction , implementing systems and new concepts etc.
Pricol Coimbatore
7 Years/1989 Engineer -machine shop Pricol is manufacturing Dash Board instruments , Speedo meters, Temperature gauges, Oil pumps , Defence equipments etc Have worked as shift incharge in Auto machine shop, and Head Of the section in Pumps machine shop.
Have manufactured a lot of SPM at inhouse .
Around 6 Single piece flow layout are formed and trained the operators. Responsible for Target achievements and Labour control. Key person in ISO system Establishment in the organization.
Shanthi Gears Ltd, Coimbatore
1 Year/1987
Incharge Gear Grinding and worm grinding section and machine shop Shanthi Gears is the Leader in Gears and Gear box manufacturing. They had about 4 manufacturing units in Coimbatore.
Incharge for the Production area.
Have established some of the gear grinding machine operations
Shift incharge for Machine shop.
Trained in Gear grinding, Hobbing, Gear Tester , and with all gear and gear box related subjects.
Easun Machine Tool Works
3 Years/ 1984 Supervisor – Machine shop Easun Machine Tool works were doing Machine Tool reconditioning work and SPM manufacturing .
They had a very good machine shop and machine Tools dismantling and assembling shop. I was working as Supervisor for machine shop and assembly shop , vendor development, Planning etc.
Have handled all types of machine tools like lathe , milling, shapping, plano miller , Gear hobbing, Thread milling, Gear Grinding machines etc.
TRAINING PROGRAMS
1 ISO 9000, QS9000, ISO 14001& TS 16949 internal auditor training
2 Cell Leader / Module Leader training ( on JIT, KANBAN, SPF etc.,)
3 JIT management training at Japan conducted by JIT Management Laboratory, Tokyo, Japan.
4 Trained in ERP system and latest manufacturing technology at Germany.
5 Project management and establishment activities.
IT SKILLS
5 Working knowledge of MS Office & Internet & possess knowledge on Networking & VPN connections. Experienced with ERP system.
ACADEMIC CREDENTIALS
1 Diploma in Management from Indhira Gandhi Open University in 2005.
2 Diploma in Mechanical Engineering from Sankar Institute of Polytechnic, Tirunelveli in 1984.