ENLIST INC Bahrain, Dubai/ UAE, Oman : MEP Projects Engineer

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    ENLIST INC Bahrain, Dubai/ UAE, Oman : MEP Projects Engineer

    ENLIST INC
    http://www.enlistinc.com

    Keywords: Execution of projects jobs including project job planning, preparation of shop drawings, billings, interaction with suppliers main contractors consultants clients, project execution, etc

    Designation: Projects Engineer-MEP
    Experience: 3 - 8 Years
    Location: Bahrain, Dubai/ UAE, Oman
    Education:
    UG - B.Tech/B.E. - Mechanical
    PG - M.Tech - Mechanical
    Industry Type:
    Construction/ Engineering/Cement/Metals
    Functional Area:
    Site Engg., Project Management
    Posted Date: 30 Sep 2008

    Job Description
    Responsible for:
    Execution of projects/jobs including project/job planning, preparation of shop drawings, billings, interaction with suppliers/main contractors/consultants/clients, project execution, etc.
    Primary objective:
    Project/ Job cost control, improvement of profitability to the company, enhancing the market image of the company and manpower control.
    Summary of main duties:
    Project/ Job execution, cost control, manpower control, material planning, liaison with other services/Client/Consultant

    Desired Candidate Profile
    Responsible for:
    Execution of projects/jobs including project/job planning, preparation of shop drawings, billings, interaction with suppliers/main contractors/consultants/clients, project execution, etc.
    Primary objective:
    Project/ Job cost control, improvement of profitability to the company, enhancing the market image of the company and manpower control.
    Summary of main duties:
    Project/ Job execution, cost control, manpower control, material planning, liaison with other services/Client/Consultant

    Company Profile
    Reputed client of Enlist Inc

    Executive Name: Mini

    Address:
    Not Mentioned

    Email Address: resumes@enlistinc.com

    Telephone: Not Mentioned

    Reference ID:
    MEP

  2. Post Count Number #2
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Name : shaik.Sarwar
    Email : affu6333 AT gmail.com
    Designation / Skillset : QA/QC ENGINEER OR MEP ENGINEER

    Resume :

    Looking out for position of MEP QA/QC Engineer / MEP Engineer in Multinational Company.
    (Total 5years Experience)
    RESUME CAPSULE
    Mechanical Engineering graduate with 3 years experience in the field of Quality Assurance, Quality Control with LRQA Certified Certificate & HVAC Design 2years experience.
    EDUCATIONAL QUALIFICATION
    B.Tech in Mechanical Engineering from JNTU University, Hyderabad.
    Software : AUTOCAD 2010, ANSYS, “C”, MS Office 2010
    Operating system : Windows 7.
    LRQA Certification for ISO 9001 :2008 QMS.
    KEY SKILLS :
    - Self-Motivated and Result oriented.
    - Initiatives and Proactive
    - Commitment and Dedication.
    - Intelligent Hard work & Fast learner.
    - Excellent Communication skills and has Positive Attitude.
    - Team Player and Facilitator.
    - Flair for Project Management.
    WORK HISTORY
    JULY 2009 TO JUNE 2011
    PROJECT : MUSHRIF MALL & GULF NATIONAL 7STAR HOTEL
    (ABU DHABI)
    COMPANY : ETA ASCON GROUP OF COMPANY MNE DIVISION.
    PROJECT VALUE : AED 1.2 BILLION & AED 1.6 BILLION.
    POSITION : MEP QA/QC ENGINEER
    CLIENT : LINE INVESNMENT PROPERTIES L.L.C & ADNH
    CONSULTANT : ACG CONSULTANT & OTAK
    JUNE 2008 TO JUNE 2009
    PROJECT : PALM JUMEIRAH MONORAIL PROJECT (DUBAI)
    COMPANY : ETA ASCON GROUP OF COMPANY MNE DIVISION.
    PROJECT VALUE : AED 2.1BILLION.
    POSITION : MEP QA\QC ENGINEER
    CLIENT : NAKHEEL, DUBAI
    CONSULTANT : MARUBANI
    MAY 2008 TO JUNE 2008
    PROJECT : DUBAI METRO PROJECT (DUBAI)
    COMPANY : ETA ASCON GROUP OF COMPANY MNE DIVISION.
    PROJECT VALUE : AED 4.9BILLION.
    POSITION : MEP QA\QC ENGINEER
    CLIENT : RTA, DUBAI
    CONSULTANT : SYSTRA, MITSUBISHI KAJIMA, YAPI MERKEZI
    DEC’ 2007 TO MAR’ 2008
    PROJECT : HAPPYDENT DENTAL HOSPITAL
    COMPANY : TAIBA ENGINEERING CONSULTANT (INDIA)
    PROJECT VALUE : AED 2.5MILLION.
    POSITION : HVAC DESIGN ENGINEER
    CLIENT : ASRA DEVELOPERS
    SEP 2006 TO NOV’ 2007
    PROJECT : LINGESHWARA MULTISTORIED BUILDING
    COMPANY : TAIBA ENGINEERING CONSULTANT (INDIA)
    PROJECT VALUE : AED 6.6MILLION.
    POSITION : HVAC DESIGN ENGINEER
    CLIENT : ASRA DEVELOPERS
    JOB RESPONSIBILITIES AS QA/QC ENGINEER:
    - Conducting Internal Audits on all disciplines of the project.
    - As a Management Representative, organizing ISO Audits & coordinating with the ISO Auditors.
    - Preparation of Project Quality Plan, Method Statements, Quality Control Procedures & Inspection & Test Plans
    - Inspection of Materials & HVAC, Plumbing & Electrical installations in line with the approved shop drawings
    - Organizing inspections with the main contractor, consultant & client
    - Listening with the main contractor QA/QC Department for all quality related issues
    - Preparation of Project Quality Plan (PQP) in line with ISO 9001 & as per contractual requirements.
    - Preparation of Method Statements (MS) as per project specifications & Industrial Standards.
    - Monitor and control the preparation/submission of drawings for Consultant‘s approval & comments.
    - Ensure that Shop Drawings issued for installation purposes to be stamp “For Construction” and updated.
    - Obtain Manufacturer’s Test Certificates for all equipment tested off site in accordance with the test plan and offer inspection of any equipment to Consultant prior to delivery.
    - Ensure that implementation of field inspection for installation, testing and commissioning done by the Subcontractor is in accordance with the approved Drawings, Method Statements, & Contract Specifications.
    - Ensure that installations are in accordance with the specifications and notify the any non-compliance.
    - To ensure clears all snags during process of works and before final handover.
    - Check and review preliminary design, related specifications, & scope of works.
    - Responsible for planning of material & equipment deliveries, project scheduling, and follow up with purchasing department for timely deliveries.
    - Coordinate with other trade contractors for proper site implementation and execution.
    - Monitor and control project accomplishments.
    - Prepare and submit samples & technical specifications of Electrical/Mechanical materials and equipments for approval.
    - Maintain and ensure quality of finished installations.
    - Ensure safety of work execution.
    - Monitor the correction of all snag/punch lists and corrective actions of non-conformances to standard requirement.
    - Ensure completion for testing and commissioning of all installed materials & equipments.
    - Conducting frequent site audits to ensure approved materials & approved documents are used for installation.
    - Reviewing & updating the Inspection & Test Plan.
    - Preparation of Operation & Maintenance Manuals.
    - Preparation of Testing and Commissioning Procedures.
    - Preparation of all quality Handover documents.
    JOB RESPONSIBILITIES AS HVAC DESIGN ENGINEER:
    1. Performing heat load calculation using Softwares (E-20, General cooling load estimation program, Career psychometric program)
    2. Creation of HVAC shop drawing, assigning duct levels, and preparing cross sectional views for ducting using softwares such as DUCTU
    3. Preparing equipment schedules/Grill schedules using softwares such as BETA

    - End of Document - -
    -------------------------------------------------------
    More Information about this submission and submitter:-
    ___________________________________________________
    Submission ID : 4381537
    Date & Time : 17th Jul 2011 7:44 PM (UTC)
    IP Address : 202.133.54.98
    Browser Info : Mozilla/5.0 (Windows NT 6.0) AppleWebKit/534.30 (KHTML, like Gecko) Chrome/12.0.742.122 Safari/534.30
    Predicted Country : India

  3. Post Count Number #3
    On probation
    Join Date
    April 7th, 2011
    Location
    QATAR
    Posts
    1

    resume

    BIO-DATA

    Full Name Sharma Ashok Satyanarayan
    E-mail Address ashok1_5001 AT yahoo.com

    Computer Proficiency M.S Office, Auto Cad-2000
    Experience 17 Years
    License UAE ,Qatar Driving license
    Educational Qualification B. E Mechanical from Amravati University
    In the 1993
    Contact No 77301092(Qatar), 55129816 ,919823542161

    S.No Company Designation Company Profile
    1 M/S Vijay Arabia fire and safety LLC Project Manager (mechanical)
    03/03/11 To till date - Erection and testing commissioning of fire protection system at NDIA (AIRPORT -Doha)under supervision of OBI(Bechtel)
    - Prepare list of equipments and tools to be use for the construction.
    - Prepare manpower analysis and costing base on the given program
    - Check safety rules and policy within the project including house keeping.
    - Attend coordination meetings with client.
    - Provide Instruction and full Coordination to Site
    - Preparing 4 week ahead schedule for work
    - Preparing weekly report submitted for the clients
    - Attend coordination meeting with clients
    - Preparing schedule for submittal ITP and method statement for the clients
    - My Key activities entail development and management , hiring and training design staff, interfacing with staff and clients during project cycle and meeting project milestones and deliver dates.
    2 M/S TECHMEP ELECTRO-MECHNAICAL CO DUBAI Project Engineer Mechanical
    17/11/08 to 05/11/10 Erection and commissioning of fire protection system Drainage ,water supply,& knowledge of installation of Chiller pump ,heat exchanger , AHU and chiller water piping
    (HVAC system) at (2B+G+17TH Floor)Prime business centre under supervision of M/S NEB consultant
    - Prepare bill of materials from the tender and approved drawings, dealing with the suppliers for the preparation of materials submittals for approval to the consultants.
    - Prepare list of equipments and tools to be use for the construction. Prepare manpower analysis and costing base on the given program
    - . Check safety rules and policy within the project including house keeping
    - Ensure that the work carried out on site conforms to approved drawings and technical specifications
    - Prepares progress report and variation claim for billing purposes
    - Attend coordination meetings with client.
    - Provide Instruction and full Coordination to Site Supervisors with regards to correct application and implementation on site.
    .
    3 M/S EFECO
    DUBAI Site Engineer
    26/12/06 to 04/08/08 Erection and Commissioning of fire protection system and plumbing system under supervision of DAR Consultants at 558Villas M/S arabian ranchies
    - Erection & Commissioning of GI Pipes size (25NB to 150NB) Fire fighting diesel engine, Deluge Valve, Alarm valve ,FM-200 Hydrants System
    - pressure testing of Pipes
    3) Erection and commission of water supply and drainage in plumbing system
    4 M/S Unisafe fire protection specialists Dubai (U.A.E) Site Engineer
    21/11/04 to 15/11/06 Erection and Commissioning of fire protection system at Nakeel Project(Garden furnished apartments(2B+G+9th Floor) under supervision of ECG Consultants & CUC-4 (Cargo Village) daral handshah (consultants)
    My responsibilities are :
    - Erection & Commissioning of GI Pipes size (25NB to 150NB) Fire fighting diesel engine, Deluge Valve, Alarm valve ,FM-200 Hydrants System
    - pressure testing of Pipes
    5 M/s Simplex Engineering & Foundry Works Ltd Construction Engineer
    16/06/03to 16/11/04 Erection & Commissioning of fire protection system at Tarapur Atomic Power Project 3&4 (NPCIL)
    My responsibility are :
    - Erection & Commissioning of MS Pipe size (25NB to 250NB) Fire fighting diesel engine, Deluge Valve Hydrants System, Sprinkler system, Jockey Pump& Valve
    - Assembling , Erection & Commissioning of vertical Turbine Pump
    - Daily planning &monitoring of works
    - Preparation of related documents &communicating with clients (NPCIL)
    - Assembling erection & commissioning of CO2 system
    6 M/s Spack Turnkey Project pvt Ltd New Delhi Site Engineer
    July 1997 to 15-6-03 Manufacture erection & Commissioning of fire protection system. I have given projects to I.O.C.L.& B.P.C.L.LPG Bottling Plants Manmad Akola & Allahabad Site
    - Erection & Commissioning of MS Pipe size (25NB to 250NB) Fire fighting diesel engine, Deluge Valve Hydrants System, Sprinkler system, Jockey Pump& Valve
    - Daily Projects planning and monitoring of works.Preparation of bill of quantity as per actual . I have successfully handled all the projects under taken by me.
    7 M/s Bharat Distilleries (P) Ltd Nashik Production cum Maintenance Engg from April 1993 to june 1997 This company is engage in the manufacture of Wines. There are 40 workers & 10 Employee.
    I am responsible for :
    - Supervision of manpower during shifts production operation
    - Production planning for achieves targets , production for dispatch.
    - Preventive & maintenance operation of plants machinery & utility equipments like compressor pumps gearbox D.G.sets