Description :
Lead In The Preparation And Perform Detailed Review Of The Bank Holding Company Regulatory Filings To The United States Federal Reserve Bank Of New York (Federal Reserve) Including Tic B, Tic S, Tic C, Tic Slt, Fr Y-8, 2314/Y-11 And Fr Y-9lp Forms And Review Related Reports As Required. The Incumbent Will Have The Opportunity To Gain A Rewarding Experience In The Highly Visible And Critical Areas Of Regulatory And Us Gaap Reporting. These Quarterly/Monthly Filings Report Certain Financial And Non Financial Information In Accordance With The Applicable Federal Reserve And Other Authoritative Guidance At Both The Consolidated American Express Co. And At Subsidiary Legal Entity Levels.
The Individual Will Be Exposed To American Express Systems & Processes And Will Work With Several Internal & External Groups Outside Of Controllership/Finance (Including Senior Leaders Of The Company) During The Course Of These Filings.
** Lead The Preparation And Detailed Review Of Regulatory And Other External Filings
** Oversee The Completion Of Us Gaap Subsidiary Financial Statements For Certain Subsidiary Entities As Required.
** Coordinate The Completion Of Regulatory Reporting Checklists And The External Auditors’ Review, Where Required.
** Work Closely And Coordinate With Various Subject Matter Experts And Global Reporting Leaders To Receive Required Deliverables.
** Respond To Inquiries Of (I) Federal Reserve Related To The Regulatory Filings; And (Ii) Other Regulatory & Reporting Related Inquiries From Internal And External Groups
** Leadership Of Financial Analysts Within Regulatory Reporting
** Assist The Director And Own The Quarterly/Monthly Planning Activities With Internal Business Partners For Timely And Efficient Completion Of The Reports.
** Support Special Projects As Needed, Including Enhancing Policies And Procedures Around The Regulatory Reporting Process, Through Use Of Six Sigma Quality Methodology.
American Express is an equal opportunity employer.
** Chartered Accountant/Cpa, A Plus. 5-7 Years Experience In Accounting / Reporting / Auditing. At Least 2** 3 Years In Public Accounting A Plus.
** Prior Regulatory/Federal Reserve/Sec/External Reporting And Banking/Financial Services Experience A Plus Though Not Required.
** Strong Understanding Of Basic Accounting And Reporting. Experience In Us Gaap Accounting / Reporting Preferred.
** Self Motivated, Proactive Team Player With A Passion To Consistently Deliver High Quality Service And Exceed Customers’ Expectations.
** Excellent Communication/ Presentation Skills – Verbal, Written & Presentation.
** Able To Understand And Enhance The Control & Compliance Environment Around The Filings.
** Demonstrated Organizational Skills With The Ability To Meet/Exceed Critical Deadlines And Manage Multiple Projects At The Same Time.
** Excellent Relationship Building, Presentation And Collaboration Skills
** Quick Learner And Superior Problem Solving Skills. Focused On Generating Efficiencies And Continuous Process Improvement.
** Ability And Desire To Coach Develop And Promote Talent Of Financial Analyst/S Reporting To This Position.
Name : RAJESH Email : rkumarcool_007 AT yahoo.com Designation / Skillset : Project head
Resume :
“KARMANYE WADHIKARASTU MAA FALESHU KADACHANAH”
RAJESH KUMAR MISHRA Objective : -
- Use best of skills and attitudes to achieve personal as well as organizational goals. Learn from the challenges by encountering during execution and becomes a competitive professional leader in Industrial Projects, bridges and Highway Constructions. (2) Work Experience : -
- More than 15 Years rich experience in Industrial Projects, bridges and Highway Construction. (3) Employment History : - From- : 09th Aug 2010 to till date-: Working with M/s Simplex Infrastructure Ltd.
Working as a project Head for The green field project the project of M/s Hindalco Industries Ltd Power Plant Unit T.G.Building/Power house/Boiler unit/Esp./C.W.P Pump house and pipe line, etc (Approx cost-300 core) and GTC1, Smeltor M/s ALSTOM (Approx cost of the project -25 Crore). Responsibility : Over all responsibility for the construction of captive Power plant and smeltor plant with coordination of client /consultant and subcontractors, resolve the financial issue and motivation of subordinate. Client- : M/s Hindalco Industries Ltd
M/s Alstom Consultant- : M/s DCPL
M/s EIL 1) From 15 Dec 2009 to 09 th Aug 2010 :- Worked as a Asst General Manager –Projects, With M/s Viraj Project I Ltd Pune for the project of M/s Arshiya International Ltd, sai Village Panvel, Ware housing work and M/s Bajaj IT tower Pune, and completed with in schedule in respect of Cost and quality. 1- From 3 rd February 2004 to 15 Dec 2009 : -
- worked as a (Project In charge)-Green field project ,Roads, Bridges & Highways and water treatment plat sewerage treatment plant SAHARA INDIA COMMERCIAL CORPORATION LTD. at (AMBY VALLEY SAHARA LAKE CITY PROJECT AT LONAVLA) under the umbrella of SAHARA GROUP, A Multi-dimensional Corporate Group having Business in Para banking, Aviation (Air Sahara), Mass Communication TV Network, Insurance and Consumer Products. Features :
- Developing First Planned Hill City in the Valley of Sahyadri Range. A Housing and Infrastructure Projects of Global standard including 2-Acres Bungalow, 1-Acres Bungalows, ½ Acres houses, Row Houses, Timber chalets, Resorts, Roads, Dams Airport 18 hole night lit Golf Course (Approved By PGA) of Global Standard. Project has been certifying by ISO-14001 (Environment Management System.) OHSAS-18001 (occupation Health and safety Assessment Series) - Consultants for Project :
- Victor Gruens & Associates for Master Planning –USA.
- M/s Burchill Partners Australia for Micro Planning.
- M/s Bechtel Overseas Corporation for Programmer Management Organization.
- M/s CES Detailed Design of Road
- M/s MWH-Detailed Design of Road
- M/s Tata Telecom-IT and Telecom Network
- M/s N. S. Dasture Electrical Network.
- M/s SPAN Consultant-Project Management Consultant. Position : - From 14 Feb 2007 to till date
- Working as a Project In charge with aamby valley city pune for Road Infrastructure Project of Road / Sewerage / Water Supply and Power / IT and Telecommunication in West Lake Village having 36 Kms of Roads Network (4 lane, 3 lane 2 lance and Single land) with Integrated Infrastructure-Project Value Rs 48 Crores. Contractor : -M/s Raj Infrastrcture & Project LTD.
From 10 Jan 2006 to Feb 2007
- Working as a Project In charge with sahara aamby valley city Pune for Water Treatment Plant and sewerage treatment Plant with rising mail line head is 200 meter Project Value Rs 25 Crores. Contractor : -M/s IVRCL Infrastructure & Project LTD.
From 03 Feb 2004 to feb2006
- Working as a Project In charge with aamby valley city pune for Integrated Project of Road / Sewerage / Water Supply and Power / IT and Telecommunication in West Lake Village having 36 Kms of Roads Network (4 lane, 3 lane 2 lance and Single land) with Integrated Infrastructure-Project Value Rs 128 Crores. - Contractor : -M/s IVRCL Infrastructure & Project LTD. Responsibility : -
- Initially the work value of Rs. 2.78 Crores for main Spine Road of East Lake Village was given to execute and to be commissioned by end of Dec -03.
- In the beginning of 2004 the Project value of Rs. 7.72 Crores was initiated on Priority of the Management that had to be completed within span of 5 month . Above responsibilities were successfully completed and handover.
- Additional Responsibility-In the same duration the additional responsibility of Integrated Infrastructure project was given for review in tendering stage.
- Review, Comments and correction over scope of work for design consultants for integrated Package of Roads Water and Sewerage/ Power/IT and telecommunications for construction.
- Review, Comments and correction of scope of work and technical specification (in consultation with design consultant) for construction contract of Integrated Infrastructure of Road/Water supply and sewerage/power IT and telecom, prequalification of contractor, Review of RFP for the construction of Integrated Package.
- Review, Comments and correction of Scope of work and technical specification for the Project Management consultants of integrated infrastructure of Road/Water supply and sewerage/power IT and telecom, prequalification of contractor, Review of RFP (Request and Proposal) for the Consultants.
Finally the total responsibility of execution of integrated infrastructure Project was handover to me. The main task with above responsibility includes.
- Co-ordination and monitoring of site execution work site management with team of engineers of earthwork and control blasting for road works, Construction of cross drainage works pipe culverts retaining structures i.e. Gabion walls and RCC walls side rain and catch water drains, embankment and sub-grade, laying of GSB WMM, DBM, BM,BC and per MIRTH&H guidelines/specification. Implementations of QA/QC plan at site along with QA/QC team of Engineers as per MORT&H guidelines.
- Construction of service corridor, laying of all services in specified corridor like water supply and sewerage line, manhole for water supply and sewerage including crossing testing of water supply line, laying IT and Telecom ducts (PVC/HDPE) hand hole and splicing chambers including crossing, construction of Electrical RCC Trench, Construction of manhole, civil works for feeder pillar and backfilling of service corridor.
- Project monitoring for progress and schedule complete site management of contractor including review of daily progress report, weekly progress report monitoring of daily machineries deployment schedule. Recovery schedule in case of slippage. Organizing and attending weekly progress review meeting with contractor. 10 th Dec -2003 to 31st January 2004 : -
Working as Project Engineer in Petron Civil Engineering Ltd Mumbai at ROB project. MSRDC Pune. 1-Construction of ROB projects near wadia College Pune : -
Handling the projects independently for execution of ROB included prestressing, Retaining wall 2 Km coordination with client Consultant and Central railways Pune as per MORTH and Technical specification and railways specifications. Preparation of client bill, scheduling, planning, Liosonig etc.
Handling the projects independently for execution of ROB included prestressing, Retaining wall 2 Km coordination with client Consultant and Central railways Pune as per MORTH and Technical specification and railways specifications. Preparation of client bill, scheduling, planning, Liosonig etc.
- Clint –MSRDC Pune
- Consultant.-Permanent Prestress Pvt. Ltd Navi Mumbai 07 th May -2002 to 10 th December 2002 : -
Working as Project Engineer in Petron Civil Engineering Ltd Mumbai at various projects. 2- Fly Over bridge and Road Project Shanker seth road Pune : -
- This was the section of Pune development from the chainage 0.0 to 1700 This was MSRDC project of four laning of existing road including Fly Overs2.2 km survive road of 12.0 mtr carriageway under the specification of MORTH. Client - MSRDC Pune
- Consultant-- Tondon consultant Mumbai 06 th May -2001 to 07 th May 2002 : -
Working as Site Engineer in Petron Civil Engineering Ltd Mumbai Cement Industries project.
3- Lafarge Cement Industries Project: - This was the package extension of tata steel cement New Plant with cement silos, Fly ash silos we have executed Cement Mill house with cement mill foundation 2 nos fan foundation, Drive foundation -02 nos with structural beam encasing with Concrete for deck slab for the erecting of cement mill for meet the schedule for completion and operation and top 2 nos deck slab with gantry work and RCC Beam for deck slab with ISMB included reinforcement steel deck slab used only because of erection of Cement Mill for meet the schedule for commissioning of projects and I have completed work with quality and correctness client has been appreciated for his successfully completion of projects.
Client: -Lafarge cement limited Jojobera Jamshedpur
Consultant: - Holtec Consulting pvt ltd 45 comunity Centre Narain New Delhi..
31 st June -2000 to 06 th May 2001: -
Working as Site Engineer in Petron Civil Engineering Ltd Mumbai Cement Industries project.
4- Madras Cement Ltd (RAMCO): - Construction of Fly ash silos and Truck loading shed and switch yard.
Job Profile:-
- Execution of earth work with PCC raft, Wall with slip form System..
- Foundation and Column and slab for truck loading shed 6.5 mtr and 11.68 mtr with conveyor opening water proofing flouring etc.
- Pouring & testing of RCC concrete grade M20, M25, M35.
- Making form work and shuttering scaffolding and Billing with client and sub contractors making daily and weekly progress report.
- Making of weekly program and break it up day by day.
- Coordination with Client, sub contractor & local personal.
- Coordination of Material ( requirement V/s ability)
- Setting up high bench mark, having Impact upon subordinates to achieve by giving them empowerment.
- Monitoring of project in view of
1-Invoice V/S Expenses
2-Programe V/S Achievement
3-job cost report V/S Accepected cost estimate.
Client: -Madras Cement Limited (RAMCO) Alathiyur Tamil Nadu.
Consultant: - Larson and Turbo Chennai.
31 st June -2000 to 06 th May 2001: -
Worked as site engineer in Petron civil Engineering Ltd at Reddipalayam ariyalur Tamil nadu Cement Industries project.
5- Grasim Industries Limited
Project Detail: - This was new projects with preheater, Cement silos, fly Ash silo, packing plans, LSPB Cooler house Pre heater, 100 Mtr height and Clinker Silos 35.5 OD. This had to be executed under its own technical specification. This project was spread over 3.0 contracts out of which Petron was awarded 80% contractors.
Job Profile: - Initially I was assigned to assist for the billing work and later on in charge of RCC structure for LSPB and flooring, Cooler House.
Client: -Grasim Industries Limited (Dharni Cement) Ariyalur Reddipalayam Tamil Nadu.
Consultant: - Holtec Consulting Pvt Ltd Delhi.
7 th - Sept 1999 to 31 st June 2000:-
Worked as site engineer with M/S Petron Civil Engineering Ltd for Gujrat Industrial power Corporation Koshamba Gujarat.
7- Gujrat Industrial Power Company Limited
Job Profile: - During above period I was responsible to execute Switch yard area and Pump House.
Client: -Gujarat Industrial Power Corporation Ltd Koshamba Gujrat.
Consultant: - Tata Consulting Engineers.
29- October 1997 to august 1999:- worked as site Graduate Trainee Engineer with Petron Civil Engineering Ltd Mumbai
8- IPCL Dahej
Job Profile: - Executed Pelletizing Building with Major foundation and pipe racks with Lift wall and Stair case cable trenches Monorails fixing etc.
1-To execute the assignment in all respect.
2-Quanitity calculation and billing of Client and sub contractor.
3- To complete the work with in time frame schedule with quality.
4-back filling and soling work for flooring and equipment foundation work on ground levels.
Client: - IPCL Dahej Bharuch Gujarat.
Consultant: - Udhe India Limited Mumbai.
12 th - March 1996 to 29 th Octor 1998:- worked as Assistant Engineer with M/s Three Circles Construction Company CBD Belapur Navi Mumbai
9- JNPT Nahva Sheva
Job Profile: - Executed Bund wall and reclaimer work with back filling in sea area and road work upto sub garde.
1-To execute the assignment in all respect.
2-Quanitity calculation and billing of Client and sub contractor.
3- To complete the work with in time frame schedule with quality.
4-back filling and soling work for flooring and equipment foundation work on ground levels.
Client: - JNPT Nahva sheva navi Mumbai.
Consultant: - Uneecs consultant Mumbai
Qualification: - B.E.Civil in 1995-96 and PGDBM in 2000
Computer proficiency: - Package -M S Office
Present salary: - 17.5 Lacs/Annum
Expected - As per negotiation
Hobby: - Listen slow music, Religious song.
Strength: - 1-To result the collective efforts of the Team.
2-Motivation and positive attitude.
Merit: - Dynamic Behaviour and positive approach.
Ideology: -
To get the best result people must have
Knowledge, Skills & Positive Attitude
TRAINING: -
Attended workshop on concreting work conducted by Builder association of India guide by M/s Rajeev Director of NICMAR Pune.
WORK EXPERIENCE:-
I have 11 year of professional experience in construction and worked in the following field and area after completion of my academic education and acquired skills as described and listed below. Execution of work has been carried out as per Indian as well international standards.
TYPE OF CONSTRUCTION: -
1) RESIDENSIAL BUILDING INCLUDED STAIR CASE AND LIFT
WELL DESIGN BY OTTIS
2) POWER PLANT
3) CEMENT PLANT
4) SLIP FORM WORK FOR SILOS UPTO 60 MTR
5) MAJOR FOUNATION WORK
6) VIA DUCT STRUCTURE
7) ROB AND FLY OVERS
8) PSC GIRDERS
9) BOX CULVERT AND CROSS DRAINAGE WORK
10) REINFORCED EARTH WALL/RCC RETAINIG WALL
11) ROAD WORK
12) FLEXIBLE PAVEMENT (ASPHALT)
13) FLEXIBLE PAVEMENT (PAVER BLOCKS)
14) RECLAIMER AND BUND WALL WORK
ACTIVITIES IN CONSTRUCTION: -
A) CONCRETING WORK:-
1) Building work such as pelletizing bldg, included major foundation foundation, cement Mill House up to 45 metres
2) Petrochemical, power plant structure.
3) Cement plant Silos Major foundation.
4) Pier, abutment, Psc Girders, Deck slab including stressing etc.
5) RCC Hume pipe Culvert Construction.
6) Box culvert.
7) Reinforced earth wall.
B) ROADS WORK:-
1) Embankment
2) Sub grade
3) Granular sub –base
4) Wet mix macadam
5) Water bound macadam
6) Dense bituminous macadam
7) Bituminous Concrete
8) Mastic Asphalt
9) Reinforced Earth wall
C) Earth Work Construction
1) High fill earthen embankment up to 8mtr. Height
2) Sub grade construction by suitable soil.
Rock fill embankment.
I possess a pleasing personality and could get along with my seniors and subordinate in an able manner. Having acquired the necessary experience I am able to interact and communicate with people and handle my job confidently.
(Rajesh Kumar Mishra)
-------------------------------------------------------
More Information about this submission and submitter:-
___________________________________________________
Submission ID : 4324126
Date & Time : 3rd Jul 2011 4:53 AM (UTC)
IP Address : 115.240.180.92
Browser Info : Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1; SV1; GTB6.6)
Predicted Country : India