    MNC EPC company Oil & Gas overseas projects

    Profiles Required:

    [If you need the details for any below mentioned position, please let me know]

    Thailand (Offshore Projects)
    Lead/ Senior Process Design Engineers
    Senior Mechanical Design Engineers
    Senior Instrumentation Design Engineers
    Senior Rotating Engineer
    Senior Contracts Engineer
    Senior Cost and Planning Engineer
    Senior Pipeline Engineer
    Architectural Engineer
    Project Manager – LQ Project
    Senior Planner / Risk Assessment Manager
    Lead Engineer – Structural
    Lead Engineer – Facilities
    Lead Safety Engineer
    Lead Instrument Engineer
    Lead Electrical Designer
    Senior Structural Engineer
    Senior Structural/ Installation Designer

    Singapore (FPSO Projects)
    Designer / Engineer-Electrical
    System Engineer-Instrument
    Technician- Electrical
    Lead System Engineer, Electrical
    PIMS Coordinator / Mechanical Completion Co-ordinator
    Lead Field Engineer - Marine
    Buyer
    Lead Process Engineer

    Malaysia
    Engineering Manager (Marine/ offshore Constructions)
    Instrumentation Engineer
    Control Systems Engineer
    Lead Electrical Designer
    Lead Instrumentation Designer

    Brunei
    Process Engineers
    Senior Systems Engineer

    Oman
    Process Engineers
    Lead Project Engineer
    Senior C&A Engineers
    Civil Structural Designers – PDMS
    Electrical Designers – PDMS
    Pipeline Designers – PDMS
    Piping Designers – PDMS
    Plant Layout Designers – PDMS

    UAE
    E & I Engineer
    Instrumentation Design Engineer
    Senior Electrical Design Engineer
    Lead / Electrical Designers
    Lead Instrumentation Designer

    If you have any query in this regard, please let me know.
    Regards
    Dinesh Kumar
    dinesh.kumar@technofac.com

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: jobs at MNC EPC company Oil & Gas overseas projects

    Dear Sir,
    This is reference with your advertisment in job portal
    i would apply to the mentioned post.
    Below listed are summary of my professional experience.
    hope that this will meet your Requirement.
    Looking forward for your response

    ADITYA VIKRAM SINGH
    Three years of Experience in Petrochemical plant and Engineering stream.
    Currently working as Execution (Projects) engineer and associated with Petrochemical project in Reliance Engineers Associates (P) Ltd. Jamnagar.
    Looking for a fast track career growth in Design and project fields with added responsibilities

    ADITYA VIKRAM SINGH
    er_aditya14 AT yahoo.co.in
    aditya.s.singh AT gmail.com

    BRIEF OVERVIEW :
    - Excellent tract records that demonstrates self-motivation, creativity and initiative to achieve both personal and corporate goals.
    - Excellent trouble shooting & analytical skills
    - Achievement oriented with excellent people management skills & an ability to manage change with ease
    - A Team player with strong Will power and analytical problem solving Skill & organizational abilities.

    EDUCATION :
    - B.E. in Mechanical Engineering : Year of passing: JUNE 2006 University : Uttar Pradesh Technical University, Lucknow, U.P, India. %Marks : 60%
    - Matriculation : %Marks : 70%
    - Intermediate of science : %Marks : 54%

    PROFESSIONAL EXPERIENCE :
    Experience: 2 Years of experience in the role of Execution (Projects) engineer in Production planning, fabrication, planning and control, scheduling, resource planning, monitoring and Control in a Manufacturing environment in Reliance Industries Ltd.

    Company: RELIANCE ENGINEERS ASSOCIATES (P) LIMITED, Jamnagar Export Refinery Project, Jamnagar, Gujarat.
    Duration: From September 2007 to Till Date
    Designation: PROJECT ENGINEER (MECHANICAL)
    Roles and Responsibilities:
    Project engineer with the role of production planning and execution of normal
    production and construction activities.
    - Responsible for planning, coordinating, execution of normal production activities.
    - Reviewing of piping isometric drawings, P&I Drawings, General arrangement drawings.
    - Conducting activities to maintain ASME & IS standards.
    - Inspection of fabricated spools with technological collaboration according to piping Isometric Drawing.
    - Material verification and Fit up inspection as per engineering requirement.
    - Responsible for issue of material, stock verification and quality of work etc. as per requirement.
    - Monitoring & maintaining daily and weekly progress of fit up, welding, and NDT clearance.
    - Responsible to assist Sr. General Manager in meeting departmental targets & objectives.
    - Responsible for preparation & release of DPR & MPR.
    - Hydro testing of pipe lines as per engineering requirement
    - Familiar about different welding methods (SMAW,GTAW,SAW etc)
    - Inspection of different type of welding processes for different types of metals like alloy steel, stainless steel and carbon steel (LTCS, NACE, IBR etc.)
    - Weld visual inspection as per standards and specification requirement.
    - Conduction of non destructive examination like as radiography test, magnetic particle test and dye penetration test as per technical requirement
    - Pneumatic test of reinforcement pad with technical collaboration.
    - Production planning and execution of Fabrication of Piping.
    - Responsible for HSSE compliance at work site.
    - Resource planning, monitoring and Control.

    Company: GANNON DUNKERLY & CO. LIMITED, MCC-PTA Project, Haldia , W.B.
    Duration: From July 2006 to Septemer 2007
    Designation: PROJECT ENGINEER (MECHANICAL)
    Roles and Responsibilities:
    Project engineer with the role of production planning and execution of normal production activities.
    - Responsible for planning, coordinating, execution of normal Construction activities.
    - Reviewing of piping isometric drawings, P&I Drawings, General arrangement drawings.
    - Conducting activities to maintain ASME & IS standards.
    - Inspection of fabricated spools with technological collaboration according to Isometric Drawing.
    - Material verification and Fit up inspection as per engineering requirement.
    - Monitoring daily and weekly progress of fit up, welding, and NDT clearance.
    - Pneumatic test of reinforcement pad with technical collaboration.
    - Resource planning, monitoring and Control.

    SOFTWARE PROFICIENCY :
    - Aware with Microsoft project (MS-Office, MS Excel).
    - Primavera, MS-project.
    - Knowledge of AUTO CAD.
    - Basic Knowledge of I DEAS.

    PERSONAL DETAILS :
    Name : ADITYA VIKRAM SINGH
    Date of Birth : 14-12-1984
    Sex : Male.
    Marital Status : Unmarried.
    Nationality : Indian.
    Languages Known : English & Hindi

    OTHER ACTIVITIES:
    - College Team member of the Cricket team.
    - Organizing various cultural & Technical activities.

    HOBBIES:
    - Net Surfing
    - Listening songs
    - Sketching

    DECLARATION:
    I herby declare that all statements mentioned as above are true to the best of my knowledge and brief, if any information given by me will be false my candidature may like to be cancelled.
    Date:
    Place: Jamnagar (ADITYA VIKRAM SINGH)

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: jobs at MNC EPC company Oil & Gas overseas projects

    SANGAPPA BIRADAR - SENIOR FIELD ENGINEER
    E-mail address : kanteshbiradar AT yahoo.co.in
    Experience : 16 years +

    Areas of Specialization :
    - CONSTRUCTION of OIL & GAS / PETROCHEM PROJECTS, NUCLEAR POWER PROJECTS, GAS BASED POWER PROJECTS
    - Related construction works, Pre-Commissioning and Commissioning
    - ROTATING and STATIC EQUIPMENT
    - Installation works, Pre-Commissioning and Commissioning
    - PIPING
    - Shop-Fabrication, Field Piping, Testing (Hydro & Pneumatic) and Pre-commissioning
    - STRUCTURAL STEEL WORKS
    - Fabrication and Erection works

    Work Experience Summary :
    1) EASTERN BECHTEL CO Ltd. [U.A.E]: Sep ~ 2007 onwards.
    FIELD ENGINEER (Piping) – ASAB GAS DEVELOPMENT PROJECT, Phase # 2. Abu Dhabi.
    - To supervise the sub contractors during execution activity at construction site.
    - Monitoring and supervising the erection of 4 x 90 TPH Natural Gas fired Bi Drum Boiler ( M/s Thermax Babcock & Wilcox, India), De aerator, HP & LP dosing systems and Boiler feed pumps. Economizer, attemperator, integral & Non-integral piping and Ducting.
    - Monitoring field quality issues on daily basis.
    - Responsible for site queries and all as built drawings.
    - Attending meeting regarding quality issue with sub contactor.
    - Reviewing / clearing test packs and preparing FCN / FCR /DCN/TQR.
    - Review and validate specification / Procedure.

    2) TELFORD INTERNATIONAL Ltd. [U.A.E] : July 2005 ~ Sep2007 (2 yrs)
    MECHANICAL ENGINEER – TAWEELAH POWER STATION. Abu Dhabi.
    - Service and maintenance of 12 Trash Rack System at Sea Water Intake Channel in continuous operation
    - Refurbishment of Cathodic Protection equipment of all 12 Trash Rack at Sea Water Intake Channel
    - Refurbishment of H2 Venting System of Hypo Tank, Old Hypo chlorination plant Acid cleaning System & Chlorine Injection lines to Distillate Headers
    - Rehabilitation of MSF units Barrel drain pump draining system & Refurbishment of MSF unit’s water box venting pipes.
    - Co2 Compressor Overhauling.(MEHER)

    3) BAHWAN ENGINEERING CO. [SULTANATE OF OMAN] : August 1998 ~ July 2005 (7 yrs)
    PIPING ENGINEER – OMAN LNG TRAIN III (QALHAT LNG) PROJECT (March 2004 till date)
    - Installation works for all Equipment including Compressors & Pumps
    - Pre-commissioning including Flushing of Lube Oil systems.
    - Piping Tie–Ins within live areas from the existing trains to the new train
    - Pro-active assistance for all Hot Tapping works
    - Field Piping including Rack & Sleeper Piping
    - Testing of Piping Systems (Hydro testing & Pneumatic Testing)
    - Pre-commissioning works including Blowing & Flushing of Piping Systems

    PIPING ENGINEER – OMAN REFINERY DHDS PROJECT (April 2003 ~ February 2004)
    - Fabrication & Erection of pipes for all Equipment including Compressors, Pumps & Fin-Fan Coolers
    - Shop Fabrication & Field Piping including Rack Piping
    - Testing of Piping Systems (Hydro testing)
    - Pre-commissioning works including Blowing & Flushing of Piping Systems.

    PIPING ENGINEER – SALALAH (Oman) POWER PROJECT (March 2002 ~ March 2003)
    - Field Piping including Sleeper Piping
    - Installation of interconnecting pipes, Commissioning and Start-up of Reverse Osmosis Plant
    - Installation works for all Equipment including Gas Turbines and Pumps

    MECHANICAL ENGINEER – DEWA (Dubai – UAE) POWER PROJECT “D” Phase II (October 2000 ~ February 2002)
    - Installation works for all Equipment including Gas Turbines and Pumps
    - Pre-commissioning including Flushing of Lube Oil systems
    - Commissioning and Start-up of all Rotating Equipment
    MECHANICAL ENGINEER – RUSAYL POWER PROJECT Unit 8 (March 2000 ~ October 2000)
    - Installation works for all Equipment including Gas Turbines and Pumps
    - Pre-commissioning including Flushing of Lube Oil systems
    - Commissioning and Start-up of all Rotating Equipment
    MECHANICAL ENGINEER – OMAN LNG TRAIN 1 & 2 PROJECT (August 1998 ~ February 2000)
    - Field Piping including Rack Piping
    - Installation works for all Equipment including Gas Turbines, Compressors, Pumps & Fin-Fan Coolers
    - Pre-commissioning including Flushing of Lube Oil systems and Trial Air Runs of Fin-Fan Coolers
    - Commissioning and Start-up of Sea Water Intake & Outfall System and Desalination Unit

    4) DODSAL [INDIA] Ltd. : September 1997 ~ August 1998 (1 yrs)
    PIPING ENGINEER – Reliance Petroleum Ltd. Project, Jamnagar - Gujarat. India
    - Cross country Sleeper and above ground piping up to 42”-
    - Testing of Piping Systems

    5) KUMAR ENGG. WORKS under BRIDGE & ROOF ( INDIA) Ltd : January 1997 ~ September 1997 (9 months)
    PIPING ENGINEER – Gas Cracker Project for India Petrochemicals & Chemicals Ltd., Gandhar - Gujarat. India
    - Rack Piping

    6) PALI ENTERPRISES under UB ENGINEERING Ltd : March 1996 ~ January 1997 (10 months)
    PIPING ENGINEER – Air Separation Unit Project for India Petrochemicals & Chemicals Ltd., Gandhar - Gujarat. India
    - Field Piping including Rack Piping
    - Installation works for all Equipment including Compressors and Pumps
    - Pre-commissioning including Flushing of Lube Oil systems, Blowing & Flushing of Piping Systems
    - Commissioning and Start-up

    7) ELECTROMECH INDUSTRIES : January 1993 ~ February 1996 (3 yrs)
    MECHANICAL ENGINEER – Nuclear Power Corporation India Ltd. Project, Kaiga - Karnataka. India
    - Installation works for all Equipment in the Fuel Handling Unit and Liner Plate installation
    - Fabrication & Erection of Structural Steel

    Personal Details :
    Date of Birth - 11. May. 1973
    Nationality - Indian
    Contact Phone No. [INDIA] - 0091-9449253993
    Mailing Address [INDIA] - 1644, 5th stage, 2nd cross,
    BEML Layout, R R Nagar, Bangalore
    Karnataka – 580039, India.
    Passport Number - E 9646303

    Qualifications - Diploma in Mechanical Engineering (Karnataka University – 1992)

    Computer Proficiency - Operating System: Windows 98/XP.
    Construction Package: Team Works (Bechtel Proprietary software).
    3D Model Viewer: Smart Plan Review.
    Office Automation Package: MS Office.

  4. Post Count Number #4
    On probation
    Join Date
    June 23rd, 2009
    Location
    KERALA
    Posts
    1

    Re: jobs at MNC EPC company Oil & Gas overseas projects

    BIODATA
    PRASHEEN. EV
    Email: pbk2001 AT gmail.com
    : pbk_2008 AT yahoo.com

    Objective :
    Intended to build a career with leading corporate of hi-tech environment with committed and dedicated people which will help me to explore fully and realize my potential willing to work on a key plays in challenging and creative environment.

    Day of birth:06-Aug-1987
    Gender : Male
    Nationality : Indian
    Marital Status : Single

    Summary of Educational Qualifications :
    Diploma in Mechanical Engineering from Department of Technical Education.
    Professional coaching towards Oil field and Quality Control.
    ASNT Level II in
    1. Radiographic Test (RT)
    2. Ultrasonic Test (UT)
    3. Magnetic particle Test (MT)
    4. Penetrant Test (PT)

    Autocad 2006 (Mechanical)
    MS Office & Photoshop.

    Experience :
    Doing work at Gujarat as Piping Inspector in SHILPI ENGINEERING PVT LTD.

    Specialization :
    1. Good Communication skill
    2. Knowledge in Mechanical Design tools AutoCAD 2006.
    3. Knowledge in Construction drawings such as p&id, piping isometrics, equipment, structural, CAD.
    4. Familiar with Material Inspection, dimensional check and documentation as per construction material standards such as ASTM/ASME SA106, SA515, , SA516 and with ANSI standards of B36.10, B16.9.
    5. Through know ledge in welding standards of ASME section 9 and API 1104.
    6. Familiar with Welding Procedure Qualification, Welder Qualification p-number selection of electrodes, Weld Visual Inspection etc.
    7. Good knowledge in Radiography Interpretation of weld joint, Ultrasonic Inspection, Magnetic Particle inspection and Inspection and Penetrant Test reporting and Documentation.
    8. Fabrication of piping, structure, pressure vessels and other equipments documentation of history, test pack clearing etc….
    9. Confident to handle the construction and quality control activities as specified in the drawings and applicable standards and specification.

    Languages known :
    1. Malayalam (Mother tongue)
    2. English (Read, Write and Speak)

    Declaration:
    I do hereby declare that the details given above are true and based on reliable certification and documents
    PRASHEEN.EV

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: jobs at MNC EPC company Oil & Gas overseas projects

    RESUME
    PIYUSH SINGH
    E-mail : piyusheciu AT gmail.com

    Objective: -
    To blend the functional and technical knowledge gained from Academics & Practical experience and to apply the secured knowledge in the Electronics & electronics field as an Automation Engineer, to work with the experts in the field and thereby enhance the knowledge in the field.

    Experience Brief:
    - Self Directed, Result focused professional with 10 months of experience in Automation Industry.
    - Handling Site Acceptance Test
    - Hand on experience on Honeywell Experion PKS SCADA and Microsoft SQL server.
    - Strong Engineering design capabilities and thorough understanding of customer Purchase requisition and system specifications.
    - Conducting communication tests for MOVs ,, Batch Controllers, Card Readers.
    - Leading a team of skilled (diploma engineers and technicians) and unskilled persons.

    Professional Experience:- Site Engineer
    1. Since Dec. 08 to till now
    Company :-Honeywell Automation India Ltd.(On contract)
    Client :- BPCL PATNA
    Project :- Terminal Automation System.
    System Details :- GE Fanuc PLC and Honeywell Experion PKS SCADA.

    2. Since july 08 to Nov. 08
    Company :- ADI
    Role :- Technical Support / Site Engineer

    Academic Background:
    Qualification: -
    1) Bachelors Degree in Electronics & Communication From Integral University
    Lucknow (B.E. First Class 66.4%)

    Academic Achievements: -
    - Summer 2007: Underwent industrial training of 6 weeks on B.H.E.L. (Bharat Heavy Electrical Limited )
    - Project :- Bomb Diffusing Robot
    - Seminar:- Animation Technology
    - Won prize: - won prize at IIT KANPUR in ENDAVOUR Event and other Certificates

    Key Strengths :
    - Positive attitude , innovative and energetic
    - Self starter
    - Take initiative and able to work independently or as a part of team

    Personal profile:
    - Name : Piyush Singh
    - Date of Birth : 9th june 1985
    - Marital Status : Unmarried
    - Nationality : Indian
    - Language Known : English , Hindi

    Hereby declare that above information is true and correct to the best of my knowledge and belief.
    PIYUSH SINGH

  6. Post Count Number #6
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: jobs at MNC EPC company Oil & Gas overseas projects

    Dear sir,
    I am looking for a challenging position as a PIPING ENGINEER in your esteemed organization. I have obtained Mechanical Degree from Mumbai University, India in 2002.

    To briefly mention about my self, I am mid careered as an Piping Engineer with interpersonal and excellent communication skills. I work well in a team. My independent and analytical thinking coupled with the ability to get along with the people and adaptability to new challenging environment is the main factors that leave me successful in most of my assignments.

    Presently I am working as a Piping Engineer in BITAMEN LITWIN LLC,ABU DHABI,UAE from 18 Months, during which I am involved in various projects which broaden my knowledge.

    I have maintained a level of excellence in my academic career until now. I am also well versed with several software in design, analysis and drafting (AutoCAD 2d, PDMS,CEASERII 5.1). Based on my qualification and strengths I look forward to a challenging career in OIL AND GAS field.

    I assure you that I have a necessary commitment, intelligence, stamina and a great deal to offer to your esteemed organization.

    I am enclosing my resume for your kind perusal. I thank you for your kind consideration and look forward to hear from you about available position in your organization.

    Yours Sincerely,

    AJAY GAWADE,
    PIPING ENGINEER
    ABU DHABI,UAE.
    971-55-8477522
    gawadeajay AT gmail.com

  7. Post Count Number #7
    Unregistered
    Guest

    CURRICULUM VITAE
    SUKUMAR PRAMANICK
    e-mail : sukumarncp AT reddifmail.com

    FATHER’S NAME : SRI BABLU PRAMANICK
    SEX : MALE
    DATE OF BIRTH : 5TH JULY, 1985
    MARITAL STATUS : SINGLE
    LANGUAGE KNOWN : BENGALI,ENGLISH,HINDI
    RELIGION : HINDU

    EDUCATION QUALIFICATION :
    EXAM PASSED NAME OF THE BOARD PASSING YEAR % OF MARKS :
    MADHYAMIK W.B.B.S.E 2002 58.75
    HIGHER SECONDARY W.B.C.H.S.E 2004 45.8

    TECHNICAL QUALIFICATION :
    DIPLOM MECHANICAL A IN ENGINEERING NAME OF BOARD YEAR OF PASSING % OF MARKS
    W.B.S.C.T.E 2007 72.3%

    OTHER QUALIFICATION :
    Basic fundamental knowledge of computer software
    Operating system : DOS,Windows
    Application software : Ms Office [word, excel, power point], Internet, AutoCAD.
    Language : C-language, basic-language.

    OTHER SPECIALITIES :
    1. Vacational Training in Gun & Shell Factory Cossipore.
    2. Fine Arts Painting in Diploma
    3. Sea-awareness Course
    4. Boy Scout of Bengal, Participate in the N. N Bose Challenge Shield state Competition & different Training Camp.

    WORK EXPERIENCE :
    MAINTENANCE ENGINEER (MECHANICAL) 2 YEAR experience,
    Working on Durgapur (SUPER SMELTER LTD) Rolling Mill,
    From 1st September 2007 onwards.
    Special training on PNEUMATIC, MANUAL & COMBINATION PACKAGING M/C & EQUIPMENTS from Hyderabad (ITW SINGNODE).

    DATE : ……………
    PLACE : ………………
    Signature of Candidate
    SUKUMAR PRAMANICK