www.npti.in MBA Admission 2012 National Power Training Institute

Closed Thread
Results 1 to 2 of 2
  1. Post Count Number #1
    Freelancer
    Join Date
    August 18th, 2010
    Location
    India
    Posts
    16,237

    www.npti.in MBA Admission 2012 National Power Training Institute

    NATIONAL POWER TRAINING INSTITUTE

    Admission Notice for Graduate Engineers

    MBA Program in Power Management (2012-14) – XI Batch
    (Approved by AICTE and affiliated to Maharshi Dayanand University, Rohtak)

    Candidates desirous of joining the 2-Year full-time program MBA in Power Management of NPTI for the academic session 2012-14 have to necessarily appear for the CAT-2011 exam (for Non-sponsored category) being conducted by IIMs.

    http://www.npti.in/admission-mba.html
    www.npti.in/pdf/NPTI%20MBA%20AD%202012.doc

    OBJECTIVE : This is a pioneering venture of two years duration to develop world-class Business Managers with a thorough understanding of Power Sector.

    ELIGIBILITY : B.E. or equivalent (General - 60% Marks in aggregate of all Semesters, SC/ST- Min. Pass Marks)

    SELECTION : CAT Score followed by GD and Interview at NPTI, Faridabad. SEBs, Utilities and Private Sector Organisations may also sponsor candidates. Sponsored candidates need not appear for CAT examination.

    PLACEMENT : NPTI maintains close linkages with Power Industry to facilitate Placement. The Institute is proud to announce that the students have been picked by leading Power Sector companies like Abellon Clean Energy, ABPS infrastructure Advisory, ACCENTURE, Adani, Adhunik, APITCO, Avantha Power, BSES, CARE, Capital Fortunes, CRISIL, DELOITTE, ECOREN, Enercon, Enzen, Energy Infratech, E&Y, FeedBack Ventures, GMR, Global Energy ltd., HCL Technology, IEX, IL & FS, Infosis, Infraline, IREDA, Jindal, KLG Systel, KPMG, KSK Energy Ventures, Lanco, Lanco Solar, Lanco Trading, Lahmeyer, LNJ Bhilwara, Monnet Ispat, Motwane Group, NCDEX, NDPL, Noida Power, PTC India, PwC, RE Gen Power, Reliance Energy, Secure Meters, SPML, Suzlon, Tata Power, Torrent Power, Tractebel, UJVNL, Ultima switchgear, Vedanta, Wipro, WISE etc.

    HOW TO APPLY : The Application Form can be downloaded from the web site and should be sent alongwith a crossed Demand Draft of Rs. 1,000/- (Rs. 500/- for SC/ST & Rs. 250/- for Haryana SC/ST candidates) in favour of National Power Training Institute payable at Faridabad. Filled-in applications may be sent to
    Principal Director, (CAMPS),
    National Power Training Institute,
    NPTI Complex, Sector-33, Faridabad-121003, Haryana
    to reach on or before 28-02-2012.

    IMPORTANT DATES :
    1) Issue of Prospectus 15-11-2011
    2) Last Date for Sale and Receipt of Application forms 28-02-2012
    3) GD & PI at NPTI, Faridabad 3 & 4-04-2012
    4) Counseling at NPTI, Faridabad 01-05-2012
    5) Commencement of Course 01-08-2012
    Last edited by mariammal; January 14th, 2012 at 04:21 PM.

  2. Post Count Number #2
    Guest Poster
    Join Date
    August 14th, 2008
    Location
    Your Heart, Delhi
    Posts
    76,213

    CV SUBMISSION

    CURRICULAM VITAE

    ANURAG GUPTA
    Address - H.NO-97,TRIMURTY CHOWK,
    SUNDAR NAGAR,RAIPUR(C.G)
    Email - gupta.anurag876 AT gmail.com

    **********************************************************************************
    Career Objective :-
    To work efficiently and to think optimistically and to satisfy the employer in the best possible way. Seeking a challenging position, where the knowledge, I have gained, can be practically utilized for the development of the organisation. Aim is to maximize and enhance my skills to better serve for the progress of the organisation.
    Educational Qualification :-
    - Bachelor’s of Engineering degree in Electrical & Electronics descipline in the year 2011 with an aggregate of 63.95% from R.G.P.V university Bhopal, Madhya pradesh.
    - Higher Secondary (Science ) in the year 2007 with 65.55% from Madhya Pradesh Board
    - High school (10th ) in the year 2005 with 55.6% from CBSE. .
    Project :-
    - Project Title - Major Project on TELEMETERING
    - Team Size - 06
    - Role - Team Leader, PCB layout designing and implimentation
    - Description - In this particular project we implimented a common thought to make electric
    Meters of houses & industries automatically centrallised controllable as to make
    system easier & faster. Automatic reading, post-paid & pre-paid of billing,
    connecting & disconnecting of electric meters are done from a centrallised
    controllable unit.
    Other Project :-
    - Project Title - Minor Project on SUN TRACKING SYSTEM
    - Team Size - 06
    - Role - Team Leader, purchasing of all electrical & electronics equipments &
    implimentation.
    - Description - In this project we desired to use solar energy as an electrical energy by using
    solar pannel, micro-controller and batteries for the storage of converted
    electric energy.
    Industrial Training :-
    Organisation - IMP POWERS LTD. SILVASSA (D & NH)
    Area Of Training - General Training as a subject of Power
    Transformer process & progress of the plant.
    Period Of Training - Three Weeks (21 Days)
    Industrial Visit :-
    Organisation - CENTRAL POWER RESEARCH INSTITUTE, BHOPAL
    Description - CPRI is an organisation where testing of power transformers
    is performed. Basically short circuit test of Power
    Transformer is performed there. Many of the switch systems
    are there which are used for performing several other tests on
    power transformers such as Insulation Resistance test, 2kv
    test & high surge short circuit test.
    Strength :-
    - Self-Confident and Hard working.
    - Enjoy accepting challenging works.
    - Sure sense of responsibility.
    Declaration :-
    I hereby declare that the information furnished above is true to the best of my knowledge.

    DATE -
    ANURAG GUPTA
    PLACE - RAIPUR