-
October 1st, 2008, 05:45 PM
Post Count Number #1
www.elsewedy.com Cables Pvt Ltd Egypt : Transformer Winding Engineer
Elsewedy Cables Pvt Ltd
http://www.elsewedy.com
elsewedy.com
Keywords: Winding, Transformer
Designation: Winding Engineer
Experience: 6 - 8 Years
Location: Egypt
Job Description
Winding Engineer
Desired Candidate Profile
Total Experience: 6-8 years
Relevant Experience: 3-5 years
Good communication skills
Company Profile
An Egyptian Electrical Industrial Group requires qualified and highly skilled Technical staff in the field of 220 kv Power Transformers and in DRY Transformers up to 33 kv for Transformer Manufacturing plant in Egypt
Last edited by muthukalee; October 28th, 2011 at 02:59 PM.
-
July 15th, 2009, 07:21 PM
Post Count Number #2
Re: Elsewedy Cables Egypt : Transformer Winding Engineer
I have the honor to submit my c.v hoping that will meet your requirements
CURRICULUM VITAE
1. Name: Refat atef ata gress
2. Date of Birth: 25/3/1969
3. Marital Status: Married
4. Address: 1-asherf alsebay from metemdeia st.- ard alwaa -giza
5. Nationality: Egyptian
6. Religion: Christian
7. Mobile: 0123800363
8. Home phone: 02-37329617
9. Military service: completed
10. E – mail: refatatef AT hotmail.com or refatatef AT yahoo.com
11. Qualification: B.Sc. electrical power engineering
(Cairo university / grade: good / year: 1992)
PREVIOUS EXPERIENCES:
From 3/1994 to 6/2008
Employer's name:-
EL-NASR FOR TRANSFORMERS&ELECTRECAL PRODUCTS (ELMACO)
Scope of production:-
- distribution& Power transformers up to 40 M.V.A. and system voltage up to 72.5K.V with on load tap changer ( main products)
- Earthing transformer
- Low & medium voltage power capacitor
- Low & medium voltage fuses
- Isolating switches
- Welding transformer
- Automatic power factor correction switch board
Jobs:
From 3/1994 to 5/1996
Production engineer
From 5/1996 to 6/2008
Testing, Quality Control Senior engineer
Main duties and responsibilities:-
- Carry out all routine and type tests according to the latest I.E.C standard on all company's products
- Analyzing the test results and issue reports
- Supervise the inspection process in each stage during production and on completion
- Make all repairing ,overhauling and servicing on all testing equipments ,tools, sets
- Continuation journeywork for the delivery committees
- Signature all reports and certificates
- Make all business correspondence with other international labs as KEMA , PHELA, CESI, EDF, ASTA ,IPH
- Sharing to solve the complains of our clients with customer service sector
- Planning & scheduling preventive & shutdown maintenance to ensure smooth operation of plant & equipments
skills:-
1- knowledgeable in many electrical subjects who can make convincing discussions
2- Consistent, loyal performer who can make an immediate contribution.
3- Proactive attitude with ability to anticipate & solve problems.
4- Having the interest in design of distribution &power transformer and keen to adopt as the carrier.
5- Language skills: fluent in Arabic and English
6- Computer skills: Win XP, Office XP, Power point
7- Full fathomed for the following standards which related to the above products and its materials
I.E.C 60076-parts 1-2-3-4-5-8-10-11-14 (power transformer)
I.E.C 60296-60422-60599-60156 -60475 (transformer oil)
I.E.C 60317-parts 01-02- 08-13-28 (copper wire)
I.E.C 60851 parts 1-2-3-4-5-6 (test methods for winding wire)
I.E.C 60554-3 parts 1-3-5&IEC60641 (insulating materials)
I.E.C 60404 parts 1-2-3 – (8-7) (magnetic materials)
I.E.C 17025 (competences of testing and calibration laboratories)
ISO 9001 (Quality management systems –Requirements)
I.E.C 60129-60269 parts 1-2-3 (switches and fuses )
I.E.C 60831 parts 1-2-3-4 low voltage capacitor
I.E.C 60871 parts 1-2-3-4 high voltage capacitor
IEEE std C57.12-2000 , C57.91-1995, C57.106-1991
IEEE std C57.113-1991, C57.111-1991(power transformer)
Some of my achievements during work:-
1- disassembly ,transportation , installation , erection the old transformer testing unit from old factory in shobra to our new factory in mataria
2- design , installation complete compensating unit(capacitor banks) in the new test field to improve the capacity of the testing unit for capability carrying routine tests for transformer up to 100 M.V.A
3- Offering Some proposals and suggestions in products design to reach optimum design and improve quality of products
4- The Contribution of putting the plan of the routine and preventive maintenance for power and distribution transformer
5- Design, aggregate, assembly complete system for checking the number of turns for primary coil individually after winding and also the number of turns for secondary coil individually after winding (not only turns ratio test )
Training Courses:-
1- transformer oil specification & maintenance by co-op petroleum (one week)
2- transformer testing at electrical engineers association (one week)
3- Witness the ability to withstand short circuit test for power and distribution transformer in kema lab. Netherland (two weeks)
4- Diploma in computer application at Al-saif international computer academy (three months )
5- General requirements for the competence of testing and calibration laboratories at Al-ahram center for organization and information technology (one week)
6- A.C &D.C drives at Egyptian iron&steel co. (one week)
7- Quality assurance program in ISO 9001 (one week)
From 1994 to current date (part time)
Employer's name:-
ELCO ENGINEERING INDUSTRIAL
Scope of production:-
- Single and three phase Voltage stabilizers up to 500 K.V.A.
- D.C power supplies
- Inductive & electronic ballast
- Reactors &chocks & filters
- Battery chargers
- Current transformer
- Dry type low voltage transformer up to 2000 K.V.A.
Scope of work
Design &technical support manger
From 6/2008 to current date
Employer's name:-
Alfanar Electrical Systems (ELETRA TRANSFORMERS)
Scope of work
Quality control and assurance manger
Main duties and responsibilities:-
a) Coordinate the formulation and implementation of the quality assurance procedures.
b) Monitor quality trends and provide inputs for corrective and preventive action.
c) Initiate corrective and preventive actions based on non-conformities.
d) Carryout process and product audits at planned interval.
e) Carryout customer complaint analysis and initiate corrective and preventive action and monitor.
f) Design and planning for procurement, repair and calibration of gauges / measuring instruments / test facilities.
g) Liaise with external inspection agencies as and when required.
h) Tool approval through evaluation of component produced.
i) Performance evaluation of subordinates and provides necessary awareness and training as applicable.
Some of my achievements during work:-
1-Prepare all documents for quality management system in the area of production, design, planning. Quality control assurance
2-Establishment the quality control lab for incoming materials
3-finalize prequalification procedure with Saudi Electricity Company to get into its vendor list for our new transformer plant
4-getting the ISO 9001-2008 certification from ABS (certification body)
DECLARATION
Being a capable, honest and enthusiastic person, I present myself as a diligent professional who will serve the needs with full devotion, dedication, confidence and punctuality. I’ll keep proactive attitude with ability to anticipate and solve problems. Moreover, information given above is correct and true to the best of my knowledge.
-
December 29th, 2011, 08:29 PM
Post Count Number #3
cv for winding engineer
Dear sir
please find attached CV for the post of winding engineer .
Thanks & Regards
Sanjay Singh