Daelim Industrial of S.Korea Salem, Saudi Arabia: MECHANICAL FOREMAN

+ Ask Question / Post resume
Results 1 to 6 of 6
  1. Post Count Number #1
    Site Admin
    Join Date
    April 17th, 2008
    Location
    Europe
    Posts
    11,588

    Daelim Industrial of S.Korea Salem, Saudi Arabia: MECHANICAL FOREMAN

    M/s. Daelim Industrial Co. Ltd (of S.Korea)
    http://www.daelim.co.kr

    Designation: MECHANICAL FOREMAN - DAELIM KSA
    Experience: 5 - 10 Years
    Location: Salem,

    Job Description
    Should be able to for see and arress nativial take off action accordingly for a large petroleium oil/Gaa Projectsite.

    Desired Candidate Profile
    I.T.I. / Diploma (Mech) with min 5 yrs exp as Mech Foreman at large Oil & Gas, Petrochem, Refinery or Power Plant project sites. Overseas exp preferred but not mandatory. Good English. Good Health. Passport holder. Willing to join immediately.

    Company Profile
    Daelim, one of the leading South Korean Const Cos, with vast interest in Oil Gas / Petrochem const projects. Present requirement is for their Kayan POLYCARBONATE Construction project in Saudi Arabia.

    Address:
    Dynamic Staffing Services Pvt Ltd
    E-40/7
    Okhla Industrial Area
    Phase – II
    Delhi,Delhi,INDIA 110020

    Email Address: dss-job3@dss-hr.com

    Keywords: MECHANICAL FOREMAN

  2. Post Count Number #2
    md Amirkhan
    Guest

    Re: Daelim Industrial of S.Korea Salem, Saudi Arabia: MECHANICAL FOREMAN

    Dear sir
    Pls find attached my cv for your kind reviw and foreeable cosideratioI have a sound knowledg andgoog experience in piping with 12 years hardworking.
    Currently I am working with PUNJ LLOYD LTD in UAE as a piping foreman.
    It will be great honour fore me to work for your steemet organization.
    A waiting for your kind reply.
    Thank you
    Md Amir khan.
    mwamirkhan AT gmail.com mdamirkhank AT yahoo.com
    AMIR KHAN

    Objective:
    To be able for challenging positions that utilize my diversified experience and educational qualification complied with efficiency with an opportunity for professional growth based on performance. The first aim is to be performing better performance for my better future and gain better experience for my development. To utilize my GOD gifted qualities for behalf of my company. To be able to efficiently implement whatever position that maybe delegated upon through continuous improvement and innovation so that my skills shall be utilized to their fullest.

    Personal Detail:
    Name: Amir Khan
    Father’s Name: Moh’d Wali Khan
    Material Status: Married
    Date of Birth: 06th January 1972
    Nationality: Indian

    Academic Qualification :
    SSCL, (Science) Passed
    Technical Qualification :
    - I.T.T (Fitter)Training course
    - Personal Safety and Social Responsibility
    - Element ARY First Aid course
    - Fire Prevention and Fire Fighting course
    - Personal Survival Techniques

    Language Known :
    English, Urdu, Hindi (Read Write & Spoken)
    Work Experience: (Start from most recent)

    1. Position: Foreman Piping.
    Duration: May 2009 – up to present
    Company: Punj Lloyd LTD UAE
    Industry: Borouge 2 Polyethylene Project (TCM Site) UAE

    2. Position: Foreman Piping.
    Duration: September 2007 to March 2009
    Company: Consolidated Contractors Int’l Company (CCIC)
    Industry: Ras Gas Onshore Expansion Project TR-6/7 (RLX) Qatar

    3. Position: Foreman Piping.
    Duration: August 2006 to November 2006
    Company: Bechtel International Inc.
    Industry: Second Generation Project Kazakhstan

    4. Position: Foreman Piping.
    Duration: January 2004 to March 2006
    Company: Moh’d Al Mojil Group Co. KSA
    Industry: Unite Olefin Complex Project KSA

    5. Position: Foreman Piping
    Duration: February 2001 to September 2003
    Company: Saudi Techint LTD. KSA
    Industry: Intel & Auxiliary Facilities Project KSA

    6. Position: Foreman Piping
    Duration: December 1998 to August 2000
    Company: Middle East Eng’g & Development CO. KSA
    Industry: Central Power Plant Extension Project KSA

    Work Experience in India:
    1. Position: Pipe Fabricator
    Duration: September 1996 to February 1997
    Company: Real Fab Engineering Co. Gujrat

    2. Position: Pipe Fabricator
    Duration: March 1995 to July 1996
    Company: Precision Engineering M.P

    3. Position: Pipe Fitter
    Duration: December 1993 to November 1994
    Company: United Construction CO. Gujrat

    JOB DESCRIPTION:
    - Working as a supervisor / Foreman Piping, having complete knowledge about erection of Large Bore Piping, Supports and Fabrication of Small Bore at Site.
    - Completely understand the Isometric Drawings, GA’s and P&ID’s.
    - Controlling the manpower and Equipment in accordance with the job nature.
    - Preparing the daily weekly progress reports.
    - Controlling the progress as per provided schedule by planning department.
    - Having a sound knowledge about clearance of Punch Items, Test packages and Pre-commissioning activities.

  3. Post Count Number #3
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    General Former - Christian Lanceleve

    Christian Lancelevé
    e-mail : lancelevec AT gmail.com
    Piping General Foreman - Petrochemical, Refinery Oil and Gas & LNG Tanks

    Employment Experience :
    Entrepose Contracting, 1985 – …
    2009 – 2010
    Project : LNG Tanks, Terminal GATE Rotterdam, NETHERLANDS
    Position Held : Piping Supervisor
    Supervising the sub-contractor for the erection of external piping and structure.

    2008 – 2009
    Project : Terminal Plant, SOMOIL Soyo, ANGOLA
    Position Held : Piping Superintendent
    Supervising the sub-contractor for the civil work construction.
    Carried out the prefabrication, erection and pressure tests : pipe and pipe-line

    2007 – 2008
    Project : Terminal Plant, LPG Bonny, NIGERIA
    Position Held : General Forman
    Responsible for the erection, welding of pipe and structure for Butane Tank and also a gas compression station.

    2005 – 2007
    Project : Petrol Pumping Plant, BURLINGTON MLN, ALGERIA
    Position Held : Piping Superintendent
    Responsible for the erection, welding of pipe and structure for the unit extension : pipeline and equipment of the PIT ( petrol extraction and re-injection gas). Responsible for the co-ordination of several teams on the pressure test and leak test.
    Carried out the preparation of the revamping.

    2004 – 2005
    Project : Gas storage Unit, MICHELIN Bassens, FRANCE
    Position Held : Piping Supervisor
    Supervising the sub-contractor for the erection of external piping and structure and also pipe line.

    2003 – 2004
    Project : Reichstett Refinery, MOBIL Reichstett, FRANCE
    Position Held : General Forman
    Responsible for the works on the tanks rehabilitation : one oil tank and a water tank. Was the representative of the company with the client.
    Project : Dunkerque, STOCKNORD Dunkerque, FRANCE
    Position Held : General Forman
    Responsible for the works on a sphere rehabilitation. Was the representative of the company with the client.
    Project : Donges, TOTAL Donges, FRANCE
    Position Held : General Forman
    Responsible for the works on a sphere rehabilitation. Was the representative of the company with the client.
    Project : Dunkerque, ARCELOR Dunkerque, FRANCE
    Position Held : General Forman
    Responsible for the change of an internal vessel from a gasometer.

    2002 – 2003
    Project : Petrol Pumping Plant, BURLINGTON MLN, ALGERIA
    Position Held : General Forman
    Responsible for the co-ordination of the pressure test and leak test.

    2000 – 2002
    Project : Gas compression Plant, TRANSCO BGE Beattock, SCOTLAND Position Held: General Forman
    1st Project - Responsible for the works on the doubling of the alimentation duct.(about 50 km duct)
    2nd Project – Carried out the erection of 4 turbines on the compression station. Responsible for hydraulic test and leak test.

    1999 – 2000
    Project: Prospecting Platform, DCN Brest, FRANCE
    Position Held: Responsible for approvisionnememnt

    1997 – 1999
    Project: Petrol Terminal, MOBIL Eket, NIGERIA
    Position Held: General Forman
    Carried out the prefabrication of piping (about 30 000 inches), structures, supports and painting.

    1996 – 1997
    Project: Petrol transformation unit TAIWAN
    Position Held: Piping Supervisor
    Supervising the prefabrication made by local sub-contractor. Responsible for hydraulic test and leak test.

    1994 – 1996
    Project: Gas Plant, CHEVRON Escravos, NIGERIA
    Position Held: Piping Supervisor
    Supervising the prefabrication and erection of piping and structure.

    1992 – 1994
    Project: Nuclear Power Plant, EDF Chooz, FRANCE
    Position Held: Piping Supervisor
    Supervising the erection of piping and supports. Responsible for preparation and control of modifications.

    1989 – 1992
    Project: Several Projects, RHODIA, SOLLAC, TOTAL & ROQUETTE
    Dunkerque, FRANCE
    Position Held: Piping Supervisor
    Responsible for quotation, preparation, procurement, job realization

    1985 – 1989
    Project: Several Projects, EDF, EXXON, TOTAL & GDF
    FRANCE and DOM-TOM
    Position Held: Pipe fitter

    Education :
    BAC Professional – Technical High School
    Lycée Carnot - Bruay, FRANCE
    2-year diploma on Pipe & Steel Works.
    1-year complementary formation in Piping Works.
    Lycée Henri Darras - Lievin, FRANCE

    Computer skills :
    As a user, medium skills in MS Office.

    Language skills :
    Native French, and working knowledge of English.
    Improving English with english lessons in Brielle, NETHERLANDS

  4. Post Count Number #4
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    Safety Officer/Safety Supervisor

    SHRIKUMAR T.C
    EMAIL : shrikumartc AT yahoo.com , shrikumartc AT gmail.com .

    OBJECTIVES :
    To obtain a suitable position in your esteemed organization, where in I can utilize my qualifications and experience in HSE field to carry out my duties efficiently and to develop a successful career.

    EDUCATIONAL QUALIFICATIONS :
    ACADEMIC :
    B.Com completed from Kerala University (Not pass)
    Diploma in Computer Application (DCA).
    TECHNICAL :
    Diploma in Engineering Electrical (Doing 6th Semester Rajasthan Vidhyapith University, India- Completion date-December 2011)
    Electrical Technology 3 year (National Trade Certificate(2year) and National Apprenticeship Certificate (1 year) Govt. of India Ministry of Labour
    SAFETY :
    Diploma in Fire and Safety Engineering from Indian Technical Education Council.
    Diploma in Environmental Management Studies ISO 14000 & 14001

    Doing NEBOSH (IGC)
    - OSHA 30 hrs (General Industry Safety & Health) from International Institute of Fire & Safety
    - B-Safe Observer Training Course, bsms (B-Safe Management Solutions Inc), `Franklin, Indiana, USA (Behavior Based Safety).
    - ADCO approval Certificate (HSE Officer)
    - Excellent HSE Officer award from ADCO for 5 million Man-hours without LTI
    - Appreciation from SKEC for Erection and Construction of Safe Scaffolding.

    Total Experience – 10+ years
    Abroad -8 years (Construction and Maintenance of PETRO CHEMICAL, OIL & GAS, INFRASTRUTURE) India - 2 years (Industrial)

    CAREER SUMMARY :
    1 Worked as a Senior HSE Officer in ADCO (Abu Dhabi Company for Onshore Oil Operations), Engineering, Procurement and Construction of BAB Gas Compression Project, under the main Contract of SK Engineering & Construction Co, for Galfar Engineering & Contracting W.L.L Emirates (EPC Contractor and major oil & gas construction co), 27th December 2009 to 28th August 2011.(Focal Point of Compressor Station # 3)
    2 Worked as a Safety Officer in RasGas-LNG plant (Qatar petroleum) under the contract of TWT (Transfield Worley Trags) joint venture.Consolidated maintenance contract from 27/07/ 2008 to 25/10/ 2009.
    3 Worked as a Safety Supervisor in (Kuwait National Petroleum Co) under the contract of AL-AHLEIA Switchgear Company K.S.C.C, Kuwait (EPC contractor), and Construction of packaged & other type substation works in Refinery, Gas Plant, Oil Pier, and New Ethane Recovery Plant from 29/01/2005 to 15/05/ 2008.
    4 Worked as a Safety Officer in Express Crane New Delhi, India from 03/04/2004 to 15/01/2005.
    5 Worked as a Safety officer in Al-Joolan Trading and contracting co Kingdom of Bahrain, from 02/02/ 2002 to 11/03/2004.
    6 Worked as a Safety Officer in Aluminium Industries Ltd, Kerala, India from 04/10/ 2000 to 25/01/2002.

    Duties and Responsibilities :
    - Manage Health, Safety and Environment at project level effectively and meeting the requirements of applicable UAE laws, client and company standards.
    - Prepare, review HSE Plans and procedures relating to projects.
    - Ensure implementation of project HSE Plan and monitor.
    - Conduct Hazard identification/Risk assessment/JSA for the project activities and ensure adequate controls are kept by the line managers/Supervisors.
    - Ensure third party certification requirements for equipment, operators and other competent personnel in the projects.
    - Ensure implementation of Environment and waste management policies and procedures are in accordance with UAE laws and are followed.
    - Develop Health, Safety and Environment training plan and conduct HSE Trainings includes on-the-job training.
    - Assist /Monitor Line Management in conducting Toolbox Meetings (TBTs).
    - Ensure implementation of Permit to work system (PTW) and monitor.
    - Assist line management in accident reporting and investigation and ensure remedial actions are implemented and lessons learnt are communicated.
    - Develop and implement Emergency Response plan/ procedures meeting Client requirement
    - Plan & Conduct Emergency response training programs and conduct drills.
    - Conduct internal HSE audits and participate in third party/Client audits.
    - Plan and conduct site inspections machinery, equipment. Workplaces, camps and identify unsafe acts/unsafe conditions/hazards and suggest for corrective measures.
    - Identify Safety signs requirement and ensure required safety signs are implemented at work locations (i.e. informative, directional, mandatory, precautionary/warning, prohibitory and other) where required.
    - Preparation safe work procedures as and when required.
    - Ensuring suitable protective equipment are available and provided and is being used correctly.
    - Organise/Conduct internal Safety meetings and follow up on actions to close outs timely.
    - Participate in Client HSE Meetings and follow up on action items.
    - Coordinates with government authorities like civil defense, others regarding HSE matters when required.
    - Coordinate with Medic and camp boss to meet Health, Medical & Welfare requirements.
    - Monitor project HSE performance and report to Client & company as required.
    - Maintaining relevant project HSE records and statistics.

    Acquired following trainings from ADCO, Rasgas, Qatar International Safety Center and K.N.P.C
    - Interactive Safety Induction (Rasgas).
    - Permit to Work Basic, Signatories and Audit.
    - Job Safety Analysis (JSA), P.P.E, M.S.D.S and Precautions.
    - Confined Space, Authorized Gas Tester, Fire and Safety Watch
    - First Aid and Emergency (CPR).
    - Hydrogen Sulphide Breathing Apparatus (H2S) & Acid Gas Injection (AGI).
    - Electrical Hazards, Arc Flash, Lockout and tag out (LOTO).
    - Scaffold, Fall Protection, Rigging and Slinging.

  5. Post Count Number #5
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    APPLICATION FOR THE POST OF SCHEDULER FOR GULF COUNTIRIES

    Jawed Ahmad
    Email : jawedahmed2010 AT yahoo.com

    PROFESSIONAL SUMMARY :
    More than 14 Yrs. of professional experience in the field of Maintenance Planning & Scheduling in Kingdom of Saudi Arabia, Doha-Qatar & India.
    (More than 12 years exp. of Saudi Arabia (Power & Desalination Plants), 1 Year exp. of State of Qatar (Sewage Water Treatment Plant, Package Treatment Plant & Pumping Stations under Ministry of Municipal Corporation) & more than 1 year exp. of Steel Plant of India.

    CAREER PROFILE :
    Period Position Employers :
    From April 2011 to Till Date Maintenance Planner/Scheduler Saudi Archirodon Ltd, Shoaiba Power Plant Project, Saudi Arabia

    From Jan. 2010 to March 2011 Planning Executive METRO TECHNOLOGY PVT. LTD, VISA BAO STEEL PLANT, Kalinga Nagar Industrial City, Jajpur Dist., Orissa, India

    From July 2008 to August 2009 Maintenance Planner/Scheduler NEW INTERNATIONAL TECNOLOGY COMPANY, AL JABOR GROUP HODLINGS, Doha, State of Qatar

    From March 1998 to July 2008 Senior Planning Technician / Scheduler SALINE WATER CONVERSION CORPORATION, YANBU POWER & DESALINATION PLANTS, Ministry of Water & Electricity, Kingdom of Saudi Arabia.

    From June 1995 to Dec. 1997 Assistant Scheduler SAUDI OGER LTD., Royal Commission’s Potable Water Project, Al-Jubail Industrial City, Kingdom of Saudi Arabia.

    SPECIAL SKILLS :
    - Proficient in Microsoft Word, Microsoft Excel, Microsoft PowerPoint, Microsoft Project, Primavera, Microsoft Publisher, Microsoft Access, Harvard Graphics & Internet Browser.
    - Proficient in Maintenance Planning Software such Operation & Maintenance Contract Management System (OMCMS) like SAP,MMS (Maintenance Management System), Plan gate & Work Authorization System.
    - Solid Communication Skill and Foresightness.
    - Enthusiastic to accomplish challenging assignments most successfully and efficiently.

    EXPERIENCE :
    April 2011 to Till Date
    Working as Maintenance Planner/Scheduler in Saudi Archirodon Ltd, Shoiaba Power Plant Project, Saudi Arabia. Archirodon, one of the leading International Construction Groups, with worldwide diversified activities, offers a full range of service in Engineering & Construction Project. The firm’s evolution for over 50 years span is reflected in its continuing record of achievement performing major Civil, Industrial and Electro Mechanical Projects worldwide.
    - Input job plans into scheduling software.
    - Identify critical path.
    - Producing resources histograms.
    - Producing daily shift and look ahead schedules.
    - Entering progress into schedule.
    - Worked with Computerized Maintenance Management System (Planning Software) for preparing & issuing the Preventive Maintenance work schedules for Boiler, Turbine, Desal, RO & Common Utilities such as Boiler Feed Pump, Turbine Condensate Pump, Turbine Main Oil Pump, Brine Recirculation Pump, Sea Water Pump, Booster Pump, Desal Condensate Pump, Product Water Pump, Boiler Water Transfer Pump, Potable Water Transfer Pump, Heavy Fuel Oil Pump, Deaerator Feed Pump, Decarbonator Feed Pump, Sulphuric Acid Pump, Sodium Sulphite Pump, High Purity Water Pump, Chilled Water Pump, Distillate pump, Air Operated Valve, Soot Blower Valve, Power Control Isolation Valve, HP Steam Inlet Valve, HP Steam Outlet Valve, Forced Draft Fan, Gland Seal Fan, Flame Detector Fan, Air Compressor, Motorized Valve, PLC, Motor Control Centre, Annunciator, Ventilation Fan, Fire Alarm System, Motor, Lighting System, Level Controller, Pressure Indicator, Flow Totalizer, Telemetry, PLC, Pressure Gauge, Pressure Transmitter, Level Indicator, Flow Meter etc.
    - Receiving, Updating & Processing of Corrective Maintenance for Boiler, Desal, Turbine, RO, Pipeline & Common Utilities such as Burner Inspection glass is broken, Flue gas is leaking from Furnace, BRP Mech. Seal is leaking, Acid Pump is not holding Pressure, Decarbonator Pump is corroded & leaking, Sea Water Cooling line is leaking, Rotor position is showing high negative side, Acid Dosing pump is pumping poorly, Sump Pump is running with vibration, Water is leaking from seal of pump, Chiller is not working, Co2 Refrigeration is not working, Motor of Boiler Feed Pump is running with more sound, Motor of Brine Heater Condenser Pump Motor is running nosiy, Generator Transformer is not working, RO Train – Bus bar sparking, Diesel Generator is not starting, Exhaust Fan is not working, Water Cooling Pump is giving abnormal sound, Furnace Pressure, Steam Drum, Water Drum are showing wrong reading, Calibrate Sea Water Flow, Calibrate Distillate Pump, Vibration monitor is not working, Bearing Vibration & Temperature are high, RO Train Control Valve is hunting, High Pressure Feed Pump is giving alarm, Flow Control Valve is giving wrong reading etc.
    - Preparing Monthly Report of Mechanical, Electrical & Inst. Maintenance Department such as Summary of Corrective Maintenance, Summary of Preventive Maintenance, Summary of Planned & Unplanned Shutdown, and Summary of Man Hours Distribution on various areas.
    - Coordinating with Operation Department regarding Work Permit.
    - To maintain the History Records of all the Mechanical, Electrical & Inst. Equipments of the Plant for their Corrective and Preventive Maintenance Works and for their Major Overhauls during Annual Shutdowns.
    - Keeping Work Order Status such as In-hand, Completed, Pending, Awaiting Shutdown, Awaiting Spare & Awaiting Contractor.
    - Coordinating with Material Department for availability of Spares.
    - To prepare the Monthly Backlog Reports of both Preventive & Corrective Maintenance Work Orders for Mechanical, Electrical & Inst. Maintenance Departments

    January 2010 to March 2011 :
    Worked as Planning Executive in Metro Technology Pvt. Ltd., Visa Bao Steel Plant Project, Kalinga Nagar Industrial City, Jajpur, Orissa, India. Metro Technology Pvt. Ltd is basically fabrication & erection company. Its headquarter is in Noida (UP), India. This company has played prominent role in Delhi Metro Rail construction. This company has performed pipeline works in Delhi Metro Rail. The main objective of this company is to provide technology to mechanical engineers, machinists, fitters, millwrights, founders, wire drawer, tube metallurgist, saddlers, enamellers and painters. This company also installs the electric furnaces for melting steel scrap and for producing steel castings and for re-rolling mild steel section. It also manufacture steel casting of all kinds such as used for textile machine parts, railways, tramway, motor parts, tractors, cement industry machinery parts, mechanical bolt, nuts, buckets, kerais & gate channel.
    JOB SUMMARY :
    - Prior to Project start, create and revise preliminary master schedules.
    - Maintaining master schedule.
    - Produce daily schedule reports.
    - Identify permitting requirements.
    - Preparing work plan & submit to client.
    - Monitoring the Completed work orders and rescheduling the next plans.
    - Preparing Monthly reports such as In-hand, Completed, Pending & Awaiting Spare.
    - Preparing charts, graphs & presentation as per the requirement.
    - Coordinating with Safety regarding work permit.
    - Coordinating with Client regarding the availability of material.

    July 2008 to August 2009 : (1Year)
    Worked as Maintenance Planner/Scheduler in New International Technology Company, Doha, State of Qatar. New International Technology Company was established as affiliate structure of NITCO S.p.A. (An Italian Stock Company) for the market of the state of Qatar. NITCO S.p.A. operates since 1986 in the Operation & Maintenance of Industrial and civil Sectors, as, main contractor. New International Technology Company avails of the long experiences of the group in several environment field, such as : Waster Water, Domestic & Industrial Waste & Renewable energy. The mission of the Company is to execute, as prime Contractor, Global Services in various areas such as Management of solid waste, management of waste water assets, refurbishment and up-grading of environmental plants & structure. Presently, the Company operates with all important clients and in all major cities (i.e. Doha, Dukhan Industrial City, Ras Laffan Industrial City & Mesaieed Industrial City) of Qatar. The Company is related to the deep knowledge of Waste Water Sector (integrated Sewerage Systems including Sewage Treatment, Pumping Station & network), of the solid waste collection and disposal and of the other environmental issues.
    JOB SUMMARY :
    - Worked with advanced Computerized Operation & Maintenance Contract Management System (OMCM) for preparing & issuing the Preventive Maintenance for Mechanical, Electrical & Instrumentation Equipments for Package Treatment Plants, Sewage Treatment Plants & related networks such as Submersible Pump, Back Wash Pump, Wash Water Pump, Irrigation Pump, Chlorine Injector Pump, Tanker Feed Pump, Sludge Feed Pump, Screw Pump, Screen, Raising Main, Scraper, Drum Filter, Gear Box, Deodorizer, Diesel Generator, Air Blower, Aerator, Pipe, Discharge Gate Valve, NRV, Inlet Gate Valve, Discharge Gate Valve, Penstock, Air Compressor, Motor, Motor Control Centre, Diesel Generator, Turbo Generator, Circuit Breaker, Battery & Battery Charger, Lighting, Annunciator, Pressure Gauge, Temperature Gauge, Level Controller, Temperature Controller, Pressure Controller, Pressure Indicator, Level Indicator, Temperature Indicator, etc.
    - Receiving & Processing of Corrective Maintenance for Package Treatment Plants, Sewage Treatment Plants & related networks.
    - Monitoring the Completed work orders and rescheduling the next preventive maintenances Schedules. UP-keeping the Equipment’s maintenance history & Major repair reports.
    - Preparing Planning Monthly Reports such as Summary of Preventive Maintenance, Corrective Maintenance & Man-Hours distribution on various areas.
    - Coordinating with Material Follow-up Department regarding availability of Spares.
    - Maintaining the History Records of all the Mechanical, Electrical & Instrumentation Equipments of the Plant for their Corrective and Preventive Maintenance Works and for their Major Overhauls during Annual Shutdowns.
    - To prepare the Monthly Backlog Reports of both Preventive & Corrective Maintenance Work Orders for Mechanical, Electrical & Inst. Maintenance Department.
    - Preparing & Issuing Checklist for Routine Maintenance.
    - Updating Check list as per requirement of Plant Engineers.
    - Keeping Work Order Status such as In-Hand, Completed, Awaiting Shutdown & Awaiting Spare.
    - Provide Adequate Information related to the work order status as required by Maintenance Engineers.
    - Keeping & Maintaining daily readings of Pumping Stations, Package Treatment Plants & Sewage Treatment Plant.
    - Preparing reports of Public Complaint such as daily report & monthly report.
    - Preparing charts, graphs & presentation as per the requirement of Project Manager & Maintenance Engineers.

    March 1998 to July 2008 :( 10 Years & 3 Months)
    Worked as Senior Planning Technician/Scheduler in Saline Water Conversion Corporation, Ministry of Water and Electricity, Kingdom of Saudi Arabia. Desalination & Power Plant, Yanbu-Al Sinaiyah is having 7 Boilers (580 t/h each) and 7 Turbines (84 MW each) with a capacity of 588 MW. In addition to this the world’s largest Reverse Osmosis Plant with the Capacity of 34 Million gallon per day and 9 Desalination plants which puts the overall capacity of the Plant to 100 MG/day of Water.
    Saline Water Conversion Corporation, which was established as the primary producer and distributor of potable water, operates 29 plants across the country and has a total installed capacity of 3.3 million cubic meters of water per day. Saline Water Conversion Corporation is also a major contributor to the Saudi electricity grid, with an output of 5,029 megawatts. Today, Saudi Arabia is the largest desalinated water producer in the world.
    JOB SUMMARY :
    - Worked with Computerized Maintenance Management System (Planning Software) for preparing & issuing the Preventive Maintenance work schedules for Boiler, Turbine, Desal, RO & Common Utilities such as Boiler Feed Pump, Turbine Condensate Pump, Turbine Main Oil Pump, Brine Recirculation Pump, Sea Water Pump, Booster Pump, Desal Condensate Pump, Product Water Pump, Boiler Water Transfer Pump, Potable Water Transfer Pump, Heavy Fuel Oil Pump, Deaerator Feed Pump, Decarbonator Feed Pump, Sulphuric Acid Pump, Sodium Sulphite Pump, High Purity Water Pump, Chilled Water Pump, Distillate pump, Air Operated Valve, Soot Blower Valve, Power Control Isolation Valve, HP Steam Inlet Valve, HP Steam Outlet Valve, Forced Draft Fan, Gland Seal Fan, Flame Detector Fan, Air Compressor, Motorized Valve, PLC, Motor Control Centre, Annunciator, Ventilation Fan, Fire Alarm System, Motor, Lighting System, Level Controller, Pressure Indicator, Flow Totalizer, Telemetry, PLC, Pressure Gauge, Pressure Transmitter, Level Indicator, Flow Meter etc.
    - Receiving, Updating & Processing of Corrective Maintenance for Boiler, Desal, Turbine, RO, Pipeline & Common Utilities such as Burner Inspection glass is broken, Flue gas is leaking from Furnace, BRP Mech. Seal is leaking, Acid Pump is not holding Pressure, Decarbonator Pump is corroded & leaking, Sea Water Cooling line is leaking, Rotor position is showing high negative side, Acid Dosing pump is pumping poorly, Sump Pump is running with vibration, Water is leaking from seal of pump, Chiller is not working, Co2 Refrigeration is not working, Motor of Boiler Feed Pump is running with more sound, Motor of Brine Heater Condenser Pump Motor is running nosiy, Generator Transformer is not working, RO Train – Bus bar sparking, Diesel Generator is not starting, Exhaust Fan is not working, Water Cooling Pump is giving abnormal sound, Furnace Pressure, Steam Drum, Water Drum are showing wrong reading, Calibrate Sea Water Flow, Calibrate Distillate Pump, Vibration monitor is not working, Bearing Vibration & Temperature are high, RO Train Control Valve is hunting, High Pressure Feed Pump is giving alarm, Flow Control Valve is giving wrong reading etc.
    - Preparing Monthly Report of Mechanical, Electrical & Inst. Maintenance Department such as Summary of Corrective Maintenance, Summary of Preventive Maintenance, Summary of Planned & Unplanned Shutdown, and Summary of Man Hours Distribution on various areas.
    - Coordinating with Operation Department regarding Work Permit.
    - To maintain the History Records of all the Mechanical, Electrical & Inst. Equipments of the Plant for their Corrective and Preventive Maintenance Works and for their Major Overhauls during Annual Shutdowns.
    - Keeping Work Order Status such as In-hand, Completed, Pending, Awaiting Shutdown, Awaiting Spare & Awaiting Contractor.
    - Coordinating with Material Department for availability of Spares.
    - To prepare the Monthly Backlog Reports of both Preventive & Corrective Maintenance Work Orders for Mechanical, Electrical & Inst. Maintenance Departments.
    - To Prepare the Mechanical, Electrical & Instrumentation - Maintenance - Departments - Monthly - Man hours Productivity Report.
    - Provide Adequate Information of Plant Equipments as required by Maintenance Engineers.
    - Processing & maintaining records of Crippling Request, Plant Unit Shutdown Request & Plant Modification Request.
    - Actively participated in the data feeding activities of Maintenance Management System (Planning Software).
    - To assist the maintenance personnel by providing the spare parts details/ PTW status well in advance for each work schedule.
    - Monitoring the Completed work orders and rescheduling the next preventive maintenances Schedules. UP-keeping the Equipment’s maintenance history, Major repair reports. Calculating the monthly Maintenance Department’s Resource utilization Reports, Follow-up reports for pending Preventive, Corrective maintenance work orders.

    June 1995 to Dec. 1997 : (2 Years & 6 Months)
    Worked as Assistant Scheduler with Saudi Oger Ltd. Saudi Oger Ltd., incorporated in January 1978 under the rules and laws of the Kingdom of Saudi Arabia with its headquarters in Riyadh. Saudi Oger Ltd. is a private company, wholly owned by the Rafic Hariri family. Since its inception, Saudi Oger has become one of the leading Construction; Facilities Management Service Provider and Infrastructure Project Development companies in The Kingdom of Saudi Arabia and the region. In relatively short period of time Saudi Oger Ltd. has grown into a multi-company, multi-divisional organization with subsidiaries and affiliates in the Kingdom of Saudi Arabia and abroad.
    Saudi Oger is one of the major O & M Contractors of Royal Commission’s Desalination and Waste Water Systems and also O & M Contractors for Domestic and International Airports and Palaces in the Kingdom of Saudi Arabia.
    JOB SUMMARY :
    - Involved in the preparation of Work Authorization.
    - Prepare & Issuance of Preventive Maintenance Work Orders for Desalination & Common Utilities.
    - Receiving & Processing of Corrective Maintenance Work Orders.
    - Estimate forecasted man-hours based on previous equipment history.
    - Prepare Planning Monthly Reports such as Summary of Corrective Maintenance, Preventive Maintenance & Man-Hours distribution on various areas.
    - Prepare Backlog report of all the Work Orders.
    - Compilation of Work Orders Status like awaiting shutdown, awaiting Spare, Awaiting Permit & In-hand.
    - Provide Adequate Information related to the work order status as required by Maintenance Engineers.
    - Collect information of Pipeline leakages from Control Room & Inform to Technical Inspector.
    - Prepare Monthly Report of major & minor Pipeline leakages.
    - Preparing various types of graphs, charts & presentations as per the requirement of Maintenance Manager & Planning Engineers.
    - Data Entry in Work Authorization Software.
    - Filing works.

    EDUCATION :
    - Matriculation from Bihar School Examination Board, Patna, India
    - Diploma in Mechanical Engineering from State Board of Technical Education, Patna, Bihar
    - Computer Diploma in End User Applications from First Computer Center (Brilliant), New Delhi, India

  6. Post Count Number #6
    Unregistered
    Guest

    APPLIED FOR STORE KEEPER ADMIN ASST/CLERK & ACCOUNTING ASST/CLERK

    HASRAT ALI
    Email add : Hasratjaipuri2002 AT yahoo.com.

    BRIEF OVERVIEW :
    Over 7 ½ years of Experiences, Admin Asst, Assisting the Senior Admin Asst Is Familiar with all Computerized Procedures, with Saleh Al-Mansoor Trad Est. in Al-Khobar, Saudi Arabia.

    Over 1 ½ years Working in Al-Nasser Co. in Riyadh Saudi Arabia worked as a Store Keeper cum computer operator.

    Well Conversions with Windows 98, Xp. Ms Office, Excel, PowerPoint, Tally, D.T.P & Internet.

    Peachtree accounting program, Posses ability to manage people. Possess Excellent Skills in communication coupled with strong problem solving abilities, Team Player.

    EDUCATION : 10+2 Highest Secondary Education from west Bengal Board of Secondary

    OTHER QUALIFICATION :
    Completed Diploma in information processing.
    Completed Diploma in Financial Accounting.
    Completed Diploma in Data Entry and Billing information.

    JOB DESCRIPTION :
    This individual reports to the Executive Director and is responsible for providing administrative Support to staff and assuming bookkeeping, reservation, and reception. These duties include but are not limited to : database system maintenance and training, office supply purchasing, typing, filing, reception and telephone duties.

    DUTIES AND RESPONSIBILITIES FOR ACCOUNTING :
    Receiving payments by cash, check, credit cards, vouchers, or automatic debits. Follow SOP pertaining to cash handling.
    Computing and recording transactions and ensuring 100% accuracy for all register transactions.
    Banking of cheques and cash received.
    Reconciliation of the credit card account.
    Check expenses and receipts to ensure they're accurately recorded and the supporting documentation is adequate
    Processing of supplier invoices and payments and processing of accounts payable transactions for the purpose of facilitating month-end financial reporting
    Responsibility for petty cash including maintenance of petty cash records and completion of cash reconciliation at each month end. Cash handling and safe custody of collected cash.

    SKILLS ATTRIBUTES :
    Strategic planner.
    Loyal of Management and Staff.
    Focus of efficient office structure and in achieving results.
    Capable of within budgetary restraints.

    Language proficiency :
    Well conversant with English, Hindi, Bengali & Arabic.

    PERSONAL DETAILS :
    Name : Hasrat Ali
    Father’s Name : Asgar Ali
    Date of Birth : 14th September, 1972
    Nationality : Indian
    Marital Status : Married
    Religion : Islam
    Hobbies : Working Hard Playing Cricket, Athletics.

    WORKING EXPERIENCE :
    Worked as an Data Entry Clerk & Accounting Clerk in DynCorp International in Kuwait from 2010 to 2013
    Worked as a STORE KEEPER cum computer optrs in GASCO (Gas Equipment & Services co. Ltd) in Doha, Qatar from 2008 - 2009.
    Worked as a Account Asst and computer operator in Hotel Presidency Inn in Kolkata, India from 2005 to 2008
    Worked as a Store Keeper cum computer operator in Al-Nasser Co. in Riyadh, Saudi Arabia From 2005 to 2006.
    Worked as a account clerk and computer operator in Bhimsain Hotel in Kolkata, India from 2003 to 2005.
    Worked as a Admin Asst cum computer operator in Saleh Al-Mansoor Trad Est. In al-Khobar, Saudi Arabia From 1996 to 2003.

    Interpersonal Skill : : Hard Worker, Self Motivated, Work under Pressure.

    Dated :
    Signature :