C&C Construction HIMACHAL : PRODUCTION ENGINEER GALVANIZING TOWER

+ Ask Question / Post resume
Results 1 to 3 of 3
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    C&C Construction HIMACHAL : PRODUCTION ENGINEER GALVANIZING TOWER

    C&C Construction Ltd.
    http://www.candcinfrastructure.com

    Keywords: PRODUCTION ENGINEERS

    Designation: PRODUCTION ENGINEERS - GALVANIZING TOWERS
    Experience: 10 - 20 Years
    Location: HIMACHAL and OTHER
    Education:
    UG - B.Tech/B.E. - Any Specialization, Civil, Electrical, Instrumentation, Mechanical, Metallurgy;Diploma - Any Specialization
    PG - Post Graduation Not Required
    Industry Type:
    Construction/ Engineering/Cement/Metals
    Functional Area:
    Production, Maintenance, Quality
    Posted Date: 10 Sep 2008

    Job Description
    Experience in Telecom Industry
    Rolling mill and fully aware and expose to the operations and maintainence of Cold Rolling Mill,Galvanizing Mill and Colour Coating operations. Should have held the similar position in the large organisation and should have full knowledge of the modern technologies.
    Should be able to handle the large no of workforce, engineers
    Fully responsible for Production, Maintenance and Quality

    Desired Candidate Profile
    The candidate shall be Engineering Graduate/Diploma Holder.
    Fully aware of Production, Maintainence and Quality
    Good in managing the plant operations and all the Resources.
    Shall have minimum experience of 2 years
    The candidates shall be willing to work anywhere in India

    Company Profile
    C&C Constructions Limited, incorporated in 1996 has executed a number of infrastructure projects independently and through Joint Ventures. C&C takes pride in its success history and in its ability to execute large, diverse projects with varying degrees of complexity across a broad span of geographies. C&C's Project expertise lies primarily in transportation engineering projects including roads, bridges, flyovers and airport runways.
    Currently, we have a number of projects under execution in India and in Afghanistan.
    One of the Key Strengths of C&C is its committed and dedicated Human Resource Professionals who see the opportunities in diversity, and are able to perform under favourable and unfavourable operating conditions, implementing projects which others would find relatively difficult to execute. Our Projects in India mainly located at Punjab, Bihar and in NCR.
    C&C's main success lies in its focus on welfare of employees. This loyalty has without doubt been due to the trust that the employees have placed in the organization. It has been reciprocal that the company has taken initiatives towards bettering the professional and personal well being of the employees. Today, our strong workforce pools in talent and trust to empower the company to seize the opportunities of tomorrow.

    Executive Name: Gurneet Singh Sodhi

    Address:
    C&C Construction Ltd
    Plot No.70, Sector 32
    Gurgaon,Haryana,INDIA 122001

    Telephone: 09818321680

    Reference ID:
    C&C/HR/PRODUCTION/Galvanizing


    C & C Constructions Limited
    Plot No. 70, Sector 32 Gurgaon-122001 (Haryana) Phone:+ 91 124 4536666Fax:+91 124 4536799Email:candc@candcinfrastructure.com

    Apply here: http://www.candcinfrastructure.com/?page=apply

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Re: C&C Construction HIMACHAL : PRODUCTION ENGINEER GALVANIZING TOWER

    Sir,
    Attached my CV for your favorable consideration. Also , pl visit my website : www.galvanising.in to get complete details of jobs 7 projects doen during teh last 4 decades of experience in teh field of hot dip galvanizing.

    looking forward to your reply

    Thanks & regards
    srinivasan.R

  3. Post Count Number #3
    IJT addict Guest-IJT's Avatar
    Join Date
    October 15th, 2010
    Location
    Looking for Job
    Posts
    20,894

    Manish Mehta
    Mobile: +91 –9717119235~ E-mail: .er.manish4saggi AT gmail.com
    er.manishmehta_007 AT yahoo.co.in

    Aspiring to contribute in the domain of Project Management entailing Erection, Commissioning and design engineering with unique drive for excellence & growth with leading organizations.

    SYNOPSIS

    - B.E (INSTRUMENTATION AND CONTROL) from P.D.M College of Engineering, under Maharishi Dayanand University, Rohtak (Haryana) with 3 years of experience in handling Detailed engineering, erection & commissioning.
    - Currently associated with Siemens, (CTDC, EFIE) for commissioning of DCS SPPA T3000(ET 200M) in changshan power plant(4*660 MW) and advanced IO system of Siemens, development of all logics of power plant and implementation with SPPA T3000 workbench .
    - Previously associated with Jindal Steel & Power Limited, Raigarh as project Engineer (C&I) for (4*135MW) Captive power plant (DCPP) at Dongamohua near Tamnar.
    - Gone through training for 4 months in 4*250 MW Power Plant, JPL, Tamnar
    - Acquired knowledge of DDCMIS(Yokogawa’s Centum VP), PLC (GE Fanuc) & its FAT
    - DCS powering on and loop checking for individual instruments.
    - Currently handling the TURBINE& its auxiliaries, CW AND ACW area in DCPP Project..
    - Preparation of FCTS for PLC and DCS from system cabinet to Junction box in field side.
    - Erection & commissioning of Schneider’s MODICON M340 (PLC) for ETS (Emergency trip system).
    - Endowed with knowledge of field instruments : Temperature, level, pressure & flow various measuring instruments & their calibration
    - Endowed with a passion for winning as evinced through demonstrated excellence in the academic & extracurricular areas.
    - Acquired practical technical knowledge through industrial trainings, seminars and academic projects.
    - A keen learner with constant zest to acquire new skills.
    - An effective communicator with excellent interpersonal & relationship building skills.
    - Commissioned Rockwell VMS (vibration monitoring system) XM161.
    - Commissioned Bentley Nevada TSI system 3500 for turbine, including calibration of vibration probes, zero speed, axial displacement, and differential and casing expansion.
    - Commissioning of HP LP bypass and DEH (max DNA),governing system of turbine.

    OCCUPATIONAL
    Current employer:
    - Organization : SIEMENS
    - Tenure : Since Jun’10
    - Role :Sr. Engineer (C&I)

    Responsibilities:

    - Testing of DCS ET 200M and advanced IO system of Siemens, development of logics of power plant and implementation with SPPA T3000 workbench.
    - Detailed engineering of DCS of changshan power plant(4*660 MW).
    - Multi unit communication, third party communication through modbus(RS-485, RS-232), peer to peer communication, FUM IO module with S7
    - execution of project management through PLM tool, MPP.

    Previous employment:

    - JINDAL STEEL AND POWER LTD
    - Overview : Jindal Steel & Power Ltd. a part of USD 15 billion O.P.
    Jindal Organization operates 2.4MTPA Integrated steel
    plant and 350MW captive power plant at Raigarh in the
    state of Chhattisgarh known to be the WORLD’S LARGEST
    COAL BASED SPONGE IRON PLANT with sister company
    JPL, Tamnar (4*250 MW) Power Plant. (July 2008-May2010)

    - Responsibilities :

    - Handled the Turbine instrument commissioning & its auxiliaries, CW and ACW area in DCPP Project.
    - Responsible for making technical comparative of different C&I packages.
    - Follow up with different vendors for timely delivery of ordered equipments.
    - Preparation of LOI for vendors and contractor.
    - Preparation of comments on various P & IDs, Hook up diagrams, cable layout, circuit wiring diagrams, PLCs technical specification etc .
    - Co-ordination with inter-departments like purchase and store for timely completion of work.
    - Erection, testing and commissioning of Yokogawa panels, loop testing & evaluation of logics.
    - Preparation of logics and protection and interlocks for various systems.
    - End user of SAP PM Module version ECC 6.0 for coordinating project activities.

    Attainments:
    - Gained insightful exposure to overall project management entailing Group Coordination and Management including techno-commercial preparation of database.
    .
    ACADEMIA

    - 2007 --B.E Bachelor of Engineering (I & C). Secured 73% Marks.
    P.D.M. College of Engineering. Affiliated to Maharshi Dayanand
    University (Rohtak).
    - 2003--10+2 All India Senior Secondary School Examination (CBSE) Secured 83% Marks. Banasthali Public School, New Delhi.

    INDUSTRIAL TRAINING

    - Organization : Indian Airlines, Mahipalpur
    - Duration : 6 weeks
    - Department : Done training in Radio & Instrumentation deptt.
    - Key Learning’s : Various instruments like GYRO, Auto pilot, Black box, GPS etc.


    - Organization : HPL Socomec, Gurgaon
    - Duration : 6 weeks
    - Department : Done training in electrical deptt.
    - Key Learning’s : Various aspects of manufacturing of Energy Meters.

    PROJECT DETAILS
    - INDUSTRIAL PROJECT: Presented a seminar on Turbine governing system (DEH) in front of AVP & Director of our company (JSPL) and all other seniors as a part of our training module & received applauds.

    IT REALM’
    - Proficient in working with Windows 98/2K/XP/Vista, MsOffice (Word, Excel, PowerPoint etc) and Email (MsOutlook).
    - Significant knowledge of ORCAD and complete exposure to Internet.

    PERSONAL DOSSIER
    - Date of Birth: 4th December, 1985
    - Address: R-48, VANI VIHAR, UTTAM NAGAR, NEW DELHI-110059