-
September 27th, 2008, 03:05 AM
Post Count Number #1
www.serikandi.com Oil Field Services Brunei Darussalam : PROJECT ENGINEER
Serikandi Oil Field Services
http://www.serikandi.com
serikandi.com
Keywords: Experience Minimum of 8 years engineering experience in Oil & Gas sector design, construction, commissioning, project management.
Designation: SENIOR PROJECT ENGINEER
Experience: 12 - 15 Years
Location: Brunei Darussalam
Compensation: Rupees 20,00,000 - 25,00,000
Education: UG - B.Tech/B.E. - Petroleum
PG - PG Diploma - Electrical
Industry Type: Oil and Gas/ Power/Infrastructure/Energy
Functional Area: Other
Posted Date: 26 Sep 2008
Job Description
Purpose of Job
All the crude production in Brunei is produced through the Seria Crude Oil Terminal (SCOT), exporting around 200,000 bopd. The facilities are aging and several projects are underway or being developed to rejuvenate the terminal or add functionality (e.g. water injection) or capacity. To extend the terminal operations the migration of the C&A infrastructure to Foundation Fieldbus is proposed. This migration needs to be implemented as a separate project under the management of the Sr. Project Engineer. The C&A migration project is currently part of the SCOT Phase 3 Rejuvenation Portfolio. It is planned to be handed over to the Project Team in Q4 2008 for the Basis for Design and managed as a separate project from there on.
The Senior Project Engineer will be the single-point accountable person for the C&A platform migration project responsible for ensuring that the project is defined, funded and executed safely, in time and within budget. The project may be executed in various phases (new field auxiliary rooms; new control room building; field re-instrumentation). The PE will be responsible for the overall completion of these phases and integration with the ongoing projects and operations, as per the migration strategy and Basis for Design.
The project will be executed within the MPO department (Onshore Major Projects). Project support such as HSE, CSR, Materials coordination, QAQC etc will be provided from within MPO on either a shared or dedicated basis.
Principal accountabilities
- Complete the Basis for Design document with support from the inhouse matrix team of design engineers.
- Complete the Contracting Strategy and seek Tender Board endorsement.
- Develop the Project Execution Plan and seek line endorsement.
- Ensure that the resources and SOW are agreed for the Conceptual Design. Complete the design as per schedule. Design party is subject to contracting strategy.
- Ensure a L3 budget estimate is prepared and approved prior to FID.
- Ensure a L3 Project Schedule is prepared and a baseline is approved prior to FID.
- Develop the budget request for the project for DRB4 endorsement (IRE or GIP). Assistance will be provided from MPO/1, MPO and MPS/4.
- Ensure contract(s) are in place for the execution of the project immediately after FID. The contracting strategy will determine if these are existing or new-tendered contract. Assume Contract Holder or Company Representative role where required.
- Ensure that design, procurement, construction and commissioning activities are carried out as per the project schedule and as per the contract(s).
- Responsible for progress management e.g. reviews, meetings, reports, schedule updates.
- Responsible for HSE management and compliance with BSPâs HSE MS requirements.
- Responsible for Change Control e.g. adherence to BSP-12 Proc.14.
- Responsible for managing the project within the approved budget and ensuring that payments are made in time and LCF and commitment reporting is updated monthly. MPS/4 will assist.
- Responsible for managing the many project interfaces during design and execution with other projects, terminal operations, suppliers, Technical Authorities etc. Develop a Project Interface Management Plan.
- Responsible for quality assurance and documentation for all project activities.
- Ensure that ORP/OPMG practices and guidelines are followed and OR&A requirements are met.
Main Contacts
- MPO department incl HSE advisor, Materials Coordinator, QAQC, Doc controller etc.
- Project Services department (MPS) including project planners, accountant, commissioning engineers
- Central Engineering department (SEN) including design matrix team, Technical Authorities, cost estimators, QS.
- Other service units such as Logistics, contracting & procurement.
- Design and Construction contractors.
- Government agencies.
âProject sponsors.
Qualifications
Required Minimum of Bachelor degree in Engineering.
Preferred Preferably Chartered Engineer or equivalent in Electrical or Instrument Engineering.
Desired Candidate Profile
Purpose of Job
All the crude production in Brunei is produced through the Seria Crude Oil Terminal (SCOT), exporting around 200,000 bopd. The facilities are aging and several projects are underway or being developed to rejuvenate the terminal or add functionality (e.g. water injection) or capacity. To extend the terminal operations the migration of the C&A infrastructure to Foundation Fieldbus is proposed. This migration needs to be implemented as a separate project under the management of the Sr. Project Engineer. The C&A migration project is currently part of the SCOT Phase 3 Rejuvenation Portfolio. It is planned to be handed over to the Project Team in Q4 2008 for the Basis for Design and managed as a separate project from there on.
The Senior Project Engineer will be the single-point accountable person for the C&A platform migration project responsible for ensuring that the project is defined, funded and executed safely, in time and within budget. The project may be executed in various phases (new field auxiliary rooms; new control room building; field re-instrumentation). The PE will be responsible for the overall completion of these phases and integration with the ongoing projects and operations, as per the migration strategy and Basis for Design.
The project will be executed within the MPO department (Onshore Major Projects). Project support such as HSE, CSR, Materials coordination, QAQC etc will be provided from within MPO on either a shared or dedicated basis.
Principal accountabilities
- Complete the Basis for Design document with support from the inhouse matrix team of design engineers.
- Complete the Contracting Strategy and seek Tender Board endorsement.
- Develop the Project Execution Plan and seek line endorsement.
- Ensure that the resources and SOW are agreed for the Conceptual Design. Complete the design as per schedule. Design party is subject to contracting strategy.
- Ensure a L3 budget estimate is prepared and approved prior to FID.
- Ensure a L3 Project Schedule is prepared and a baseline is approved prior to FID.
- Develop the budget request for the project for DRB4 endorsement (IRE or GIP). Assistance will be provided from MPO/1, MPO and MPS/4.
- Ensure contract(s) are in place for the execution of the project immediately after FID. The contracting strategy will determine if these are existing or new-tendered contract. Assume Contract Holder or Company Representative role where required.
- Ensure that design, procurement, construction and commissioning activities are carried out as per the project schedule and as per the contract(s).
- Responsible for progress management e.g. reviews, meetings, reports, schedule updates.
- Responsible for HSE management and compliance with BSPâs HSE MS requirements.
- Responsible for Change Control e.g. adherence to BSP-12 Proc.14.
- Responsible for managing the project within the approved budget and ensuring that payments are made in time and LCF and commitment reporting is updated monthly. MPS/4 will assist.
- Responsible for managing the many project interfaces during design and execution with other projects, terminal operations, suppliers, Technical Authorities etc. Develop a Project Interface Management Plan.
- Responsible for quality assurance and documentation for all project activities.
- Ensure that ORP/OPMG practices and guidelines are followed and OR&A requirements are met.
Main Contacts
- MPO department incl HSE advisor, Materials Coordinator, QAQC, Doc controller etc.
- Project Services department (MPS) including project planners, accountant, commissioning engineers
- Central Engineering department (SEN) including design matrix team, Technical Authorities, cost estimators, QS.
- Other service units such as Logistics, contracting & procurement.
- Design and Construction contractors.
- Government agencies.
- Project sponsors.
Qualifications
Required Minimum of Bachelor degree in Engineering.
Preferred Preferably Chartered Engineer or equivalent in Electrical or Instrument Engineering.
Competence Required
Experience - Minimum of 8 years engineering experience in Oil & Gas sector (design, construction, commissioning, project management).
- Minimum 4 years experience as project engineer for Oil & Gas project.
- Experience with managing contract(s).
- C&A background (design) and/or experience with C&A projects.
- Experience in managing HSE in projects and knowledge of BSP HSE Management System.
- Familiar with design process in BSP (BSP-12) or equivalent.
- Familiar with C&A supplier market, products and capabilities.
Training ï Project Engineering / Management foundation course(s).
ï Basic Instrument Engineering training courses (preferred).
Special Abilities - Demonstrates accountability for his/her project.
- Able to lead a multi-discipline matrix team across departmental interfaces. Able to drive team for delivery.
- Acts with integrity and respect for others.
- Proven team worker. Good interpersonal skills. Effective net-worker.
- Good verbal and written communications skills.
Email Address:
oilfieldrecruiters@gmail.com
Last edited by muthukalee; November 5th, 2011 at 01:02 PM.
-
June 13th, 2011, 11:13 AM
Post Count Number #2
IJT addict
Name : G .Karthikeyan
Email : gk7589 AT gmail.com
Designation / Skillset : Sr.Manager / Procurement
Sub : 20+ Years Experience in Project Procurement
Resume :
SENIOR MANAGERIAL ASSIGNMENTS
Material Management ~ Vendor Development ~ Procurement ~ Supply Chain Management
PROFESSIONAL PROFILE
Experience Profile
Diploma in Materials Management & an accomplished professional with rich experience in Supply Chain Management, Material Management with well known organisations.
Core Competencies Evolved
Abilities in harmoniously managing day to day tasks with a talent for Supply Chain Management involving Logistics, Warehouse Administration, Inventory Control, Techno-Commercial functions, Procurement, Vendor Management Documentation.
AREAS OF EXPERTISE
Vendor Development
- Strengthening existing vendor source & developing alternate suppliers.
- Communicating technical specifications, negotiating with Vendors, monitoring Vendor performance to ensure cost effective supply of quality material.
- Negotiating & assessing the performance of the vendors based on various criteria such as prices, quality improvement rate, timely delivery, credit terms etc.
- Ensuring adherence to quality standards for all incoming materials/parts.
- Undertaking VA/ VE (Value Analysis & Engineering) initiatives at supplier’s end to reduce cost of rejection of the material supplied.
Procurement
- Ascertaining Material Requirements; identifying and developing a reliable Vendor base in local market for procurement of materials & spares..
- Developing sound sourcing strategies to minimise Total Cost of Acquisition of direct materials.
- Releasing supply schedules regularly to Vendors to ensure on time deliveries.
Storehouse/ Warehouse Management
- Carrying out storehouse & inventory management and monitoring the replenishment of stock items by raising purchase indents and delivery advices & scrutinizing purchase indents.
- Undertaking perpetual inventory checks of stock at regular intervals, co-ordinate with store department for receipt, checking and clarification of all incoming materials/ purchase orders.
- Governing the inventory function so as to curtail inventory-holding expenses and adherence to the minimum inventory level to minimize wastage.
- Managing inventory relating to engineering goods, electrical goods & electronics including returnable/ non returnable items.
Inventory Management
- Streamlining the system and procedures for effective inventory control for ensuring ready availability of materials to meet targets.
- Efficiently using inventory management system for ensuring ready availability of materials to meet the targets.
CAREER HIGHLIGHTS
EMPEE Hotels Ltd , Chennai Since 02 Mar 09
Sr.Manager – Procurement
In Civil Construction Project division .
HILTON 5 Star Deluxe , Project , Chennai
- Responsible for purchase activity of Direct items , indirect items for Construction Project .
- Responsible for vendor development activities.
- Responsible for for the material planning activities co ordination with Project Execution Team.
- Responsible for Negotiation and Finalization of Procurement items..
- Alternate sourcing.
- Scheduling of the projects procurement for timely execution.
- Review of vendor, offers, preparation of Technical / commercial Bid Analysis and recommendation of vendors.
- Review and approvals of vendor specifications.
- Analysis and recommendation of Vendors.
- Rate Analysis & comparing with Various Quotations of Vendors
- Preparation of note for management approval.
- Rate negotiation with Contractors/ Vendors.
- Sourcing and identifying in global market for Hotel operational items as per operators requirement / specifications.
- Finalaisation of Import orders , Import clearance thro EPCG scheme .
Maytas Properties Ltd , Chennai Sep 08 - Mar 09
Sr.Manager – Procurement
- Reported to Asst. Vice President (SCM) in the company.
- Responsible for purchase activity of Direct items ,indirect items and coordinating for the procurement of and other consumables.
- Responsible for vendor development activities.
- Responsible for for the material planning activities co ordination with Project Execution Team.
- Responsible for Negotiation and Finalization of Procurement / Contracts.
- Implementation and proper Compliance of various procedures, systems.
- Alternate sourcing.
- Scheduling of the projects procurement for timely execution.
- Review of vendor, offers, preparation of Technical / commercial Bid Analysis and recommendation of vendors.
- Review and approvals of vendor specifications.
- Analysis and recommendation of Contractors/ Vendors.
- Rate Analysis & comparing with Various Quotations of Vendors
- Preparation of note for management approval.
- Rate negotiation with Contractors/ Vendors.
BGR ENERGY SYSTEMS LTD : Power projects Division Jan 08 – Aug 08
Manager – Purchase
- Reported to Executive Director ( CPSG) in the company.
- Responsible for purchase activity of Reinforcement Steel , Cement for various projects all over india..
- Responsible for vendor development activities.
- Responsible for the material planning activities , co ordination Project Planning and Project Execution Team .
- Responsible for the logistics activity.
- Responsible for Negotiation and Finalization of Contracts.
- To monitor all Contractual obligations (commercial & technical). Goal setting, monitoring and reviewing the performance of Project Procurement.
- Implementation and proper Compliance of various procedures, systems.
- Alternate sourcing.
- Scheduling of the project Procurement for timely execution.
- Responsible for maintaining Reconciliation of all procurement .
SHAPOORJI PALLONJI & CO LTD Nov’03-Dec 07
Manager – Purchase
Steered diverse responsibilities entailing Procurement, Vendor Development, Logistics, Techno-Commercial Operations, Material Specification across assignments.
Significant Highlights garnered across the tenure;
- Strengthened Key Operational Metrics in terms of Profitability, Inventory, Cost Control & Management etc.
- Key focus on driving the achievement of goals through executing Business Plans geared towards capitalising on horizontal / vertical business opportunities; improvising on business systems.
- Served as Purchase In charge of Tamil Nadu Operations Projects
- Maintained Purchase / Store activity thro ERP Systems.
- Key role in finalising Fixed Price Rate Contracts.
- Coordinated for Plant & Machinery Movement / Stock Verification / Maintaining Records and hiring of equipment’s.
- Distinction in the following Civil projects;
- 530 MLD Water Treatment Plant , Chembarrambakkam, Chennai
- Baba Atomic Research Plant Expansion Work
- DUCC : Sunami Housing Projects , Nagapattinum , Tamil Nadu
- DLF Info City Project , Ramavaram, Chennai
- India Info Tech Project , Ambattur, Chennai
- BMW – CKD Project, Maraimalai Nagar, Chennai
- SP Info Tech Project, Chennai
MAHINDRA CONSTRUCTION COMPANY LIMITED Jul’99 – Oct’03
Deputy Manager – Materials, Chennai
- Steered responsibilities spanning Materials Management, Procurement, Finished Product Dispatch, Strategic Sourcing & Contracting, of materials.
- Played active roll in southern Region projects for material procurement , logistics & warehousing. Managed and maintained vendors for Plant & Machinery, Scaffolding ,Shuttering & Construction Materials.
- Distinction in the following Civil projects;
- Factory for Ford India Ltd, MaraimalaiNagar.
- Visteon Automotive Factory, MaraimalaiNagar.
- Office Building for Polaris Software Ltd, Navalur.
- Residential Flats for Doshi Housing Lid, Vadapalani, Chennai.
- DSQ Bio Tech, Cuddalore.
- Residential Flats for Jain Housin, Vadapalani & Kodambakkam, Chennai.
- Residential Flats for BHURANI HOUSING CONSTRUCTION, Chennai.
- ROB Project at Karur.
- TWAD Project at Sirkazhi.
MAC CIVIL ENGINEERS LIMITED (SPIC GROUP) Jan’92 – Jul’99
Purchase Officer
- Served as In charge of entire Planning and Procurement for centralized purchase of Plant & Machinery, Construction Materials & Logistics.
- Facilitated procurement of materials for Mechanical & Electrical projects.
- Developed Vendor Data Bank for the above Industry.
- Developed procedures and system for Purchase & Stores department for ISO 9002 accreditation And was Internal Auditor for ISO 9002 quality systems in Mac Civil Engineer’s.
MECHANICAL & ELECTRICAL PROJECTS WORKED
- Fabrication, Erection and Piping work for SPIC Fine Chemicals Ltd, Karaikal.
- Ammonia Tank Fabrication, Erection and Piping work for SPIC Ltd , Tuticorin.
- Fabrication, Erection , Equipment Erection and piping work for SPIC Pharmaceuticals, Cuddalore.
- Tamil Nadu Petrochemicals Ltd, Chennai
- ISRO, Mahendragiri.
- Grasim Industries, Karnataka.
- SAFL, Mundiambakkam, Villupuram.
- Work shop for ACT India Ltd , Chennai.
- R&D Centre for Spic Pharmaceuticals Ltd, Maraimalainagar.
- Factory and Administrative Building for SPIC Petrochemicals Ltd, Chennai
- Factory Building & Administrative Building for SPIC-JEL, Chennai.
- Madras School of Economics, Chennai
- MAC Sunny Side – Residential Building , Chennai.
- MAC House – Commercial Complex, Chennai.
- MLA Hostel - Pilling Work, Chennai.
- RITES – Students Day Centre – Veterinary College, Chennai
- Seventh Berth for Port Trust, Tuticorin
- PWD – Vidur Dam, Villupuram
- PWD – Canal Lining and Land Development, Nedunkal.
- MAC Container Warehouse Terminal, Chennai.
- Study Centre for Sri Venkateswara Engineering College, Sriperubudur.
- Office Building for Tuticorin Alkaline Chemicals (TAC), Sembarambakkam.
- Housing Quarters for India Cements Ltd, Trichi.
PREVIOUS ASSIGNMENTS
Oct’89 – Jan’92 Sanmac Limited Cashier
EDUCATION
Diploma in Materials Management
MANAGEMENT BUSINESS PROMOTION INSITUTE 1994
Bachelor of Science (Physics)
Madras University in 1989
Diploma in Computer Application
POWER POINT SOLUTUIONS 1996
-------------------------------------------------------
More Information about this submission and submitter :-
___________________________________________________
Submission ID : 4226547
Date & Time : 8th Jun 2011 9:22 AM (UTC)
IP Address : 122.174.115.61
Browser Info : Mozilla/5.0 (Windows NT 5.1; rv:5.0) Gecko/20100101 Firefox/5.0
Predicted Country : India
-
June 12th, 2013, 01:45 PM
Post Count Number #3
RESUME
PERSONAL DATA :
NAME HASHIM BIN SANIF
FEDERAL TERITORY LABUAN. EAST MALAYSIA
POSITION APPLY
OPERATION / SUPERVISOR
DATE / PLACE OF BIRTH 10TH MAY 1964,
LABUAN
NATIONALITY MALAYSIAN
MYKAD / I.C NO. 640810-12-5389
RACE MALAY
MARITAL STATUS MARRIED
EPF NO.
SOCSO NO.
INCOME-TAX NO
E-MAIL Hashimluv01 AT yahoo.com.
SALLARY EXPECTED USD/MYR. Monthly(Basic)
QUALIFICATION :
19711976 ATTENDED SR. KEBANGSAAN PEKAN, LABUAN
1977 1982 ATTENDED SMK GOVERNMENT INSTITUTE, LABUAN
TRAINING ATTENDED/CERTIFICATE :
1983 BASIC SAFETY / FIRE FIGHTING AND OPERATION
AT SABAH SHIPYARD SDN BHD., LABUAN MALAYSIA
1984 OUTFIT WELDING SKILL WORKS 21 MONTHS ON THE JOB TRAINING AT THE OUTFIT WELDING.HAS SATUSFACTIORILY COMPL ORIENTATION COURSE ON SAFETY PROCEDURE AT THE COMPANYS TRAINING CENTRE, LABUAN-SUBJECT; FIRE/EXPLOSION/ENTRY INTO CONFINE SPACES/SLINGING/LIFTING/SPRAY PAINTING/HAND TOOL/ELECTRICAL APPLIANCES/HOUSE KEEPING/PERTECTIVE EQUIPMENT.
NATIONAL INSTITUTE OF ADMINISTRATION MALAYSIA(INTAN).KOTA KINABALU,SABAH,MALAYSIA
INTRODUCTION COMPUTER KNOWLEDGE & SKILL (MS_WORD_WINDOWS).LABUAN MALAYSIA.
COMMUNICATION AND MULTIMEDIA MALAYSIA.PROJCET Y2K NATIONAL.AT KUALA LUMPUR.
NPC NATIONAL PRODUCITIVITY CORPORATION.(OPRATIONS PROJCET SERVIGE MANAGEMENT).AT KOTA KINABALU.SABAH.MALAYSIA.
PUNCAK ITIZAM(MANAGEMENT SERVICES).AT WOODLAND RASORT,NATIONAL PARK PAHANG DARUL MAKMUR.MALAYSIA.
WORKING EXPERIENCES :
1984-1993 :
LABUAN SHIPYARD.
MALAYSIA. P0SITION;ASST OPERATIONS SUPERVISOR JOB SUPERVISE THE WORKER TO SUPPLY MANPOWER TO WORK TO SITE /OFFSHORE AND ONSHORE PROJCET.PROJCET NAME PIPELINE/PLATFORM,OIL AND GAS PETROLEUM.CLINT PROTRONAS CARIGALI BHD MALAYSIA/SABAH SHELL PETROLEUM AND SERAWAK SHELL PETROLEUM MALAYSIA.
1994-2006 :
LABUAN
MALAYSIA. POSITION;SITE SUPERVISOR GOVERMENT DEPARTMENT(CONTRACT)
PLACE OF WORK; GOVERNMENT MINISTRY DEPARTMENT PROJCET/FEDERAL TERITORY LABUAN/SABAH/SERAWAK/WEST MALAYSIA.
2006-2013 :
TASIK KRISTAL SDN BHD.LABUAN MALAYSIA. POSITION OPERATIONS ASST MANAGER;PLACE OF WORK LABUAN FABRICATION YARD.OPERATION JOB;THE RELEVANT DUTIES AS DIRECTED BY COMPANY MENAGEMENT FROM TIME TO TIME/TO ENSURE SAFE WORKING PRACTICE AT WORK SITE / RESPONSIBLE TO RECEIVE AND INSPECT THE INCOMING MATERIAL TIMELY AGAINST DELIVERY ORDER AND RELATED DOCUMENT,RECORD IN INVENTORY SYSTEM AND STORE PROPERLY TO STORAGE YARD OR FABRICATION YARD , ENGINEERING OPERATES WITH THE SKILLED WORKFORCE ,THE EFFECTIVE PROJCET MANAGEMENT TEAMS, TASIK KRISTAL IS ABLE TO UNDERTAKE OFFSHORE PROJCET AND ECONOMICALLY. HAVING COMPLETED MANY WORLD CLASS PROJCET INCLUDING JACKUP AND SEMISUBMERSIBLLE RIGS, PIPE LINE , VESSELS, BARGES AND PIPE RACK STRUCTURES, THE COMPANY HAS ESTABLISHED ITSELF AS THE MOST VERSATILE AND RELIABLE OFFSHORE SOLUTIONS IN THE CLINT COMPANY SABAH SHELL AND SERAWAK SHELL OIL AND GAS PETROLEUM MALAYSIA/PETRONAS CARI GALI OIL AND GAS PETROLEUM MALAYSIA./SABAH SHIPYARD SDN BHD.
WORKING EXPERIENCE :
MAY/2013 PLACE OF WORK. SABAH SHIPYARD SDN BHD, F.T LABUAN./ZONE OIL&GAS FABRICATIONS ,FEDERAL TERITORY.
PROJECT INVOLVED :
OIL & GAS PLATFORMS FABRICATION (PCSB / SHELL / EPMI)
SHIPBUILDING ENGINEERING -LOG CARRIER / CHEMICAL TANKER /
CEMENT CARRIER / HABOUR TUG /OFFSHORE DRILING TENDER BARGE / POWER BARGE-(MISC / KEDAH CEMENT CORP. / YAYASAN SHIPING / UEA BARAKAH CORP/ SABAH ELEC BOARD / SABAH ENERGY CORP / JACKSON MARINE / PHLIPPINES ELEC CORP / PAKISTAN ELECT CORP )
CIVIL ENGINEERING (LABUAN SPORTS COMPLEX / TENOM HYDRO STATION)
SHIPREPAIR ENGINERING (SHIP UNDER REPAIR / OFFSHORE RIG & BARGE / SUPER TANKER)
WORKING EXPERIENCE :
JOB RESPONSIBILITIES :
As adviser to site project management for all safety issues
Perform regular safety surveillance and inspection at works site
To raise the level on safety awareness to all the workers at site
To organize /HSE Committee meeting conduct tool box meeting /HSE audit / inspection at site
To conduct HSE induction to all new staff / employees
To investigate and prepare all incident and accident report
Prepare and submit daily/monthly report and statistic
To kept and maintain all HSE documents at all time to time
Coordinate of the emergency with ERT
To review all documents related safe work method/procedure
To conduct gas test / inspection for confine space works
REFERENCES PERSONNEL :
MR MOHD ABDUL RAHMAN SSPC(SHELL)MALAYSIA
PUAN SARIMAH ZAINI PETRONAS GAS BHD.MALAYSIA
TUAN LAWRENCE JOMIJI KINSIL AT MAXIMILHIAN. TASI KRISTAL SDN BHD.MALAYSIA/DIRECTORS. 087-410960 / 019-8122192